Saturn TWT - meeting # 14, 10Dec 01, 11:00-12:30 PDT Meet-me line 818-354-5157 Led by Kevin Baines, with Dan Winterhalter, Jerod Gross, Scott Edgington. Reported by Ian S. The Saturn TWT has 5 segments to work on for the next submission in February 02. - orbits 11 & 12, both inbound & outbound, and 15 at periapse. We have already worked most of the big issues on 11 & 12, but 15 is untouched. John Pearl warned that CIRS was developing a dust-impact flight rule. People should not assume that all such problems went away when INCA's door moved. Rev 11 inbound - UVIS Impact was trimmed by 2 hours, the RSS calibration was advanced, and 2 more ISS pickets added in the gap thus created. Secondary axis pointing is needed for UVIS Impacts (from Jeff Cuzzi). Rev 11 outbound - VIMS lightning, CIRS 2-rotation map looking for waves (1 hemisphere only), & VIMS search for methane fluorescence. CDA said the would like to control the secondary axis for 2 hrs after 196T18:27 & for as long as possible following 197T19:35. The first is during a downlink, & for the second he should negotiate with Amy S/CIRS. Note that the CIRS map with parallel slits should give UVIS ridealong polar limb profiles - 6 mrad off limb at 25 microrad/sec (3,500 km, 15 km/sec) Rev 12 inbound - UVIS Impact, CIRS far-IR map, ISS pickets and VIMS mosaic, and UVIS EUVFUV. Kevin B wondered why Bob W was doing 1/2 rotn each with ISS & UVIS, instead of 1 rotation with one or the other. Rev 12 outbound - UVIS EUVFUV, 3 ISS mutual events, & 5 ISS pickets. Too much data for a 34m DSN dish, but Kevin wants to not request a 70m - we already have on the other 3 segmants. Maybe UVIS EUVFUV could be traded with CIRS 2-rotation map on Rev 11. Rev 15 - crowded. VIMS map of Saturn, an OTM, RSS radiometry of Saturn, CIRS limb map, VIMS lightning, CIRS composition, CIRS calibration. Amanda H pointed out SOST interest in flyby of Calypso (4 hrs) in the middle of RSS's 9 hours. Since the STWT had promised this (close) periapse to RSS, Kevin suggested looking for a suitable substitute later in the tour. 11 & 12 inbounds are now done. Next meeting 17 Dec, then a break until the new year.