Special Budget Meeting City of Charlotte September 27, 2012 12:00 p.m. – 2:00 p.m. West Area Service Center, 4150 Wilkinson Blvd. Page I. Introduction Mayor Foxx II. Discuss General Capital Investment Plan (CIP) Mayor and City Council a. b. c. d. General Comments Current CIP Proposals Projects with Common Interest Projects without Common Interest Attachments • Special Budget Meeting Call and September 14 Letter to City Council from Mayor Foxx 1 • Summary of CIP Proposals, Commonalities and Differences 7 • Detailed list of CIP Proposals from June 25th Straw Votes and Budget Adoption meetings 9 • City Manager’s Prior Recommended General CIP presentation 15 • City Manager’s Prior Recommended General CIP Summary Brochure 49 • General CIP Projects by Council District 52 • Economic Impact and Measureable Outcomes distributed at May 30th Straw Votes meeting 67 • Optional, additional fall Budget Workshop meeting dates/times 75 Distribution: Mayor and City Council Curt Walton, City Manager Leadership Team Department Directors Budget and Evaluation Staff Rd St 85 Gr ah am INTERSTATE 77 N o Neighborhood Improvement Project B on y r T N r o ck Dr Ln Bv Rd e s Dr al y Ave twa awt hor H Dr Qu S Kings Bv R d an emarle b l A Rd dolp h E Sou t n h R en e Prov i d e nc d lv Mo n Rd ce en nd pe de Rd In roe Rd E Pa rk R d hColonial Village/ NIP 7t Ce n tr Co mm on we al th St B a az l P Mi l to St NIPne W est Bl vd Sedgefield Sha m Belmont Tr INTERSTATE 277 77 e e Av N ad e Ea st Th n Land Acquisition & Street Connection INTERSTATE St M athe so ds i v a D e Th Pl aza on Streetscapes cord Rd n Co E WT Harri s l vd Ol d St Eas Bro Intersection Improvement INTERSTATE Rd Ford s e i Be att Road/ Infrastructure Projects ks hi re NIP ek Cre gar Su Ave svill e S t ate Sidewalk & Bikeway Improvements Funded CIP 2002-2010 ity s r ive Council District Un 1 Woodla wn Rd vd Bl 0 1 Miles Fairv i ew 2 Project Status June 2012 Rd 52 Complete Ongoing NIP: Belmont, Colonial Village/ Sedgefield Intersection Improvements Road Widening/Improvements N Road Extension W E New Sidewalk S Streetscape Rd Ford s e i Be att 0 1 Miles o N re Ol d e Th Pl Dr Central/Eastland/Albemarle y Ave twa Eas an Rd dolp h E Mo n e nd pe de In roe Rd nc Sidewalk & Bikeway Improvements Streetscapes Bojangles/Ovens Redevelopment Maintenance Facilities Public/Private Redevelopment Opportunities Rd 53 Streetcar vd Bl Land Acquisition & Street Connection e Cross Charlotte Multi-Use Trail Rd Public Safety Facilities Improvement emarle b l A Eastland CTC Rd Woodla wn Rd Fairv i ew Neighborhood Dr Ln H Rd e Qu h R S Kings D r Central Sunnyside Ave St s e Prov i d e nc Bv St Pa rk R d South ne 7t en r o ck Bv Tr Westover Division d R N ad e Arena CTC n n so d i Sha m e Av Gateway v Da St athe so n N on y Tr az a Th e St F " M a az l P Mi l to French St W est Blv d cord Rd n Co E WT Harri s Brightwalk/ Double Oaks awt hor B l vd E St JT Williams Middle Rd Bro ks hi S Gr ah am Rosa Parks CTC E Proposed CIP Council District 1 2 Matheson Bridge, Graham, & Monroe Streetscape Projects Woodward/24th Street Connection Streetcar Currently Funded N Streetcar Proposed Extension NECI Project W Private Leverage Fund Existing Multi-Use Trail Proposed Multi-Use Trail Northeast Equipment Maintenance Facility ek Cre gar Su F Joint Communications Center " Tryon Street Plan - Street Connectivity Ave svill e S t ate Comprehensive Neighborhood Improvement Program - Central/Eastland/Albemarle Police Station in Westover Division Wilkinson MT ll y Ho - Hu lle vi B lvd oo k sh ire Br B lvd INTERSTATE 485 Rd Sun 