Capacity Analysis Summary Casey Overpass Boston, MA DRAFT ‐ June 18, 2012 ‐ WORK IN PROGRESS Weekday Morning Existing vs At Grade Comparison Existing Roadway At Grade Alt. Existing Roadway (Existing Volumes) (Existing Volumes) (Future Volumes)4 Intersection 1 2 Movement LOS Delay South Street at EB New Washington Street/ Arborway Ramps WB SB 3 V/C LOS Delay F 297.9 1.39 n/a n/a n/a F 104.2 0.84 n/a n/a n/a T n/a n/a n/a B 12.0 0.58 A 1.4 0.34 B 12.5 0.63 R A 1.5 0.30 A 0.4 0.26 n/a n/a n/a A 0.4 0.30 LTR F 94.1 0.86 n/a n/a n/a F 181.8 1.19 n/a n/a n/a n/a n/a n/a C 24.3 0.98 n/a n/a n/a D 47.9 1.07 LT TR NB V/C LOS Delay V/C LOS Delay At Grade Alt. (Future Volumes) V/C D 51.9 0.92 n/a n/a n/a F 83.9 1.09 n/a n/a n/a L n/a n/a n/a B 18.3 0.73 n/a n/a n/a C 20.8 0.82 TR LTR n/a n/a n/a C 21.9 0.69 n/a n/a n/a E 71.6 0.74 L F 173.6 1.16 E 74.6 0.83 F 542.5 2.05 F 139.8 1.07 TR B 18.7 0.29 C 25.8 0.51 C 20.3 0.34 C 26.9 0.55 E 67.2 1.39 B 19.9 0.98 F 113.7 2.05 D 39.5 1.07 1.00 Overall South Street at EB LR F 250.1 0.89 D 44.8 0.85 F 90.8 1.02 E 77.3 Washington Street/ WB LR D 36.8 0.25 n/a n/a n/a C 23.9 0.27 n/a n/a n/a MBTA Busway#2 NB LT C 24.2 0.79 C 24.5 0.79 D 36.8 0.86 C 28.0 0.85 SB TR C 29.3 0.45 B 15.6 0.45 C 23.4 0.48 B 19.0 0.55 E 66.2 0.89 C 25.5 0.85 D 41.8 1.02 C 34.0 1.00 Overall Washington Street at WB L n/a n/a n/a C 29.4 0.27 n/a n/a n/a C 34.0 0.27 MBTA Busway#2 NB TR A 2.5 0.34 A 6.5 0.64 A 2.8 0.37 A 9.2 0.73 SB LR A 1.7 0.18 A 1.0 0.18 A 0.9 0.21 A 0.8 0.19 A 2.2 0.34 A 5.2 0.64 A 2.1 0.37 A 7.1 0.73 L E 59.5 0.69 D 47.0 0.62 E 57.8 0.73 D 42.9 0.76 R B 17.9 0.81 B 19.2 0.79 B 18.5 0.82 C 20.1 0.82 Overall Washington Street at WB Ukraine Way NB SB C 20.1 0.37 n/a n/a n/a C 25.6 0.46 n/a n/a n/a T n/a n/a n/a B 10.9 0.39 n/a n/a n/a B 13.8 0.47 R n/a n/a n/a A 2.0 0.22 n/a n/a n/a A 2.1 0.25 L C 25.8 0.53 A 8.6 0.41 B 15.5 0.60 A 8.2 0.48 T B 18.4 0.21 A 6.2 0.20 A 7.8 0.23 A 3.2 0.22 C 23.6 0.81 B 14.9 0.79 C 22.6 0.82 B 15.0 0.82 TR Overall Hyde Park Avenue at WB LR B 17.7 0.78 B 15.6 0.77 B 17.4 0.79 B 18.8 0.81 Walk Hill Street NB TR C 31.1 0.68 C 31.1 0.78 C 33.6 0.74 C 32.1 0.81 SB L E 68.6 0.62 E 73.0 0.93 E 55.6 0.65 D 45.8 0.77 T A 6.1 0.21 A 7.8 0.25 A 7.5 0.23 B 13.0 0.26 C 26.6 0.78 C 27.1 0.93 C 26.7 0.79 C 26.6 0.81 Overall Hyde Park Avenue at L D 54.8 0.76 D 51.4 0.77 E 75.2 0.90 E 65.4 0.88 R C 23.5 0.62 B 16.5 0.63 C 25.3 0.64 B 14.6 0.63 NB LT D 37.0 0.87dl B 17.2 1.00dl E 78.7 1.37dl D 44.3 1.15dl SB TR D 40.3 0.49 A 8.2 0.36 A 6.2 0.35 B 12.9 0.40 D 37.5 0.84 B 17.5 0.92 D 53.9 1.11 C 34.7 1.02 0.58 EB Ukraine Way Overall Washington Street at EB LR D 53.0 0.56 D 40.6 0.58 E 61.1 0.56 D 39.8 Tower Street/MBTA Busway#1 WB LR C 26.7 0.19 B 19.3 0.19 C 26.1 0.19 B 19.2 0.19 NB TR B 16.0 0.43 B 12.7 0.47 B 11.6 0.45 B 12.4 0.49 SB LT Overall B 10.6 0.24 B 11.2 0.26 A 3.4 0.27 B 10.6 0.29 B 16.0 0.56 B 13.5 0.58 B 11.0 0.56 B 12.9 0.58 Washington Street at WB LR A 0.0 0.01 A 0.0 0.00 C 26.2 0.14 C 23.6 0.03 Fitzgerald Parking Lot/ NB LTR B 14.0 0.43 A 2.0 0.45 A 1.0 0.44 A 2.1 0.46 MBTA Busway#1 SB LTR A 2.7 0.27 A 2.7 0.29 A 3.3 0.23 A 3.7 0.25 Overall A 9.9 0.43 A 2.3 0.45 A 2.1 0.44 A 2.7 0.46 n/a L E 62.2 0.71 n/a n/a n/a E 76.7 0.95 n/a n/a Arborway WB Surface Road/ T E 77.9 0.86 n/a n/a n/a E 63.3 0.87 n/a n/a n/a New Washington St/ R B 10.8 0.28 n/a n/a n/a A 7.0 0.22 n/a n/a n/a 0.87 Washington Street at EB TR Orchard Hill Road WB LTR TR NB SB Arborway at n/a n/a C 20.5 0.83 n/a n/a n/a B 18.7 F 86.6 1.01 n/a n/a n/a E 72.9 0.96 n/a n/a n/a n/a n/a n/a D 42.5 1.02 n/a n/a n/a E 64.0 1.09 C 26.3 0.69 n/a n/a n/a C 32.7 0.87 n/a n/a n/a L n/a n/a n/a B 13.0 0.38 n/a n/a n/a B 18.7 0.48 T n/a n/a n/a C 27.9 0.84 n/a n/a n/a D 47.5 0.96 R n/a n/a n/a C 20.4 0.55 n/a n/a n/a C 25.7 0.60 LT C 34.4 0.59 n/a n/a n/a C 30.0 0.61 n/a n/a n/a L n/a n/a n/a C 27.0 0.49 n/a n/a n/a C 30.7 0.52 TR 0.71 LT n/a n/a n/a C 29.7 0.61 n/a n/a n/a C 34.7 R A 2.2 0.12 n/a n/a n/a A 3.8 0.13 n/a n/a n/a NE L n/a n/a n/a D 38.5 0.18 n/a n/a n/a D 37.7 0.16 SW L n/a n/a n/a D 40.2 0.23 n/a n/a n/a D 41.0 0.25 Overall D 48.1 1.01 C 31.0 1.02 D 46.7 0.96 D 42.3 1.09 L n/a n/a n/a F 90.2 1.09 n/a n/a n/a F 114.5 1.14 TR n/a n/a n/a A 5.9 0.30 n/a n/a n/a A 302.0 0.32 L n/a n/a n/a B 13.2 0.06 n/a n/a n/a A 9.9 0.22 TR n/a n/a n/a F 83.4 1.03 n/a n/a n/a F 140.9 1.15 NB LTR n/a n/a n/a D 49.9 0.62 n/a n/a n/a D 46.8 0.59 SB LT n/a n/a n/a C 32.4 0.14 n/a n/a n/a C 32.2 0.13 R n/a n/a n/a C 21.3 0.75 n/a n/a n/a C 31.7 0.94 n/a n/a n/a D 54.4 1.09 n/a n/a n/a F 81.9 1.15 U n/a n/a n/a B 18.9 0.55 n/a n/a n/a C 28.4 0.68 T n/a n/a n/a A 1.4 0.45 n/a n/a n/a A 1.2 0.47 T n/a n/a n/a B 12.4 0.87 n/a n/a n/a C 31.2 0.97 n/a n/a n/a A 8.3 0.87 n/a n/a n/a B 19.2 0.97 EB Forest Hills Drive WB Overall Arborway at n/a EB East Bowtie WB Overall Arborway at EB T n/a n/a n/a B 12.7 0.50 n/a n/a n/a B 13.6 0.54 West Bowtie WB U n/a n/a n/a B 17.8 0.65 n/a n/a n/a B 15.8 0.68 T n/a n/a n/a A 1.7 0.53 n/a n/a n/a A 1.8 0.56 n/a n/a n/a A 7.7 0.65 n/a n/a n/a A 7.9 0.68 Overall Morton Street (Route 203)/ EB Cemetery Road 1 Level‐of‐Service 2 Average vehicle delay in seconds 3 Volume to capacity ratio 4 A 8.9 0.37 n/a n/a n/a A 7.6 0.37 n/a n/a n/a L n/a n/a n/a F 85.4 0.97 n/a n/a n/a F 89.9 0.95 TR 0.30 LTR n/a n/a n/a A 3.8 0.28 n/a n/a n/a A 6.2 WB LTR D 35.4 1.00 E 65.4 0.89 C 32.9 1.00 F 171.0 0.98 NB LTR B 17.4 0.02 C 26.3 0.03 C 21.4 0.02 C 26.3 0.03 SB LTR C 33.6 0.72 E 74.2 0.94 D 48.1 0.83 F 84.7 0.98 Overall C 29.0 1.00 D 53.9 0.97 C 28.3 1.00 F 125.4 0.98 Future Volumes on Existing Roadway include signal timing adjustments Queue Analysis Summary Casey Overpass Boston, MA DRAFT ‐ June 18, 2012 ‐ WORK IN PROGRESS Weekday Morning Existing vs At Grade Comparison Existing Roadway Existing Volumes 50th Queue 95th Queue 50th Queue 95th Queue 50th Queue ~78 #179 n/a n/a 66 #154 n/a n/a T n/a n/a 78 105 n/a n/a 79 107 EB R NB SB At Grade Alt. Future Volumes LT South Street at WB Future Volumes3 95th Queue Movement Arborway Ramps 2 Existing Roadway 50th Queue Intersection New Washington Street/ 1 At Grade Alt. Existing Volumes LTR 95th Queue 0 0 0 0 0 0 0 0 167 #251 n/a n/a ~186 #283 n/a n/a m#166 TR n/a n/a ~205 m#197 n/a n/a ~446 LTR 269 #640 n/a n/a ~665 m#771 n/a n/a L n/a n/a 57 m50 n/a n/a 61 m47 TR n/a n/a 107 71 n/a n/a 114 m94 L ~111 #162 44 #128 ~117 #243 ~63 #160 TR 117 160 102 154 142 191 120 177 #311 South Street at EB LR 265 368 166 219 ~317 #526 195 Washington Street/ WB LR 33 76 n/a n/a 17 46 n/a n/a MBTA Busway#2 NB LT 146 #475 102 #482 376 #487 56 #494 SB TR 204 m278 49 #113 226 m222 56 #150 Washington Street at WB L n/a n/a 16 m29 n/a n/a MBTA Busway#2 NB TR 81 127 161 299 220 46 161 13 SB LR 35 41 23 10 21 m25 188 m46 Washington Street at WB Ukraine Way NB SB L 117 m114 98 m106 139 m113 113 m129 R 58 m196 117 m121 76 m99 111 m131 TR 144 225 n/a n/a 188 286 n/a n/a T n/a n/a 95 183 n/a n/a 135 212 23 R n/a n/a 0 22 n/a n/a 0 L 119 212 71 144 72 102 59 78 T 88 184 61 128 60 87 48 42 Hyde Park Avenue at WB LR 14 0 9 9 16 0 10 9 Walk Hill Street NB TR 395 484 ~311 #474 439 #601 ~370 #497 SB L 187 256 94 #214 181 249 129 #196 T 79 94 41 94 102 105 106 146 #234 Hyde Park Avenue at EB L 148 232 102 #174 189 #311 129 R 104 224 5 113 120 247 41 111 NB LT 418 #768 237 #467 ~316 #970 ~273 #417 SB TR 167 308 26 71 94 72 83 151 71 Ukraine Way Washington Street at EB LR 35 88 26 70 36 88 26 Tower Street/MBTA Busway#1 WB LR 11 43 7 33 11 44 7 34 NB TR 255 393 170 m252 217 m184 193 m232 SB LT 50 138 80 106 24 34 97 107 11 Washington Street at WB LR 0 0 0 0 1 25 0 Fitzgerald Parking Lot/ NB LTR 18 #446 11 16 2 13 8 17 MBTA Busway#1 SB LTR 0 m91 10 m77 23 m101 9 m87 Washington Street at EB L 139 182 n/a n/a 188 #282 n/a n/a Arborway WB Surface Road/ T 164 #230 n/a n/a 160 #269 n/a n/a New Washington St/ R 0 29 n/a n/a 7 17 n/a n/a Orchard Hill Road TR n/a n/a ~180 #406 n/a n/a ~165 m#414 LTR WB NB SB Arborway at ~253 #336 n/a n/a 266 #344 n/a n/a TR n/a n/a ~519 #604 n/a n/a ~558 m#548 n/a LT 137 324 n/a n/a 126 151 n/a L n/a n/a 8 21 n/a n/a 10 31 T n/a n/a 188 134 n/a n/a ~232 #281 R n/a n/a 72 89 n/a n/a 90 #149 LT 151 192 n/a n/a 140 181 n/a n/a L n/a n/a 29 37 n/a n/a 32 41 TR n/a n/a 111 147 n/a n/a 134 175 R 0 24 n/a n/a 0 m32 n/a n/a NE L n/a n/a 8 26 n/a n/a 7 24 SW L n/a n/a 9 31 n/a n/a 10 33 EB L n/a n/a ~339 #534 n/a n/a ~411 #611 TR n/a n/a 87 127 n/a n/a 8 71 L n/a n/a 2 m3 n/a n/a 8 m10 Forest Hills Drive WB TR n/a n/a ~369 m#460 n/a n/a ~439 m#462 NB LTR n/a n/a 49 90 n/a n/a 51 #95 SB LT n/a n/a 11 33 n/a n/a 11 33 R n/a n/a 212 345 n/a n/a 46 #259 U n/a n/a 65 m96 n/a n/a 142 m182 T n/a n/a 0 47 n/a n/a 0 45 WB T n/a n/a 151 m#652 n/a n/a 516 m#666 Arborway at EB T n/a n/a 154 183 n/a n/a 169 200 West Bowtie WB U n/a n/a 174 m205 n/a n/a 189 m185 T n/a n/a 4 m12 n/a n/a 6 m2 LTR 74 132 n/a n/a 81 111 n/a n/a L n/a n/a 25 #115 n/a n/a 52 #99 Arborway at EB East Bowtie Morton Street (Route 203)/ EB Cemetery Road TR n/a n/a 37 42 n/a n/a 51 84 WB LTR ~384 #669 362 #493 ~449 #662 465 #703 NB LTR 3 11 4 14 3 12 4 14 SB LTR 97 171 128 #274 117 #238 136 #289 1 50th Percentile Queue Length in feet 2 95th Percentile Queue Length, in feet 3 Future Volumes on Existing Roadway include signal timing adjustments N/A Not Applicable Capacity Analysis Summary Casey Overpass Boston, MA DRAFT ‐ June 18, 2012 ‐ WORK IN PROGRESS Weekday Evening Existing vs At Grade Comparison Existing Roadway At Grade Alt. Existing Roadway (Existing Volumes) (Existing Volumes) (Future Volumes)4 Intersection Movement South Street at EB New Washington Street/ Arborway Ramps WB SB 1 Delay 2 V/C 3 V/C LOS Delay F 83.0 0.81 n/a n/a n/a F 91.2 0.90 n/a n/a n/a T n/a n/a n/a C 20.9 0.76 n/a n/a n/a C 28.7 0.91 R F 150.0 0.64 A 0.8 0.44 F 216.9 0.68 A 1.0 0.49 LTR F 87.2 0.77 n/a n/a n/a F 280.8 1.24 n/a n/a n/a n/a n/a n/a C 22.5 0.80 n/a n/a n/a C 34.8 0.99 LT TR NB LOS LTR LOS Delay V/C LOS Delay At Grade Alt. (Future Volumes) V/C D 35.6 0.78 n/a n/a n/a E 74.0 0.93 n/a n/a n/a L n/a n/a n/a D 43.4 0.75 n/a n/a n/a E 56.7 0.82 TR n/a n/a n/a B 14.1 0.38 n/a n/a n/a D 39.1 0.58 L D 48.2 0.62 D 43.6 0.53 F 84.2 0.91 F 99.4 0.94 TR C 32.0 0.52 D 52.5 0.82 C 30.0 0.56 D 51.3 0.83 Overall E 68.4 0.81 C 22.1 0.82 F 141.6 1.24 C 33.0 0.99 0.87 South Street at EB LR F 101.0 0.97 E 55.3 0.85 F 106.9 1.04 E 55.3 Washington Street/ WB LR D 39.6 0.34 n/a n/a n/a D 38.4 0.34 n/a n/a n/a MBTA Busway#2 NB LT B 13.8 0.45 B 16.5 0.45 C 21.3 0.56 B 19.8 0.62 SB TR C 29.4 0.64 B 14.9 0.55 D 42.2 0.78 C 20.8 0.64 Overall D 38.8 0.97 C 23.3 0.85 D 47.4 1.04 C 26.8 0.87 Washington Street at WB L n/a n/a n/a B 16.9 0.17 n/a n/a n/a B 17.7 0.17 MBTA Busway#2 NB TR A 1.6 0.20 A 6.6 0.40 A 2.8 0.24 A 6.1 0.49 SB LR A 0.8 0.29 A 5.9 0.33 A 1.2 0.33 A 3.3 0.35 Overall A 1.1 0.29 A 6.4 0.40 A 1.9 0.33 A 4.7 0.49 L D 44.8 0.75 D 55.0 0.75 F 113.4 0.95 E 77.7 0.84 R B 11.5 0.67 B 16.5 0.67 E 61.0 0.71 B 19.7 0.69 TR B 17.2 0.35 n/a n/a n/a D 37.0 0.67 n/a n/a n/a T n/a n/a n/a C 22.3 0.42 n/a n/a n/a C 28.5 0.55 R n/a n/a n/a A 3.2 0.26 n/a n/a n/a A 4.6 0.35 L D 52.4 0.97 B 10.9 0.65 E 58.1 0.93 B 18.9 0.82 T A 8.6 0.29 A 2.6 0.26 A 7.7 0.33 A 3.0 0.31 C 26.8 0.97 B 15.8 0.75 D 50.0 0.95 C 22.7 0.84 Washington Street at WB Ukraine Way NB SB Overall Hyde Park Avenue at WB LR F 80.3 1.00 F 80.3 1.00 D 54.9 0.91 E 69.3 0.97 Walk Hill Street NB TR C 33.7 0.49 C 34.7 0.49 D 39.7 0.61 D 37.7 0.58 SB L C 32.4 0.79 D 55.0 0.73 D 52.4 0.84 D 53.3 0.78 T A 4.8 0.46 B 12.7 0.46 C 22.1 0.53 B 16.2 0.52 C 26.9 1.00 C 34.3 1.00 D 35.8 0.91 C 34.6 0.97 L E 55.6 0.78 E 75.0 0.80 D 37.6 0.81 F 149.9 0.91 R B 19.4 0.76 D 35.9 0.88 E 72.3 0.88 E 58.0 0.93 1.43dl Overall Hyde Park Avenue at EB Ukraine Way NB LT B 14.2 0.99dl B 13.3 0.99dl D 35.5 2.11dl B 18.1 SB TR B 18.4 0.74 B 19.8 0.54 C 29.9 0.83 C 24.7 0.65 Overall C 20.4 0.78 C 25.5 0.88 D 40.2 0.88 D 41.0 0.93 Washington Street at EB LR E 58.6 0.34 E 76.1 0.59 D 49.3 0.34 E 74.7 0.60 Tower Street/MBTA Busway#1 WB LR C 34.1 0.23 D 45.4 0.40 C 34.8 0.25 D 47.8 0.43 NB TR B 14.3 0.37 A 6.1 0.34 B 11.2 0.43 A 7.7 0.40 SB LT A 2.6 0.52 A 2.4 0.48 A 8.1 0.58 A 2.9 0.54 Overall A 9.5 0.52 A 6.7 0.59 B 10.9 0.58 A 7.5 0.60 Washington Street at WB LR C 34.6 0.26 D 53.7 0.50 C 26.2 0.23 C 30.2 0.23 Fitzgerald Parking Lot/ NB LTR A 9.0 0.53 A 2.8 0.43 A 2.9 0.49 A 1.8 0.47 MBTA Busway#1 SB LTR A 9.6 0.59 A 8.3 0.48 A 6.1 0.60 A 7.1 0.58 B 10.6 0.59 A 7.6 0.50 A 5.1 0.60 A 5.1 0.58 Overall Washington Street at L E 60.4 0.68 n/a n/a n/a E 78.0 0.95 n/a n/a n/a Arborway WB Surface Road/ EB T E 73.2 0.82 n/a n/a n/a E 61.4 0.85 n/a n/a n/a New Washington St/ R Orchard Hill Road TR WB LTR TR NB LT L SB NE SW EB 0.35 n/a n/a n/a A 5.6 0.37 n/a n/a n/a n/a C 33.8 0.98 n/a n/a n/a E 67.6 1.09 E 59.9 0.87 n/a n/a n/a E 67.4 0.93 n/a n/a n/a n/a n/a n/a D 31.5 0.81 n/a n/a n/a D 39.6 0.93 A 5.5 0.48 n/a n/a n/a B 14.9 0.64 n/a n/a n/a n/a n/a n/a E 66.3 0.78 n/a n/a n/a F 80.5 0.86 T n/a n/a n/a C 27.3 0.39 n/a n/a n/a C 29.2 0.48 n/a n/a n/a D 37.0 0.65 n/a n/a n/a D 40.4 0.71 LT C 31.8 0.61 n/a n/a n/a D 46.6 0.91 n/a n/a n/a L n/a n/a n/a C 24.6 0.22 n/a n/a n/a C 26.9 0.35 TR 1.06 n/a n/a n/a D 48.6 0.85 n/a n/a n/a F 84.7 R A 1.9 0.18 n/a n/a n/a A 4.7 0.26 n/a n/a n/a L n/a n/a n/a E 65.7 0.28 n/a n/a n/a E 58.2 0.16 L n/a n/a n/a E 64.6 0.26 n/a n/a n/a E 63.3 0.26 C 34.9 0.87 D 35.7 0.98 D 42.5 0.95 E 57.1 1.09 0.97 L n/a n/a n/a D 53.8 0.90 n/a n/a n/a E 64.5 TR n/a n/a n/a A 2.0 0.52 n/a n/a n/a A 4.0 0.56 WB L n/a n/a n/a C 22.4 0.09 n/a n/a n/a B 16.8 0.26 TR n/a n/a n/a C 20.9 0.64 n/a n/a n/a B 19.7 0.79 NB LTR n/a n/a n/a D 45.6 0.16 n/a n/a n/a D 44.4 0.16 SB LT n/a n/a n/a D 49.9 0.27 n/a n/a n/a F 720.7 0.23 Forest Hills Drive R n/a n/a n/a C 27.5 0.93 n/a n/a n/a C 34.3 0.96 n/a n/a n/a C 20.3 0.93 n/a n/a n/a C 31.7 0.97 U n/a n/a n/a D 43.9 0.53 n/a n/a n/a D 43.0 0.62 T n/a n/a n/a A 5.1 0.60 n/a n/a n/a A 5.7 0.64 T n/a n/a n/a B 17.7 0.71 n/a n/a n/a C 29.9 0.83 n/a n/a n/a B 12.7 0.71 n/a n/a n/a B 18.6 0.83 Overall Arborway at 9.9 n/a R Overall Arborway at A n/a EB East Bowtie WB Overall Arborway at EB T n/a n/a n/a C 27.7 0.77 n/a n/a n/a C 31.9 0.85 West Bowtie WB U n/a n/a n/a D 54.3 0.80 n/a n/a n/a E 56.7 0.85 T n/a n/a n/a A 0.2 0.37 n/a n/a n/a A 0.1 0.42 n/a n/a n/a C 22.5 0.80 n/a n/a n/a C 24.7 0.85 Overall Morton Street (Route 203)/ EB Cemetery Road LTR B 19.4 0.82 n/a n/a n/a D 38.7 0.98 n/a n/a n/a L n/a n/a n/a B 19.6 0.28 n/a n/a n/a C 24.3 0.33 TR 0.95 n/a n/a n/a C 31.2 0.92 n/a n/a n/a D 43.5 WB LTR B 13.1 0.64 E 70.2 1.01 B 18.4 0.76 F 104.0 1.09 NB LTR B 15.9 0.03 B 16.6 0.03 B 13.4 0.03 B 17.1 0.03 F 230.5 1.43 E 77.6 1.03 F 169.7 1.29 F 100.6 1.10 E 58.7 1.43 D 