Technology enhancement for smooth migration to NGN GROUP-5 REPORT 2007/7/11 TRAI , New Delhi 1 Agenda ¾ Introduction ¾ Issues with IP Based Networks ¾ Precedence of difficulties ¾ Smooth realization of IP based network ¾ Way Ahead 2007/7/11 TRAI, New Delhi 2 Introduction ¾ Group Subject: Problems and remedies for planning / deploying IP based network Infrastructure ¾ Group Members 2007/7/11 Bangladesh : Mr. Md. Golam Razzaque India : Nishith Kumar Upadhyay (Presenter) Myanmar : Myo Swe Vietnam: Dang Hai Dinh TRAI, New Delhi 3 Issues with IP Based Networks ¾ Business/ Economic Issues ¾ Human Resource related issues ¾ Technical Issues ¾ Regulatory Issues 2007/7/11 TRAI, New Delhi 4 Business/ Economic Issues ¾ Issues related to migration ¾ Huge Investment requirement ¾ Sunk Cost of Legacy Network ¾ Monopoly issues by Incumbents ¾ Proven Business Model 2007/7/11 Significance 5 Urgency 4 Cost to resolve problem 5 Degree of difficulty 2 TRAI, New Delhi 5 Human Resource related issues ¾ Content and training environment ¾ Lack of sufficient expertise in Planning / Operation of NGN ¾ Awareness building and educating the end user 2007/7/11 Significance 2 Urgency 2 Cost to resolve problem 3 Degree of difficulty 5 TRAI, New Delhi 6 Technical Issues ¾ Interconnecting existing networks & IP based Networks ¾ Interoperability related issues ¾ Up gradation of existing Mobile, Fixed & IP Networks ¾ Technical Problems in migration ¾ Security in IP Networks ¾ Numbering ¾ Standardization 2007/7/11 Significance 4 Urgency 5 Cost to resolve problem 4 Degree of difficulty 4 TRAI, New Delhi 7 Regulatory Issues ¾ High Level of regulation ¾ Low penetration of Broadband & PC/End Devices ¾ Access to the Network by third party content application providers ¾ Low penetration of Telecom facilities in Rural Areas ¾ Infrastructure related issues. (Electricity etc.) 2007/7/11 Significance 3 Urgency 3 Cost to resolve problem 2 Degree of difficulty 3 TRAI, New Delhi 8 Precedence of Difficulties ¾ The priority of the issues to be resolved: 2007/7/11 1. Technical issues 2. Business & Economic Issues 3. Human Resources Issues 4. Regulatory Issue TRAI, New Delhi 9 Smooth realization of IP based network ¾ Various measures related to assure end-to-end connectivity, QoS and Standardization for the new IP Networks: 2007/7/11 Proper planning Operational measures Standardization Pilot /Test Implementation Skill Development TRAI, New Delhi 10 Planning ¾ Adopt tested and successful technologies as per country’s need ¾ Frame proper regulatory mechanism to address licensing, QoS & Interconnection related issues ¾ Identifying the various NGN Related Services and developing favorable environment for them. 2007/7/11 TRAI, New Delhi 11 Operation issues ¾ ¾ Addressing ENUM (Electronic NUMbering) by Internet Engineering Task Force (IETF) Mapping traditional telephone numbers with IP addresses Security: ¾ End-to-End Quality of service (QoS) 2007/7/11 Network operators expect their infrastructure to be secure Control and management plane information in-band in a shared user plane Guarantee of secure delivery of content during periods of congestion TRAI, New Delhi 12 Operation issues (contd.) ¾ Upgrade the Network at Core & Access areas. ¾ Operations, administration & maintenance (OAM) ¾ Network Management Automated management tools to address the complex network requirement 2007/7/11 Development of flexible service integration framework TRAI, New Delhi 13 Standardization ¾ Well defined country specific standards to ensure interoperability ¾ Setting up certifying Agencies like Conformity Assessment Bodies (CAB) to conform Interface compliance ¾ Setting up of test facilities and certification agencies 2007/7/11 TRAI, New Delhi 14 Pilot /Test Implementation ¾ Overall NGN implementation can be supported by a Pilot project with : 2007/7/11 ITU/ MIC Japan assistance Joint efforts by local Network operators TRAI, New Delhi 15 Skill Development ¾ Educating service providers ¾ Organizing more training courses ¾ Exchange of Information between various countries ¾ Requesting ITU/MIC Japan for development of training facilities. 2007/7/11 TRAI, New Delhi 16 Way Ahead ¾ Proper Regulatory framework for NGN Environment ¾ Implementation of the Pilot Project ¾ Customization of Standards for country need ¾ Roadmap for migration of NGN specific applications and contents ¾ Generating awareness ¾ Skill building 2007/7/11 TRAI, New Delhi 17 Thank You 2007/7/11 TRAI, New Delhi 18