77 INTERSTATE W set R d G NIP ib bo n T Rd H ar r i s Rd r ga Su Ln Nevin s le el zz Ro h St Funded CIP 2002-2010 Council District 2 Blvd en av llh Rd 3 a za on Tr y Rd N 1.5 k ee Cr y INTERSTATE n yo Tr 277 N St McCrorey Heights 77 INTERSTATE Lasalle St Cindy Ave l INTERSTATE Statesville om 85 Fe rr NIP de S t W Be Fr ee d NIP Thomasboro Dr W 4th S t 77 INTERSTATE 0 Miles ive Un ty rsi Sidewalk & Bikeway Improvements o Neighborhood Improvement Project Intersection Improvement C Road/Infrastructure OldProjects NIP Land Acquisition & Street Connection Streetscapes 54 e Blvd Project Status Blvd June 2012 Complete Ongoing 29 or d nc nt INTERSTATE 485 st H w US y C Albe Rd d Dr tway Eas Rd Ford ies Beatt Rd NIP: McCorey Heights, Nevin, and Thomasboro/Hoskins Intersection Improvements Road Widening/Improvements N Road Extension W E New Sidewalk S Streetscape Pl St T e Ne vin Gr ah am N sk in s Ho Rd e Oa kd a rs W Tra Wilkinson MT lly Ho - INTERSTATE 485 om Bro hi re Rd INTERSTATE 485 s Rd Rosa Parks CTC 77 INTERSTATE set R d Sun WT n Gi bb o Sunset/ Beatties Ford Cindy Ln ave n llh F re H a rris n Rd Rd on Tr y St ed Rd W Tra Streetcar ive Un Streetscapes Neighborhood Improvement Co ty rsi Public Safety Facilities Old Proposed CIP Council District 2 Bl a za vd N h Rd Sunnyside Ave 3 e ek Cr ry INTERSTATE F " n yo Tr 77 Lasalle St nA v Oa kla w INTERSTATE 277 French St W 4th d e St St N Arena CTC Gateway 1.5 r ga Su Ro z z B e lle lv d s Fe r INTERSTATE 85 W S ve tatesvi lle A D r ok s H unte r s Bv Blvd West Trade/ Rozzelles Ferry 0 Eastland CTC 55 Be F " Blvd 29 y or d Beatti s e H w US nc rd Rd o F Miles Dr tway Eas C Albe Rd d Comprehensive Neighborhood Improvement Program - Sunset/Beatties Ford - West Trade/Rozzelles Ferry Joint Communications Center N Graham Streetscape Project Streetcar Currently Funded W E Streetcar Proposed Extension S Streetcar Future Extension st Pl St T e Ne vi Gr ah am N sk in Ho vi ll e om INTERSTATE D r Enderly Park INTERSTATE Cre Stee le Bl v r rte Po We sti ng house B lvd n yo r T Ar ro wo o o l a Rd T yv Intersection Improvement F ai NIP dR d INTERSTATE 485 He bro INTERSTATE 77 t 0 1.5 Miles 3 56 Complete Ongoing On Hold Rd Land Acquisition & Street Connection Ca rm Project Status June 2012 r v i ew Neighborhood Improvement Project Streetscapes Sharon Rd W est n yo Tr Sidewalk & Bikeway Improvements Road/Infrastructure Projects nS S Rd el Rd Rd ek San d W y S am York/Cama Pk w y NIP R Park Rd k Rd St Rd ee le Shopton INTERSTATE Cla 77 nto n South Blvd Rd n so rri Ga Cree m Bea Pine nt Revolution Park Rd Ty vo la lk e Rd Riv er ie ix D ah r mD u r By Dr s k Oa ou do lp h an y NIP 277 P a rk Rd kw Gr West d B i lly Rd ch Chur nP INTERSTATE Ponderosa Boulevard Homes vi a D Rd liv e Wallace Neal Rd a W M tO rde NIP N NIP Ferry Rd n o ds Re m rs wd Ga N Blv d Do rd d Nations Fo Ol W ilkins on 85 Tr Th Tuck a seege e NIP: Enderly Park, Pawtucket (Phase 1), Ponderosa, Revolution Park, & York/Cama Hw Intersection y Improvements 51 NC Road Widening / Improvements N Road Extension W E New Sidewalk S Streetscape Rea Rd N Tod dville Rd am 85 Gr ah Little Rock NIP ed Fre INTERSTATE 485 Pawtucket Phase 1 Funded CIP 2002-2010 Council District 3 lv d St B es Ford B eatti ir e Proposed CIP Council District 3 lv d e Fr e do m INTERSTATE Gr ah Rd N Tuck a seege e West Trade/ Rozzelles Ferry INTERSTATE Ol d 85 wd Section I i Road/av D Infrastructure N Projects ley Blv d Do n o ds h As The Vineyards @ Lake Wylie Public Safety Tr Facilities N Th Rd W ilkins on am 85 Dr Tod dville Little Rock INTERSTATE 485 