53.4 1.03 E 56.8 1.29 E 75.6 1.10 SB LTR Overall 1 Level‐of‐Service 2 Average vehicle delay in seconds 3 Volume to capacity ratio 4 Future Volumes on Existing Roadway include signal timing adjustments Queue Analysis Summary Casey Overpass Boston, MA DRAFT ‐ June 18, 2012 ‐ WORK IN PROGRESS Weekday Evening Existing vs At Grade Comparison Existing Roadway Existing Volumes At Grade Alt. Future Volumes 50th Queue 95th Queue 50th Queue 95th Queue 50th Queue LT 96 #174 n/a n/a 127 #248 n/a n/a T n/a n/a 202 387 n/a n/a 280 437 South Street at EB R 95th Queue 0 66 0 0 30 133 0 m0 219 271 n/a n/a ~315 #445 n/a n/a n/a n/a 247 284 n/a n/a 306 m#310 262 m#446 n/a n/a 348 m#505 n/a n/a n/a 74 66 n/a n/a 93 149 WB LTR TR NB LTR L n/a SB Future Volumes3 95th Queue Movement Arborway Ramps 2 Existing Roadway 50th Queue Intersection New Washington Street/ 1 At Grade Alt. Existing Volumes TR n/a n/a 100 74 n/a n/a 182 199 L 68 #223 75 122 105 #276 114 #245 TR 217 370 310 326 246 365 354 411 307 South Street at EB LR 267 #468 252 287 ~322 #523 275 Washington Street/ WB LR 24 59 n/a n/a 26 65 n/a n/a MBTA Busway#2 NB LT 112 128 117 138 176 223 164 206 SB TR 321 286 190 325 438 m410 259 #448 Washington Street at WB L n/a n/a 9 m19 n/a n/a 9 m21 MBTA Busway#2 NB TR 30 35 119 211 71 82 141 228 SB LR 10 m15 113 188 10 m31 75 78 WB L 124 137 150 194 183 m#268 208 262 R 60 48 61 98 86 141 92 121 TR 132 196 n/a n/a 248 #330 n/a n/a T n/a n/a 178 282 n/a n/a 252 368 Washington Street at Ukraine Way NB SB R n/a n/a 0 44 n/a n/a 7 60 L ~324 #515 107 191 294 #582 67 241 T 160 176 43 67 94 133 32 39 125 Hyde Park Avenue at WB LR ~156 117 ~156 117 158 116 168 Walk Hill Street NB TR 217 281 226 292 266 #345 260 332 SB L 241 #263 305 m379 312 m#434 324 m393 T 95 114 187 296 323 480 307 m384 L 148 m144 166 222 204 m215 226 #291 R 89 m114 118 #276 368 m444 169 #435 NB LT 116 m135 127 m134 230 #282 152 m156 SB TR 447 #655 463 506 505 #748 525 569 m62 Hyde Park Avenue at EB Ukraine Way Washington Street at EB LR 29 m58 28 m#71 27 m59 28 Tower Street/MBTA Busway#1 WB LR 25 65 28 70 27 69 32 75 NB TR 256 243 61 140 180 200 101 183 SB LT 36 42 13 18 91 121 31 29 Washington Street at WB LR 53 104 48 96 7 42 6 37 Fitzgerald Parking Lot/ NB LTR 61 29 30 23 20 22 19 20 MBTA Busway#1 SB LTR 153 187 156 m183 154 m188 166 m163 Washington Street at EB n/a L 134 202 n/a n/a 186 #346 n/a Arborway WB Surface Road/ T 156 228 n/a n/a 151 #280 n/a n/a New Washington St/ R 0 47 n/a n/a 6 26 n/a n/a #939 Orchard Hill Road WB NB SB Arborway at n/a n/a ~715 #802 n/a n/a ~822 222 286 n/a n/a 252 #361 n/a n/a TR n/a n/a 534 423 n/a n/a ~621 #668 LT 13 39 n/a n/a 62 91 n/a n/a L n/a n/a 38 #150 n/a n/a 0 #177 T n/a n/a 107 110 n/a n/a 132 154 R n/a n/a 172 284 n/a n/a 212 332 LT 234 323 n/a n/a 347 #483 n/a n/a L n/a n/a 34 57 n/a n/a 48 76 TR n/a n/a 316 397 n/a n/a ~478 #612 n/a R 0 30 n/a n/a 22 m72 n/a NE L n/a n/a 12 37 n/a n/a 7 26 SW L n/a n/a 11 35 n/a n/a 12 36 EB L n/a n/a 455 #596 n/a n/a 514 #710 TR n/a n/a 6 70 n/a n/a 86 204 L n/a n/a 2 m2 n/a n/a 4 m7 TR n/a n/a 129 m128 n/a n/a 102 m93 NB LTR n/a n/a 21 42 n/a n/a 24 50 SB LT n/a n/a 31 65 n/a n/a 30 65 R n/a n/a 48 #264 n/a n/a 82 #332 Forest Hills Drive WB Arborway at TR LTR EB East Bowtie WB U n/a n/a 164 m190 n/a n/a 240 m250 T n/a n/a 100 m147 n/a n/a 116 m119 T n/a n/a 294 369 n/a n/a 350 439 Arborway at EB T n/a n/a 435 557 n/a n/a 534 610 West Bowtie WB U n/a n/a 472 587 n/a n/a 516 m536 T n/a n/a 0 0 n/a n/a 0 m0 LTR 277 371 n/a n/a 360 #532 n/a n/a L n/a n/a 0 48 n/a n/a 23 m60 Morton Street (Route 203)/ EB Cemetery Road TR n/a n/a 331 #689 n/a n/a 286 #723 WB LTR 165 228 ~462 #615 215 295 ~571 #711 NB LTR 5 15 6 17 4 14 6 18 SB LTR ~418 #617 ~537 #769 ~412 #615 ~597 #831 1 50th Percentile Queue Length in feet 2 95th Percentile Queue Length, in feet 3 Future Volumes on Existing Roadway include signal timing adjustments N/A Not Applicable EXISTING 2010 (EXISTING 2010 TRAFFIC VOLUMES ON EXISTING STREET NETWORK) Casey Overpass 2163: Arborway Ramps & South St CST McMahon 6/25/2012 EBT EBR EBR2 WBL WBT WBR NBL NBT NBR SBL2 SBL 47 1900 0 1 25 1.00 22 1900 0 1900 200 1 25 1.00 0.850 180 1900 70 1900 271 1900 0 0 25 0.95 287 1900 0 0 25 0.95 89 1900 13 1900 0 1 25 1.00 1583 0 0 0 0 0 0 1583 0 Yes 0 0.95 0.935 0.979 3177 0.979 3177 206 1900 0 0 25 0.95 586 1900 1.00 198 1900 0 0 25 0.95 0 Yes 0 0 0 0.950 1441 0.123 187 0.83 3% 139 30 245 5.6 0.92 1% 30 253 5.8 0.91 4% 0.90 2% 0.89 14% 0.89 100% 1242 0 0 Perm 115 Perm 1 12.0 19.0 63.0 52.5% 56.0 3.0 4.0 4.0 Lead 1 12.0 19.0 63.0 52.5% 56.0 3.0 4.0 4.0 Lead 1.00 0 0.967 1801 0.495 922 0.93 2% 30 697 15.8 0.93 2% 0 573 75 191 custom 4 4.0 12.0 15.0 12.5% 7.0 4.0 4.0 8.0 Lag 4 4.0 12.0 15.0 12.5% 7.0 4.0 4.0 8.0 Lag 4 4.0 12.0 15.0 12.5% 7.0 4.0 4.0 8.0 Lag 2.0 None 2.0 None 7.0 0.06 1.39 297.9 0.0 297.9 F 85.1 F ~78 7.0 0.06 0.30 1.2 0.2 1.5 A 0 0.0 0.0% R 0 custom 2.0 None 0.94 2% 0.86 6% AF 0.92 2% T EBL D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Existing AM 0 4.0 0 Split 3 555 0 0.97 0% 0 Perm 3 0.95 0.961 0.989 3345 0.757 2560 1.00 1 1 12.0 19.0 63.0 52.5% 56.0 3.0 4.0 4.0 Lead 4.0 12.0 25.0 20.8% 19.0 3.0 3.0 4.0 Lead 4.0 12.0 25.0 20.8% 19.0 3.0 3.0 4.0 Lead 2.0 None 2.0 None 2.0 2.0 C-Max C-Max 2.0 2.0 C-Max C-Max 20.0 0.17 0.86 50.2 43.9 94.1 F 94.1 F 167 63.4 0.53 0.92 25.2 26.6 51.9 D 51.9 D 269 63.4 0.53 1.16 173.6 0.0 173.6 F 0.0 0.0% 4.0 12.0 19.0 63.0 52.5% 56.0 3.0 4.0 4.0 Lead 0.0 0.0% 4.0 ~111 Synchro 7 Page 1 Casey Overpass 2163: Arborway Ramps & South St CST McMahon 6/25/2012 NWR 208 1900 11 1900 0 0 25 1.00 13 1900 0 1 25 1.00 0.865 1722 0 1611 1722 0 Yes 1611 3 30 167 3.8 0.83 10% 0.92 0% 0.92 2% 263 0 14 custom 1.00 0.993 1 2 0.0 0.0% 4 4.0 12.0 15.0 12.5% 7.0 4.0 4.0 8.0 Lag 4.0 17.0 17.0 14% 15.0 2.0 0.0 R 12.0 19.0 63.0 52.5% 56.0 3.0 4.0 4.0 Lead ø2 T SBR AF SBT 4.0 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Existing AM 2.0 C-Max 2.0 None 63.4 0.53 0.29 18.1 0.6 18.7 B 65.8 E 117 7.0 0.06 0.15 57.5 0.0 57.5 E Lag 2.0 None 7.0 8.0 60 11 Synchro 7 Page 2 Casey Overpass 2163: Arborway Ramps & South St Lane Group Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT #179 617 54 0 0 0 1.39 Existing AM 6/25/2012 EBR 0 EBR2 200 632 0 118 0 0.37 WBL WBT #251 165 WBR NBL 671 158 14 0 1.08 NBT #640 173 1352 172 0 0 1.05 NBR SBL2 SBL #162 99 0 0 0 1.16 2163: Arborway Ramps & South St D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 0 (0%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.39 Intersection Signal Delay: 67.2 Intersection LOS: E Intersection Capacity Utilization 89.6% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. CST McMahon Synchro 7 Page 3 Casey Overpass 2163: Arborway Ramps & South St Lane Group Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio SBT 160 87 SBR 910 0 354 0 0.47 Existing AM 6/25/2012 NWR 33 ø2 94 0 0 0 0.15 D R AF T Intersection Summary CST McMahon Synchro 7 Page 4 Casey Overpass 253: South St & Washington St CST McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 218 1900 1.00 0 1900 1.00 0.99 0.962 0.965 1737 0.761 1363 93 1900 1.00 30 1900 1.00 6 1900 1.00 91 1900 0.95 923 1900 0.95 1.00 0 1900 1.00 0 1900 1.00 392 1900 0.95 0.99 0.953 181 1900 0.95 0 0 0 0 0 0 3280 0 0 Yes 0 0 1900 1.00 0.99 0.969 0.963 883 0.713 652 0 Yes 0 0 Yes 0 3280 0 Yes 0 19 30 846 19.2 0 Perm 0.92 0% 9 0.86 1% 9 0.75 100% 380 0 0 Perm 3 10.0 18.0 49.0 40.8% 44.0 4.0 1.0 5.0 Lead 2.0 None 2.0 None 36.4 0.30 0.89 60.7 189.4 250.1 F 250.1 F 265 368 9 0.50 100% 9 0.91 2% 0.0 0.0% 4.0 0.95 1% 9 0.92 0% 9 0.92 0% 0.91 5% 9 0.91 1% 1072 0 0 630 0 52 3 14 3 10.0 18.0 49.0 40.8% 44.0 4.0 1.0 4.0 Lead 10.0 18.0 49.0 40.8% 44.0 4.0 1.0 5.0 Lead 0 D.P+P 4 1 12.0 14.0 0.0 14.0 0.0% 11.7% 12.0 2.0 0.0 4.0 4.0 Lag 2.0 None 2.0 None 2.0 None R 3 10.0 18.0 49.0 40.8% 44.0 4.0 1.0 4.0 Lead 0.92 100% 36.4 0.30 0.25 36.8 0.0 36.8 D 36.8 D 33 76 64 30 253 5.8 30 277 6.3 0 AF 9 0.80 1% 12 30 338 7.7 0.995 3553 0.735 2624 T 0 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Existing AM 1 55.0 45.8% 0.0 0.0% 0.0 0.0% 5.0 4.0 4.0 30.0 38.0 41.0 34.2% 36.0 4.0 1.0 5.0 Lead 0.0 0.0% 4.0 2.0 C-Max 59.0 0.49 0.79 23.6 0.5 24.2 C 24.2 C 146 #475 50.0 0.42 0.45 28.5 0.8 29.3 C 29.3 C 204 m278 Synchro 7 Page 1 Casey Overpass 253: South St & Washington St CST McMahon 6/25/2012 AF T ø2 6.0 16.0 16.0 13% 14.0 2.0 0.0 Lag R 2 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Existing AM 3.0 None 4.0 10.0 34 Synchro 7 Page 2 Casey Overpass 253: South St & Washington St Lane Group Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT 766 Existing AM 6/25/2012 EBR WBL 512 0 243 0 1.41 WBT 258 WBR NBL 247 0 0 0 0.21 NBT 197 1361 0 69 0 0.83 NBR SBL SBT 173 SBR 1405 452 0 0 0.66 253: South St & Washington St D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 28 (23%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.89 Intersection Signal Delay: 66.2 Intersection LOS: E Intersection Capacity Utilization 84.0% ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CST McMahon Synchro 7 Page 3 Casey Overpass 253: South St & Washington St Lane Group Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing AM 6/25/2012 ø2 D R AF T Intersection Summary CST McMahon Synchro 7 Page 4 Casey Overpass 1712: Washington Street & MBTA Busway #2 CST McMahon 6/25/2012 WBR NBT NBR SBL SBT 0 1900 1.00 0 1900 1.00 958 1900 0.95 0.994 34 1900 0.95 8 1900 0.95 478 1900 0.95 0 0 3423 0 0 0 0 Yes 3423 0 Yes 0 0.999 3426 0.925 3172 30 333 7.6 0.95 3% 30 377 8.6 0.92 0% 0 0.92 0% 14 30 181 4.1 0.96 1% 0.85 100% 0.67 100% 0 1038 0 0 Perm 4.0 0.0 0.0% 1 2 12.0 20.0 103.0 85.8% 98.0 4.0 1.0 4.0 Lead 8.0 17.0 17.0 14% 15.0 2.0 0.0 2.0 C-Max 2.0 2.0 C-Max C-Max 2.0 None 5.0 10.0 35 107.4 0.90 0.34 2.3 0.1 2.5 A 2.5 A 81 127 101 107.4 0.90 0.18 1.7 0.0 1.7 A 1.7 A 35 41 253 12.0 20.0 103.0 85.8% 98.0 4.0 1.0 4.0 Lead 297 0.0 0.0% R 0.0 0.0% 4.0 515 AF 1 ø2 T WBL D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Existing AM 4.0 1 12.0 20.0 103.0 85.8% 98.0 4.0 1.0 4.0 Lead Lag Synchro 7 Page 1 Casey Overpass 1712: Washington Street & MBTA Busway #2 WBL WBR NBT 3065 888 0 0 0.48 NBR Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 0 (0%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.34 Intersection Signal Delay: 2.2 Intersection Capacity Utilization 30.9% Analysis Period (min) 15 SBL SBT 2839 0 0 0 0.18 ø2 Intersection LOS: A ICU Level of Service A 1712: Washington Street & MBTA Busway #2 D R AF Splits and Phases: 6/25/2012 T Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing AM CST McMahon Synchro 7 Page 2 Casey Overpass 2272: Washington St & Ukraine Way CST McMahon 6/25/2012 WBL WBR NBT NBR SBL SBT 163 1900 1.00 553 1900 1.00 0.850 386 1900 0.95 0.946 183 1900 0.95 265 1900 1.00 226 1900 1.00 1599 3381 0 1599 Yes 614 3381 0 Yes 0.950 1787 0.342 643 83 30 1282 29.1 0.96 1% 0.82 1% 625 0 3 614 Prot 3 10.0 17.0 43.0 35.8% 39.0 3.0 1.0 4.0 Lead 10.0 17.0 43.0 35.8% 39.0 3.0 1.0 4.0 Lead 12.0 19.0 33.0 27.5% 29.0 3.0 1.0 4.0 Lead 285 D.P+P 4 1 4.0 19.0 0.0 20.0 0.0% 16.7% 17.0 3.0 0.0 4.0 4.0 Lag 2.0 2.0 None C-Max 3.0 None 2.0 None 1 17.1 0.14 0.69 59.4 0.1 59.5 E 27.2 C 117 m114 213 17.1 0.14 0.81 15.0 2.9 17.9 B 58 m196 0.93 1% 1863 1863 30 388 8.8 0.91 2% 248 14 AF 177 0.90 1% R 30 293 6.7 0.92 0% ø2 T 0.950 1805 0.950 1805 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Existing AM 58.0 0.48 0.37 20.0 0.0 20.1 C 20.1 C 144 225 1202 73.3 0.61 0.53 25.7 0.1 25.8 C 119 212 53.0 44.2% 2 4.0 24.0 24.0 20% 22.0 2.0 0.0 4.0 Lag 3.0 None 7.0 13.0 45 77.3 0.64 0.21 18.4 0.0 18.4 B 22.4 C 88 184 308 Synchro 7 Page 1 Casey Overpass 2272: Washington St & Ukraine Way Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio WBL 587 43 0 0 0.33 WBR 934 212 0 0 0.85 NBT 1676 0 112 0 0.40 Existing AM 6/25/2012 NBR SBL 549 0 21 0 0.54 SBT 1198 0 0 0 0.21 ø2 2272: Washington St & Ukraine Way D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 28 (23%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.81 Intersection Signal Delay: 23.6 Intersection LOS: C Intersection Capacity Utilization 57.4% ICU Level of Service B Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. CST McMahon Synchro 7 Page 2 Casey Overpass 249: Hyde Park Ave & Walk Hill St CST McMahon 6/25/2012 WBL WBR NBT NBR SBL SBT 13 1900 0 1 25 1.00 0.872 0.998 1638 0.998 1638 347 1900 0 0 25 1.00 962 1900 26 1900 0 0 25 0.95 193 1900 200 1 25 1.00 495 1900 0 3549 0 0 Yes 3549 0 Yes 0.89 1% 4 30 478 10.9 0.92 1% 410 0 1090 0 1 10.0 18.0 50.0 41.7% 45.0 4.0 1.0 5.0 Lead 25.0 30.0 30.0 25.0% 25.0 4.0 1.0 5.0 Lag 0.0 0.0% R 0.0 0.0% 4.0 0.85 2% 227 Prot 4 3 13.0 18.0 18.0 15.0% 13.0 4.0 1.0 5.0 Lead 0.59 4% 0.95 3574 3574 30 828 18.8 0.94 1% AF 390 30 111 2.5 0.65 0% 0.950 1770 0.950 1770 ø2 T 0.95 0.994 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Existing AM 4.0 2.0 None 2.0 C-Max 3.0 None 13.0 0.11 0.78 17.7 0.0 17.7 B 17.7 B 14 53.8 0.45 0.68 31.1 0.0 31.1 C 31.1 C 395 25.0 0.21 0.62 68.6 0.0 68.6 E 187 527 14 80.0 66.7% 2 7.0 22.0 22.0 18% 20.0 2.0 0.0 5.0 Lag 3.0 None 7.0 13.0 30 83.8 0.70 0.21 6.1 0.0 6.1 A 24.9 C 79 Synchro 7 Page 1 Casey Overpass 249: Hyde Park Ave & Walk Hill St WBL 0 31 WBR 525 0 0 0 0.78 6/25/2012 NBT 484 398 NBR 1593 0 0 0 0.68 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 5 (4%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.78 Intersection Signal Delay: 26.6 Intersection Capacity Utilization 75.8% Analysis Period (min) 15 ø2 2496 0 0 0 0.21 Intersection LOS: C ICU Level of Service D AF 249: Hyde Park Ave & Walk Hill St 200 369 0 0 0 0.62 SBT 94 748 D R Splits and Phases: SBL 256 T Lane Group Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing AM CST McMahon Synchro 7 Page 2 Casey Overpass 2162: Hyde Park Ave & Ukraine Way CST McMahon 6/25/2012 EBL EBR NBL NBT SBT SBR 173 1900 1.00 275 1900 1.00 0.850 566 1900 0.95 743 1900 0.95 413 1900 0.95 0.960 150 1900 0.95 1599 0 3440 0 1599 Yes 316 0 0.979 3499 0.548 1959 3440 0 Yes 0.93 1% 30 828 18.8 0.89 1% 38 30 489 11.1 0.86 1% 1444 652 14 1 3 8.0 16.0 32.0 26.7% 27.0 4.0 1.0 5.0 Lead 2.0 None 316 0 Prot D.P+P 3 4 1 8.0 4.0 16.0 12.0 32.0 38.0 26.7% 31.7% 27.0 34.0 4.0 4.0 1.0 0.0 5.0 4.0 Lead Lag 17.8 0.15 0.76 53.9 0.9 54.8 D 35.6 D 148 232 213 0.87 0% T 201 0.87 1% ø2 0 AF 30 293 6.7 0.86 1% 67.0 55.8% R 0.950 1787 0.950 1787 2.0 None D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Existing AM 17.8 0.15 0.62 21.9 1.5 23.5 C 104 224 5.0 2.0 None 78.8 0.66 0.87dl 37.0 0.0 37.0 D 37.0 D 418 #768 748 12.0 20.0 29.0 24.2% 24.0 4.0 1.0 5.0 Lead 2.0 C-Max 0.0 0.0% 2 7.0 21.0 21.0 18% 19.0 2.0 0.0 4.0 Lag 3.0 None 7.0 12.0 20 45.8 0.38 0.49 40.3 0.0 40.3 D 40.3 D 167 308 409 Synchro 7 Page 1 Casey Overpass 2162: Hyde Park Ave & Ukraine