Self-Gatekeeping Checklist for Commercial Permitting and Plan Review Mecklenburg County Code Enforcement 700 N Tryon Street, Charlotte, NC 28202 For Code questions, contact CTAC at 704-432-4668 / For general questions contact 704-336-3837 Fax: 704-336-3823 www.meckpermit.com Incoming Commercial Plans Date Submitted Date to be Reviewed Project Name Date Accepted Project Number Project Address Contact Person Cell Number Phone Number Email Fax Number I certify, to the best of my professional belief, this submission meets all minimum submittal requirements required by Mecklenburg County Code Enforcement and the Plans Submittal Guidelines. Signature of Seal holder / Designer License # This form is intended to be used with OnSchedule, Express Review, Rehab and CTAC (Commercial Technical Assistance Center) plan submittals only. It is not intended to be used with Mega plan submittals. Instructions Each item should be evaluated and then indicate Included or N/A for each item as applicable. Every project is different and will require different items. This form should be completed by the Seal holder responsible for the submittal package. If a seal holder is not required, it should be completed by the designer responsible for the submittal package. If items are missing from the submittal package that require the review to be stopped, the review will be disapproved and the disapproval will be counted against the A/E Pass Rate. This form must be submitted with the submittal package. General Requirements Item # Item G1 Included N/A Drawings Packaged per Packaging Guidelines G2 Included N/A 2012 Appendix B - (Including Schedule of Special Inspection Services) must be reproduced on the plans G3 Included N/A G4 Included G5 Included N/A A key plan is required to show location for upfit, renovations, and alterations only G6 Included N/A Estimated Permit Fees are required for OnSchedule, Express Review, RTAP's, and Rehab project submittals G7 Included N/A Zoning Approval from Towns (Huntersville, Cornelius, Davidson) if applicable G8 Included N/A Planning Commission Approval as required G9 Included N/A Professional Seals signed and dated as required G10 Included N/A Completed Permit Application with Estimated Project Cost and Address Verification (one application per building or unit address) Plans that are submitted to our office, if they are marked, must be marked "For Construction Only". Cannot be N/A marked as Bid Only, Permit Only, or 80% complete, only. All plan sheets are required to be "authored". Need name, address, phone, and signature of individual responsible for each plan sheet when not done by licensed professional. CTAC General Requirements G11 Included N/A Drawings Packaged per Packaging Guidelines contained in one file (all trades) including a table of contents G12 Included N/A 2012 Appendix B - (Including Schedule of Special Inspection Services) must be reproduced on the plans G13 Included N/A G14 Included N/A A key plan is required to show location for upfit, renovations, and alterations only Completed Permit Application submitted by contractor online, including Lien Agent (one application per building or unit address) Identify projects that involve multiple building permits Phased Construction (see Plans Submittal Document for additional information) Construction Phasing Plan with detailed information on the scope of work for each phase along with the appropriate number of permit applications for each phase if applicable G15 Included N/A G16 Included N/A Footing / Foundation G17 Included N/A Structural Frame G18 Included N/A Shell G19 Included N/A Shell with Core Revisions to Approved Plans (RTAP) G20 Included G21 Included G22 Included Only the revised sheets from the original drawings needs to be uploaded and listed on the Sheet Index with appropriate dates and revision numbers If the original approved plans were electronic plans from the old system (pre Feb. 1, 2012) upload the original N/A plans as reference plans If the original approved plans were electronic plans in the new system (post Feb. 1, 2012) no reference plans N/A are necessary to be uploaded, but will be accessed internally by our staff. N/A Special