Belmont Street Bridge Rehabilitation Public Informational Meeting June 13, 2013 Project Team Members Responsible For: Oversight of project Responsible For: Responsible For: Public involvement Bridge/Roadway Design Public Outreach To Date • Public Informational Meetings held in Oct. & Nov. 2012 • 25% Design Public Hearing held in January 2013 • Outreach Through: – Courtesy emails/phone calls to stakeholders (120 people including City of Worcester & State Officials) – Coordination with State officials via MassDOT legislative liaison – Local Newspapers in English, Spanish & Vietnamese – Coordination with CMRPC • Individual Abutter Meetings (67 Belmont & Chinese Gospel Church) • Informational Meeting at UMass Memorial in March 2013 • Project Website: www.mass.gov/massdot/belmontstbridge Project Site Belmont Street Bridge Project Scope • Rehabilitate the Bridge – Complete replacement of the superstructure. – Partial replacement of the substructure. – Approx. cost: $9.8 million – Accelerated construction methods are proposed – Traffic management and detour plans are required – Coordinate with: • Local officials • Residents • Key stakeholders – Ensure public safety throughout. Existing Proposed Construction Phase 1 PHASE 1 CONSTRUCTION Construction Phase 2 PHASE 2 CONSTRUCTION Current Detour Plan Bridge Location Belmont St. MLK Jr. Blvd. Exit 16 Proposed Final Configuration Pedestrian Crossing at UMMMC • MassDOT and the City are discussing adding safety enhancements to this location as part of this bridge replacement project. • Potential option is the use of Rectangular Rapid Flashing Beacons (RRFB). Preliminary Project Schedule • Advertising for Construction – Prior to October 2013 • Construction Start – Spring 2014 • Construction Duration – Two Construction Seasons Questions or Comments?? www.mass.gov/massdot/belmontstbridge