Way Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL 402 59 0 0 0.59 EBR 605 144 0 0 0.69 NBL Existing AM 6/25/2012 NBT 1709 0 1 0 0.85 SBT 1335 0 2 0 0.49 SBR ø2 AF 2162: Hyde Park Ave & Ukraine Way D R Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 0 (0%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.84 Intersection Signal Delay: 37.5 Intersection LOS: D Intersection Capacity Utilization 75.3% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. dl Defacto Left Lane. Recode with 1 though lane as a left lane. CST McMahon Synchro 7 Page 2 Casey Overpass 1759: Hyde Park Avenue & Tower St CST McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 24 1900 1.00 18 1900 1.00 9 1900 1.00 0 1900 1.00 892 1900 0.95 0.998 9 1900 0.95 6 1900 0.95 475 1900 0.95 0 1900 1.00 0 0 0 0 3568 0 0 0 Yes 0 0 1900 1.00 0.919 0.980 1711 0.905 1580 15 1900 1.00 0 0 1900 1.00 0.936 0.974 866 0.862 766 0 Yes 0 3568 0 Yes 0 0.999 3537 0.923 3268 0.67 100% 32 30 94 2.1 0.92 100% 0.56 100% 0.56 0% 24 30 283 6.4 0.92 0% 0.92 0% 2 30 201 4.6 0.86 1% 0.75 0% 0.50 0% 30 440 10.0 0.91 2% 0.92 0% 68 0 0 Perm 0 0 Perm 534 0 3 2.0 None 13.0 17.0 23.0 19.2% 19.0 3.0 1.0 4.0 3 2.0 None 14.5 0.12 0.56 53.0 0.0 53.0 D 53.0 D 35 88 14 0 0 0.0 0.0% 4.0 1049 1 13.0 17.0 23.0 19.2% 19.0 3.0 1.0 4.0 2.0 None 2.0 None 2.0 C-Max 2.0 2.0 C-Max C-Max 14.5 0.12 0.19 26.7 0.0 26.7 C 26.7 C 11 43 203 82.5 0.69 0.43 16.0 0.0 16.0 B 16.0 B 255 393 121 82.5 0.69 0.24 10.6 0.0 10.6 B 10.6 B 50 138 360 0.0 0.0% 0.0 0.0% 4.0 4.0 15.0 21.0 75.0 62.5% 69.0 4.0 2.0 6.0 Lead 0 0 Yes 1 3 13.0 17.0 23.0 19.2% 19.0 3.0 1.0 4.0 R 3 13.0 17.0 23.0 19.2% 19.0 3.0 1.0 4.0 40 T 0 Perm 0.63 0% AF 0 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Existing AM 0.0 0.0% 4.0 1 15.0 21.0 75.0 62.5% 69.0 4.0 2.0 4.0 Lead 15.0 21.0 75.0 62.5% 69.0 4.0 2.0 6.0 Lead 0.0 0.0% 4.0 Synchro 7 Page 1 Casey Overpass 1759: Hyde Park Avenue & Tower St CST McMahon 6/25/2012 T ø2 Lag 3.0 None 12.0 8.0 60 R 12.0 22.0 22.0 18% 20.0 2.0 0.0 AF 2 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Existing AM Synchro 7 Page 2 Casey Overpass 1759: Hyde Park Avenue & Tower St Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT 148 0 0 0 0.46 EBR Existing AM 6/25/2012 WBL WBT 270 0 0 0 0.15 WBR NBL NBT 2455 0 0 0 0.43 NBR SBL SBT 2248 0 0 0 0.24 SBR 1759: Hyde Park Avenue & Tower St D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 14 (12%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.56 Intersection Signal Delay: 16.0 Intersection LOS: B Intersection Capacity Utilization 44.1% ICU Level of Service A Analysis Period (min) 15 CST McMahon Synchro 7 Page 3 Casey Overpass 1759: Hyde Park Avenue & Tower St Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing AM 6/25/2012 ø2 D R AF T Intersection Summary CST McMahon Synchro 7 Page 4 Casey Overpass 2303: Hyde Park Ave & Fitzgerald Parking Lot CST McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 1.00 0 1900 1.00 0 1900 1.00 0 1900 1.00 0 1900 1.00 0.865 1 1900 1.00 21 1900 0.95 31 1900 0.95 51 1900 0.95 0 0 0 1644 0 0 0 0 0 0 0 Yes 0 1644 0 Yes 0 0 Yes 0 467 1900 0.95 0.990 0.995 3498 0.788 2770 28 1900 0.95 0 862 1900 0.95 0.991 0.998 3424 0.923 3167 0.92 0% 30 125 2.8 0.92 0% 0.92 0% 0.92 0% 572 30 187 4.3 0.92 0% 0.58 100% 12 30 440 10.0 0.89 1% 0.46 0% 0.85 0% 14 30 118 2.7 0.95 2% 0.70 0% 0 0 0 0 Perm 0 0 Perm 592 0 4.0 4.0 45 0 Perm AF 0.0 0.0% 0 0.0 0.0% 4.0 1 2.0 None 2.0 None 2.0 2.0 C-Max C-Max 2.0 2.0 C-Max C-Max 8.0 0.13 0.01 0.0 0.0 0.0 A 0.0 A 0 0 107 47.2 0.79 0.43 14.0 0.0 14.0 B 14.0 B 18 #446 360 47.2 0.79 0.27 2.7 0.0 2.7 A 2.7 A 0 m91 38 4.0 15.0 23.0 25.0 41.7% 19.0 4.0 2.0 4.0 Lead 0 0 Yes 1 8.0 13.0 13.0 21.7% 9.0 3.0 1.0 4.0 0.0 0.0% 1 15.0 23.0 25.0 41.7% 19.0 4.0 2.0 4.0 Lead 1072 3 8.0 13.0 13.0 21.7% 9.0 3.0 1.0 4.0 R 0.0 0.0% 0.25 0% T 4 3 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Existing AM 0.0 0.0% 4.0 1 15.0 23.0 25.0 41.7% 19.0 4.0 2.0 4.0 Lead 15.0 23.0 25.0 41.7% 19.0 4.0 2.0 4.0 Lead 0.0 0.0% 4.0 Synchro 7 Page 1 Casey Overpass 2303: Hyde Park Ave & Fitzgerald Parking Lot CST McMahon 6/25/2012 T ø2 Lag 3.0 None 12.0 8.0 40 R 12.0 22.0 22.0 37% 20.0 2.0 0.0 AF 2 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Existing AM Synchro 7 Page 2 Casey Overpass 2303: Hyde Park Ave & Fitzgerald Parking Lot Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL Existing AM 6/25/2012 WBT 733 0 0 0 0.01 WBR NBL NBT 2494 0 54 0 0.44 NBR SBL SBT 2182 0 0 0 0.27 SBR AF 2303: Hyde Park Ave & Fitzgerald Parking Lot D R Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 60 Actuated Cycle Length: 60 Offset: 10 (17%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.43 Intersection Signal Delay: 9.9 Intersection LOS: A Intersection Capacity Utilization 57.4% ICU Level of Service B Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CST McMahon Synchro 7 Page 3 Casey Overpass 2303: Hyde Park Ave & Fitzgerald Parking Lot Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing AM 6/25/2012 ø2 D R AF T Intersection Summary CST McMahon Synchro 7 Page 4 Casey Overpass 2164: New Washington & Washington St CST McMahon 6/25/2012 EBL EBR EBR2 WBL WBT WBR NBL NBT SBL SBT SBR 147 1900 0 1 25 1.00 180 1900 330 1 25 1.00 0.850 71 1900 281 1900 85 1900 0 0 25 0.95 52 1900 0 0 25 0.95 309 1900 108 1900 200 1 25 1.00 0.850 1568 1524 0 0 0 1568 1524 Yes 93 0 0.95 0.982 0.983 3282 0.983 3282 53 1900 0 0 25 0.95 591 1900 1.00 0.850 166 1900 0 0 25 0.95 0 Yes 0 0.80 13% 10 30 352 8.0 0.84 2% 0.82 3% 0.76 6% 0.74 6% 0.88 1% AF 0.77 10% 0 Split 3 2.0 None 7.0 6.0 0 19.6 0.16 0.71 62.2 0.0 62.2 E 2.0 None 7.0 6.0 0 19.6 0.16 0.86 77.9 0.0 77.9 E 2.0 None 7.0 6.0 0 19.6 0.16 0.28 10.8 0.0 10.8 B 139 164 0 615 3 8.0 27.0 27.0 22.5% 22.0 4.0 1.0 1.0 Lead 8.0 27.0 27.0 22.5% 22.0 4.0 1.0 5.0 Lead 2.0 None 9.0 10.0 0 2.0 None 9.0 10.0 0 22.0 0.18 1.01 86.6 0.0 86.6 F 86.6 F ~253 R 191 220 93 custom custom custom 2 2 2 2 2 2 4.0 4.0 4.0 21.0 21.0 21.0 27.0 27.0 27.0 22.5% 22.5% 22.5% 22.0 22.0 22.0 4.0 4.0 4.0 1.0 1.0 1.0 5.0 5.0 5.0 Lag Lag Lag 0.95 0.994 3433 0.734 2535 30 270 6.1 0.82 5% T 0.950 1641 0.950 1641 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Existing AM 0 0 D.P+P 4 1 4.0 10.0 0.0 19.0 0.0% 15.8% 17.0 2.0 0.0 4.0 4.0 Lag 818 0 0.990 3248 0.622 2041 0.59 6% 30 323 7.3 0.84 11% 0 0 Perm 14 66.0 55.0% 8.0 2.0 None 52.4 0.44 0.69 26.3 0.1 26.4 C 26.4 C 137 0.95 456 1553 1553 Yes 117 0.92 4% 117 custom 1 1 8.0 18.0 47.0 39.2% 39.0 4.0 4.0 4.0 Lead 12 8.0 18.0 47.0 39.2% 39.0 4.0 4.0 4.0 Lead 2.0 2.0 C-Max C-Max 7.0 7.0 3.0 3.0 0 0 45.4 0.38 0.59 34.4 0.0 34.4 C 27.8 C 151 74.0 61.7% 4.0 70.0 0.58 0.12 2.2 0.0 2.2 A 0 Synchro 7 Page 1 Casey Overpass 2164: New Washington & Washington St Lane Group Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL 182 EBR #230 EBR2 29 301 0 0 0 0.63 330 287 0 0 0 0.77 330 355 0 0 0 0.26 Existing AM 6/25/2012 WBL WBT #336 272 WBR NBL 610 0 0 0 1.01 NBT 324 190 1189 31 0 0 0.71 SBL SBT 192 243 772 0 0 0 0.59 SBR 24 200 983 0 0 0 0.12 2164: New Washington & Washington St D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 45 (38%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.01 Intersection Signal Delay: 48.1 Intersection LOS: D Intersection Capacity Utilization 72.6% ICU Level of Service C Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. CST McMahon Synchro 7 Page 2 Casey Overpass 9: Route 203 & Cemetery Rd CST McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 3 1900 0.95 623 1900 0.95 0 1900 0.95 5 1900 0.95 1132 1900 0.95 0.941 737 1900 0.95 4 1900 1.00 3 1900 1.00 0 1900 1.00 219 1900 1.00 22 1900 1.00 0 0 0 0 0 0 0 Yes 0 0.973 1812 0.860 1602 0 0 Yes 3343 0.954 3190 0 0 3540 0.902 3193 0 Yes 0 2 1900 1.00 0.988 0.957 1780 0.741 1379 0.89 0% 30 496 11.3 0.89 2% 0.89 0% 0.93 1% 304 30 216 4.9 0.93 2% 0.80 2% 30 115 2.6 0.80 2% 0.80 2% 0.92 1% 7 30 193 4.4 0.92 0% 0.92 0% 703 0 0 Perm 0 0 Perm 264 0 0.0 0.0% 1 8.0 24.0 45.0 60.0% 40.0 4.0 1.0 5.0 Lead R 4.0 Min 8.0 24.0 45.0 60.0% 40.0 4.0 1.0 5.0 Lead 1 4.0 Min 41.2 0.59 0.37 8.9 0.0 8.9 A 8.9 A 74 132 416 1891 0 0 T 1 1 8.0 24.0 45.0 60.0% 40.0 4.0 1.0 5.0 Lead 2014 0.93 1% 0 0 Perm AF 0 Perm D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Existing AM 4.0 4.0 Min 8.0 24.0 45.0 60.0% 40.0 4.0 1.0 5.0 Lead 4.0 Min 41.2 0.59 1.00 35.4 0.0 35.4 D 35.4 D ~384 #669 136 2013 0 0 0.0 0.0% 4.0 2 8.0 24.0 30.0 40.0% 25.0 4.0 1.0 5.0 Lag 4.0 None 9 2 8.0 24.0 30.0 40.0% 25.0 4.0 1.0 5.0 Lag 4.0 None 18.4 0.26 0.02 17.4 0.0 17.4 B 17.4 B 3 11 35 577 0 0 0 0 Yes 2 0.0 0.0% 4.0 2 8.0 24.0 30.0 40.0% 25.0 4.0 1.0 5.0 Lag 4.0 None 8.0 24.0 30.0 40.0% 25.0 4.0 1.0 5.0 Lag 0.0 0.0% 4.0 4.0 None 18.4 0.26 0.72 33.6 0.0 33.6 C 33.6 C 97 171 113 501 0 0 Synchro 7 Page 1 Casey Overpass 9: Route 203 & Cemetery Rd Lane Group Storage Cap Reductn Reduced v/c Ratio EBL EBT 0 0.37 Existing AM 6/25/2012 EBR WBL WBT 0 1.00 WBR NBL NBT 0 0.02 NBR SBL SBT 0 0.53 SBR 9: Route 203 & Cemetery Rd D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 75 Actuated Cycle Length: 69.6 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.00 Intersection Signal Delay: 29.0 Intersection LOS: C Intersection Capacity Utilization 87.1% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. CST McMahon Synchro 7 Page 2 Casey Overpass 2163: Arborway Ramps & South St CMM McMahon 6/25/2012 EBL EBT EBR EBR2 WBL WBT WBR NBL NBT NBR SBL2 SBL 47 1900 0 1 25 0 71 1900 0 1900 200 1 25 1583 310 1900 306 1900 0 0 25 0 101 1900 125 1900 0 0 25 0 147 1900 0 0 25 0 178 1900 102 1900 1583 0 Yes 0 Yes 0 3242 0.608 1999 279 1900 0 0 25 0 0 0 10 1900 0 1 25 1509 0.293 465 0.76 0% 30 252 5.7 0.94 6% 0.93 2% 0.88 12% 0.88 100% 682 0 0 Perm 127 Perm 0 1825 0.606 1129 0.92 2% 30 697 15.8 0.92 2% 0 0 3330 0.971 3330 31 30 245 5.6 0.90 1% 0.92 2% 0.92 2% 0.86 1% 337 custom 0 0 Split 3 4 4 3 3 1 1 1 1 1 1 1 4.0 11.0 37.0 30.8% 3.0 3.0 -2.0 4.0 Lead 4.0 11.0 37.0 30.8% 3.0 3.0 -2.0 4.0 Lead 4.0 11.0 37.0 30.8% 3.0 4.0 -3.0 4.0 Lead 4.0 11.0 37.0 30.8% 3.0 4.0 -3.0 4.0 Lead 4.0 11.0 37.0 30.8% 3.0 4.0 -3.0 4.0 Lead 4.0 11.0 37.0 30.8% 3.0 4.0 -3.0 4.0 Lead None None 27.5 0.23 0.77 47.7 39.5 87.2 F 87.2 F 219 271 165 C-Max C-Max 52.8 0.44 0.78 31.4 4.2 35.6 D 35.6 D 262 m#446 172 C-Max C-Max 52.8 0.44 0.62 48.2 0.0 48.2 D 938 370 880 130 205 0 128 4 4 4 4 4.0 24.0 29.0 24.2% 4.0 4.0 0.0 8.0 Lag 4.0 24.0 29.0 24.2% 4.0 4.0 0.0 8.0 Lag 4.0 24.0 29.0 24.2% 4.0 4.0 0.0 8.0 Lag None 16.9 0.14 0.81 83.0 0.0 83.0 F 131.6 F 96 #174 617 None 16.9 0.14 0.64 9.5 140.5 150.0 F None 0.0 0.0% R 198 0 605 0 0 66 200 571 0 0.0 4.0 0 Perm 3 AF 0 custom 0.91 4% 0 T 356 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Existing PM 0.0 0.0% 0.0 4.0 1 0.0 0.0% 0.0 4.0 68 #223 Synchro 7 Page 1 Casey Overpass 2163: Arborway Ramps & South St CMM McMahon 6/25/2012 SBR NWR 328 1900 13 1900 0 0 25 0 10 1900 0 1 25 1611 0 Yes 1611 2 30 167 3.8 0.79 1% 0.81 0% 0.92 2% 431 0 11 custom 1871 1 2 4 4 1 4.0 24.0 29.0 24.2% 4.0 4.0 0.0 8.0 Lag 1.0 17.0 17.0 14% 2.0 0.0 C-Max 52.8 0.44 0.52 31.9 0.2 32.0 C 35.7 D 217 370 87 None 16.9 0.14 0.05 42.4 0.0 42.4 D None 825 0 282 0 0.0 0.0% R 4.0 11.0 37.0 30.8% 3.0 4.0 -3.0 4.0 Lead AF 1871 ø2 T SBT 0.0 4.0 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Existing PM Lag 7 24 Synchro 7 Page 2 Casey Overpass 2163: Arborway Ramps & South St Lane Group Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT 0 0 0.65 Existing PM 6/25/2012 EBR 311 0 1.30 EBR2 WBL WBT 213 0 1.07 WBR NBL NBT 0 0 0.91 NBR SBL2 SBL 0 0 0.62 2163: Arborway Ramps & South St D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 30 (25%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.81 Intersection Signal Delay: 68.4 Intersection LOS: E Intersection Capacity Utilization 89.0% ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 3 Casey Overpass 2163: Arborway Ramps & South St Lane Group Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio SBT 51 0 0.56 SBR Existing PM 6/25/2012 NWR 0 0 0.04 ø2 D R AF T Intersection Summary CMM McMahon Synchro 7 Page 4 Casey Overpass 253: South St & Washington St CMM McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 151 1900 0 136 1900 0 29 1900 0 81 1900 0 0 1900 0 665 1900 3413 269 1900 0 0 0 Yes 0 443 1900 3552 0.584 2091 0 1900 0 0 Yes 0 1900 886 0.638 587 10 1900 0 0 0 1900 1718 0.830 1461 0 Yes 0 3413 0 Yes 0.81 1% 42 30 846 19.2 0.92 0% 0.69 0% 0.73 100% 12 30 338 7.7 0.92 100% 0.83 100% 0.84 0% 30 277 6.3 0.92 1% 0.92 0% 0.92 0% 65 30 252 5.7 0.95 1% 0.90 1% 383 0 0 Perm 52 0 0 D.P+P 4 1 4 578 0 0 999 0 3 10.0 18.0 35.0 29.2% 4.0 1.0 -1.0 4.0 Lag 10.0 18.0 35.0 29.2% 4.0 1.0 0.0 5.0 Lag None None 29.7 0.25 0.97 79.9 21.2 101.0 F 101.0 F 267 #468 766 397 0 31 0 1.05 3 AF 3 3 3 3 0.0 0.0% 0.0 4.0 10.0 18.0 35.0 29.2% 4.0 1.0 -1.0 4.0 Lag 10.0 18.0 35.0 29.2% 4.0 1.0 0.0 5.0 Lag None None 29.7 0.25 0.34 39.3 0.4 39.6 D 39.6 D 24 59 258 R 3 3 156 0 11 0 0.36 14 1 14 1 T 0 Perm D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing PM 0.0 0.0% 0.0 4.0 15.0 17.0 17.0 14.2% 2.0 0.0 2.0 4.0 Lead 69.0 57.5% 0.0 0.0% 0.0 0.0% 0.0 5.0 0.0 4.0 0.0 4.0 None 30.0 38.0 52.0 43.3% 4.0 1.0 0.0 5.0 Lead 65.7 0.55 0.45 13.4 0.4 13.8 B 13.8 B 112 128 197 C-Max 53.7 0.45 0.64 25.8 3.6 29.4 C 29.4 C 321 286 172 1292 0 300 0 0.58 1564 458 0 0 0.90 0.0 0.0% 0.0 4.0 Synchro 7 Page 1 Casey Overpass 253: South St & Washington St CMM McMahon 6/25/2012 ø2 AF T 2 Lag None R 6.0 16.0 16.0 13% 2.0 0.0 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing PM Synchro 7 Page 2 Casey Overpass 253: South St & Washington St Existing PM 6/25/2012 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 20 (17%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.97 Intersection Signal Delay: 38.8 Intersection LOS: D Intersection Capacity Utilization 81.7% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. 253: South St & Washington St D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 3 Casey Overpass 1712: Washington St & MBTA Busway #2 CMM McMahon 6/25/2012 WBL WBR NBT NBR SBL SBT 0 1900 0 0 1900 0 526 1900 3391 23 1900 0 6 1900 0 0 0 Yes 3391 0 Yes 0 799 1900 3542 0.950 3364 30 333 7.6 0.95 1% 0 0.92 0% 17 30 181 4.1 0.94 1% 0.82 100% 0.75 100% 0 588 0 0 Perm 1 0.0 4.0 297 2 1 AF 0.0 4.0 12.0 20.0 103.0 85.8% 4.0 1.0 -1.0 4.0 Lead 12.0 20.0 103.0 85.8% 4.0 1.0 -1.0 4.0 Lead 4.0 17.0 17.0 14% 2.0 0.0 C-Max 103.2 0.86 0.20 1.6 0.0 1.6 A 1.6 A 30 35 101 C-Max C-Max 103.2 0.86 0.29 0.8 0.0 0.8 A 0.8 A 10 m15 253 None 2919 0 0 0 0.20 2893 0 0 0 0.29 0.0 0.0% 0.0 4.0 R 0.0 0.0% 849 1 1 1 1 0.0 0.0% ø2 T 30 377 8.6 0.92 0% D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing PM 12.0 20.0 103.0 85.8% 4.0 1.0 -1.0 4.0 Lead Lag Synchro 7 Page 1 Casey Overpass 1712: Washington St & MBTA Busway #2 Existing PM 6/25/2012 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 100 (83%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 40 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.29 Intersection Signal Delay: 1.1 Intersection LOS: A Intersection Capacity Utilization 29.6% ICU Level of Service A Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. 