Edgewater/Rosecrest your storm water fees at work

advertisement
Edgewater/Rosecrest
s t o r m
d r a i n a g e
i m p r o v e m e n t
p r o j e c t
your storm water fees at work
March 2014
Dear Resident,
Charlotte-Mecklenburg Storm Water Services and US
Infrastructure of Carolinas (USI) continue to work through
the planning phase of the Edgewater/Rosecrest Storm
Drainage Improvement Project. USI has prepared the
alternatives analysis report. City staff has compared the
various possible alternatives for addressing the stormwater
drainage issues in the neighborhood and selected a
preferred alternative. USI is completing analysis of the
preferred alternative. Once USI has completed this
analysis, a public meeting will be scheduled to present the
recommended alternative and solicit comments from the
residents. Meeting details will be mailed to residents two
weeks prior to the meeting.
oad
Downl y!
a
it tod
The project goals are to update the existing
infrastructure, reduce the flooding in structures and
streets, increase channel capacity and reduce erosion.
For more information, please visit our website at
http://stormwater.charmeck.org and click on Storm
Water Projects drop down menu in the green bar, then
Active Projects and Edgewater/Rosecrest.
If you have any questions about this project, please
contact Project Manager Greg Cole at 704-336-4824 or
gcole@charlottenc.gov.
Water Pollution...
Be part of the
solution!
The Water Watchers app makes
it easier than ever for citizens
to report pollution on the go
For more information visit
StormWater.CharMeck.org
Engineering & Property Management
Storm Water Services Division
600 East Fourth Street
Charlotte, North Carolina 28202
Download