Saturn TWT - meeting # 8, 15 Oct 01, 11:00-12:30... line 818-354-5157

advertisement
Saturn TWT - meeting # 8, 15 Oct 01, 11:00-12:30 PDT meet-me
line 818-354-5157
Led by Kevin Baines, with Dan Winterhalter, Jerod Gross, Scott
Edgington
Reported by Ian S.
Agenda: (1) "flesh out" plan for revs 7,8,10,11,12
(2) work on rev 9 / revs 7, 8, 10 trade with Rings TWT
Rev 6: ISS, RSS, UVIS (ie Bob W.) still need to clean up CIMS
inputs
Rev 7: move UVIS EUVFUV ~ 2 hrs earlier to end at beginning of
GS pass (2005-125), shift ISS Titan 1x1s to bracket UVIS. Fill
gap between end of ISS Saturn 1x2s & beginning of Titan 1x1
with: OPNAV, ISS mutual event (2 satellites in 1 frame, for
ephemerides improvement).
Rev 8: CIRS prime, 22 hrs, N-S scans on central meridian w/FarIR
sensors (ie co-aligned w/other ORS), 1 hemisphere per rotation;
+X to nep. Move Madrid DL (05-142) earlier to enable UVIS Dione
stellar occ (for ephemerides purposes). OpNav really wants Rhea
(05-142/06:30) accept this.
Note: data volumes -
CIRS 4 kbps, 15
UVIS 1 kbps, 40
OpNav 15 Mb per
MAPS survey 350
Mb/hr, 320 Mb total
Mb / 11 hrs
opportunity (1 image)
Mb/day
Rev 10 - UVIS EUVFUV prime. Delete ISS mutual event (05-179)
which conflicts; same for first ISS Saturn 1x2. ISS should get
its Saturn 1x2s and its Satorbs to interleave. Accept the OpNav
Hyperion (05-179/12) & the ENGR DSAT (same day), after moving it
to avoid UVIS prime.
Rev 9 trade: Saturn TWT has given 34 hours to Rings in exchange
for a busy Hyperion-intensive time period on Rev 9. Kevin will
work on ISS & CIRS to increase their picket-fence spacing (x2?
more?) so that some Saturn stuff can be incorporated. Propose to
Cross-D TWT that Saturn TWT extend its jurisdiction at least to
05-162/21 or even until end of GS DL (05-163/03); then observe
thru GS DL on 05-161, downlink everything over GS on 05-162.
Note: Saturn & Hyperion are many degs apart, 15-25 min slews
each way.
Next meetings - #9, Revs 11 & 12; #10, begin next set of revs.
Download