1712: Washington St & MBTA Busway #2 D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 2 Casey Overpass 2272: Washington St & Ukraine Way CMM McMahon 6/25/2012 WBL WBR NBT NBR SBL SBT 156 1900 1787 0.950 1787 272 1900 1599 329 1900 3323 211 1900 0 304 1900 1863 1599 Yes 373 3323 0 Yes 484 1900 1787 0.358 673 200 0.73 1% 373 Perm 3 118 30 1282 29.1 0.89 3% 0.89 1% 0.86 1% 607 0 563 D.P+P 4 1 4 1 1 10.0 17.0 40.0 33.3% 3.0 1.0 0.0 4.0 Lag 10.0 17.0 40.0 33.3% 3.0 1.0 0.0 4.0 Lag 12.0 19.0 36.0 30.0% 3.0 1.0 0.0 4.0 Lead 536 42 0 0 0.40 0.0 0.0% 0.0 4.0 R None 18.0 0.15 0.75 44.7 0.1 44.8 D 23.1 C 124 137 213 None C-Max 18.0 60.8 0.15 0.51 0.67 0.35 10.5 17.2 1.0 0.0 11.5 17.2 B B 17.2 B 60 132 48 196 1202 741 171 0 0 0.65 1863 30 388 8.8 0.85 2% 358 14 2 14 AF 3 3 3 ø2 T 30 293 6.7 0.78 1% D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing PM 1743 0 20 0 0.35 4.0 20.0 20.0 16.7% 3.0 0.0 1.0 4.0 Lead None 76.8 0.64 0.97 51.1 1.3 52.4 D ~324 #515 579 0 4 0 0.98 56.0 46.7% 7.0 24.0 24.0 20% 2.0 0.0 0.0 4.0 Lag None 78.4 0.65 0.29 8.6 0.0 8.6 A 35.3 D 160 176 308 1218 0 0 0 0.29 Synchro 7 Page 1 Casey Overpass 2272: Washington St & Ukraine Way Existing PM 6/25/2012 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 11 (9%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.97 Intersection Signal Delay: 26.8 Intersection LOS: C Intersection Capacity Utilization 61.3% ICU Level of Service B Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. 2272: Washington St & Ukraine Way D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 2 Casey Overpass 249: Hyde Park Ave & Walk Hill St CMM McMahon 6/25/2012 WBL WBR NBT NBR SBL SBT 38 1900 0 1 25 1649 0.990 1649 223 1900 0 0 25 0 559 1900 21 1900 0 0 25 0 1044 1900 0 Yes 3511 345 1900 200 1 25 1770 0.950 1770 333 0.83 2% 5 30 478 10.9 0.95 2% 0.65 2% 0.87 2% 0 620 0 1 397 Prot 4 1 4 10.0 18.0 39.0 32.5% 4.0 1.0 0.0 5.0 Lag 34.0 39.0 39.0 32.5% 4.0 1.0 0.0 5.0 Lead 3 0.0 0.0% R 0.0 0.0% 0.0 4.0 3539 3539 30 828 18.8 0.95 2% 1099 14 AF 3 15.0 20.0 20.0 16.7% 4.0 1.0 0.0 5.0 Lag 0 Yes ø2 T 144 30 111 2.5 0.59 0% 3511 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Existing PM None 15.0 0.12 1.00 80.3 0.0 80.3 F 80.3 F ~156 117 31 C-Max 42.8 0.36 0.49 33.7 0.0 33.7 C 33.7 C 217 281 398 332 0 1255 0 0.0 4.0 None 34.0 0.28 0.79 32.4 0.0 32.4 C 241 #263 200 502 0 2 14 78.0 65.0% 7.0 22.0 22.0 18% 2.0 0.0 0.0 5.0 Lead None 81.8 0.68 0.46 4.8 0.0 4.8 A 12.1 B 95 114 748 2413 0 Synchro 7 Page 1 Casey Overpass 249: Hyde Park Ave & Walk Hill St Lane Group Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio WBL 0 0 1.00 WBR Existing PM 6/25/2012 NBT 0 0 0.49 NBR SBL 0 0 0.79 SBT 0 0 0.46 ø2 AF 249: Hyde Park Ave & Walk Hill St D R Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 55 (46%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.00 Intersection Signal Delay: 26.9 Intersection LOS: C Intersection Capacity Utilization 72.8% ICU Level of Service C Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. CMM McMahon Synchro 7 Page 2 Casey Overpass 2162: Hyde Park Ave & Ukraine Way CMM McMahon 6/25/2012 EBL EBR NBL NBT SBT SBR 185 1900 1770 0.950 1770 510 1900 1583 283 1900 0 879 1900 3458 145 1900 0 1583 Yes 554 0 499 1900 3501 0.518 1847 3458 0 Yes 0.88 0% 30 828 18.8 0.91 2% 17 30 489 11.1 0.86 2% 0.78 2% 870 1208 0 14 1 14 1 3 8.0 16.0 35.0 29.2% 4.0 1.0 0.0 5.0 Lead None 20.6 0.17 0.78 54.6 1.0 55.6 E 30.3 C 148 m144 213 8.0 16.0 35.0 29.2% 4.0 1.0 0.0 5.0 Lead 4.0 12.0 25.0 20.8% 4.0 0.0 -1.0 3.0 Lag None 20.6 0.17 0.76 9.8 9.6 19.4 B None 443 67 0 0 0.63 89 m114 811 225 0 0 0.95 2 T 3 554 0 Perm D.P+P 4 3 1 3 4 ø2 AF 237 0.92 2% 64.0 53.3% 0.0 5.0 R 30 293 6.7 0.78 2% D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing PM 12.0 20.0 39.0 32.5% 4.0 1.0 0.0 5.0 Lag 71.8 0.60 0.99dl 14.2 0.0 14.2 B 14.2 B 116 m135 748 C-Max 56.6 0.47 0.74 18.3 0.0 18.4 B 18.4 B 447 #655 409 1431 0 6 0 0.61 1641 0 11 0 0.74 0.0 0.0% 7.0 21.0 21.0 18% 2.0 0.0 0.0 4.0 Lead None Synchro 7 Page 1 Casey Overpass 2162: Hyde Park Ave & Ukraine Way Existing PM 6/25/2012 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 75 (63%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.78 Intersection Signal Delay: 20.4 Intersection LOS: C Intersection Capacity Utilization 73.7% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. dl Defacto Left Lane. Recode with 1 though lane as a left lane. 2162: Hyde Park Ave & Ukraine Way D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 2 Casey Overpass 1759: Hyde Park Ave & Tower St CMM McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 22 1900 0 14 1900 0 16 1900 0 0 1900 0 736 1900 3564 11 1900 0 17 1900 0 0 0 Yes 0 3564 0 Yes 0 985 1900 3571 0.928 3318 0 1900 0 0 Yes 0 1900 1753 0.827 1496 14 1900 0 0 0 1900 875 0.845 763 0.79 100% 16 30 94 2.1 0.92 100% 0.88 100% 0.44 0% 20 30 283 6.4 0.92 0% 0.70 0% 0.92 0% 3 30 201 4.6 0.89 1% 0.69 0% 0.85 0% 30 440 10.0 0.92 1% 0.92 0% 44 0 0 Perm 56 0 0 843 0 0 Perm 1091 0 3 18.0 22.0 23.0 19.2% 3.0 1.0 0.0 4.0 18.0 22.0 23.0 19.2% 3.0 1.0 0.0 4.0 None None 18.0 0.15 0.34 58.6 0.0 58.6 E 58.6 E 29 m58 14 134 0 0 0 0.33 3 1 0.0 0.0% 1 1 15.0 23.0 75.0 62.5% 4.0 2.0 -2.0 4.0 Lead 15.0 23.0 75.0 62.5% 4.0 2.0 -2.0 4.0 Lead 15.0 23.0 75.0 62.5% 4.0 2.0 -2.0 4.0 Lead 0.0 4.0 18.0 22.0 23.0 19.2% 3.0 1.0 0.0 4.0 18.0 22.0 23.0 19.2% 3.0 1.0 0.0 4.0 None None 18.0 0.15 0.23 34.1 0.0 34.1 C 34.1 C 25 65 203 C-Max 76.4 0.64 0.37 14.3 0.0 14.3 B 14.3 B 256 243 121 C-Max C-Max 76.4 0.64 0.52 2.6 0.0 2.6 A 2.6 A 36 42 360 254 0 0 0 0.22 2270 0 0 0 0.37 2113 61 0 0 0.53 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0 Yes 1 1 1 AF 3 3 3 3 R 3 3 T 0 Perm D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing PM 0.0 0.0% 0.0 4.0 0.0 0.0% 0.0 4.0 Synchro 7 Page 1 Casey Overpass 1759: Hyde Park Ave & Tower St CMM McMahon 6/25/2012 ø2 AF T 2 Lag None R 12.0 22.0 22.0 18% 2.0 0.0 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing PM Synchro 7 Page 2 Casey Overpass 1759: Hyde Park Ave & Tower St Existing PM 6/25/2012 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 19 (16%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 70 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.52 Intersection Signal Delay: 9.5 Intersection LOS: A Intersection Capacity Utilization 61.0% ICU Level of Service B Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. 1759: Hyde Park Ave & Tower St D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 3 Casey Overpass 2303: Hyde Park Ave & Fitzgerald Parking Lot CMM McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 0 1900 0 0 1900 0 51 1900 0 21 1900 0 21 1900 0 7 1900 0 0 Yes 0 0 Yes 0 0 Yes 0 921 1900 3484 0.941 3282 16 1900 0 0 723 1900 3403 0.885 3018 22 1900 0 0 0 1900 1758 0.967 1758 0.92 0% 30 125 2.8 0.92 0% 0.92 0% 0.75 0% 18 30 187 4.3 0.92 0% 0.66 0% 0.75 100% 8 30 440 10.0 0.90 2% 0.46 0% 0.58 0% 3 30 118 2.7 0.89 1% 0.67 100% 0 0 0 0 Perm 100 0 0 Perm 879 0 0 Perm 1071 0 15.0 23.0 69.0 57.5% 4.0 2.0 -2.0 4.0 Lead AF 1 1 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 1 1 15.0 23.0 69.0 57.5% 4.0 2.0 -2.0 4.0 Lead 15.0 23.0 69.0 57.5% 4.0 2.0 -2.0 4.0 Lead 15.0 23.0 69.0 57.5% 4.0 2.0 -2.0 4.0 Lead 8.0 13.0 29.0 24.2% 3.0 1.0 0.0 4.0 Max Max 25.0 0.21 0.26 34.6 0.0 34.6 C 34.6 C 53 104 107 C-Max C-Max 66.0 0.55 0.53 9.0 0.1 9.0 A 9.0 A 61 29 360 C-Max C-Max 66.0 0.55 0.59 9.3 0.2 9.6 A 9.6 A 153 187 38 381 0 0 0 0.26 1664 68 0 0 0.55 1806 205 0 0 0.67 0.0 0.0% 0.0 4.0 0 Yes 1 1 1 8.0 13.0 29.0 24.2% 3.0 1.0 0.0 4.0 R 0.0 0.0% 45 3 1 T 3 3 3 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing PM 0.0 0.0% 0.0 4.0 0.0 0.0% 0.0 4.0 Synchro 7 Page 1 Casey Overpass 2303: Hyde Park Ave & Fitzgerald Parking Lot CMM McMahon 6/25/2012 ø2 AF T 2 Lag None R 12.0 22.0 22.0 18% 2.0 0.0 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing PM Synchro 7 Page 2 Casey Overpass 2303: Hyde Park Ave & Fitzgerald Parking Lot Existing PM 6/25/2012 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 19 (16%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.59 Intersection Signal Delay: 10.6 Intersection LOS: B Intersection Capacity Utilization 49.2% ICU Level of Service A Analysis Period (min) 15 2303: Hyde Park Ave & Fitzgerald Parking Lot D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 3 Casey Overpass 2164: New Washington & Washington St CMM McMahon 6/25/2012 EBL EBR EBR2 WBL WBT WBR NBL NBT SBL SBT SBR 161 1900 0 1 25 1687 0.950 1687 181 1900 330 1 25 1599 110 1900 228 1900 0 0 25 0 246 1900 58 1900 0 0 25 0 110 1900 0 0 25 0 374 1900 606 1900 176 1900 200 1 25 1583 1599 1599 Yes 126 0 Yes 0 3489 0.587 2073 56 1900 0 0 25 0 0.90 3% 30 270 6.1 0.94 2% 0.87 1% 0.92 1% 12 30 352 8.0 0.96 7% 183 208 126 custom custom custom 2 2 2 2 2 2 2 2 2 0 Split 3 576 0.81 3% 3 3 0 D.P+P 4 1 4 8.0 13.0 13.0 10.8% 2.0 0.0 -4.0 -2.0 Lag 0 AF 3 4.0 21.0 28.0 23.3% 4.0 1.0 0.0 5.0 Lag 4.0 21.0 28.0 23.3% 4.0 1.0 0.0 5.0 Lag 8.0 27.0 31.0 25.8% 4.0 1.0 -4.0 1.0 Lead 8.0 27.0 31.0 25.8% 4.0 1.0 0.0 5.0 Lead None 19.0 0.16 0.68 60.4 0.0 60.4 E None 19.0 0.16 0.82 73.2 0.0 73.2 E None 19.0 0.16 0.35 9.9 0.0 9.9 A None 134 202 156 228 0 47 None 23.5 0.20 0.87 59.9 0.0 59.9 E 59.9 E 222 286 272 323 0 330 306 0 330 408 0 R 4.0 21.0 28.0 23.3% 4.0 1.0 0.0 5.0 Lag 0.87 1% T 0 3336 0.979 3336 0.88 7% 1599 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Existing PM 732 0 0.0 0.0% 0.0 4.0 520 0 3529 0.805 2855 0.74 0% 30 323 7.3 0.94 2% 0 Perm 14 14 61.0 50.8% 0.0 5.0 None 721 1583 Yes 193 0.91 2% 193 custom 1 1 1 1 8.0 18.0 48.0 40.0% 4.0 1.0 -4.0 1.0 Lead 8.0 18.0 48.0 40.0% 4.0 1.0 0.0 5.0 Lead 57.4 0.48 0.48 5.5 0.0 5.5 A 5.5 A 13 39 190 C-Max C-Max 49.7 0.41 0.61 31.8 0.0 31.8 C 25.5 C 234 323 243 1090 11 1181 0 12 12 76.0 63.3% 0.0 5.0 73.7 0.61 0.18 1.9 0.0 1.9 A 0 30 200 1093 0 Synchro 7 Page 1 Casey Overpass 2164: New Washington & Washington St Lane Group Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL 0 0 0.57 EBR 0 0 0.68 EBR2 0 0 0.31 Existing PM 6/25/2012 WBL WBT 0 0 0.79 WBR NBL NBT 0 0 0.48 SBL SBT 0 0 0.61 SBR 0 0 0.18 2164: New Washington & Washington St D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 35 (29%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.87 Intersection Signal Delay: 34.9 Intersection LOS: C Intersection Capacity Utilization 75.1% ICU Level of Service D Analysis Period (min) 15 CMM McMahon Synchro 7 Page 2 Casey Overpass 9: Route 203 & Cemetery Rd CMM McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 4 1900 0 0 1900 0 1 1900 0 8 1900 0 593 1900 0 0 Yes 0 0 Yes 0 3 1900 1765 0.729 1346 44 1900 0 0 4 1900 1815 0.859 1606 2 1900 0 0 Yes 761 1900 3400 0.954 3243 292 1900 0 0 1351 1900 3539 0.952 3370 0.92 0% 30 490 11.1 0.92 2% 0.92 0% 0.92 0% 114 30 165 3.8 0.92 2% 0.92 1% 0.80 0% 2 30 155 3.5 0.80 0% 0.80 0% 0.99 2% 5 30 365 8.3 0.99 0% 0.99 2% 1472 0 0 Perm 1145 0 0 Perm 17 0 0 Perm 646 0 1 8.0 24.0 45.0 60.0% 4.0 1.0 0.0 5.0 Lead 8.0 24.0 45.0 60.0% 4.0 1.0 0.0 5.0 Lead Min Min 40.0 0.53 0.82 19.4 0.0 19.4 B 19.4 B 277 371 410 1797 0 0 0 0.82 1 2 2 2 0.0 0.0% 0.0 4.0 8.0 24.0 45.0 60.0% 4.0 1.0 0.0 5.0 Lead 8.0 24.0 45.0 60.0% 4.0 1.0 0.0 5.0 Lead Min Min 40.0 0.53 0.64 13.1 0.0 13.1 B 13.1 B 165 228 85 1783 0 0 0 0.64 0.0 0.0% 0.0 4.0 2 2 8.0 24.0 30.0 40.0% 4.0 1.0 0.0 5.0 Lag 8.0 24.0 30.0 40.0% 4.0 1.0 0.0 5.0 Lag 8.0 24.0 30.0 40.0% 4.0 1.0 0.0 5.0 Lag 8.0 24.0 30.0 40.0% 4.0 1.0 0.0 5.0 Lag None None 25.0 0.33 0.03 15.9 0.0 15.9 B 15.9 B 5 15 75 None None 25.0 0.33 1.43 230.5 0.0 230.5 F 230.5 F ~418 #617 285 537 0 0 0 0.03 0 Yes 2 2 2 AF 1 1 1 1 R 1 1 T 0 Perm D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing PM 0.0 0.0% 0.0 4.0 0.0 0.0% 0.0 4.0 452 0 0 0 1.43 Synchro 7 Page 1 Casey Overpass 9: Route 203 & Cemetery Rd Existing PM 6/25/2012 Intersection Summary Area Type: Other Cycle Length: 75 Actuated Cycle Length: 75 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.43 Intersection Signal Delay: 58.7 Intersection LOS: E Intersection Capacity Utilization 90.8% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. 9: Route 203 & Cemetery Rd D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 2 AT-GRADE 2010 (EXISTING 2010 TRAFFIC VOLUMES ON AT-GRADE STREET NETWORK) Casey Arborway 2163: Arborway & South St CMM McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 11 0 0 25 0 1148 1900 11 378 1900 11 100 1 25 1531 0 1900 11 0 0 25 0 1796 1900 11 252 1900 11 0 0 25 0 600 1900 11 286 1900 11 50 0 25 0 11 1900 11 0 0 25 0 4916 1531 No 0 4817 89 1900 10 100 1 25 1478 0.250 389 208 1900 11 0 271 1900 10 70 1 25 1685 0.467 828 0.92 2% 35 224 4.4 0.87 2% 0.94 2% 0.92 2% 35 677 13.2 0.95 2% 0 1320 402 Free 0 2184 1 0 No 0.86 2% 0.97 0% 0 279 pm+pt 3 34 6.0 10.0 10.0 12.5% 6.0 3.0 1.0 4.0 Lead 1 Free 4.0 0.0 0.0% 0.0 0.0% R 0.0 0.0% 7.0 38.0 39.0 48.8% 35.0 3.0 1.0 4.0 4.0 3.0 C-Max 20.0 14.0 90 37.1 0.46 0.58 12.0 0.0 12.0 B 9.3 A 78 105 144 80.0 1.00 0.26 0.4 0.0 0.4 A 0 0 4.0 7.0 38.0 39.0 48.8% 35.0 3.0 1.0 4.0 3.0 C-Max 20.0 14.0 90 37.1 0.46 0.98 24.3 0.0 24.3 C 24.3 C ~205 m#197 597 3214 3214 0.0 0.0% 4.0 0.92 2% 0.89 14% 970 0 100 Perm 34 0.0 0.0% 4.0 4.0 57 m50 34.9 0.44 0.69 10.6 11.3 21.9 C 21.1 C 107 71 139 1665 1665 0 No 35 152 3.0 0.83 10% 0.92 0% 263 0 4 41.0 51.3% 3.0 None 30.9 0.39 0.73 17.7 0.7 18.3 B 0 No 35 219 4.3 0.91 4% T 4817 AF 4916 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) At Grade 2010 AM 4 7.0 29.0 31.0 38.8% 27.0 3.0 1.0 4.0 Lag 3.0 None 12.0 13.0 30 24.9 0.31 0.83 74.6 0.0 74.6 E 44 #128 7.0 29.0 31.0 38.8% 27.0 3.0 1.0 4.0 Lag 0.0 0.0% 4.0 3.0 None 12.0 13.0 30 24.9 0.31 0.51 25.8 0.0 25.8 C 39.3 D 102 154 72 Synchro 7 Page 1 Casey Arborway 2163: Arborway & South St Lane Group Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL At Grade 2010 AM 6/25/2012 EBT 2280 0 0 0 0.58 EBR 100 1531 0 0 0 0.26 WBL WBT WBR 2234 0 0 0 0.98 NBL 70 384 14 0 0 0.75 NBT 1486 498 0 0 0.98 NBR SBL 100 131 0 0 0 0.76 SBT SBR 562 0 0 0 0.47 2163: Arborway & South St D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 0 (0%), Referenced to phase 1:EBWB, Start of Green, Master Intersection Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.98 Intersection Signal Delay: 19.9 Intersection LOS: B Intersection Capacity Utilization 81.9% ICU Level of Service D Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 2 Casey Arborway 253: South St & Washington St CMM McMahon 6/25/2012 EBL EBR NBL NBT