Please join us for a public meeting on the Route 79/Braga Bridge Improvements Project Wednesday, May 27, 2015 6:00 pm to 8:00 pm Heritage State Park Auditorium 200 Davol Street, Fall River Please join the Massachusetts Department of Transportation (MassDOT) at a public meeting on Wednesday, May 27 for an update on construction progress and upcoming activities, including traffic management changes, for the Route 79/Braga Bridge Improvements Project. The presentation will conclude with a question and answer session. The purpose of the Route 79/Braga Bridge Improvements Project is to enhance safety and access along the Route 79 corridor and the interchange with I-195 and bring the roadway and bridges up to current standards. MassDOT is removing the elevated section of Route 79 and building a new surface roadway to connect with Davol Street and the waterfront; rebuilding the nine “spaghetti ramps” connecting Route 79 and I-195; constructing two new roadways to connect with the waterfront; repairing, cleaning and painting the Braga Bridge; and enhancing pedestrian and bicycle accommodations. Please visit the website at www.mass.gov/massdot/route79project to sign up for email alerts and learn more about this important project. For questions or concerns, please contact the project team by calling the hotline at 781-774-0441 or by emailing to route79project@state.ma.us. This meeting is accessible to people with disabilities and those with limited English proficiency. Accessibility accommodations and language services will be provided free of charge, upon request, as available. Such services include documents in alternate formats, translated documents, assistive listening devices, and interpreters (including American Sign Language). For more information or to request reasonable accommodation and/or language services, please contact MassDOT’s Director of Civil Rights by phone at (857) 368-8580, TTD/TTY at (857) 368-0603, fax (857) 368-0602 or by email to MASSDOT.CivilRights@dot.state.ma.us.