1 - HAMPTON / HANSON / MYERS PARK 152 28 1528 5 5 3 2225 9 ! ( 9 ) !" ( 24 in RCP 2236 2 236 4 ft C B RC " ) 3001 3001 " ) ft x4 0 ft BC C 3005 3005 " ") ) 1626 1626 0 1629 1629 1635 1635 d HAMPTON AVE CONSTRUCTION TIME APPROXIMATELY 2 WEEKS R nce vide Pro ft C 2926 2 926 1620 1 620 SEGMENT 2 ft x4 9 ft BC 2951 2951 1618 1618 " ) ) "" ) 2922 2922 2945 2945 1619 1 61 19 1610 1610 2929 2929 10 ft Av 2918 2918 The Selected Alternative meets the City Design Standard 9f 2914 2914 1616 1 616 2927 2927 1 2910 2910 1611 1 611 Alleviate finished floor flooding on residences by providing the 100-year storm runoff Level of Service 1600 1600 ) "" ) 2224 2224 6 16 1612 1 612 d 2228 2228 1546 1546 2921 2921 ) " )" f B ton " 9 RC ") ) mp Ha ! ( 2220 2 220 The Selected Alternative Will: 1601 1601 1608 1 608 Alleviate street intersection flooding by providing the 25-year storm runoff Level of Service ft 10 C R 2242 2242 1540 1540 2915 2915 4 ft Rd SELECTED ALTERNATIVE - SEGMENT 1 R nce vide Pro " ) ! ( " ) 24 in RCP ft x4 BC ! ( ) " )" 3011 3011 1 1634 1634 3015 3015 ft C 30 9 30 1641 1641 8 " ) WALKWAY TO BE REBUILT 10f R REBUILD FENCE , GATE, AND MAILBOX AT 3034 HANSON DRIVE " ") ) 3021 3021 3025 3 025 3017 3017 012 3012 3 3008 3008 008 ) "" ) ) "" ) 3029 3029 3021 3021 10 R 3012 3012 3034 " ) 18 RC in P " )" ) 1652 1 18 in RCP ") ) " " ) 18 in RCP 1434 1 4 30' Easement 1442 1442 18 in RCP REBUILD BRICK WALL 18 in CP in 18 P RC " ) " ) " ) 15 in RCP 1506 1 506 1524 1524 " ) ") Han r D n so " ) DRIVEWAY ACCESS AFFECTED t 5f ft x 10 CBC R 1500 1 500 15 536 1536 3115 3033 3033 t 5f ft x 10 CBC R HANSON DR CONSTRUCTION TIME APPROXIMATELY 4 WEEKS 1727 1727 CONCRETE CURB REBUILD t 5f x C ft 10 CB R " ) 3027 3027 15 i CP n 18 in RCP ) " )" EXISTING SANITARY SEWER SERVICES, WATERLINE SERVICES AND GAS 3026 3026 MAIN SERVICES TO BE ADJUSTED FOR CLEARANCE WITHIN HANSON DR AND HAMPTON AVE RESET FENCE 1648 48 1648 ft 3026 3 026 3016 3016 RESET MAILBOX 1642 16 16 64 42 RESET GRATE 1401 1 401 1700 1 700 1516 1516 1411 r D k Par 1425 1425 ! ( REBUILD BRICK WALL 10 f tx RCB 5 ft C rs e y M 1415 1419 1 419 1431 1431 % 14 43 37 1437 1443 1443 1501 1 501 MYERS PARK DR CONSTRUCTION1507 1507 TIME APPROXIMATELY 2 WEEKS SEGMENT 1 1 1513 513 1519 1519 529 529 1523 1523 Briar Flood Limits @ Hampton Peak During 10yr Storm 1108 1 108 1120 1120 ar i r B Legend ) " )" " ) 1119 1119 Single Inlet Double Inlet % Headwall S T Slot Inlet ( ! k e e Cr 1111 1111 Junction Box 1 1844 1844 LAG 1902 1902 1910 1910 100-yr Flooding Limits 1800 1800 1918 1 918 100-yr Existing Limits 2002 2 002 Existing Pipes 2010 2 010 D DD Abandoned Pipes D Existing Open Channel Modified Pipes New Pipes Tree Removal Easements Concrete curb FEMA Streams FEMA Floodplain Estimated Total Cost = $1,100,000 . 0 70 140 Feet 1 inch = 67 feet Hampton Storm Drainage Analysis 100 YR Pipe System SELECTED ALTERNATIVE SEGMENT 1