SBT SBR 218 1900 1736 0.965 1724 93 1900 0 91 1900 0 392 1900 3275 181 1900 0 0 Yes 0 929 1900 3553 0.787 2809 3275 0 Yes 9 0.86 1% 380 0 2.0 None 0.95 1% 0.91 5% 9 0.91 1% 1078 630 0 14 1 15.0 20.0 23.0 28.8% 18.0 4.0 1.0 5.0 Lead 2 6.0 19.0 19.0 24% 17.0 2.0 0.0 AF 0 D.P+P 4 1 8.0 10.0 0.0 10.0 0.0% 12.5% 8.0 2.0 0.0 4.0 4.0 Lag 87 30 219 5.0 33.0 41.3% 5.0 R 3 3 9.0 14.0 28.0 35.0% 23.0 4.0 1.0 5.0 Lead 9 0.91 2% 30 201 4.6 ø2 T 25 30 846 19.2 9 0.80 1% D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn At Grade 2010 AM 2.0 None 2.0 C-Max 19.7 0.25 0.85 44.8 0.0 44.8 D 44.8 D 166 219 766 37.7 0.47 0.79 22.1 2.4 24.5 C 24.5 C 102 #482 121 32.7 0.41 0.45 14.9 0.7 15.6 B 15.6 B 49 #113 139 517 0 1369 175 1388 417 0.0 0.0% 4.0 Lag 3.0 None 7.0 10.0 30 Synchro 7 Page 1 Casey Arborway 253: South St & Washington St Lane Group Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL 0 0 0.74 EBR At Grade 2010 AM 6/25/2012 NBL NBT 6 0 0.90 SBT 0 0 0.65 SBR ø2 253: South St & Washington St D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 55 (69%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.85 Intersection Signal Delay: 25.5 Intersection LOS: C Intersection Capacity Utilization 75.8% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. CMM McMahon Synchro 7 Page 2 Casey Arborway 25: Washington St & MBTA Busway #2 CMM McMahon 6/25/2012 WBL WBR NBT NBR SBL SBT 30 1900 902 0.950 902 6 1900 808 929 1900 1863 0 1900 0 0 1900 0 485 1900 3505 808 Yes 8 1863 0 Yes 0 3505 38 0.80 100% 8 Free 2 30 339 7.7 0.95 2% 0.95 2% 0.96 2% 30 116 2.6 0.96 3% 978 0 0 505 1 1 T 35 82 1.6 0.80 100% Free 3.0 None 6.0 10.0 35 12.4 0.16 0.27 29.4 0.0 29.4 C 24.3 C 16 m29 2 4.0 180 0 0 80.0 1.00 0.01 0.0 0.0 0.0 A 0 m0 808 0 0 7.0 20.0 60.0 75.0% 56.0 3.0 1.0 4.0 Lead AF 0.0 0.0% 7.0 20.0 60.0 75.0% 56.0 3.0 1.0 4.0 Lead 0.0 0.0% 0.0 0.0% 4.0 4.0 R 7.0 20.0 20.0 25.0% 16.0 3.0 1.0 4.0 Lag 3.0 C-Max 6.0 10.0 0 65.6 0.82 0.64 6.5 0.0 6.5 A 6.5 A 161 299 259 3.0 C-Max 6.0 10.0 0 65.6 0.82 0.18 1.0 0.0 1.0 A 1.0 A 23 10 36 1528 0 0 2874 0 0 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2010 AM Synchro 7 Page 1 Casey Arborway 25: Washington St & MBTA Busway #2 Lane Group Storage Cap Reductn Reduced v/c Ratio WBL 0 0.21 WBR 0 0.01 NBT 0 0.64 At Grade 2010 AM 6/25/2012 NBR SBL SBT 0 0.18 Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 25 (31%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.64 Intersection Signal Delay: 5.2 Intersection LOS: A Intersection Capacity Utilization 61.4% ICU Level of Service B Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. 25: Washington St & MBTA Busway #2 D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 2 Casey Arborway 2272: Washington St & Ukraine Way CMM McMahon 6/25/2012 WBL WBR NBT NBR SBL SBT 163 1900 1770 0.950 1770 553 1900 1599 386 1900 1759 183 1900 1583 226 1900 1696 1599 Yes 614 1759 1583 Yes 223 265 1900 1787 0.463 871 10.0 17.0 22.0 27.5% 18.0 3.0 1.0 4.0 Lead 2.0 None 614 Prot 3 10.0 17.0 22.0 27.5% 18.0 3.0 1.0 4.0 Lead 402 13.0 0.16 0.62 47.0 0.0 47.0 D 25.4 C 98 m106 213 398 0 0 0.82 2% 0.93 1% 223 Perm 285 pm+pt 4 14 7.0 12.0 12.0 15.0% 9.0 3.0 0.0 4.0 Lag 1 12.0 19.0 28.0 35.0% 24.0 3.0 1.0 4.0 Lead 1 12.0 19.0 28.0 35.0% 24.0 3.0 1.0 4.0 Lead 2.0 2.0 2.0 None C-Max C-Max 13.0 0.16 0.79 17.0 2.3 19.2 B 117 m121 836 114 0 1696 30 388 8.8 0.91 12% 248 14 2 T 3 0.90 1% ø2 4.0 18.0 18.0 23% 16.0 2.0 0.0 AF 177 30 1282 29.1 0.96 8% R 30 293 6.7 0.92 2% D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2010 AM 40.0 50.0% 4.0 Lag 3.0 None 47.0 0.59 0.39 10.9 0.0 10.9 B 7.7 A 95 183 1202 47.0 0.59 0.22 2.0 0.0 2.0 A 55.0 0.69 0.41 8.6 0.0 8.6 A 0 22 71 144 1034 0 0 1022 0 0 691 0 0 2.0 None 5.0 11.0 0 59.0 0.74 0.20 6.2 0.0 6.2 A 7.5 A 61 128 308 1251 0 0 Synchro 7 Page 1 Casey Arborway 2272: Washington St & Ukraine Way Lane Group Storage Cap Reductn Reduced v/c Ratio WBL 0 0.44 WBR 0 0.85 NBT 0 0.39 At Grade 2010 AM 6/25/2012 NBR 0 0.22 SBL 0 0.41 SBT 0 0.20 ø2 Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 31 (39%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.79 Intersection Signal Delay: 14.9 Intersection LOS: B Intersection Capacity Utilization 61.2% ICU Level of Service B Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. 2272: Washington St & Ukraine Way D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 2 Casey Arborway 249: Hyde Park Ave & Walk Hill St CMM McMahon 6/25/2012 WBL WBR NBT NBR SBL SBT 13 1900 0 1 25 1638 0.998 1638 347 1900 0 0 25 0 962 1900 26 1900 0 0 25 0 495 1900 0 Yes 3515 193 1900 200 1 25 1770 0.950 1770 410 0.89 1% 5 30 478 10.9 0.92 2% 0.59 4% 0.85 2% 0 1090 0 1 227 Prot 4 10.0 18.0 26.0 32.5% 21.0 4.0 1.0 5.0 Lead 7.0 12.0 16.0 20.0% 11.0 4.0 1.0 5.0 Lag 9.1 0.11 0.77 15.6 0.0 15.6 B 15.6 B 9 9 31 0.0 0.0% R 2.0 None 0.0 0.0% 4.0 3505 3505 30 828 18.8 0.94 3% 527 14 AF 3 8.0 16.0 16.0 20.0% 11.0 4.0 1.0 5.0 Lead 0 Yes ø2 T 390 30 111 2.5 0.65 0% 3515 4.0 2.0 C-Max 3.0 None 31.7 0.40 0.78 31.1 0.0 31.1 C 31.1 C ~311 #474 398 11.0 0.14 0.93 73.0 0.0 73.0 E D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) At Grade 2010 AM 94 #214 42.0 52.5% 2 7.0 22.0 22.0 28% 20.0 2.0 0.0 5.0 Lag 3.0 None 7.0 13.0 30 47.7 0.60 0.25 7.8 0.0 7.8 A 27.5 C 41 94 748 200 Synchro 7 Page 1 Casey Arborway 249: Hyde Park Ave & Walk Hill St Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio WBL 562 0 0 0 0.73 WBR At Grade 2010 AM 6/25/2012 NBT 1396 0 0 0 0.78 NBR SBL 243 0 0 0 0.93 SBT 2090 0 0 0 0.25 ø2 249: Hyde Park Ave & Walk Hill St D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 68 (85%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.93 Intersection Signal Delay: 27.1 Intersection LOS: C Intersection Capacity Utilization 72.8% ICU Level of Service C Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. CMM McMahon Synchro 7 Page 2 Casey Arborway 2162: Hyde Park Ave & Ukraine Way CMM McMahon 6/25/2012 EBL EBR NBL NBT SBT SBR 173 1900 1770 0.950 1770 275 1900 1599 566 1900 0 413 1900 3373 150 1900 0 1599 Yes 316 0 743 1900 3479 0.586 2083 3373 0 Yes 0.87 1% 0.93 1% 30 828 18.8 0.89 2% 64 30 489 11.1 0.86 3% 0.87 2% 652 0 14 1 8.0 18.0 18.0 22.5% 13.0 4.0 1.0 5.0 Lead 8.0 18.0 18.0 22.5% 13.0 4.0 1.0 5.0 Lead 0 pm+pt 4 14 7.0 12.0 16.0 20.0% 12.0 4.0 0.0 4.0 Lag 1444 3 316 Prot 3 2.0 None 2.0 None 11.8 0.15 0.77 51.4 0.0 51.4 D 30.1 C 102 #174 213 11.8 0.15 0.63 15.4 1.1 16.5 B 288 0 0 524 71 0 5 113 2 T 12.0 20.0 28.0 35.0% 23.0 4.0 1.0 5.0 Lead ø2 4.0 18.0 18.0 23% 16.0 2.0 0.0 AF 201 44.0 55.0% 5.0 R 30 293 6.7 0.86 2% D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2010 AM 2.0 None 2.0 C-Max 53.2 0.66 1.00dl 17.2 0.0 17.2 B 17.2 B 237 #467 748 42.2 0.53 0.36 8.2 0.0 8.2 A 8.2 A 26 71 409 1578 0 0 1811 0 0 0.0 0.0% 4.0 Lag 2.0 None 5.0 11.0 0 Synchro 7 Page 1 Casey Arborway 2162: Hyde Park Ave & Ukraine Way Lane Group Storage Cap Reductn Reduced v/c Ratio EBL 0 0.70 EBR 0 0.70 NBL At Grade 2010 AM 6/25/2012 NBT 0 0.92 SBT 0 0.36 SBR ø2 2162: Hyde Park Ave & Ukraine Way D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 19 (24%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.92 Intersection Signal Delay: 17.5 Intersection LOS: B Intersection Capacity Utilization 75.3% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. dl Defacto Left Lane. Recode with 1 though lane as a left lane. CMM McMahon Synchro 7 Page 2 Casey Arborway 1759: Hyde Park Ave & Tower St CMM McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 24 1900 0 18 1900 0 9 1900 0 0 1900 0 892 1900 3533 9 1900 0 6 1900 0 0 0 Yes 0 3533 0 Yes 0 475 1900 3537 0.926 3279 0 1900 0 0 Yes 0 1900 1711 0.904 1578 15 1900 0 0 0 1900 866 0.817 726 0.67 100% 32 30 94 2.1 0.92 100% 0.56 100% 0.56 0% 24 30 283 6.4 0.92 0% 0.63 0% 0.92 0% 2 30 201 4.6 0.86 2% 0.75 0% 0.50 0% 30 440 10.0 0.91 2% 0.92 0% 68 0 0 Perm 40 0 0 1049 0 0 Perm 534 0 3 2.0 None 2.0 None 8.0 13.0 17.0 21.3% 13.0 3.0 1.0 4.0 1 AF 8.0 13.0 17.0 21.3% 13.0 3.0 1.0 4.0 3 3 8.0 13.0 17.0 21.3% 13.0 3.0 1.0 4.0 0.0 0.0% 4.0 R 3 8.0 13.0 17.0 21.3% 13.0 3.0 1.0 4.0 2.0 None 0.0 0.0% 0.0 0.0% 4.0 4.0 15.0 23.0 41.0 51.3% 35.0 4.0 2.0 6.0 Lead 0 Yes 1 T 0 Perm 0.0 0.0% 4.0 1 15.0 23.0 41.0 51.3% 35.0 4.0 2.0 4.0 Lead 15.0 23.0 41.0 51.3% 35.0 4.0 2.0 6.0 Lead 2.0 None 2.0 C-Max 2.0 2.0 C-Max C-Max 9.8 0.12 0.58 40.6 0.0 40.6 D 40.6 D 26 70 14 9.8 0.12 0.19 19.3 0.0 19.3 B 19.3 B 7 33 203 50.6 0.63 0.47 12.7 0.0 12.7 B 12.7 B 170 m252 121 50.6 0.63 0.26 11.2 0.0 11.2 B 11.2 B 80 106 360 145 0 0 277 0 0 2236 0 44 2075 0 0 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2010 AM 0.0 0.0% 4.0 Synchro 7 Page 1 Casey Arborway 1759: Hyde Park Ave & Tower St CMM McMahon 6/25/2012 ø2 T 2 AF 12.0 22.0 22.0 28% 20.0 2.0 0.0 3.0 None 12.0 8.0 60 R Lag D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2010 AM Synchro 7 Page 2 Casey Arborway 1759: Hyde Park Ave & Tower St Lane Group Storage Cap Reductn Reduced v/c Ratio EBL EBT 0 0.47 At Grade 2010 AM 6/25/2012 EBR WBL WBT 0 0.14 WBR NBL NBT 0 0.48 NBR SBL SBT 0 0.26 SBR Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 16 (20%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.58 Intersection Signal Delay: 13.5 Intersection LOS: B Intersection Capacity Utilization 39.9% ICU Level of Service A Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. 1759: Hyde Park Ave & Tower St D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 3 Casey Arborway 1759: Hyde Park Ave & Tower St Lane Group Storage Cap Reductn Reduced v/c Ratio At Grade 2010 AM 6/25/2012 ø2 D R AF T Intersection Summary CMM McMahon Synchro 7 Page 4 Casey Arborway 2303: Hyde Park Ave & Fitzgerald Parking Lot CMM McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 0 1900 0 0 1900 0 0 1900 0 0 1900 1644 1 1900 0 21 1900 0 31 1900 0 51 1900 0 0 0 Yes 0 1644 0 Yes 0 0 Yes 0 467 1900 3498 0.763 2682 28 1900 0 0 862 1900 3424 0.918 3150 0.92 0% 30 125 2.8 0.92 0% 0.92 0% 0.92 0% 421 30 187 4.3 0.92 0% 0.92 0% 0.58 100% 12 30 440 10.0 0.89 1% 0.46 0% 0.85 0% 13 30 207 4.7 0.95 2% 0.70 0% 0 0 0 0 Perm 1 0 0 Perm 1072 0 0 Perm 592 0 0.0 0.0% 0.0 0.0% 4.0 4.0 4.0 R 0.0 0.0% 2.0 None 45 8.0 13.0 13.0 16.3% 9.0 3.0 1.0 4.0 1 1 15.0 23.0 45.0 56.3% 39.0 4.0 2.0 4.0 Lead AF 3 8.0 13.0 13.0 16.3% 9.0 3.0 1.0 4.0 0.0 0.0% 4.0 15.0 23.0 45.0 56.3% 39.0 4.0 2.0 6.0 Lead 0 Yes 1 T 3 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2010 AM 0.0 0.0% 4.0 1 15.0 23.0 45.0 56.3% 39.0 4.0 2.0 4.0 Lead 15.0 23.0 45.0 56.3% 39.0 4.0 2.0 6.0 Lead 2.0 None 2.0 2.0 C-Max C-Max 2.0 2.0 C-Max C-Max 8.0 0.10 0.00 0.0 0.0 0.0 A 0.0 A 0 0 107 60.8 0.76 0.45 1.9 0.1 2.0 A 2.0 A 11 16 360 60.8 0.76 0.29 2.7 0.0 2.7 A 2.7 A 10 m77 127 559 0 0 2397 235 0 2042 0 0 0.0 0.0% 4.0 Synchro 7 Page 1 Casey Arborway 2303: Hyde Park Ave & Fitzgerald Parking Lot CMM McMahon 6/25/2012 ø2 T 2 AF 12.0 22.0 22.0 28% 20.0 2.0 0.0 3.0 None 12.0 8.0 40 R Lag D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2010 AM Synchro 7 Page 2 Casey Arborway 2303: Hyde Park Ave & Fitzgerald Parking Lot Lane Group Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL At Grade 2010 AM 6/25/2012 WBT 0 0.00 WBR NBL NBT 0 0.50 NBR SBL SBT 0 0.29 SBR Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 28 (35%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.45 Intersection Signal Delay: 2.3 Intersection LOS: A Intersection Capacity Utilization 60.7% ICU Level of Service B Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. 2303: Hyde Park Ave & Fitzgerald Parking Lot D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 3 Casey Arborway 2303: Hyde Park Ave & Fitzgerald Parking Lot Lane Group Storage Cap Reductn Reduced v/c Ratio At Grade 2010 AM 6/25/2012 ø2 D R AF T Intersection Summary CMM McMahon Synchro 7 Page 4 Casey Arborway 2164: Washington Street & Arborway CMM McMahon 6/25/2012 EBT EBR WBT WBR NBL NBT NBR NBR2 SBL SBT SBR2 NEL2 1286 1900 11 1855 1900 11 108 1900 11 15 1900 11 3077 0 0 4832 0 3323 1432 0 No 52 1900 10 100 1 25 1589 0.192 321 309 1900 11 3323 0 1900 11 100 1 25 1432 4793 85 1900 10 50 1 25 1668 0.343 602 187 1900 11 4832 200 1900 11 0 0 25 0 591 1900 11 4793 237 1900 11 100 0 25 0 3077 0 No 872 0.950 872 35 677 13.2 0.87 2% 0.80 2% 35 177 3.4 0.95 2% 0.80 2% 0.88 1% 1774 0 2203 0 97 pm+pt 3 4 5.0 9.0 9.0 11.3% 5.0 3.0 1.0 4.0 Lead 1 0.0 0.0% 10.0 32.0 32.0 40.0% 28.0 3.0 1.0 4.0 3.0 C-Max 14.0 14.0 30 35.6 0.44 0.83 20.5 0.0 20.5 C 20.5 C ~180 #406 597 0.0 0.0% R 10.0 32.0 32.0 40.0% 28.0 3.0 1.0 4.0 4.0 3.0 C-Max 14.0 14.0 30 35.6 0.44 1.02 42.5 0.0 42.5 D 42.5 D ~519 #604 97 4.0 3.0 None 24.8 0.31 0.38 13.0 0.0 13.0 B 8 21 0 0.92 2% 0.92 9% 0.59 6% 203 Perm 0 88 pm+pt 3 4 5.0 9.0 9.0 11.3% 5.0 3.0 1.0 4.0 Lead T 35 181 3.5 0.82 5% 721 AF 1 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) At Grade 2010 AM 4 7.0 25.0 25.0 31.3% 21.0 3.0 1.0 4.0 Lag 3.0 None 10.0 11.0 20 20.8 0.26 0.84 27.9 0.0 27.9 C 25.0 C 188 134 101 4 7.0 25.0 25.0 31.3% 21.0 3.0 1.0 4.0 Lag 0.0 0.0% 4.0 3.0 None 10.0 11.0 20 20.8 0.26 0.55 20.4 0.0 20.4 C 3.0 None 72 89 29 37 24.8 0.31 0.49 27.0 0.0 27.0 C 35 323 6.3 0.84 11% 0.92 4% 0.92 100% 485 0 16 Prot 8 4 7.0 25.0 25.0 31.3% 21.0 3.0 1.0 4.0 Lag 3.0 None 10.0 11.0 20 20.8 0.26 0.61 29.7 0.0 29.7 C 29.3 C 111 147 243 0.0 0.0% 4.0 8.0 14.0 14.0 17.5% 8.0 3.0 3.0 6.0 2.0 None 8.0 0.10 0.18 38.5 0.0 38.5 D 8 26 Synchro 7 Page 1 Casey Arborway 2164: Washington Street & Arborway CMM McMahon 6/25/2012 SWL 18 1900 11 0 1 25 872 0.950 872 T 0.92 100% R 8.0 14.0 14.0 17.5% 8.0 3.0 3.0 6.0 AF 20 Prot 8 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) At Grade 2010 AM 2.0 None 8.0 0.10 0.23 40.2 0.0 40.2 D 9 31 Synchro 7 Page 2 Casey Arborway 2164: Washington Street & Arborway Lane Group Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBT EBR 2134 0 0 0 0.83 WBT At Grade 2010 AM 6/25/2012 WBR 2151 0 0 0 1.02 NBL 50 253 0 0 0 0.38 NBT 872 0 0 0 0.83 NBR 100 376 0 0 0 0.54 NBR2 SBL 100 179 0 0 0 0.49 SBT 808 0 0 0 0.60 SBR2 NEL2 87 0 0 0 0.18 2164: Washington Street & Arborway D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 1 (1%), Referenced to phase 1:EBWB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.02 Intersection Signal Delay: 31.0 Intersection LOS: C Intersection Capacity Utilization 77.5% ICU Level of Service D Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. CMM McMahon Synchro 7 Page 3 Casey Arborway 2164: Washington Street & Arborway Lane Group Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio At Grade 2010 AM 6/25/2012 SWL 87 0 0 0 0.23 D R AF T Intersection Summary CMM McMahon Synchro 7 Page 4 Casey Arborway 3: Arborway & Forest Hills Drive CMM McMahon 6/25/2012 EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 562 1900 10 180 1 25 1652 0.950 1652 692 1900 11 13 1900 11 0 0 25 0 12 1900 10 100 