Belmont Street Bridge Rehabilitation Design Public Hearing January 31, 2013

advertisement
Belmont Street Bridge Rehabilitation
Design Public Hearing
January 31, 2013
Project Team Members
Responsible For:
Oversight of project
Responsible For:
Responsible For:
Public involvement
Bridge Design
Overview
• Public Hearing Agenda:
–
–
–
–
–
–
Project Team
Meeting Overview
Legal Notice
ROW Discussion
Project Presentation
Q&A session
Project Site
Belmont Street Bridge
Project Scope
• Rehabilitate the Bridge
– Complete replacement of the
superstructure.
– Partial replacement of the
substructure.
– Approx. cost: $9.7 million
– Accelerated construction
methods are proposed
– Traffic management and
detour plans are required
– Coordinate with:
• Local officials
• Residents
• Key stakeholders
– Ensure public safety
throughout.
Construction Phase 1
• To be inserted by WSP Sells
PHASE 1 CONSTRUCTION
Construction Phase 1
PHASE 1 CONSTRUCTION
Construction Phase 2
PHASE 2 CONSTRUCTION
Construction Phase 2
I-290 Traffic Control Scheme
I-290 Off-Ramp
I-290 East
Work Area
I-290 West
Current Detour Plan
Bridge
Location
Belmont St.
MLK Blvd.
Exit 16
Existing
Proposed
Preliminary Project Time Line
• Advertising for Construction – Prior to October, 2013.
• Construction Start – Spring, 2014
• Construction Duration – Two Construction Seasons
Next Steps
• Please make sure you have signed in.
• Please make sure you have one of the
Public Hearing Handouts.
• Note that in the back of the Handout is a
pre-addressed form for providing any
comments/feedback to MassDOT.
– We look forward to hearing from you!