Inspection (Chapter 17, www.meck-si.com ) Plan Sheet when Special Inspections are required G23 Included N/A a: Special Inspections checklist completed on Appendix B G24 Included N/A b: Statement of Special Inspections (DPIRC) must be reproduced on the plans - see www.meck-si.com G25 Included N/A c: IT categories 1-19 must be reproduced on the plans with the appropriate items indicated that are required for this project. This information is consistent with Appendix B - see www.meck-si.com Re- submittals - Disapproved plans G26 Included N/A a: Upload modified Sheet Index G27 Included N/A b: Modified Drawing Files G28 Included N/A c: Written and signed response letter to Reviewers comments and uploaded as file G29 Included N/A CTAC: Modified drawing files should include the disapproved plan set with the revised sheets at the back of the plan set and amended table of contents Civil / Site Plan C1 Included N/A Type of Occupancy and Land Use C2 Included N/A Vicinity Map / Key Map C3 Included N/A North Arrow and Map Scale C4 Included N/A Property and Street Right of Way Lines with Dimensions C5 Included N/A Existing and Proposed Driveway Connections C6 Included N/A Show All Easements and Right of Ways C7 Included N/A Locations of All Existing and Proposed Structures with Dimensions from Property Lines C8 Included N/A Locations of All Other Existing and Proposed Site Improvements C9 Included N/A Parking Plan, including Accessible Parking, with Calculations C10 Included N/A Accessible Curb Cuts C11 Included N/A Site Lighting Plan C12 Included N/A Screening and Buffers C13 Included N/A Location, Type and Size of Public/Private Water Lines, Meters and Backflows C14 Included N/A Fire Hydrants - Public and Private C15 Included N/A Location of Sewer Lines C16 Included N/A Storm Drainage / Topography / Grading C17 Included N/A Adjoining Property Owners Names and Land Uses C18 Included N/A Owners Name, Address, and Contact Information C19 Included N/A Person Responsible for Plan ( Name, Address and Contact Information) Architectural / Structural / Fire A1 Included N/A Soil Reports or Load Capacity when required A2 Included N/A Design Loads A3 Included N/A Footing Details (sizes & steps) A4 Included N/A Foundation Plan A5 Included N/A Show foundation slab details including vapor barrier A6 Included N/A Provide basement percentage below grade calculations A7 Included N/A Floor/ Wall/ Roof Plan A8 Included N/A Elevations of building with dimensions (building height, floor to floor, height to ridge and eave) A9 Included N/A Identify the names and uses of each room A10 Included N/A All penetration details for fire-rated construction including approved agency system information A11 Included N/A Partition Layout/ Fire Ratings with UL/FM # A12 Included N/A Seating Layout - Furniture Plans A13 Included N/A Calculations for means of egress widths for occupancy loads A14 Included N/A Show toilet room layouts at sufficient scale for dimensions and details to verify for accessibility compliance A15 Included N/A NCSBC Chapter 3411.7 Compliance shown on plans if applicable A16 Included N/A Rehab Code expenditure log information shown on plans if applicable A17 Included N/A Ramps (slope) A18 Included N/A Stair Details (risers/treads/handrails) A19 Included N/A Firestopping and Draftstopping A20 Included N/A Interior Finish Schedule/ Type Material A21 Included N/A Door Schedule Including Hardware A22 Included N/A Sections through Building (Detailed Wall Sections) A23 Included N/A Wall bracing details A24 Included N/A Insulation/Energy Form - Comcheck information must be included on plan sheets if used A25 Included N/A Glass Type - Safety Glass as Required A26 Included N/A Chimney/ Fireplace Details A27 Included N/A Gross and Net Floor Area A28 Included N/A Construction Type A29 Included N/A Occupancy Category A30 Included N/A Hazardous Materials Storage or Use A31 Included N/A High Piled Storage A32 Included N/A I-2 occupancy color coded life safety drawings from NC (DHSR) A33 Included N/A Attic ventilation details including overall ventilation calculations A34 Included N/A Fixed Extinguishing Systems (halon/foam) A35 Included N/A Window Schedule A36 