MECKLENBURG COUNTY Land Use and Environmental Services Agency Code Enforcement 10-7-2010 Fire Restoration Project Procedures I. II. Total rebuild: When the entire building is damaged to the extent that only the foundation remains and/or the ground floor system remains, then it will be handled as construction of a new building with the addition of a structural analysis of the building remains. All new components of the building will be required to meet the current code. Partial rebuild: When a portion(s) of a building is damaged, there are two options for reconstruction. a. Option 1 Plan Submittal: Utilizing one of our plan submittal methods is the preferred method for permitting a fire reconstruction project to ensure code compliance. The designer/contractor may choose the current NC State Building Code or current NC State Rehabilitation Code for the reconstruction of the building. Repaired or replaced components of the building would be required to comply with the chosen code, with the exception of sprinklers, if the original building was un-sprinkled. Follow the plan submittal requirements appropriate with the plan submittal method you choose. b. Option 2 CTAC In-Scope Review: This process is an informal review of the scope of work for the repair and reconstruction of the building components. Replaced components of the building (including trades) would be required to meet the current NC State Building Codes with the exception of sprinklers if the original building was un-sprinkled. Reconstruction affecting the building will require the following information to be submitted to CTAC to define the scope of work prior to permit issuance: i. A complete permit application(s) ii. Modified Appendix B iii. Structural analysis of the affected structural components PEOPLE PRIDE PROGRESS PARTNERSHIPS 700 North Tryon Street Charlotte, North Carolina 28202 (704) 336-3821 Fax (704) 336-3839 www.meckpermit.com Page 2 of 2 iv. A detail description of each fire rated assembly utilized in repair/reconstruction. v. A floor plan of each affected floor identifying the area of repair/reconstruction. vi. A roof plan if part of the reconstruction vii. Identify compliance with Section 3409 Accessibility for Existing Buildings viii. A detailed description of the scope of work involving each trade (electrical, mechanical and plumbing) ix. At the final building inspection, a letter from the designer of record verifying that the new structural components align with and do not adversely affect the existing construction shall be presented to the building inspector. x. Once the permit is issued copies of the above listed information must be available on the jobsite for the inspectors. PEOPLE PRIDE PROGRESS PARTNERSHIPS 700 North Tryon Street Charlotte, North Carolina 28202 (704) 336-3821 Fax (704) 336-3839 www.meckpermit.com