St B es Ford B eatti ir e Ty vo la INTERSTATE S Rd INTERSTATE W We sti ng house B lvd Ar ro wo o Freedom Park Park Rd Shopping Center Marion Diehl l a o Rd Park Tyv Park Rd South Park Mall Park F ai rv i ew Rd South Natio n 485 Whitehall/Ayrsley dR d 77 He br on Park Rd INTERSTATE St Sharon Rd W est Rd Rea el Rd n yo Tr Ca rm S n yo 77 r T Blvd n ton opto Shop Sh SStt eeee llee Berewick Pine Pkw y m Bea Section III CCrreeee kkRRdd Ga rri so n Rd D sF ord lk e Rd Riv er ie ix y d do lp h an kw R nR m r mD u r By Dr s k Oa Maintenance Facilities P a rk Rd nP nto Rd rde Westover Division Cla Gr a h a West m nt Rd ch BlvdRd Section II Ga Re Neighborhood Improvement ou liv e Chur Wallace Neal Rd a W M tO 277 Bi l l y rs INTERSTATE Ferry Rd Comprehensive Neighborhood Improvement Program - West Trade/Rozzelles Ferry Hw y 51 Whitehall/Ayrsley C Carolina N Police Station in Westover Division Place Mall 0 1.5 Miles 3 57 Garrison Road Extension Dixie River Road Widening/Improvements Sweden Rd Maintenance Yard Replacement N W E S Funded CIP 2002-2010 Council District 4 Rid ge R d INTERSTATE 485 John n - O e h sto le d nR r o R Rd rd C ek re Ch ch ur M a ll a y d perit Pros arm De Rd INTERSTATE 85 Malla r INTERSTATE Ch 485 R S U Bl vd H w y k d d B lv Ba Complete Ongoing On Hold T H arr is 29 d WW Project Status June 2012 Cr ee C ck Rd NIP N NIP we ll Rd ald C iv e r yR Rd R R d Newell South Hidden Valley Tryon St St N 85 oc k INTERSTATE Creek Gr ah am Ha h Rd rc T is Blvd rr ar Su g ity ers v i E Un W r e ek C h u Ci t Old ord C onc Rd r Grie N W E S 0 1.25 2.5 Miles NIP: Hidden Valley, Newell South Intersection Improvements Road Widening/Improvements Road Extension New Sidewalk Sidewalk & Bikeway Improvements Intersection Improvement Road/Infrastructure Projects Neighborhood Improvement Project 58 NIP Land Acquisition & Street Connection Proposed CIP Council District 4 Prosperity Church Rd Northwest Arc Comprehensive Neighborhood Improvement Program - Prosperity Village Police Station in University City Division Road/Infrastructure Projects Prosperity Village Rid ge R N New Bridges over I-85 W Existing Multi-Use Trail Proposed Multi-Use Trail S d INTERSTATE Rd ospe le r rit Rd Miles ch R ur INTERSTATE 85 C Dr IBM Ik e Rd 85 TH ar ri t N Tr y e Th n Ro d co N S Co d l O INTERSTATE 485 Eastern Circumferential/ d rR Railroad Bridge Riv e rd St W l s B vd Rd Gr ah am ty rsi e n iv E Blvd ck y a Blvd n yL nd Ci ty Ci INTERSTATE on R ch ur Cree C h ck Ba k ee Cr U INTERSTATE 485 d Rd JWC y la n Re re ek C h G r ga Su Statesv i lle A v e se ar ch D r 77 Ca ld we ll R d allar d INTERSTATE 9 S d University City M Division 2 Hwy U Blv Harris er R WT 2.5 Ma d ib bo 1.25 l lard yC h W 0 eh r o arm De onJoh n st O d nR P Cre ek 485 Gr i a az l P Public Safety Facilities Bridge & Connectors Streetscapes Road/Infrastructure Projects Neighborhood Improvement Informatics & Innovation Partnership 59 E Funded CIP 2002-2010 Council District 5 INTERSTATE NIP Rd A mity Av e NIP Blv d Rd rr i s Ha Sidewalk & Bikeway Improvements ild Rd Rd Road/Infrastructure Projects W al la ce vd E WT ron S ha e East Forest Rd le w Id Bl e nc Rd de en ep NIP u Rd Eastwoods d In nro arle m e b Al La wy ers E Mo ce Blvd nt ra l isb Pe n ris Har EastwaySheffield Ce rg in s Rob Hickory G rove R d NIP Rd Rd Church Ha rr NIP 485 on WT Grove Park P lott Rd Delta Lake E e Th za Hood Rd a Pl Intersection Improvement ret ga Ma r Neighborhood Improvement NIP N W E Project Status June 2012 S 0 1 Miles 2 60 Complete Ongoing Neighborhood Improvement Project NIP: East