Dear Resident,
April 3, 2013
Charlotte-Mecklenburg Storm Water Services held a public
meeting on March 12 at Roof with a View to present the existing
conditions analysis for the Hill Street Storm Drainage Improvement
Project.
Meeting highlights:
• Project Manager Danee McGee introduced the project
team, discussed goals and components of the program and
summarized what storm water items qualify for service.
• McGee explained public involvement includes citizen input
from 311 requests and citizen questionnaires, feedback on
existing drainage issues not previously reported, areas of
roadway or structural flooding within the project limits, and
support for the project’s future phases.
• Chris Fleck with Dewberry indicated that a detailed survey of
the existing topographic and storm water system information
has been completed. The existing conditions have been
Engineering & Property Management
Storm Water Services Division
600 East Fourth Street
Charlotte, North Carolina 28202
Hill Street Project Update
HIGHLIGHTS FROM PUBLIC MEETING
•
analyzed, evaluated against nearly 50 criteria and
combined with citizen reported data as summarized on
the maps in the presentation.
Fleck reviewed the magnitude of the study and the results
of the analysis. He indicated these areas were studied
in detail for existing conditions and will be investigated
further to determine potential improvements.
For more information about this project, visit our website:
http://stormwater.charmeck.org. Click on the Storm Water
Projects drop down menu in the green bar, then Active
Projects and Hill Street.
If you have any questions, please contact Project Manager
Danee McGee at 704-336-4102 or dmcgee@charlottenc.gov.