Alanhurst/Cherrycrest

advertisement
Alanhurst/Cherrycrest
storm drainage improvement project
YOUR STORM WATER FEES AT WORK
July 2011
Dear Resident,
Charlotte-Mecklenburg Storm Water Services has
hired a consultant, W. K. Dickson & Co., Inc., to
study possible storm drainage improvements in
the Alanhurst/Cherrycrest project area. The project
boundaries are Archdale Road and Griffin Road to the
south and north, King’s Branch floodplain to the west
and Old Pineville Road to the east.
Representatives from the Project Team may need
to enter your property to collect survey data on the
existing storm drainage system. While State law
authorizes this access to private property, no buildings
or structures will be entered or disturbed. You may see
small round metal discs attached to trees. Each “tree
tag” serves as an identifier of the tree location and
variety for easier recognition and will stay in place for
the life of the project. The survey work will begin over
the next couple of weeks and take several months to
complete.
For more information about this project, please visit
our website at http://stormwater.charmeck.org and
click on Storm Water Projects drop down menu in
the green bar, then Active Projects and Alanhurst/
Cherrycrest.
If you have any questions, please contact Project
Manager Susan Tolan at stolan@charlottenc.gov or
704-432-0407.
Y
E
V W
R E D
U R A
S C E
H
A
Engineering & Property Management
Storm Water Services Division
600 East Fourth Street
Charlotte, North Carolina 28202
Download