Forest, Eastway-Sheffield, Grove Park, Delta Lake, Eastwoods Intersection Improvements Road Widening/Improvements Road Extension New Sidewalk Proposed CIP Council District 5 za INTERSTATE P lott Rd Rd A mity In Ha rr Rd Rd Bl v d Public Safety Facilities rr i s Sidewalk & Bikeway Improvements d il Rd Intersection Improvement W al Independence Division la ce Rd E WT vd Bl Rd Ha u Rd lew Id e Sh a nc e nd ron pe de ! ce Central/Eastland/ lbemarle nt A ra l Av Albemarle e La wy ers isb Pe n Hickory Grove Division Mo nro e rg n so Hickory G rove R d E Rd Rd Church n R obi Ce 485 Hood Rd e Th a Pl re ga Mar Neighborhood Improvement t Streetscapes Land Acquisition & Street Connection Comprehensive Neighborhood Improvement Program - Central/Eastland/Albemarle N W Police Station in Independence & Hickory Grove Divisions E Independence Blvd Redevelopment S 0 1 Miles Monroe Road Streetscape 2 61 Idlewild & Monroe Road Intersection Improvement 77 INTERSTATE Park Rd Shopping Center Freedom Park lony Co en r ve Rd Rd Rd E d is S ar Rd 51 A l b em La Funded CIP 2002-2010 w y e Council District 6 r w ollo l H ai Qu Rd Colo n y R d on Sha r e nc E No r th INTERSTATE Sidewalk & Bikeway Improvements Road/Infrastructure Projects Intersection Improvement e Rd Rd Intersection Improvements 485 Road Widening/Improvements New Sidewalk Rd nroe Mo Vi Complete Ongoing Project Status June 2012 Sardis vd Bl e Rd w y Hw e nd pe de Fairview en c vid Pro Rd d R N E NC Ea 2 Blvd a rr is WT H In South Park Mall Rd W S 1 h dolp Ran Rd Park Rd Park neagl es G le W Rd 0 Miles 62 Marion Diehl Park Tyv ola Sharon Rd West NC Hwy 51 Rea Park Rd do Rd rm el Ca Sh ar on P ark Rd INTERSTATE 485 Rd rm el Ca Blvd Sou th 77 INTERSTATE Freedom Park en r ve Rd Fairview en c vid Pro Rd h dolp Ran Rd N E E d is S ar Rd 51 w ollo l H ai Qu Rd Colo n y R d on Sha r nroe Mo Rd E r th No A l b em e Rd Sweden Rd Maintenance Yard Replacement Proposed Multi-Use Trail 485 INTERSTATE Park South Drive Extension Police Station in Park South Division Maintenance Facilities Cross Charlotte Multi-Use Trail Public Safety Facilities Proposed CIP La w y e Council District 6 r is Sard e nc Vi S vd Bl e Rd w y Hw W 2 e nd pe de lony Co Rd NC 1 Blvd a rr is WT H In South Park Mall Rd W Rd Park Rd Shopping Center Rd Park Rd Park neagl es G le d R 0 Ea Miles 63 Marion Diehl Park Tyv ola Sharon Rd West Park South Division NC Hwy 51 Rea Park Rd do Rd rm el Ca Sh ar on Par k R d INTERSTATE 485 Rd rm el Ca Blvd Sou th Rd INTERSTATE 77 W N Sidewalk & Bikeway Improvements N Pkwy s y Hw 51 Rd ee cK M vd Bl E lm e nc de mm Co ston u n i ty Rea o H Ln e Intersection Improvements Road Widening / Improvements New Sidewalk Rd Funded CIP 2013-2017 Council District 7 INTERSTATE 485 n pe de In NC di 51 C Hwy us mons t ll Ke E Road/Infrastructure Projects R Intersection Improvement l me C om W es Rd ce INTERSTATE ntyne la 485 Ba vide nce P ro Rd Ardrey Project Status June 2012 Complete Ongoing 64 Providen E 3 John S 1.5 Miles Rd rt Sh o Tom Rd d Rd Rea Park Rd r Ca l Sar 0 Sout h Blvd Rd Rd Rd NC H w y 1 6 INTERSTATE 77 Sout h Blvd NC s Hw y 51 Rd Proposed CIP Council District 7 Rd n pe de In J oh n Ln e nc de ston u n i ty mm Co o H e a Re W N S 1.5 Miles E 3 Police Station in South Division Public Safety Facilities vd Bl NC INTERSTATE e e 485 cK M E 5 Pkw y di y Hw South Division us ce E lm mon s Com t ll Ke Sar l INTERSTATE 485 ntyne la W es Rd 0 65 Rd 1 Rea Providen Ba Rd vide nce P ro Rd Ardrey Rd rt Sh o Tom Rd Park Rd me Ca r l Rd Rd Rd NC H w y 1 6 66 Questions and Answers May 16 Budget Adjustments Question 