Edgewater/Rosecrest s t o r m d r a i n a g e i m p r o v e m e n t p r o j e c t your storm water fees at work March 2014 Dear Resident, Charlotte-Mecklenburg Storm Water Services and US Infrastructure of Carolinas (USI) continue to work through the planning phase of the Edgewater/Rosecrest Storm Drainage Improvement Project. USI has prepared the alternatives analysis report. City staff has compared the various possible alternatives for addressing the stormwater drainage issues in the neighborhood and selected a preferred alternative. USI is completing analysis of the preferred alternative. Once USI has completed this analysis, a public meeting will be scheduled to present the recommended alternative and solicit comments from the residents. Meeting details will be mailed to residents two weeks prior to the meeting. oad Downl y! a it tod The project goals are to update the existing infrastructure, reduce the flooding in structures and streets, increase channel capacity and reduce erosion. For more information, please visit our website at http://stormwater.charmeck.org and click on Storm Water Projects drop down menu in the green bar, then Active Projects and Edgewater/Rosecrest. If you have any questions about this project, please contact Project Manager Greg Cole at 704-336-4824 or gcole@charlottenc.gov. Water Pollution... Be part of the solution! The Water Watchers app makes it easier than ever for citizens to report pollution on the go For more information visit StormWater.CharMeck.org Engineering & Property Management Storm Water Services Division 600 East Fourth Street Charlotte, North Carolina 28202