1 25 1652 0.335 582 1088 1900 11 58 1900 11 0 1 25 0 79 1900 11 0 0 25 0 2 1900 11 22 1900 11 0 0 25 0 1 1900 11 0 0 No 0 1718 0.790 1423 551 1900 11 100 1 25 1531 0 No 1742 0.724 1319 5 1900 11 0 0 25 0 0.88 2% 0.83 0% 35 168 3.3 0.83 0% 0.83 0% 0.91 2% 35 241 4.7 0.91 2% 0 0 Perm 103 0 0 Perm 7.0 32.0 32.0 40.0% 28.0 3.0 1.0 4.0 Lead 3.0 None 13.0 15.0 20 28.0 0.35 1.09 90.2 0.0 90.2 F ~339 #534 0 No 35 188 3.7 0.89 2% 0.89 1% 0.88 2% 793 0 14 Perm 13 65.0 81.3% 4.0 61.9 0.77 0.30 5.6 0.0 5.6 A 43.1 D 87 127 108 3394 3394 35 348 6.8 0.88 2% 1302 AF 631 Prot 3 3412 1 0.0 0.0% 1 7.0 31.0 33.0 41.3% 29.0 3.0 1.0 4.0 R 0.89 2% 3412 T EBL D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) At Grade 2010 AM 4.0 7.0 31.0 33.0 41.3% 29.0 3.0 1.0 4.0 3.0 3.0 C-Max C-Max 12.0 12.0 15.0 15.0 20 20 29.9 29.9 0.37 0.37 0.06 1.03 13.2 45.2 0.0 38.2 13.2 83.4 B F 82.7 F 2 ~369 m3 m#460 268 0.0 0.0% 4.0 4 7.0 15.0 15.0 18.8% 11.0 3.0 1.0 4.0 Lag 3.0 None 6.0 4.0 20 4 7.0 15.0 15.0 18.8% 11.0 3.0 1.0 4.0 Lag 3.0 None 6.0 4.0 20 10.1 0.13 0.62 49.9 0.0 49.9 D 49.9 D 49 90 88 25 4 0.0 0.0% 4.0 4 7.0 15.0 15.0 18.8% 11.0 3.0 1.0 4.0 Lag 3.0 None 6.0 4.0 20 7.0 15.0 15.0 18.8% 11.0 3.0 1.0 4.0 Lag 3.0 None 6.0 4.0 20 10.1 0.13 0.14 32.4 0.0 32.4 C 21.7 C 11 33 161 1531 Yes 10 0.91 2% 605 custom 4 3 7.0 15.0 15.0 18.8% 11.0 3.0 1.0 4.0 Lag 3.0 None 6.0 4.0 20 42.1 0.53 0.75 21.3 0.0 21.3 C 212 345 Synchro 7 Page 1 Casey Arborway 3: Arborway & Forest Hills Drive Lane Group Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL 180 578 0 0 0 1.09 EBT At Grade 2010 AM 6/25/2012 EBR 2640 0 0 0 0.30 WBL 100 218 0 0 0 0.06 WBT WBR NBL 1268 109 0 0 1.12 NBT 181 0 0 0 0.57 NBR SBL SBT 196 0 0 0 0.13 SBR 100 828 0 0 0 0.73 3: Arborway & Forest Hills Drive D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 60 (75%), Referenced to phase 1:EBWB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.09 Intersection Signal Delay: 54.4 Intersection LOS: D Intersection Capacity Utilization 84.5% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 2 Casey Arborway 13: Arborway & East Bow Tie CMM McMahon 6/25/2012 EBU EBL EBT WBT WBR SBL SBR 193 1900 11 0 1900 11 250 1 25 0 1267 1900 11 1801 1900 11 3421 3421 0 1900 11 0 0 25 0 0 1900 11 0 0 25 0 0 1900 11 0 0 25 0 0 3421 3421 0 Yes 0 0 Yes 0.92 0.92 35 373 7.3 0.87 35 478 9.3 0.95 0.92 210 Prot 3 0 1456 1896 0 13 1 2.0 None 7.0 10.0 10 17.9 0.22 0.55 18.9 0.0 18.9 B 0.0 0.0% 65.0 81.3% 4.0 65 m96 10.0 24.0 40.0 50.0% 36.0 3.0 1.0 4.0 Lag 4.0 0.92 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% 4.0 4.0 4.0 2 4.0 15.0 15.0 19% 13.0 2.0 0.0 Lead 2.0 C-Max 76.2 51.1 0.95 0.64 0.45 0.87 1.4 12.4 0.0 0.0 1.4 12.4 A B 3.6 12.4 A B 0 151 47 m#652 293 398 ø2 T 35 121 2.4 0.92 AF 10.0 25.0 25.0 31.3% 21.0 3.0 1.0 4.0 R 1711 0.950 1711 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) At Grade 2010 AM 2.0 None 7.0 6.0 10 41 250 Synchro 7 Page 1 Casey Arborway 13: Arborway & East Bow Tie Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBU 449 0 0 0 0.47 EBL At Grade 2010 AM 6/25/2012 EBT 3231 101 0 0 0.47 WBT 2183 0 0 0 0.87 WBR SBL SBR ø2 AF 13: Arborway & East Bow Tie D R Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 66 (83%), Referenced to phase 1:EBWB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.87 Intersection Signal Delay: 8.3 Intersection LOS: A Intersection Capacity Utilization 53.1% ICU Level of Service A Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 2 Casey Arborway 11: Arborway & West Bow Tie CMM McMahon 6/25/2012 EBL EBT WBU WBT WBR SBL SBR 0 1900 11 0 0 25 0 1162 1900 11 1714 1900 11 0 1900 11 0 0 25 0 0 1900 11 0 0 25 0 0 1900 11 0 0 25 0 0 4916 364 1900 11 350 1 25 1711 0.950 1711 0 Yes 0 0 Yes 0.92 35 192 3.7 0.87 0 1336 0.92 1 4.0 35 419 8.2 0.95 0.92 1804 0 12 7.0 31.0 35.0 80.0 43.8% 100.0% 31.0 3.0 1.0 4.0 4.0 Lag R 0.0 0.0% 7.0 22.0 45.0 56.3% 41.0 3.0 1.0 4.0 Lead 3421 2.0 C-Max 43.7 0.55 0.50 12.7 0.0 12.7 B 12.7 B 154 183 112 2684 0 0 35 115 2.2 0.92 0.92 0 0 AF 396 Prot 2 3421 T 4916 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2010 AM 2.0 None 28.3 0.35 0.65 17.8 0.0 17.8 B 174 m205 350 663 0 0 80.0 1.00 0.53 1.7 0.0 1.7 A 4.6 A 4 m12 339 0.0 0.0% 0.0 0.0% 0.0 0.0% 4.0 4.0 4.0 35 3416 0 0 Synchro 7 Page 1 Casey Arborway 11: Arborway & West Bow Tie Lane Group Storage Cap Reductn Reduced v/c Ratio EBL EBT 0 0.50 At Grade 2010 AM 6/25/2012 WBU 0 0.60 WBT 0 0.53 WBR SBL SBR Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 68 (85%), Referenced to phase 1:EBWB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.65 Intersection Signal Delay: 7.7 Intersection LOS: A Intersection Capacity Utilization 50.7% ICU Level of Service A Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. 11: Arborway & West Bow Tie D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 2 Casey Arborway 9: Arborway & Cemetery Rd CMM McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 133 1900 10 150 1 25 1685 0.085 151 586 1900 11 0 1900 11 0 0 25 0 5 1900 11 0 0 25 0 1132 1900 16 737 1900 11 0 0 25 0 4 1900 12 0 0 25 0 3 1900 12 0 1900 12 0 0 25 0 219 1900 12 0 0 25 0 2 1900 12 22 1900 12 0 0 25 0 0 Yes 0 0 Yes 0 0 Yes 0 3421 3787 0.954 3613 322 35 97 1.9 35 348 6.8 0.89 2% 0.89 0% 0.93 20% 0.93 2% 149 pm+pt 4 14 3.0 7.0 7.0 8.8% 3.0 3.0 1.0 4.0 Lag Yes 3.0 None 51.0 0.64 0.97 85.4 0.0 85.4 F 658 0 0 Perm 2014 14 5.0 25 #115 150 154 1 0.80 25% 0 0 Perm 1 0.0 0.0% 1 7.0 20.0 52.0 65.0% 47.0 4.0 1.0 5.0 R 59.0 73.8% 0.93 1% 4.0 7.0 20.0 52.0 65.0% 47.0 4.0 1.0 5.0 54.0 0.68 0.28 3.6 0.2 3.8 A 18.9 B 37 42 268 3.0 3.0 C-Max C-Max 47.0 0.59 0.89 18.6 46.9 65.4 E 65.4 E 362 #493 17 2309 2255 0.0 0.0% 4.0 3 7.0 17.0 21.0 26.3% 16.0 4.0 1.0 5.0 Lead Yes 3.0 None 0.80 0% 1 0.80 0% 9 0 295 0 Yes 0.92 1% 0.92 0% 0.92 0% 0 Perm 264 0 3 7.0 17.0 21.0 26.3% 16.0 4.0 1.0 5.0 Lead Yes 3.0 None 16.0 0.20 0.03 26.3 0.0 26.3 C 26.3 C 4 14 176 1780 0.741 1379 6 35 140 2.7 35 256 5.0 AF 0.89 0% 1623 0.883 1473 T 3421 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) At Grade 2010 AM 3 0.0 0.0% 4.0 3 7.0 17.0 21.0 26.3% 16.0 4.0 1.0 5.0 Lead Yes 3.0 None 7.0 17.0 21.0 26.3% 16.0 4.0 1.0 5.0 Lead Yes 3.0 None 16.0 0.20 0.94 74.2 0.0 74.2 E 74.2 E 128 #274 60 0.0 0.0% 4.0 281 Synchro 7 Page 1 Casey Arborway 9: Arborway & Cemetery Rd Lane Group Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL 0 0 0 0.97 At Grade 2010 AM 6/25/2012 EBT 815 0 0 0.44 EBR WBL WBT 0 427 0 1.10 WBR NBL NBT 0 0 0 0.03 NBR SBL SBT 0 0 0 0.94 SBR 9: Arborway & Cemetery Rd D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 48 (60%), Referenced to phase 1:EBWB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.97 Intersection Signal Delay: 53.9 Intersection LOS: D Intersection Capacity Utilization 103.9% ICU Level of Service G Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. CMM McMahon Synchro 7 Page 2 Casey Arborway 2163: Arborway & South St CMM McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 11 0 0 25 0 1716 1900 11 616 1900 11 100 1 25 1531 0 1900 11 0 0 25 0 1473 1900 11 172 1900 11 0 0 25 0 188 1900 11 279 1900 11 50 0 25 0 13 1900 11 0 0 25 0 4916 1531 No 0 4842 102 1900 10 100 1 25 1504 0.469 743 328 1900 11 0 147 1900 10 100 1 25 1685 0.195 346 0.92 2% 35 235 4.6 0.94 2% 0.92 2% 0.92 2% 35 677 13.2 0.86 2% 0 1826 670 Free 0 1902 0.0 0.0% 1 1 7.0 28.0 55.0 45.8% 50.0 4.0 1.0 5.0 3.0 C-Max 10.0 13.0 60 58.9 0.49 0.76 20.8 0.1 20.9 C 15.5 B 202 387 155 0 No 0.91 2% 0.76 0% 0 193 pm+pt 3 34 7.0 16.0 16.0 13.3% 11.0 4.0 1.0 5.0 Lead 0.0 0.0% 0.0 0.0% 4.0 120.0 1.00 0.44 0.6 0.2 0.8 A 0 0 4.0 1 1 7.0 28.0 55.0 45.8% 50.0 4.0 1.0 5.0 3.0 C-Max 10.0 13.0 60 58.9 0.49 0.80 22.5 0.1 22.5 C 22.5 C 247 284 597 3065 3065 0.0 0.0% 4.0 0.93 2% 0.88 12% 500 0 116 Perm 34 0.0 0.0% 5.0 4.0 74 66 51.1 0.43 0.38 13.5 0.6 14.1 B 22.2 C 100 74 148 1791 1791 0 No 35 152 3.0 0.79 2% 0.81 0% 431 0 4 65.0 54.2% 3.0 None 46.1 0.38 0.75 35.1 8.3 43.4 D 0 No 35 228 4.4 0.94 6% T 4842 AF Free R 4.0 4916 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) At Grade 2010 PM 4 7.0 28.0 49.0 40.8% 44.0 4.0 1.0 5.0 Lag 2.0 None 10.0 13.0 30 35.1 0.29 0.53 43.6 0.0 43.6 D 75 122 7.0 28.0 49.0 40.8% 44.0 4.0 1.0 5.0 Lag 0.0 0.0% 4.0 2.0 None 10.0 13.0 30 35.1 0.29 0.82 52.5 0.0 52.5 D 50.6 D 310 326 72 Synchro 7 Page 1 Casey Arborway 2163: Arborway & South St Lane Group Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL At Grade 2010 PM 6/25/2012 EBT 2415 81 0 0 0.78 EBR 100 1531 0 290 0 0.54 WBL WBT WBR 2378 30 8 0 0.81 NBL 100 256 3 37 0 0.88 NBT 1533 624 0 0 0.55 NBR SBL 100 272 0 0 0 0.43 SBT SBR 657 0 0 0 0.66 2163: Arborway & South St D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 0 (0%), Referenced to phase 1:EBWB, Start of Green, Master Intersection Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.82 Intersection Signal Delay: 22.1 Intersection LOS: C Intersection Capacity Utilization 71.9% ICU Level of Service C Analysis Period (min) 15 CMM McMahon Synchro 7 Page 2 Casey Arborway 253: South St & Washington St CMM McMahon 6/25/2012 EBL EBR NBL NBT SBT SBR 151 1900 1726 0.976 1726 136 1900 0 81 1900 0 665 1900 3413 269 1900 0 0 Yes 0 443 1900 3522 0.604 2145 3413 0 Yes 30 198 4.5 0.92 2% 62 30 228 5.2 0.95 1% 0.90 1% 578 999 0 14 1 0.84 0% 383 0 0 pm+pt 4 14 8.0 10.0 10.0 8.3% 8.0 2.0 0.0 4.0 Lag 3 2.0 None 0.0 0.0% 4.0 58.0 48.3% 5.0 R 8.0 10.0 43.0 35.8% 41.0 2.0 0.0 2.0 Lead 30.0 38.0 48.0 40.0% 43.0 4.0 1.0 5.0 Lead 2 T 0.69 0% ø2 6.0 19.0 19.0 16% 17.0 2.0 0.0 AF 48 30 846 19.2 0.81 0% D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2010 PM 2.0 None 2.0 C-Max 28.7 0.24 0.85 55.3 0.0 55.3 E 55.3 E 252 287 766 67.9 0.57 0.45 16.2 0.3 16.5 B 16.5 B 117 138 118 62.9 0.52 0.55 14.6 0.3 14.9 B 14.9 B 190 325 148 621 0 0 1271 218 1 1819 312 0 0.0 0.0% 4.0 Lag 3.0 None 7.0 10.0 25 Synchro 7 Page 1 Casey Arborway 253: South St & Washington St Lane Group Storage Cap Reductn Reduced v/c Ratio EBL 0 0.62 EBR At Grade 2010 PM 6/25/2012 NBL NBT 0 0.55 SBT 0 0.66 SBR ø2 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 68 (57%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.85 Intersection Signal Delay: 23.3 Intersection LOS: C Intersection Capacity Utilization 80.4% ICU Level of Service D Analysis Period (min) 15 253: South St & Washington St D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 2 Casey Arborway 25: Washington St & MBTA Busway #2 CMM McMahon 6/25/2012 WBL WBR NBT NBR SBL SBT 29 1900 902 0.950 902 10 1900 808 526 1900 1863 0 1900 0 0 1900 0 820 1900 3574 808 Yes 11 1863 0 Yes 0 3574 32 0.92 100% 11 Free 2 30 310 7.0 0.92 2% 0.92 2% 0.92 2% 30 139 3.2 0.92 1% 572 0 0 891 1 1 T 30 105 2.4 0.92 100% Free 3.0 None 6.0 10.0 50 12.4 0.21 0.17 16.9 0.0 16.9 B 12.5 B 9 m19 25 4.0 301 0 0 60.0 1.00 0.01 0.0 0.0 0.0 A 0 m0 808 0 0 7.0 24.0 36.0 60.0% 32.0 3.0 1.0 4.0 Lead AF 0.0 0.0% 7.0 24.0 36.0 60.0% 32.0 3.0 1.0 4.0 Lead 0.0 0.0% 0.0 0.0% 4.0 4.0 R 7.0 24.0 24.0 40.0% 20.0 3.0 1.0 4.0 Lag 3.0 C-Max 6.0 10.0 0 45.6 0.76 0.40 6.6 0.0 6.6 A 6.6 A 119 211 230 3.0 C-Max 6.0 10.0 0 45.6 0.76 0.33 5.9 0.1 5.9 A 5.9 A 113 188 59 1416 0 0 2716 558 0 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2010 PM Synchro 7 Page 1 Casey Arborway 25: Washington St & MBTA Busway #2 Lane Group Storage Cap Reductn Reduced v/c Ratio WBL 0 0.11 WBR 0 0.01 NBT 0 0.40 At Grade 2010 PM 6/25/2012 NBR SBL SBT 0 0.41 Intersection Summary Area Type: Other Cycle Length: 60 Actuated Cycle Length: 60 Offset: 0 (0%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.40 Intersection Signal Delay: 6.4 Intersection LOS: A Intersection Capacity Utilization 40.2% ICU Level of Service A Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. 25: Washington St & MBTA Busway #2 D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 2 Casey Arborway 2272: Washington St & Ukraine Way CMM McMahon 6/25/2012 WBL WBR NBT NBR SBL SBT 156 1900 1787 0.950 1787 272 1900 1599 329 1900 1792 211 1900 1599 304 1900 1759 1599 Yes 373 1792 1599 Yes 237 484 1900 1787 0.432 813 0.73 1% 373 Perm 370 3 2.0 None 0.86 1% 237 Perm 563 pm+pt 4 14 7.0 20.0 35.0 29.2% 32.0 3.0 0.0 4.0 Lag 1 3 10.0 17.0 31.0 25.8% 27.0 3.0 1.0 4.0 Lead 12.0 19.0 30.0 25.0% 26.0 3.0 1.0 4.0 Lead 1 12.0 19.0 30.0 25.0% 26.0 3.0 1.0 4.0 Lead R 10.0 17.0 31.0 25.8% 27.0 3.0 1.0 4.0 Lead 0.89 1% 2.0 2.0 2.0 None C-Max C-Max 17.8 0.15 0.75 54.2 0.8 55.0 D 29.9 C 150 194 213 17.8 0.15 0.67 15.2 1.2 16.5 B 402 54 0 649 117 0 61 98 1759 30 388 8.8 0.85 8% 358 14 2 T 200 30 1282 29.1 0.89 6% ø2 4.0 24.0 24.0 20% 16.0 4.0 4.0 AF 30 293 6.7 0.78 1% D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2010 PM 65.0 54.2% 4.0 Lag 3.0 None 59.2 0.49 0.42 22.3 0.0 22.3 C 14.8 B 178 282 1202 59.2 0.49 0.26 3.2 0.0 3.2 A 90.2 0.75 0.65 10.8 0.1 10.9 B 0 44 107 191 884 0 0 909 0 51 863 0 21 2.0 None 5.0 11.0 0 94.2 0.78 0.26 2.6 0.0 2.6 A 7.7 A 43 67 308 1381 0 0 Synchro 7 Page 1 Casey Arborway 2272: Washington St & Ukraine Way Lane Group Storage Cap Reductn Reduced v/c Ratio WBL 0 0.57 WBR 0 0.70 NBT 0 0.42 At Grade 2010 PM 6/25/2012 NBR 0 0.28 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 9 (8%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.75 Intersection Signal Delay: 15.8 Intersection Capacity Utilization 62.8% Analysis Period (min) 15 SBT 0 0.26 ø2 Intersection LOS: B ICU Level of Service B 2272: Washington St & Ukraine Way D R AF T Splits and Phases: SBL 0 0.67 CMM McMahon Synchro 7 Page 2 Casey Arborway 249: Hyde Park Ave & Walk Hill St CMM McMahon 6/25/2012 WBL WBR NBT NBR SBL SBT 38 1900 0 1 25 1649 0.990 1649 223 1900 0 0 25 0 559 1900 21 1900 0 0 25 0 1044 1900 0 Yes 3511 345 1900 200 1 25 1770 0.950 1770 333 0.83 2% 4 30 478 10.9 0.95 2% 0.65 2% 0.87 2% 0 620 0 1 397 Prot 4 10.0 18.0 36.0 30.0% 31.0 4.0 1.0 5.0 Lead 4.0 10.0 42.0 35.0% 40.0 2.0 0.0 2.0 Lag 15.0 0.12 1.00 80.3 0.0 80.3 F 80.3 F ~156 117 31 0.0 0.0% R 2.0 None 0.0 0.0% 4.0 3539 3539 30 828 18.8 0.95 2% 1099 14 AF 3 8.0 16.0 20.0 16.7% 15.0 4.0 1.0 5.0 Lead 0 Yes ø2 T 144 30 111 2.5 0.59 0% 3511 4.0 2.0 C-Max 3.0 None 43.2 0.36 0.49 34.7 0.0 34.7 C 34.7 C 226 292 398 36.6 0.30 0.73 55.0 0.0 55.0 D D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) At Grade 2010 PM 305 m379 78.0 65.0% 2 7.0 22.0 22.0 18% 20.0 2.0 0.0 5.0 Lag 3.0 None 7.0 13.0 25 81.8 0.68 0.46 12.7 0.0 12.7 B 23.9 C 187 296 748 200 Synchro 7 Page 1 Casey Arborway 249: Hyde Park Ave & Walk Hill St Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio WBL 332 0 0 0 1.00 WBR At Grade 2010 PM 6/25/2012 NBT 1265 0 0 0 0.49 NBR SBL 590 0 0 0 0.67 SBT 2410 0 0 0 0.46 ø2 AF 249: Hyde Park Ave & Walk Hill St D R Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 8 (7%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.00 Intersection Signal Delay: 34.3 Intersection LOS: C