3: What is the economic impact of the recommended Capital Investment Plan (CIP)? The City’s CIP serves as a local economic stimulus tool that will create jobs and benefit the local economy. Government spending on infrastructure projects has a ripple effect throughout the economy. Every dollar put into circulation is recycled multiple times as it passes down from taxpayer to employer to employee to local businesses. This multiplier factor is what allows the City’s investment in infrastructure to be expansionary on the local economy. City staff utilized the most recent federal Bureau of Economic Analysis Regional InputOutput Modeling System (RIMS) Type II Data to determine the cumulative effects on total industry output, earnings, and employment within Mecklenburg County that would be derived directly from the City’s capital expenditures and construction of infrastructure projects. RIMS Type II multipliers account for direct and indirect economic impact based on the supply of goods and services in the region (Output Impact), and for induced impact associated with the purchases made by the local workforce (Earnings Impact). Using the RIMS II analysis, every $10 million of annual construction spending will potentially result in $18.0 million of Output Impact, $4.1 million of Earnings Impact, and the support of 123 jobs. This analysis shows that the $926.4 million total capital program could provide a total of $1.7 billion in Output Impact, $383.7 million in Earnings Impact, and the support of 11,409 jobs over the entire period of construction for the program. Attachment# 2 is a representation of the potential impact of each of the projects over its construction period. It should be noted however, that these potential impacts are the result of a standardized formula based on general assumptions about capital infrastructure projects. Actual economic impacts won’t be known until specific project designs and scope have been fully developed and the projects are underway. To get a general sense of the ultimate economic impact of the completed projects once they are operational, staff analyzed data from the Federal Bureau of Economic Analysis that calculates the economic effect of government spending on the wider economy. This analysis shows that the economic impact of the City’s capital investments can be substantial, with a multiplier factor between $5.71 and $13.20 per government investment dollar. Applying this multiplier to the proposed $926.4 million capital program would yield between $5.3 billion and $12.2 billion in comprehensive economic impact on the economy. Staff further reviewed various projects in the proposed $926.4 million capital program to identify other economic and non-economic outcomes that can be estimated from activities and development opportunities created by the completion and implementation of the proposed projects. Attachment# 3 provides a summary listing of those identified outcomes. 67 68 Proposed Capital Program for Bond Years 2012 - 2018 RIMS II Input-Output Data Type II Analysis of Economic Impact Capital Spending Output* Impact Earnings** Impact INVESTING IN CORRIDORS Airport/West Corridor $ 43,000,000 $ 77,185,000 $ 17,810,600 Spine Dixie Berryhill Infrastructure (New Garrison Road) 30,000,000 53,850,000 12,426,000 Southern Dixie Berryhill Infrastructure (Widen Dixie River Road) 13,000,000 23,335,000 5,384,600 East/Southeast Corridor 92,000,000 165,140,000 38,106,400 Land Acquisition and Street Connections 25,000,000 44,875,000 10,355,000 Monroe Road Streetscape 10,000,000 17,950,000 4,142,000 