7 Water Efficiency Buildings are major users of our potable water supply. The goal of the Water Efficiency category is to encourage smarter use of water, inside and out. Water reduction is typically achieved through more efficient appliances, fixtures and fittings inside and water-conscious landscaping outside. –LEED 2009 | Water Efficient Landscaping | Innovative Wastewater Technologies | Water Use Reduction | | Cooling Tower Water Management | Water Performance Measurement | Water Reclamation | | Water Efficient Practices & Procedures | 8 SUSTAINABILITY PROJECTS Profile Sheet Low Flow Restroom Fixtures Project Overview The Airport’s restrooms were using outdated fixtures that required a lot of water usage. Incorporating recent water-saving fixtures reduced restroom water usage by a weighted average of approximately 50%. • Before Construction • Toilets: 3 gallons per minute (gpm) • Urinals: 1gpm • Faucets: 2gpm • After Construction • Toilets: 1.5 gpm • Urinals: 0.5 gpm • Faucets: 0.5 gpm Fast Facts Start Date............................................................................................. 2007 Completion Date................................................................................ 2009 Updated..................................................................................... 9/19/2011 Location......................................................................................... Terminal Environmental Benefit........................................ 50% less water use Industry Standards LEED................................................................. 2009 O&M - WE Credit 2 IgCC....................................................................................... Section 702.1 SAM.............................................................................................. O&M 2.3.5 IECC.................................................................................... Not Applicable Project Notes Provider................................................................................................ Sloan Usage...................... 300-325 passengers visit restrooms per hour • The Airport’s bathrooms were in need of renovations. The decision was made to implement efficient flush valves during the renovation. • A significant environmental improvement is less water is distributed to the local waste water treatment plant (WWTP), which in turn causes less water to be pulled from the local river. • There are many other indirect significant environmental benefits to low-flow fixtures, such as environmental restoration, less energy used at WWTP, conservation awareness and less restroom repair problems. Global Initiative #: 12 Focus Area: 2 CLT’s Commitment to Sustainability: Identify and pursue fiscally responsible practices and strategies that minimize environmental impacts to achieve a sustainable enterprise for the benefit of the region. 5501 Josh Birmingham Parkway Charlotte, NC 28208 moving towards a sustainable future P.O. Box 19066 Charlotte, NC 28219 P 704.359.4000 F 704.359.4030 T 1.800.FLY.CDIA cltairport.com 9 SUSTAINABILITY PROJECTS Profile Sheet Water Efficient Landscaping Project Overview CLT’s Field Maintenance landscape supervisor used a number of methods to promote efficient water use throughout Airport property including ground preparation improvements and installing water-wise plant material. To create rich, well-draining conditions, staff used locally produced organic compost and aged pine bark fines to prepare grounds for plant materials. This foundation promotes thicker, deeper and more extensive root systems that are more drought resistant. Additionally, this type of ground preparation encourages moisture retention to combat dry spells while also preventing “boggy areas”. Another key component to CLT’s water efficient landscaping included the selection of water wise plant material. In an effort to increase a plant’s adaptability to a new location, the landscaping team ensured plant material was appropriately matched with a potential site’s microclimate. Using this method, none of the newly installed plant material should receive supplemental watering after their first year of adjustment. Fast Facts Start Date ..................................................................... February 2012 Completion Date ............................................................... April 2012 Updated .................................................................................. 5/10/2012 Location ........................... CLT Center, Wilson Air, Business Valet Environmental Benefit ................................... water use reduction Industry Standards L E E D............................................................ 2009 O&M - WE Credit 3 I gCC ................................................ Section 404.1.1 & Section 405.3 S A M............................................................................................. O&M 2.4 IECC ............................................................................... Not Applicable Project Notes Led by ............................................................. Landscape Supervisor In the future, all new plant material will be selected to ensure it is drought tolerant and that approximately 75 percent of the Airport’s landscape materials are native to the region. Project Sites include: Some of the selected plants include: Hanger 11 (Wilson Air) CLT Center Business Valet Parking Deck East Daily Deck Overlook Purple Coneflower- Echinacea Purpurea Dwarf Yaupon Holly- ilex Vomitoria Nana Pink Muhly Grass- Muchlenbergia Capillaris Redbud- Cercis Canadensis Ninebark- Physocarpus Opulifolius Global Initiative #: 10 Focus Area: 13 CLT’s Commitment to Sustainability: Identify and pursue fiscally responsible practices and strategies that minimize environmental impacts to achieve a sustainable enterprise for the benefit of the region. 5501 Josh Birmingham Parkway Charlotte, NC 28208 moving towards a sustainable future P.O. Box 19066 Charlotte, NC 28219 P 704.359.4000 F 704.359.4030 T 1.800.FLY.CDIA cltairport.com