Intersection Capacity Utilization 62.8% ICU Level of Service B Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 2 Casey Arborway 2162: Hyde Park Ave & Ukraine Way CMM McMahon 6/25/2012 EBL EBR NBL NBT SBT SBR 185 1900 1770 0.950 1770 510 1900 1583 283 1900 0 879 1900 3458 145 1900 0 1583 Yes 437 0 499 1900 3501 0.497 1772 3458 0 Yes 0.92 2% 0.88 0% 30 828 18.8 0.91 2% 21 30 489 11.1 0.86 2% 0.78 2% 554 Perm 0 pm+pt 4 14 7.0 12.0 12.0 10.0% 8.0 4.0 0.0 3.0 Lag 870 1208 0 14 1 3 2.0 None 20.1 0.17 0.80 72.1 2.9 75.0 E 47.6 D 166 222 213 369 60 0 66.0 55.0% 5.0 R 8.0 16.0 30.0 25.0% 25.0 4.0 1.0 5.0 Lead 3 8.0 16.0 30.0 25.0% 25.0 4.0 1.0 5.0 Lead 2.0 None 20.1 0.17 0.88 32.3 3.5 35.9 D 118 #276 676 62 0 12.0 20.0 54.0 45.0% 49.0 4.0 1.0 5.0 Lead 2 T 237 ø2 4.0 24.0 24.0 20% 22.0 2.0 0.0 AF 30 293 6.7 0.78 2% D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2010 PM 2.0 None 2.0 C-Max 84.9 0.71 0.99dl 13.2 0.1 13.3 B 13.3 B 127 m134 748 77.9 0.65 0.54 19.8 0.0 19.8 B 19.8 B 463 506 409 1354 0 39 2252 0 76 0.0 0.0% 4.0 Lag 2.0 None 5.0 11.0 0 Synchro 7 Page 1 Casey Arborway 2162: Hyde Park Ave & Ukraine Way Lane Group Storage Cap Reductn Reduced v/c Ratio EBL 0 0.77 EBR 0 0.90 NBL At Grade 2010 PM 6/25/2012 NBT 0 0.66 SBT 0 0.56 SBR ø2 2162: Hyde Park Ave & Ukraine Way D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 0 (0%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay: 25.5 Intersection LOS: C Intersection Capacity Utilization 73.7% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. dl Defacto Left Lane. Recode with 1 though lane as a left lane. CMM McMahon Synchro 7 Page 2 Casey Arborway 1759: Hyde Park Ave & Tower St CMM McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 22 1900 0 14 1900 0 16 1900 0 0 1900 0 736 1900 3564 11 1900 0 17 1900 0 0 0 Yes 0 3564 0 Yes 0 985 1900 3571 0.929 3321 0 1900 0 0 Yes 0 1900 1753 0.830 1501 14 1900 0 0 0 1900 875 0.804 726 0.79 100% 16 30 94 2.1 0.92 100% 0.88 100% 0.44 0% 19 30 283 6.4 0.92 0% 0.70 0% 0.92 0% 3 30 201 4.6 0.89 1% 0.69 0% 0.85 0% 30 440 10.0 0.92 1% 0.92 0% 44 0 0 Perm 56 0 0 843 0 0 Perm 1091 0 3 2.0 None 2.0 None 8.0 13.0 16.0 13.3% 12.0 3.0 1.0 4.0 1 AF 8.0 13.0 16.0 13.3% 12.0 3.0 1.0 4.0 3 3 8.0 13.0 16.0 13.3% 12.0 3.0 1.0 4.0 0.0 0.0% 4.0 R 3 8.0 13.0 16.0 13.3% 12.0 3.0 1.0 4.0 2.0 None 0.0 0.0% 0.0 0.0% 4.0 4.0 15.0 23.0 82.0 68.3% 76.0 4.0 2.0 4.0 Lead 0 Yes 1 T 0 Perm 0.0 0.0% 4.0 1 15.0 23.0 82.0 68.3% 76.0 4.0 2.0 4.0 Lead 15.0 23.0 82.0 68.3% 76.0 4.0 2.0 4.0 Lead 2.0 None 2.0 C-Max 2.0 2.0 C-Max C-Max 9.8 0.08 0.59 76.1 0.0 76.1 E 76.1 E 28 m#71 14 9.8 0.08 0.40 45.4 0.0 45.4 D 45.4 D 28 70 203 82.6 0.69 0.34 6.1 0.0 6.1 A 6.1 A 61 140 121 82.6 0.69 0.48 2.3 0.0 2.4 A 2.4 A 13 18 360 87 0 0 167 0 0 2454 0 0 2286 69 0 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2010 PM 0.0 0.0% 4.0 Synchro 7 Page 1 Casey Arborway 1759: Hyde Park Ave & Tower St CMM McMahon 6/25/2012 ø2 T 2 AF 12.0 22.0 22.0 18% 20.0 2.0 0.0 3.0 None 7.0 13.0 120 R Lag D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2010 PM Synchro 7 Page 2 Casey Arborway 1759: Hyde Park Ave & Tower St Lane Group Storage Cap Reductn Reduced v/c Ratio EBL EBT 0 0.51 At Grade 2010 PM 6/25/2012 EBR WBL WBT 0 0.34 WBR NBL NBT 0 0.34 NBR SBL SBT 0 0.49 SBR 1759: Hyde Park Ave & Tower St D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 47 (39%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.59 Intersection Signal Delay: 6.7 Intersection LOS: A Intersection Capacity Utilization 52.6% ICU Level of Service A Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 3 Casey Arborway 1759: Hyde Park Ave & Tower St Lane Group Storage Cap Reductn Reduced v/c Ratio At Grade 2010 PM 6/25/2012 ø2 D R AF T Intersection Summary CMM McMahon Synchro 7 Page 4 Casey Arborway 2303: Hyde Park Ave & Fitzgerald Parking Lot CMM McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 0 1900 0 0 1900 0 51 1900 0 21 1900 0 21 1900 0 7 1900 0 0 Yes 0 0 Yes 0 0 Yes 0 921 1900 3484 0.941 3282 16 1900 0 0 723 1900 3403 0.884 3015 22 1900 0 0 0 1900 1762 0.966 1762 0.92 0% 30 125 2.8 0.92 0% 0.92 0% 0.92 0% 15 30 187 4.3 0.92 0% 0.92 0% 0.75 100% 8 30 440 10.0 0.90 2% 0.46 0% 0.58 0% 3 30 194 4.4 0.89 1% 0.67 100% 0 0 0 0 Perm 78 0 0 Perm 879 0 0 Perm 1071 0 0.0 0.0% 0.0 0.0% 4.0 4.0 4.0 R 0.0 0.0% 2.0 None 45 8.0 13.0 24.0 20.0% 20.0 3.0 1.0 4.0 1 1 15.0 23.0 74.0 61.7% 68.0 4.0 2.0 4.0 Lead AF 3 8.0 13.0 24.0 20.0% 20.0 3.0 1.0 4.0 0.0 0.0% 4.0 15.0 23.0 74.0 61.7% 68.0 4.0 2.0 6.0 Lead 0 Yes 1 T 3 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2010 PM 0.0 0.0% 4.0 1 15.0 23.0 74.0 61.7% 68.0 4.0 2.0 4.0 Lead 15.0 23.0 74.0 61.7% 68.0 4.0 2.0 6.0 Lead 2.0 None 2.0 2.0 C-Max C-Max 2.0 2.0 C-Max C-Max 9.6 0.08 0.50 53.7 0.0 53.7 D 53.7 D 48 96 107 80.8 0.67 0.43 2.7 0.1 2.8 A 2.8 A 30 23 360 80.8 0.67 0.48 7.8 0.5 8.3 A 8.3 A 156 m183 114 306 0 0 2033 193 22 2211 640 0 0.0 0.0% 4.0 Synchro 7 Page 1 Casey Arborway 2303: Hyde Park Ave & Fitzgerald Parking Lot CMM McMahon 6/25/2012 ø2 T 2 AF 12.0 22.0 22.0 18% 20.0 2.0 0.0 3.0 None 7.0 13.0 100 R Lag D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2010 PM Synchro 7 Page 2 Casey Arborway 2303: Hyde Park Ave & Fitzgerald Parking Lot Lane Group Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL At Grade 2010 PM 6/25/2012 WBT 0 0.25 WBR NBL NBT 0 0.48 NBR SBL SBT 0 0.68 SBR Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 65 (54%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.50 Intersection Signal Delay: 7.6 Intersection LOS: A Intersection Capacity Utilization 50.9% ICU Level of Service A Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. 2303: Hyde Park Ave & Fitzgerald Parking Lot D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 3 Casey Arborway 2303: Hyde Park Ave & Fitzgerald Parking Lot Lane Group Storage Cap Reductn Reduced v/c Ratio At Grade 2010 PM 6/25/2012 ø2 D R AF T Intersection Summary CMM McMahon Synchro 7 Page 4 Casey Arborway 2164: Washington St & Arborway CMM McMahon 6/25/2012 EBT EBR WBT WBR NBL NBT NBR NBR2 SBL SBT SBR2 NEL2 1759 1900 11 1359 1900 11 176 1900 11 15 1900 11 3301 0 0 4808 0 3421 1459 0 No 56 1900 10 100 1 25 1685 0.415 736 606 1900 11 3421 0 1900 11 100 1 25 1459 4798 110 1900 10 0 1 25 1636 0.118 203 260 1900 11 4808 219 1900 11 100 0 25 0 374 1900 11 4798 338 1900 11 100 0 25 0 3301 0 No 872 0.950 872 35 677 13.2 0.94 2% 0.94 2% 35 147 2.9 0.86 2% 0.81 2% 0.90 3% 2231 0 1850 0 122 pm+pt 3 4 5.0 11.0 11.0 9.2% 7.0 3.0 1.0 4.0 Lead 1 0.0 0.0% 10.0 54.0 54.0 45.0% 50.0 3.0 1.0 4.0 3.0 C-Max 36.0 14.0 30 56.7 0.47 0.98 33.8 0.0 33.8 C 33.8 C ~715 #802 597 0.0 0.0% R 10.0 54.0 54.0 45.0% 50.0 3.0 1.0 4.0 4.0 3.0 C-Max 36.0 14.0 30 56.7 0.47 0.81 31.3 0.3 31.5 C 31.5 C 534 423 67 4.0 3.0 None 42.9 0.36 0.78 66.3 0.0 66.3 E 38 #150 0 0.92 2% 0.92 7% 0.80 0% 283 Perm 0 70 pm+pt 3 4 5.0 11.0 11.0 9.2% 7.0 3.0 1.0 4.0 Lead T 35 193 3.8 0.94 2% 398 AF 1 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) At Grade 2010 PM 4 7.0 41.0 41.0 34.2% 37.0 3.0 1.0 4.0 Lag 3.0 None 24.0 13.0 20 35.9 0.30 0.39 27.3 0.0 27.3 C 36.7 D 107 110 113 4 7.0 41.0 41.0 34.2% 37.0 3.0 1.0 4.0 Lag 0.0 0.0% 4.0 3.0 None 24.0 13.0 20 35.9 0.30 0.65 36.3 0.7 37.0 D 3.0 None 172 284 34 57 42.9 0.36 0.22 24.6 0.0 24.6 C 35 323 6.3 0.94 2% 0.91 2% 0.92 100% 838 0 16 Prot 8 4 7.0 41.0 41.0 34.2% 37.0 3.0 1.0 4.0 Lag 3.0 None 24.0 13.0 20 35.9 0.30 0.85 48.6 0.0 48.6 D 46.8 D 316 397 243 0.0 0.0% 4.0 8.0 14.0 14.0 11.7% 8.0 3.0 3.0 6.0 2.0 None 8.0 0.07 0.28 65.7 0.0 65.7 E 12 37 Synchro 7 Page 1 Casey Arborway 2164: Washington St & Arborway CMM McMahon 6/25/2012 SWL 14 1900 11 0 1 25 872 0.950 872 T 0.92 100% R 8.0 14.0 14.0 11.7% 8.0 3.0 3.0 6.0 AF 15 Prot 8 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) At Grade 2010 PM 2.0 None 8.0 0.07 0.26 64.6 0.0 64.6 E 11 35 Synchro 7 Page 2 Casey Arborway 2164: Washington St & Arborway Lane Group Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBT EBR 2265 0 0 0 0.98 At Grade 2010 PM 6/25/2012 WBT WBR 2270 34 77 0 0.84 NBL NBT 156 0 0 0 0.78 1055 0 0 0 0.38 NBR 100 450 35 0 0 0.68 NBR2 SBL 100 319 0 0 0 0.22 SBT 1018 0 0 0 0.82 SBR2 NEL2 58 0 0 0 0.28 2164: Washington St & Arborway D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 5 (4%), Referenced to phase 1:EBWB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.98 Intersection Signal Delay: 35.7 Intersection LOS: D Intersection Capacity Utilization 86.7% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. CMM McMahon Synchro 7 Page 3 Casey Arborway 2164: Washington St & Arborway Lane Group Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio At Grade 2010 PM 6/25/2012 SWL 58 0 0 0 0.26 D R AF T Intersection Summary CMM McMahon Synchro 7 Page 4 Casey Arborway 3: Arborway & Forest Hills Drive CMM McMahon 6/25/2012 EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 520 1900 10 180 1 25 1636 0.950 1636 1336 1900 11 1 1900 11 0 0 25 0 8 1900 10 100 1 25 1668 0.136 239 772 1900 11 33 1900 11 0 0 25 0 10 1900 11 0 0 25 0 5 1900 11 38 1900 11 0 0 25 0 1 1900 11 0 0 No 0 1733 0.729 1326 599 1900 11 100 1 25 1546 0 No 1703 0.902 1567 10 1900 11 0 0 25 0 0.92 1% 0.80 0% 35 179 3.5 0.80 0% 0.80 0% 0.89 1% 35 284 5.5 0.89 1% 0 0 Perm 30 0 0 Perm 7.0 40.0 51.0 42.5% 47.0 3.0 1.0 4.0 2.0 None 20.0 15.0 20 45.6 0.38 0.90 53.8 0.0 53.8 D 455 #596 0 No 35 177 3.4 0.93 2% 0.93 0% 0.92 1% 1438 0 9 Perm 13 95.0 79.2% 4.0 97.3 0.81 0.52 1.9 0.2 2.0 A 16.5 B 6 70 97 3434 3434 35 313 6.1 0.92 1% 875 AF 559 Prot 3 3421 1 0.0 0.0% 1 7.0 39.0 44.0 36.7% 40.0 3.0 1.0 4.0 R 0.93 3% 3421 T EBL D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) At Grade 2010 PM 4.0 3.0 C-Min 20.0 15.0 20 47.7 0.40 0.09 22.4 0.0 22.4 C 2 m2 7.0 39.0 44.0 36.7% 40.0 3.0 1.0 4.0 3.0 C-Min 20.0 15.0 20 47.7 0.40 0.64 20.1 0.8 20.9 C 20.9 C 129 m128 233 0.0 0.0% 4.0 5 7.0 25.0 25.0 20.8% 21.0 3.0 1.0 4.0 2.0 None 7.0 14.0 20 5 7.0 25.0 25.0 20.8% 21.0 3.0 1.0 4.0 2.0 None 7.0 14.0 20 14.7 0.12 0.16 45.6 0.0 45.6 D 45.6 D 21 42 99 44 1546 Yes 606 0.89 1% 673 Perm 5 0.0 0.0% 4.0 5 7.0 25.0 25.0 20.8% 21.0 3.0 1.0 4.0 2.0 None 7.0 14.0 20 7.0 25.0 25.0 20.8% 21.0 3.0 1.0 4.0 2.0 None 7.0 14.0 20 14.7 0.12 0.27 49.1 0.8 49.9 D 28.9 C 31 65 204 5 7.0 25.0 25.0 20.8% 21.0 3.0 1.0 4.0 2.0 None 7.0 14.0 20 14.7 0.12 0.93 27.5 0.0 27.5 C 48 #264 Synchro 7 Page 1 Casey Arborway 3: Arborway & Forest Hills Drive Lane Group Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL 180 641 0 0 0 0.87 EBT At Grade 2010 PM 6/25/2012 EBR 2814 500 228 0 0.62 WBL 100 95 0 0 0 0.09 WBT WBR NBL 1365 213 0 0 0.76 NBT 274 0 0 0 0.11 NBR SBL SBT 232 0 78 0 0.29 SBR 100 771 0 0 0 0.87 3: Arborway & Forest Hills Drive D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 35 (29%), Referenced to phase 1:EBWB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.93 Intersection Signal Delay: 20.3 Intersection LOS: C Intersection Capacity Utilization 75.3% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 2 Casey Arborway 13: Arborway & East Bow Tie CMM McMahon 6/25/2012 EBU EBL EBT WBT WBR SBL SBR 208 1900 11 0 1900 11 250 1 25 0 1858 1900 11 1378 1900 11 3421 3421 0 1900 11 0 0 25 0 0 1900 11 0 0 25 0 0 1900 11 0 0 25 0 0 3421 3421 0 Yes 0 0 Yes 0.92 0.92 35 458 8.9 0.94 35 458 8.9 0.86 0.92 226 Prot 3 0 1977 1602 0 13 1 2.0 None 7.0 20.0 10 29.7 0.25 0.53 43.9 0.0 43.9 D 0.0 0.0% 105.0 87.5% 4.0 164 m190 10.0 24.0 69.0 57.5% 65.0 3.0 1.0 4.0 Lead 4.0 0.92 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% 4.0 4.0 4.0 79.3 0.66 0.71 17.6 0.1 17.7 B 17.7 B 294 369 378 2 4.0 15.0 15.0 13% 13.0 2.0 0.0 Lag 2.0 C-Max 116.2 0.97 0.60 5.1 0.0 5.1 A 9.1 A 100 m147 378 ø2 T 35 112 2.2 0.92 AF 10.0 34.0 36.0 30.0% 32.0 3.0 1.0 4.0 R 1711 0.950 1711 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) At Grade 2010 PM 2.0 None 7.0 6.0 10 32 250 Synchro 7 Page 1 Casey Arborway 13: Arborway & East Bow Tie Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBU 471 0 0 0 0.48 EBL At Grade 2010 PM 6/25/2012 EBT 3313 64 44 0 0.61 WBT 2260 82 61 0 0.74 WBR SBL SBR ø2 13: Arborway & East Bow Tie D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 5 (4%), Referenced to phase 1:EBWB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.71 Intersection Signal Delay: 12.7 Intersection LOS: B Intersection Capacity Utilization 54.7% ICU Level of Service A Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 2 Casey Arborway 11: Arborway & West Bow Tie CMM McMahon 6/25/2012 EBL EBT WBU WBT WBR SBL SBR 0 1900 11 0 0 25 0 1798 1900 11 1099 1900 11 0 1900 11 0 0 25 0 0 1900 11 0 0 25 0 0 1900 11 0 0 25 0 0 4916 534 1900 11 350 1 25 1711 0.950 1711 0 Yes 0 0 Yes 0.92 35 172 3.4 0.94 0 1913 0.92 1 4.0 35 412 8.0 0.86 0.92 1278 0 12 10.0 35.0 63.0 120.0 52.5% 100.0% 59.0 3.0 1.0 4.0 4.0 Lag R 0.0 0.0% 10.0 24.0 57.0 47.5% 53.0 3.0 1.0 4.0 Lead 3421 2.0 C-Max 61.0 0.51 0.77 27.7 0.1 27.7 C 27.7 C 435 557 92 2500 0 41 35 131 2.6 0.92 0.92 0 0 AF 580 Prot 2 3421 T 4916 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2010 PM 2.0 None 51.0 0.42 0.80 52.9 1.4 54.3 D 472 587 350 841 113 0 120.0 1.00 0.37 0.2 0.0 0.2 A 17.1 B 0 0 332 0.0 0.0% 0.0 0.0% 0.0 0.0% 4.0 4.0 4.0 51 3409 0 0 Synchro 7 Page 1 Casey Arborway 11: Arborway & West Bow Tie Lane Group Storage Cap Reductn Reduced v/c Ratio EBL EBT 0 0.78 At Grade 2010 PM 6/25/2012 WBU 0 0.80 WBT 0 0.37 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 5 (4%), Referenced to phase 1:EBWB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.80 Intersection Signal Delay: 22.5 Intersection Capacity Utilization 71.0% Analysis Period (min) 15 SBL SBR Intersection LOS: C ICU Level of Service C 11: Arborway & West Bow Tie D R AF T Splits and Phases: WBR CMM McMahon Synchro 7 Page 2 Casey Arborway 9: Arborway & Cemetery Rd CMM McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 55 1900 10 150 1 25 1685 0.100 177 1329 1900 11 0 1900 11 0 0 25 0 1 1900 11 0 0 25 0 761 1900 16 292 1900 11 0 0 25 0 8 1900 12 0 0 25 0 4 1900 12 2 1900 12 0 0 25 0 593 1900 12 0 0 25 0 3 1900 12 44 1900 12 0 0 25 0 0 Yes 0 0 Yes 0 0 Yes 0 3421 3853 0.855 3294 50 35 337 6.6 35 313 6.1 0.92 2% 0.92 0% 0.92 0% 0.92 2% 60 pm+pt 4 14 7.0 15.0 15.0 12.5% 11.0 3.0 1.0 4.0 Lag 1445 0 0 Perm 1145 14 5.0 2.0 None 52.0 0.43 0.28 19.6 0.0 19.6 B 0 48 150 215 0.92 1% 1 0.80 0% 0 0 Perm 1 0.0 0.0% 1 7.0 20.0 45.0 37.5% 40.0 4.0 1.0 5.0 R 60.0 50.0% 2 35 153 3.0 AF 0.92 0% 4.0 7.0 20.0 45.0 37.5% 40.0 4.0 1.0 5.0 55.0 0.46 0.92 30.0 1.1 31.2 C 30.7 C 331 #689 233 3.0 3.0 C-Max C-Max 40.0 0.33 1.01 68.1 2.1 70.2 E 70.2 E ~462 #615 257 1568 1131 1813 0.783 1462 0.0 0.0% 4.0 3 7.0 20.0 60.0 50.0% 55.0 4.0 1.0 5.0 Lead 1 0.80 0% 17 0 3.0 None 3.0 None 55.0 0.46 0.03 16.6 0.0 16.6 B 16.6 B 6 17 73 671 0 Yes 0.99 1% 0.99 0% 0.99 2% 0 Perm 646 