Bojangles/Ovens Area Redevelopment 25,000,000 44,875,000 10,355,000 Public/Private Redevelopment Opportunities 20,000,000 35,900,000 8,284,000 Idlewild Road/Monroe Road Intersection 4,000,000 7,180,000 1,656,800 Sidewalk and Bikeway Improvements 8,000,000 14,360,000 3,313,600 Northeast Corridor 170,000,000 305,150,000 70,414,000 Research Drive - J.W. Clay Connector over I-85 (North Bridge #1) 15,000,000 26,925,000 6,213,000 University Pointe Connection - IBM Drive to Ikea Blvd (South Bridge #2) 14,500,000 26,027,500 6,005,900 102,500,000 183,987,500 42,455,500 Applied Innovation Corridor 28,000,000 50,260,000 11,597,600 UNCC Informatics and Innovation Partnership 10,000,000 17,950,000 4,142,000 24,900,000 44,695,500 10,313,580 5,000,000 8,975,000 2,071,000 11,600,000 20,822,000 4,804,720 Park South Drive Extension 8,300,000 14,898,500 3,437,860 26-Mile Cross Charlotte Multi-Use Trail 35,000,000 62,825,000 14,497,000 Streetcar Extension (Bonds and COPs*) 119,000,000 213,605,000 49,289,800 Sidewalks and Pedestrian Safety 60,000,000 107,700,000 24,852,000 Traffic Control and Bridges 48,000,000 86,160,000 19,881,600 Upgrade Traffic Signal System Coordination 15,000,000 26,925,000 6,213,000 Upgrade Traffic Control devices 19,000,000 34,105,000 7,869,800 Repair and Replace Bridges 14,000,000 25,130,000 5,798,800 Northeast Corridor Infrastructure (NECI) INCREASING CONNECTIONS Road/Infrastructure Projects Prosperity Church Road NW Arc Eastern Circumferential/Railroad Bridge IMPROVING COMMUNITIES Public Safety Facilities 124,500,000 223,477,500 51,567,900 Joint Communications Center 64,000,000 114,880,000 26,508,800 6 Police Division Stations 56,500,000 101,417,500 23,402,300 4,000,000 7,180,000 1,656,800 30,000,000 53,850,000 12,426,000 21,750,000 39,041,250 9,008,850 8,250,000 14,808,750 3,417,150 60,000,000 107,700,000 24,852,000 120,000,000 215,400,000 49,704,000 926,400,000 $ 1,662,888,000 Land Purchase for Future Fire Stations Maintenance Facilities/Customer Service Sweden Road Maintenance Yard Replacement ($30 m total for Sweden & NE Facility) Northeast Equipment Maintenance Facility Affordable Housing Comprehensive Neighborhood Improvement Program (Complete Communities) Total $ * Output Impacts account for direct and indirect economic impact based on the supply of goods and services in the region ** Earnings Impact accounts for the induced economic impact associated with the purchases made by local workforce 69 $ 383,714,880 70 71 Northeast Corridor Infrastructure (NECI) NECI improvements consist of new sidewalks, new street connections, streetscape enhancements, bicycle facilities, connections to greenways, pedestrian safety projects, landscaping, and lighting to complement the Blue Line Extension. These projects will support economic development and redevelopment similar to what has occurred along the South Corridor. These investments are a key component to realizing the economic development benefits associated with station area development. Northeast Corridor Research Drive-J.W. Clay Connector over I-85 (North Bridge) This new bridge over I-85 will increase access to University Research Park and assist with the development of 700 acres of currently undeveloped land. The fully developed land would bring new office space to the area and create additional taxable investments for the City. Bojangles/Ovens Redevelopment Redevelopment will create a destination-defining amateur sports complex capable of hosting major events. A study conducted in February 2012 on behalf of the Sports Commission entitled “The Economic