October 2015 Project Status: Charlotte-Mecklenburg Storm Water Services and Dewberry Engineers are redesigning a portion of the storm drainage system to save trees and eliminate overhead utility conflicts. These changes will create a slight setback to the design schedule. Next Steps: The design modifications will be added to the plans, with easement preparations to resume. For more information: Please contact Jackie Bray, Project Manager jbray@charlottenc.gov 704-336-6770 StormWater.CharMeck.org Chandworth Storm Drainage Improvement Project Engineering & Property Management Storm Water Services Division 600 East Fourth Street Charlotte, North Carolina 28202 ro Chand nt P e worth St m o r m D ra i n a g e I m p r o v e Investing in Infrastructure The City replaces pipes, storm drains and other structures when they deteriorate or become too small to handle increases in stormwater. Investing in infrastructure protects public safety, guards private property, improves water quality and enhances quality of life. The Chandworth Storm Drainage Improvement Project goal is to reduce flooding of streets and structures by improving the storm drainage infrastructure within the neighborhood. For more information: StormWater.CharMeck.org jec t