ADDENDUM No. 3 FROM: James Schumacher, CMR Facilitator DATE: October 2, 2015 PROJECT: CONSTRUCTION MANAGER AT RISK SERVICES (CMR) FOR EAST TERMINAL EXPANSION PHASE II Project # TM12-026 The following items are being issued herein for clarification, addition and/or deletion and are incorporated into the Request for Qualifications issued September 16, 2015. Changes, Clarifications & Modifications 1. On Page 3, Section 1.2 Project Description is modified by the addition of the following: A limited set of the project drawings is available for review at the following link: http:/www.richa.com/download/CMR_East_Terminal_Expansion_Phase_II_Informational_drawings_O NLY.zip These drawings are for general information purposes only and to provide a high level understanding of the scope and construction sequencing required. Sheet G0.00 provides an isometric illustration of the project in relation to existing Concourse D. The Location Map on this sheet illustrates the location of the Phase II Expansion relative to the Terminal complex and airfield. Sheets G6.01 - G6.06 illustrate construction sequences 1 - 7a for the vertical circulation facilities that connect Concourse E to Concourse D. 2. On page 12, Section 4.9 Financial Capacity; Insurance Requirements is modified as follows: Successful firms must have the financial capacity to undertake the work and assume associated liability. The successful firm will be required to furnish proof of insurance coverage in the minimum amounts specified below: • Automobile liability in the minimum amount of $15,000,000; • Commercial general liability in the minimum amount of $15,000,000; and • Workers’ compensation insurance as required by North Carolina statutes. End of ADDENDEM No. 3