Impact of Sports and Sports Events on the Charlotte MSA Economy”, calculated the current economic impact of amateur sports in Charlotte at approximately $233 million per year. Staff estimates that the redevelopment of Bojangles/Ovens will increase amateur sports activity by 20% to 25%. East/Southeast Corridor Public/Private Redevelopment Opportunities The express purpose of this program is to leverage private investment and job creation throughout the East/Southeast Corridor and to serve as a catalyst for redevelopment of underutilized land and vacant commercial property. Staff estimates a 10:1 leverage ratio for the City’s investment. PROJECT Airport/West Corridor Dixie Berryhill Infrastructure supporting Intermodal Facility The two road projects in the Airport/West Corridor will support development associated with the Intermodal Facility, helping to leverage private development, economic growth, jobs, and tax base growth over the next 20 years. • 3.6 miles of new streets • 84 intersections improved • 11 miles new bike lanes • 20 miles of new or improved sidewalks • $280 million additional investment tax base • 10,000 new jobs • 3.5 million square feet of new office space • 540 – 675 new jobs • $50 – $60 million economic impact • 20% to 25 increase in amateur sports activity • $200 million in new development • $625 million tax revenue • 5,000 new jobs • $9 billion economic impact • $90 million private investments ECONOMIC IMPACT/MEASURABLE OUTCOMES Recommended Capital Investment Program Summary of Economic Impact and Measurable Outcomes 72 Streetcar Extension The proposed streetcar extension would add a 2.5 mile segment between the Charlotte Transit Center and Johnson C. Smith University (French Street) to the west, and between Presbyterian Hospital and Sunnyside Avenue to the east. The new segment will include 11 stop locations connecting business, residential, entertainment, educational and employment centers. This 2.5 mile segment will bring the streetcar extension to 4 miles of the total 10 miles planned for the overall streetcar system corridor, and will help move the system closer to reaching its projected higher tax revenue impact at full build out. 26-Mile Cross Charlotte Multi-Use Trail The Cross Charlotte Trail will have significant transportation, recreation, and economic development benefits. Within one mile of the trail there are over 142,000 residents, 15.6 million square feet of retail, 40.2 million square feet of office space, and 35.6 million square feet of industrial activity. The trail will connect key destinations, including Carolina Place Mall, Park Road Shopping Center, NoDa arts and entertainment district, Metropolitan Mixed Use Village, and Charlotte Center City. Applied Innovation Corridor This effort focuses on targeted economic growth and industry recruitment in an applied innovation corridor extending from Center City to UNCC. Commercial and residential development along this corridor would close the gap between Uptown/South End and the University, linking and leveraging the City’s business assets and government support with its academic and research capital. Streetscape and street realignments included in this project will create more viable retail locations and potentially a “town center” concept. Staff estimates a 10:1 leverage ratio for the City’s investment. UNCC Informatics and Innovation Partnership The immediate expected impact of this facility will be to increase federally and industrially funded research and development in the Charlotte region. Over a five to ten year horizon, the