Dear Resident,
March 26, 2013
Charlotte-Mecklenburg Storm Water Services held a public
meeting on February 26 at St. Andrew’s United Methodist
Church to present the results of the storm water analysis for the
Edgewater/Rosecrest Storm Drainage Improvement Project. The
project goals are to update the existing infrastructure, reduce the
flooding in structures and streets, increase channel capacity and
reduce erosion.
Meeting highlights:
• Project Manager Greg Cole introduced the project team and
gave a presentation on the project history, boundaries and
how the Edgewater project was selected.
• Cole explained the phases: planning, design, real estate, bid
and construction. The project is in the planning phase.
• The engineering consultant for this project is US Infrastructure
Of Carolina (USI).
•
•
•
USI reviewed the results of the stormwater modeling.
A question and answer session was held.
Three break-out groups answered specific questions.
For more information about this project or a meeting
summary, visit our website: http://stormwater.charmeck.org.
Click on the Storm Water Projects drop down menu in the
green bar, then Active Projects and Edgewater/Rosecrest.
If you have any questions about this project, please contact
Project Manager Greg Cole at email gcole@charlottenc.gov or
704-336-4824.
Engineering & Property Management
Storm Water Services Division
600 East Fourth Street
Charlotte, North Carolina 28202
Edgewater/Rosecrest Project Update
HIGHLIGHTS FROM PUBLIC MEETING
Download