2 & 3 - HAMPTON / BEVERLY / MALVERN P P 2608 1336 2627 2627 ) " )" D 1310 1 31 3 10 in 18 P RC P D " ) D ! ( 2614 2 614 1325 1 325 - SEGMENTS 2 & 3 SELECTED ALTERNATIVE 1340 1 340 2711 11 D 2708 60 in D % The Selected Alternative Will: Alleviate street intersection flooding by providing 1333 1 333 of Service 333 the 25-year storm runoff Level 1322 1 322 P D 2618 2715 1100 1 100 2624 Alleviate finished floor flooding on residences by providing the 100-year storm runoff Level of Service 2549 2 549 d R e l l i The Selected Alternative meets the City Design Standard v l o C 2632 2638 1 341 1341 2723 2644 2601 2727 DRIVEWAY ACCESS EFFECTED FOUNDATION SUPPORT CONSTRUCTION TIME APPROXIMATELY 6 WEEKS 2728 2611 SEGMENT 3 1400 1400 2735 1404 1 404 1115 1 115 2619 2734 14 140 2623 1 1409 1 409 2740 2746 SANITARY SEWER, WATERLINE AND GAS MAIN RELOCATION WITHIN HAMPTON DRIVE 1412 1412 o rw A od 1417 1 417 2635 Open Channel Banks v 2752 Existing Open Channel EXISTING CLOSED SYSTEM BETWEEN HEADWALL AND BEVERLY DRIVE DOES NOT 2707 2707 MEET CITY STANDARD 20' Easement 3 ft 7 ft x C RCB ( )! ! (" " ) DRIVEWAY ACCESS AFFECTED 60 in RCP % 2701 2 701 01 3 ft 7 ft x C RCB 2758 32 2 271 13 3 2713 Existing 36" CMP To Remain Down To Beverly Dr 2229 60 in RCP " " )) 2219 RESET STREET SIGN SHERWOOD AVENUE CONSTRUCTION TIME APPROXIMATELY 4 WEEKS 2211 36 in RCP RESET LIGHT POLE 72 RC in P D 2306 ly Dr 2300 2226 2210 0 2222 Abandon Existing 36" CMP 2218 1518 1 518 51 DRIVEWAY ACCESS AFFECTED ! ( 2214 2136 2136 in 72 P RC RESET LIGHT POLE 2108 2108 2225 2 225 2219 Existing 48" CMP To T Be Replaced Down To Outlet 2229 2215 2201 220 201 ! ( ) " )" " ) ! ( " ) 2217 2205 2205 ! ( 2233 24 in RCP 1532 1532 RESET FIREHYDRANT 2903 1 540 1540 HAMPTON AVE SOUTH OF MALVERN CONSTRUCTION TIME APPROXIMATELY 6 MONTHS 11546 546 ) ! (" 2909 2909 4 ft ft x 10 CBC R MALVERN ROAD 2147 2 147CONSTRUCTION TIME 2145 2 145 APPROXIMATELY 2 MONTHS 24 in RCP 2825 4 ft ft x 10 CBC R EXISTING GAS MAIN TO BE RELOCATED. EXISTING WATER SERVICES TO BE ADJUSTED FOR CLEARANCES WITHIN BEVERLY DRIVE " ) t 4f tx C 8 f CB R " ") ) 2241 2 112 11 2112 2242 2236 2915 2232 2228 2220 2910 2212 2 2210 2210 ) " Slot Inlet 2922 2945 2945 2941 2941 2926 2926 " ) 2921 % LAG 2917 3005 300 05 5 Existing Pipes D DD Abandoned Pipes 3019 3019 3004 3004 3025 D 2928 2928 New Pipes 3012 2924 2 924 3029 2920 920 4 ft 10 ft x RCBC 3035 2900 3026 3 3016 016 3034 3 034 " ) 18 RC in P in P " )" ) 140 Feet 1600 1 inch = 67 feet 1524 1516 100 1442 YR Pipe System SELECTED ALTERNATIVE SEGMENTS 2 & 3 ) " 18 in RCP ) " " ) t 5f ft x 10 CBC R 1536 Hampton Storm 1500 Drainage 1506 Analysis 1434 18 in RCP 1 RCP 15 R " ) " ) t 5f ft x 10 CBC R 70 in P RC "" ) ) 1604 1 604 1608 3115 3115 3 RC 3032 3 032 " ) 3027 1 . P ) " )" Estimated Total3020 Cost 3026 Segment 3 = $0 Segment 2 = $3,120,000 0 3021 3020 3012 3 012 FEMA Floodplain 1612 3017 " ") ) ) " )" 2916 4ft 10ft x RCBC 3000 3 000 2910 16 3015 " ) ) " )" 3021 Modified Pipes FEMA Streams 3011 3008 Existing Open Channel Easements 1626 4 ft ft x 10 CBC R 2 SANITARY SEWER, WATERLINE AND GAS MAIN 3013 3013 WITHIN HAMPTON DRIVE TO BE RELOCATED 2909 3005 3 ) " )" 100-yr Flooding Limits 2911 2905 2 3001 4 ft ft x 10 CBC R REPAIR SPEED BUMP 2927 2 927 2 " ) 4 ft ft x C B RC 2951 2935 2 935 Open Channel Bank 4 ft ft x 10 CBC R Junction Box " ) S T 3001 DRIVEWAY ACCESS AFFECTED " ") ) 32 3 2 2918 2 9 1610 1610 2929 2 929 9 29 v nA ( ! 2142 Headwall 2927 " ) ft x4 9 ft BC RC 2136 2152 2148 Double Inlet 2914 pto )" " ) Single Inlet m Ha 2204 2 204 2200 2200 4 ft ft x 10 CBC R Legend 2 ) " )" 2224 SEGMENT 2216 2921 t 4f tx C 9 f CB R Ma d R n r lve 1600 1 600 RESET HORSEHEAD POST MONUMENT ! ( ) " )" 5 1 EXISTING CLOSED SYSTEM ALONG HAMPTON AVE 1522 1522 BETWEEN BEVERLY DR AND HANSON DR DOES NOT MEET CITY STANDARD 2821 2821 Existing g 36" CMP T Be Replaced To 2 2118 118 REPAIR SPEED 2124 2 124 BUMP 1519 1519 2815 815 2815 2206 2206 2200 200 2200 BEVERLY DRIVE CONSTRUCTION TIME APPROXIMATELY 4 MONTHS 2151 2151 21 51 2310 D in CP CP 2314 14 d r e v e B ! (" ") ) 48 in RCP D ! ( ! ( ! ( n 72 i RCP 2117 " ) ! ( " ) 2201 36 in RCP 48 in RCP " " )) 18 in RCP D 4 in 24 P 2121 2121 36 in RCP " ) " )! ( 2207 " ) ! ( " ) 48 in RCP 48 in RCP R nce vide Pro ! ( 2125 2 125 1 ) " )" ! ( 18 in RCP 2215 2714 2 714 HAMPTON AVE / PORTION OF BEVERLY DR 2 NORTH OF MALVERN RD TO 2752 HAMPTON AVE 1 511 1511 2 318 2318 CONSTRUCTION TIME APPROXIMATELY 6 MONTHS ) !" ( 2223 2708 2708 INTERSECTION DRAINAGE PROBLEM DOES NOT 1501 1 501 MEET CITY STANDARD S T EXISTING SANITARY SEWER, WATERLINE AND MAIN WITHIN BEVERLY DR TO BE 2700 2 70GAS 0 RELOCATED 1423 1423 1 e Sh 2627 1