increased research will generate dozens of new inventions and ideas for next generation informatics products and biotechnology companies. This facility will also support direct growth in the number of skilled informatics workers in Charlotte. In the medium term, this facility will lead to the formation of entirely new types of knowledge worker jobs in Charlotte, and in the long term will contribute to a new sector of knowledge intensive informatics companies. PROJECT 9% to 14% increase in multifamily housing 34,000 to 40,000 square feet additional retail space 35,750 to 53,120 square feet additional office space 50% to 70% higher tax revenue at full build out • • • • 21% to 28% increase in single family housing • • Strong potential for new commercial and retail development • Expected increase in property values (TBD) • Dozens of new companies in the long term, serving national and international markets • 1 to 2 new companies or products per year in the medium term • $2 million per year in immediate federal and industrial research funding • $280 million in new development ECONOMIC IMPACT/MEASURABLE OUTCOMES 73 Comprehensive Neighborhood Improvement Program (CNIP) The new CNIP program will continue to focus on Area Plans, but will look beyond boundaries of residential areas for opportunities to enhance collaboration with public/private partners and leverage multiple investments in neighborhoods. The five proposed community areas were selected in part to stabilize and improve residential housing markets and to take advantage of the availability of strong private sector development partners. 6 Police Division Station The six police division stations will be located along main thoroughfares that will be easily visible to the public - in the heart of the areas that they serve, enhancing police ownership of the issues in their service areas and facilitating the relationship between police and the community. This strategic location and increased visibility of police divisions has been shown to have a positive impact on service response and crime reduction in Charlotte. Currently, two of CMPD’s thirteen patrol divisions, Metro and Providence, have moved into division stations built by the City. Since moving into its new station in September 2009, Metro Division has experienced decreases in response times to all categories of calls for service, and both Metro and Providence divisions have reported decreases in crime. Public Safety Facilities Joint Communications Center The Joint Communications Center is expected to house 911 communications for Fire and Police, the Fire Emergency Management’s Emergency Operations Center, 311 Communications, and a consolidated Datacenter. The physical consolidation of these operations, along with a virtual consolidation of the E911 phone system, will reduce the time needed for transfers and incoming 911 calls and eliminate annual operating costs for separate facilities. PROJECT • New commercial and retail development • Expected increase in property values (TBD) • 10% to 30% decrease in crime • 5% to 10% reduction in response times to Priority 1 emergency calls • Annual cost savings of $705,549 from eliminated facility leases • Up to 45 second reduction in Call handling time ECONOMIC IMPACT/MEASURABLE OUTCOMES 74 OPTIONAL, ADDITIONAL FALL BUDGET WORKSHOP DATES In the event that additional Budget Workshops are desired, the following dates are proposed: • Tuesday, October 30th (12:00 – 2:00 p.m.) at the Belmont Service Center • Thursday, November 15th (2:00 – 4:00 p.m.) at the CMGC Room CH-14 75