Statesville Road Widening &
Cindy Lane Extension
Statesville Road Widening &
Cindy Lane Extension
Summer 2004 Update
Summer 2004 Update
Project History:
Project History:
z
z
z
z
z
Widen Statesville Road from Starita Road to Sunset Road to a four-lane divided curb and
gutter facility. The roadway section will include a planted median, bicycle lanes, planting strips
and sidewalks.
Extend Cindy Lane on new location from Statesville Road to the Nevin/Lake Road intersection.
The two-lane curb and gutter roadway section will also include a planted median, bicycle lanes,
planting strips and sidewalks.
Two public meetings were held in 2001 (one meeting for Statesville Road Widening on March
29th and one combined meeting for Statesville Road Widening and Cindy Lane Extension on
September 20th).
One public meeting was held in 2002 (for Cindy Lane Extension on May 14th).
Preliminary design is complete for both the Statesville Road Widening and Cindy Lane
Extension projects.
z
z
z
z
z
Widen Statesville Road from Starita Road to Sunset Road to a four-lane divided curb and
gutter facility. The roadway section will include a planted median, bicycle lanes, planting strips
and sidewalks.
Extend Cindy Lane on new location from Statesville Road to the Nevin/Lake Road intersection.
The two-lane curb and gutter roadway section will also include a planted median, bicycle lanes,
planting strips and sidewalks.
Two public meetings were held in 2001 (one meeting for Statesville Road Widening on March
29th and one combined meeting for Statesville Road Widening and Cindy Lane Extension on
September 20th).
One public meeting was held in 2002 (for Cindy Lane Extension on May 14th).
Preliminary design is complete for both the Statesville Road Widening and Cindy Lane
Extension projects.
What’s Next?
What’s Next?
Cindy Lane Extension
On June 14, 2004, City Council adopted its FY2005 Operating Budget and FY2005-2009
Capital Investment Plan. The Capital Investment Plan includes $101.8 million in voter
approved Street Improvement Bonds for November of this year. The funds would be used
for several projects including the South Corridor Station Area Infrastructure, Sidewalks,
Minor Roadway Improvements, Bridge Replacements and Repair, and other programs.
Designated road improvement projects include Fred D. Alexander Boulevard,
Cindy Lane Extension, Nevin Road, Freedom Drive, and Dixie River Road. If the
November 2004 Street Improvement Bonds are approved, funds will be available to move
forward with right-of-way acquisition and construction. Property owners who own parcels
impacted by the Cindy Lane Extension Project would then be contacted by City Real Estate
Representatives in early 2005, with construction beginning in early 2006.
Cindy Lane Extension
On June 14, 2004, City Council adopted its FY2005 Operating Budget and FY2005-2009
Capital Investment Plan. The Capital Investment Plan includes $101.8 million in voter
approved Street Improvement Bonds for November of this year. The funds would be used
for several projects including the South Corridor Station Area Infrastructure, Sidewalks,
Minor Roadway Improvements, Bridge Replacements and Repair, and other programs.
Designated road improvement projects include Fred D. Alexander Boulevard,
Cindy Lane Extension, Nevin Road, Freedom Drive, and Dixie River Road. If the
November 2004 Street Improvement Bonds are approved, funds will be available to move
forward with right-of-way acquisition and construction. Property owners who own parcels
impacted by the Cindy Lane Extension Project would then be contacted by City Real Estate
Representatives in early 2005, with construction beginning in early 2006.
Statesville Road Widening
Funding for the Statesville Road Widening Project will not be included in the November
2004 bond referendum. Funding for right-of-way acquisition and construction will be
proposed in a future bond referendum.
Statesville Road Widening
Funding for the Statesville Road Widening Project will not be included in the November
2004 bond referendum. Funding for right-of-way acquisition and construction will be
proposed in a future bond referendum.
We will continue to keep you informed of the progress on both of these projects.
We will continue to keep you informed of the progress on both of these projects.
Project Contacts:
Project Contacts:
Kruti Desai, P.E.
City of Charlotte Project Manager
Engineering & Property Management
(704)353-1795
kdesai@ci.charlotte.nc.us
Tim Hayes, P.E.
Project Manager
Mulkey Engineers & Consultants
(704)566-4349
thayes@mulkeyinc.com
Kruti Desai, P.E.
City of Charlotte Project Manager
Engineering & Property Management
(704)353-1795
kdesai@ci.charlotte.nc.us
Tim Hayes, P.E.
Project Manager
Mulkey Engineers & Consultants
(704)566-4349
thayes@mulkeyinc.com
CITY OF CHARLOTTE
ENGINEERING & PROPERTY MANAGEMENT
600 EAST FOURTH STREET
CHARLOTTE, NC 28202-2844
CITY OF CHARLOTTE
ENGINEERING & PROPERTY MANAGEMENT
600 EAST FOURTH STREET
CHARLOTTE, NC 28202-2844
Statesville Road Widening & Cindy Lane Extension
Statesville Road Widening & Cindy Lane Extension
Type charmeck.org into your internet browser.
At the top of the web page select Departments.
Then select Engineering & Property Management.
Select See Our Projects from the menu on the left.
z
z
z
z
Type charmeck.org into your internet browser.
At the top of the web page select Departments.
Then select Engineering & Property Management.
Select See Our Projects from the menu on the left.
The City’s website, charmeck.org, includes up-to-date information on
the Statesville Road Widening and the Cindy Lane Extension projects.
z
z
z
z
The City’s website, charmeck.org, includes up-to-date information on
the Statesville Road Widening and the Cindy Lane Extension projects.