Included N/A Pre-Engineered Metal Building Details - Option A or B - see Department policy A37 Included N/A Details for fabric awnings and canopies including fire-resistance information Electrical E1 Included N/A Number of Services and Equipment Physical Locations E2 Included N/A Riser Diagram E3 Included N/A Grounding Electrode Conductor E4 Included N/A Service Overcurrent Protection - Identify service mains, ratings and characteristics E5 Included N/A Panel Overcurrent Protection E6 Included N/A Feeder Overcurrent Protection E7 Included N/A Transformer Overcurrent Protection E8 Included N/A Panel Schedules with NEC 220 load summary for all new and/or affected panels and services E9 Included N/A Ground Fault Protection E10 Included N/A Separately Derived Systems Ground E11 Included N/A Fixed Electric Heat E12 Included N/A Hazardous Areas - Show classification of hazardous areas and define all boundaries. E13 Included N/A Signs E14 Included N/A Emergency Systems/ Lights E15 Included N/A Exit Lights E16 Included N/A Smoke Detectors E17 Included N/A Lighting Fixtures/ Outlet Layout E18 Included N/A Upfits of Multi-Tenant Buildings E19 Included N/A Require Electrical Shell Drawing of Building E20 Included N/A Fire Alarm Devices, Riser Diagram and Sequence of Operations Mechanical M1 Included N/A Equipment (types, sizes, & location) M2 Included N/A Fuel-Vent or Chimney Size and Location M3 Included N/A Combustion/ Ventilation, Air, Size and Location with Calculations M4 Included N/A Ductwork (sizing, locations & insulation) M5 Included N/A Supply & Return Air Outlet, Inlet Locations, and Exhaust Terminations M6 Included N/A Type of Duct Materials M7 Included N/A Show all fire-rated and smoke-rated walls (both existing and new) with their ratings on the Mechanical Plans M8 Included N/A Exhaust Fans (CFM's) M9 Included N/A Smoke Detection for Return Air M10 Included N/A Fire Dampers with applicable type noted; Static or Dynamic M11 Included N/A Kitchen Hood M12 Included N/A HVAC Condensation Drain and termination / discharge location M13 Included N/A Energy Form (2012 NCECC 506 Requirements) M14 Included N/A Gas Piping Detail Material, Size, Loads (Existing & New) and Total Equivalent Pipe Length M15 Included N/A Rooftop Equipment Detail M16 Included N/A Structural Support Detail for RTU's > 500 lbs M17 Included N/A Accessibility of Equipment M18 Included N/A BTU's/ CFM/ Tons of Equipment Plumbing P1 Included N/A Fixture (location) P2 Included N/A Drainage, Waste and Vent System Pipe Diagram Sizes (isometric & floor plans) and Materials P3 Included N/A Traps P4 Included N/A Cleanouts P5 Included N/A Water Distribution Diagram and Piping Materials P6 Included N/A Pressure Reducing Valves P7 Included N/A Backflow Preventers (Fixtures and Appliances) P8 Included N/A Equipment Accessibility P9 Included N/A Leaders and Storm Drains with storm sizing calculations and design criteria P10 Included N/A Connector to City Water/ Sewer P11 Included N/A Connection to Private Well/ Septic Tank P12 Included N/A Water Heater Details and Location P13 Included N/A Interceptors - sizing and calculations P14 Included N/A Minimum Facilities with calculations Sprinkler S1 Included N/A System Standard (NFPA 13, 13R, 231 etc) S2 Included N/A Location of Water Connection S3 Included N/A Test Data (Static, Residual, Flow) S4 Included N/A Fire Pump Data S5 Included N/A Type System (wet, dry, etc.) S6 Included N/A Pipe Schedule or Hydraulic S7 Included N/A Total Flow & Pressure Demand S8 Included N/A Size, Location, & Main Risers and FDC S9 Included N/A Location of Private Mains S10 Included N/A Note Any Unprotected Areas S11 Included N/A If Hydraulic Design provide: a) Design/ Density/ Area S12 Included N/A If Hydraulic Design provide: b) Type & Model Sprinkler S13 Included N/A If Hydraulic Design provide: c) Discharge Constant (X) S14 Included N/A If Hydraulic Design provide: d) Hazen-Williams C. Factor S15 Included N/A Evacuation Alarm S16 Included N/A Electrical Connection to Central Station S17 Included N/A Sprinkler Riser Detail S18 Included N/A Sprinkler Information (alterations, renovations, and upfits- Reflective ceiling plan head locations)