0 3 7.0 20.0 60.0 50.0% 55.0 4.0 1.0 5.0 Lead 1781 0.729 1358 4 35 181 3.5 0.80 0% T 3421 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) At Grade 2010 PM 3 0.0 0.0% 4.0 3 7.0 20.0 60.0 50.0% 55.0 4.0 1.0 5.0 Lead 3.0 None 7.0 20.0 60.0 50.0% 55.0 4.0 1.0 5.0 Lead 0.0 0.0% 4.0 3.0 None 55.0 0.46 1.03 77.6 0.0 77.6 E 77.6 E ~537 #769 101 625 Synchro 7 Page 1 Casey Arborway 9: Arborway & Cemetery Rd Lane Group Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL 0 0 0 0.28 At Grade 2010 PM 6/25/2012 EBT 33 0 0 0.94 EBR WBL WBT 0 8 0 1.02 WBR NBL NBT 0 0 0 0.03 NBR SBL SBT 0 0 0 1.03 SBR AF 9: Arborway & Cemetery Rd D R Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 40 (33%), Referenced to phase 1:EBWB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.03 Intersection Signal Delay: 53.4 Intersection LOS: D Intersection Capacity Utilization 96.4% ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. CMM McMahon Synchro 7 Page 2 EXISTING 2035 (PROJECTED 2035 TRAFFIC VOLUMES ON EXISTING STREET NETWORK) Casey Overpass 2163: Arborway Ramps & South St 6/25/2012 EBL EBT EBR EBR2 WBL WBT WBR NBL NBT NBR SBL2 SBL 54 0 0 1583 213 0 213 0 297 0 100 0 0 0 0 0 643 3341 0.736 2486 328 0 0 0 13 1454 0.080 122 0.93 2% 2 0.93 2% 2 1583 541 0.92 2% 0 0.94 2% 2 0.83 3% 0 82 3177 0.979 3177 131 0.92 1% 0 227 0 0 27 1789 0.477 881 0.86 6% 0 0.97 0% 0 0.91 4% 0 0.90 2% 0 0.89 14% 0 0.89 100% 0 0 custom 87 227 custom 0 0 Split 3 610 0 0 Perm 1377 0 0 Perm 127 Perm 4 24.0 8.0 4 24.0 8.0 14.2 0.12 0.84 104.2 0.0 104.2 F 29.9 C 66 #154 617 4 24.0 8.0 14.2 0.12 0.34 1.4 0.0 1.4 A 1 60.0 4.0 1 60.0 4.0 61.2 0.51 2.05 542.5 0.0 542.5 F 19.0 4.0 15.0 0.12 1.19 138.8 43.0 181.8 F 181.8 F ~186 #283 165 1 0.0 4.0 0 0 200 680 0 27 0 0.35 1 60.0 4.0 T 19.0 4.0 3 AF 0.0 4.0 R 117 0 0 0 0.74 D Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Peak Hour Factor Heavy Vehicles (%) Bus Blockages (#/hr) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing 2035 AM 512 39 3 0 1.29 60.0 4.0 61.2 0.51 1.09 66.2 17.7 83.9 F 83.9 F ~665 m#771 248 1268 47 0 0 1.13 0.0 4.0 ~117 #243 62 0 0 0 2.05 Intersection Summary Cycle Length: 120 Actuated Cycle Length: 120 Offset: 4 (3%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 2.05 Intersection Signal Delay: 113.7 Intersection LOS: F Intersection Capacity Utilization 96.8% ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 1 Casey Overpass 2163: Arborway Ramps & South St 6/25/2012 2163: Arborway Ramps & South St SBR NWR 235 1722 12 0 13 1611 1722 3 0.83 10% 0 0 1611 0.92 0% 0 0.92 2% 0 296 0 14 custom ø2 2 1 0.0 4.0 880 0 85 0 0.37 17.0 AF 60.0 4.0 61.2 0.51 0.34 20.2 0.1 20.3 C 177.1 F 142 191 87 4 24.0 8.0 14.2 0.12 0.07 46.7 0.0 46.7 D T SBT R Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Peak Hour Factor Heavy Vehicles (%) Bus Blockages (#/hr) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio D Splits and Phases: Existing 2035 AM 10 30 215 0 0 0 0.07 Intersection Summary CMM McMahon Synchro 7 Page 2 Casey Overpass 253: South St & Washington St 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 234 0 0 1736 0.767 1371 17 100 0 30 0 6 0 98 0 0 0 453 3290 195 0 0 0 0 1015 3553 0.701 2503 0 0 0 0 882 0.725 662 12 0 0 3290 65 0 0.92 0% 9 0.86 1% 9 0.75 100% 0.92 100% 9 0.50 100% 9 0.91 2% 0.95 1% 9 0.92 0% 9 0.92 0% 0.91 5% 9 0.91 1% 408 0 0 Perm 52 0 1176 0 0 712 0 9 0.80 1% 0 Perm 3 0.0 4.0 401 0 0 0 1.02 39.0 5.0 34.0 0.28 0.27 23.9 0.0 23.9 C 23.9 C 17 46 187 AF 39.0 5.0 34.0 0.28 1.02 90.8 0.0 90.8 F 90.8 F ~317 #526 766 3 3 39.0 4.0 R 3 39.0 4.0 0 D.P+P 4 1 0.0 14.0 4.0 4.0 14 65.0 5.0 61.4 0.51 0.86 34.6 2.2 36.8 D 36.8 D 376 #487 122 T 0 D Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing 2035 AM 196 0 0 0 0.27 1360 0 89 0 0.93 1 0.0 4.0 0.0 4.0 51.0 5.0 52.4 0.44 0.48 22.7 0.7 23.4 C 23.4 C 226 m222 248 0.0 4.0 1473 402 0 0 0.66 Intersection Summary Cycle Length: 120 Actuated Cycle Length: 120 Offset: 11 (9%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.02 Intersection Signal Delay: 41.8 Intersection LOS: D Intersection Capacity Utilization 88.1% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 1 Casey Overpass 253: South St & Washington St 6/25/2012 253: South St & Washington St T ø2 AF 2 16.0 R Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio D Splits and Phases: Existing 2035 AM Intersection Summary CMM McMahon Synchro 7 Page 2 Casey Overpass 1712: Washington St & MBTA Busway #2 6/25/2012 WBL WBR NBT NBR SBL SBT 0 0 0 0 1053 3438 34 0 8 0 0 0 0 0 0.92 0% 0.92 0% 3438 12 0.96 1% 546 3435 0.925 3181 0.85 100% 0.67 100% 0.95 3% 0 0 1137 0 0 Perm 587 0.0 4.0 103.0 4.0 107.4 0.90 0.37 2.4 0.3 2.8 A 2.8 A 220 46 101 0.0 4.0 1 2 103.0 4.0 107.4 0.90 0.21 0.9 0.0 0.9 A 0.9 A 21 m25 253 17.0 AF 0.0 4.0 1 103.0 4.0 ø2 T 1 R 297 D Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing 2035 AM 3078 1171 0 0 0.60 2847 0 0 0 0.21 Intersection Summary Cycle Length: 120 Actuated Cycle Length: 120 Offset: 72 (60%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.37 Intersection Signal Delay: 2.1 Intersection LOS: A Intersection Capacity Utilization 33.5% ICU Level of Service A Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: CMM McMahon 1712: Washington St & MBTA Busway #2 Synchro 7 Page 1 Casey Overpass 2272: Washington St & Ukraine Way 6/25/2012 WBL WBR NBT NBR SBL SBT 189 1805 0.950 1805 598 1599 434 3388 197 0 251 1863 1599 664 0.90 1% 3388 76 0.96 1% 0 308 1787 0.286 538 0.82 1% 0.93 1% 0.91 2% 664 Prot 3 692 0 276 36.0 4.0 18.8 0.16 0.82 11.8 6.7 18.5 B 32.0 4.0 52.1 0.43 0.46 25.5 0.1 25.6 C 25.6 C 188 286 1202 331 D.P+P 4 1 0.0 28.0 4.0 4.0 73.2 0.61 0.60 15.4 0.1 15.5 B 36.0 4.0 18.8 0.16 0.73 57.4 0.4 57.8 E 27.8 C 139 m113 213 481 62 0 0 0.49 76 m99 1 913 201 0 0 0.93 1863 14 2 60.0 4.0 77.2 0.64 0.23 7.8 0.0 7.8 A 12.0 B 60 87 308 24.0 T 3 ø2 AF 205 R 0.92 0% D Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing 2035 AM 1515 0 110 0 0.49 72 102 586 0 17 0 0.58 1189 0 0 0 0.23 Intersection Summary Cycle Length: 120 Actuated Cycle Length: 120 Offset: 69 (58%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.82 Intersection Signal Delay: 22.6 Intersection LOS: C Intersection Capacity Utilization 62.0% ICU Level of Service B Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: CMM McMahon 2272: Washington St & Ukraine Way Synchro 7 Page 1 Casey Overpass 249: Hyde Park Ave & Walk Hill St 6/25/2012 WBL WBR NBT NBR SBL SBT 14 1638 0.998 1638 417 0.65 0% 371 0 1035 3549 27 0 530 3574 0 0 0.89 1% 3549 4 0.92 1% 205 1770 0.950 1770 0.59 4% 0.85 2% 0.94 1% 439 0 1171 0 241 Prot 4 564 14 2 30.0 5.0 25.0 0.21 0.65 55.6 0.0 55.6 E 77.0 5.0 83.2 0.69 0.23 7.5 0.0 7.5 A 21.9 C 102 105 748 22.0 580 0 0 0 0.76 47.0 5.0 53.2 0.44 0.74 33.6 0.0 33.6 C 33.6 C 439 #601 398 0.0 4.0 3574 AF 0.0 4.0 R 21.0 5.0 13.6 0.11 0.79 17.4 0.0 17.4 B 17.4 B 16 0 31 1 ø2 T 3 D Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing 2035 AM 1575 0 0 0 0.74 181 249 200 369 0 0 0 0.65 2478 0 0 0 0.23 Intersection Summary Cycle Length: 120 Actuated Cycle Length: 120 Offset: 114 (95%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.79 Intersection Signal Delay: 26.7 Intersection LOS: C Intersection Capacity Utilization 80.3% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. CMM McMahon Synchro 7 Page 1 Casey Overpass 249: Hyde Park Ave & Walk Hill St 6/25/2012 249: Hyde Park Ave & Walk Hill St D R AF T Splits and Phases: Existing 2035 AM CMM McMahon Synchro 7 Page 2 Casey Overpass 2162: Hyde Park Ave & Ukraine Way 6/25/2012 EBL EBR NBL NBT SBT SBR 210 1787 0.950 1787 295 1599 610 0 441 3430 177 0 1599 339 0.87 1% 0 800 3499 0.563 2012 0 0.93 1% 0.89 1% 3430 68 0.86 1% 0.87 0% 339 0 Prot D.P+P 3 4 1 24.0 12.0 5.0 4.0 18.2 0.15 0.64 19.1 6.1 25.3 C 1555 716 0 14 1 75.0 5.0 78.4 0.65 1.37dl 77.0 1.7 78.7 E 78.7 E ~316 #970 748 63.0 5.0 71.4 0.60 0.35 6.2 0.0 6.2 A 6.2 A 94 72 409 24.0 5.0 18.2 0.15 0.90 64.8 10.4 75.2 E 46.2 D 189 #311 213 283 26 0 0 0.95 120 247 539 147 0 0 0.86 2 0.0 4.0 21.0 T 3 ø2 AF 244 R 0.86 1% D Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing 2035 AM 1401 0 5 0 1.11 2068 0 9 0 0.35 Intersection Summary Cycle Length: 120 Actuated Cycle Length: 120 Offset: 1 (1%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.11 Intersection Signal Delay: 53.9 Intersection LOS: D Intersection Capacity Utilization 81.8% ICU Level of Service D Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. dl Defacto Left Lane. Recode with 1 though lane as a left lane. CMM McMahon Synchro 7 Page 1 Casey Overpass 2162: Hyde Park Ave & Ukraine Way 6/25/2012 2162: Hyde Park Ave & Ukraine Way D R AF T Splits and Phases: Existing 2035 AM CMM McMahon Synchro 7 Page 2 Casey Overpass 1759: Hyde Park Ave & Tower St 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 24 0 0 866 0.862 766 32 0.92 100% 18 0 9 0 16 0 0 0 937 3567 9 0 6 0 0 0 0 0 0 0.56 100% 0.56 0% 0.63 0% 0.92 0% 3567 1 0.86 1% 544 3537 0.925 3275 0 0 0 0 1711 0.908 1584 25 0.92 0% 0.75 0% 0.50 0% 0.91 2% 0.92 0% 68 0 0 Perm 41 0 0 1102 0 0 Perm 610 0 0.67 100% 0 Perm 3 0.0 4.0 69.0 6.0 82.4 0.69 0.45 11.6 0.0 11.6 B 11.6 B 217 m184 121 350 0 0 0 0.12 2449 0 0 0 0.45 185 0 0 0 0.37 29.0 4.0 14.6 0.12 0.19 26.1 0.0 26.1 C 26.1 C 11 44 203 1 AF 29.0 4.0 14.6 0.12 0.56 61.1 0.0 61.1 E 61.1 E 36 88 14 3 3 29.0 4.0 R 3 29.0 4.0 0.0 4.0 0.0 4.0 T 0 D Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing 2035 AM 0 1 0.0 4.0 1 69.0 4.0 69.0 6.0 82.4 0.69 0.27 3.3 0.1 3.4 A 3.4 A 24 34 360 0.0 4.0 2248 606 0 0 0.37 Intersection Summary Cycle Length: 120 Actuated Cycle Length: 120 Offset: 108 (90%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.56 Intersection Signal Delay: 11.0 Intersection LOS: B Intersection Capacity Utilization 45.4% ICU Level of Service A Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: CMM McMahon 1759: Hyde Park Ave & Tower St Synchro 7 Page 1 Casey Overpass 1759: Hyde Park Ave & Tower St Intersection Summary CMM McMahon 6/25/2012 ø2 2 R AF T 22.0 D Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing 2035 AM Synchro 7 Page 2 Casey Overpass 2303: Hyde Park Ave & Fitzgerald Parking Lot 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 0 0 0 0 0 1 0 4 0 21 0 2 0 0 0 0 0 0 0 0.92 0% 0.92 0% 0.92 0% 0.92 0% 0.25 0% 0.58 100% 0.46 0% 0.85 0% 539 3509 0.953 3344 13 0.95 2% 28 0 0 935 3452 0.913 3158 1 0.89 1% 2 0 0 0 1654 0.997 1654 16 0.92 0% 0.70 0% 0 0 0 0 Perm 17 0 0 Perm 1091 0 0 Perm 609 0 3 0.0 4.0 45 84.0 4.0 95.2 0.79 0.44 1.0 0.0 1.0 A 1.0 A 2 13 360 153 0 0 0 0.11 2506 26 0 0 0.44 T 0.0 4.0 AF 14.0 4.0 8.0 0.07 0.14 26.2 0.0 26.2 C 26.2 C 1 25 107 1 1 84.0 4.0 0.0 4.0 R 0.0 4.0 3 14.0 4.0 D Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing 2035 AM 0 1 0.0 4.0 1 84.0 4.0 84.0 4.0 95.2 0.79 0.23 3.1 0.2 3.3 A 3.3 A 23 m101 38 0.0 4.0 2656 1209 0 0 0.42 Intersection Summary Cycle Length: 120 Actuated Cycle Length: 120 Offset: 102 (85%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.44 Intersection Signal Delay: 2.1 Intersection LOS: A Intersection Capacity Utilization 54.3% ICU Level of Service A Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: CMM McMahon 2303: Hyde Park Ave & Fitzgerald Parking Lot Synchro 7 Page 1 Casey Overpass 2303: Hyde Park Ave & Fitzgerald Parking Lot Intersection Summary CMM McMahon 6/25/2012 ø2 2 R AF T 22.0 D Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing 2035 AM Synchro 7 Page 2 Casey Overpass 2164: New Washington & Washington St 6/25/2012 EBL EBR EBR2 WBL WBT WBR NBL NBT SBL SBT SBR 208 1641 0.950 1641 194 1568 53 1524 176 0 64 0 93 0 0 0 0 0 340 3250 0.597 1958 126 1553 0.77 10% 0.82 3% 1524 70 0.76 6% 649 3433 0.728 2514 55 0 1568 303 3283 0.984 3283 12 0.84 2% 0.74 6% 0.88 1% 0.82 5% 0.59 6% 0.84 11% 667 0 0 D.P+P 4 1 0.0 10.0 4.0 4.0 897 0 Perm 498 160 #269 287 0 0 0 0.94 330 274 0 0 0 0.86 0 Split 3 3 64.0 8.0 48.3 0.40 0.87 31.8 0.9 32.7 C 32.7 C 126 151 190 693 0 0 0 0.96 1027 28 0 0 0.90 7 17 330 324 0 0 0 0.22 30.0 5.0 25.0 0.21 0.96 72.9 0.0 72.9 E 72.9 E 266 #344 272 14 T 30.0 1.0 R 188 #282 0.80 13% AF 270 237 70 custom custom custom 2 2 2 2 2 2 26.0 26.0 26.0 5.0 5.0 5.0 20.7 20.7 20.7 0.17 0.17 0.17 0.95 0.87 0.22 76.7 63.3 7.0 0.0 0.0 0.0 76.7 63.3 7.0 E E A D Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing 2035 AM 1553 137 0.92 4% 137 custom 1 1 54.0 4.0 54.0 4.0 50.3 0.42 0.61 30.0 0.0 30.0 C 24.3 C 140 181 243 821 0 0 0 0.61 12 80.0 4.0 76.0 0.63 0.13 3.8 0.0 3.8 A 0 m32 200 1038 0 0 0 0.13 Intersection Summary Cycle Length: 120 Actuated Cycle Length: 120 Offset: 108 (90%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.96 Intersection Signal Delay: 46.7 Intersection LOS: D Intersection Capacity Utilization 77.5% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 1 Casey Overpass 2164: New Washington & Washington St 6/25/2012 2164: New Washington & Washington St D R AF T Splits and Phases: Existing 2035 AM CMM McMahon Synchro 7 Page 2 Casey Overpass 9: Route 203 & Cemetery Rd 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 3 0 0 0 5 0 4 0 229 0 0 0 0 0 0.89 0% 0.89 2% 0.89 0% 0.93 1% 0.93 1% 0.80 2% 0.80 2% 0.80 2% 0.92 1% 2 1780 0.741 1379 6 0.92 0% 23 0 0 3 1812 0.851 1585 0 0 0 1200 3343 0.954 3190 360 0.93 2% 774 0 0 656 3539 0.900 3186 0.92 0% 0 Perm 740 0 0 Perm 2127 0 0 Perm 9 0 0 Perm 276 0 1 1992 0 0 0 0.37 51.0 5.0 46.1 0.63 1.00 32.9 0.0 32.9 C 32.9 C ~449 #662 23 0.0 4.0 24.0 5.0 17.6 0.24 0.02 21.4 0.0 21.4 C 21.4 C 3 12 27 2129 0 0 0 1.00 409 0 0 0 0.02 T 0.0 4.0 2 2 24.0 5.0 AF 51.0 5.0 46.1 0.63 0.37 7.6 0.0 7.6 A 7.6 A 81 111 391 1 1 51.0 5.0 R 1 51.0 5.0 D Lane Group Lane Configurations Volume (vph) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Satd. Flow (RTOR) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Total Split (s) Total Lost Time (s) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing 2035 AM 0 2 0.0 4.0 2 24.0 5.0 24.0 5.0 17.6 0.24 0.83 48.1 0.0 48.1 D 48.1 D 117 #238 44 0.0 4.0 361 0 0 0 0.76 Intersection Summary Cycle Length: 75 Actuated Cycle Length: 73.7 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.00 Intersection Signal Delay: 28.3 Intersection LOS: C Intersection Capacity Utilization 90.9% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. CMM McMahon Synchro 7 Page 1 Casey Overpass 9: Route 203 & Cemetery Rd 6/25/2012 9: Route 203 & Cemetery Rd D R AF T Splits and Phases: Existing 2035 AM CMM McMahon Synchro 7 Page 2 Casey Overpass 2163: Arborway Ramps & New Washington St CMM McMahon 6/25/2012 EBL EBT EBR EBR2 WBL WBT WBR NBL NBT NBR SBL2 SBL 63 1900 0 1 25 0 94 1900 0 1900 200 1 25 1583 358 1900 329 1900 0 0 25 0 145 1900 163 1900 0 0 25 0 195 1900 0 0 25 0 217 1900 131 1900 1583 0 Yes 0 Yes 0 3251 0.582 1921 326 1900 0 0 25 0 0 0 10 1900 0 1 25 1529 0.231 372 0.76 0% 30 328 7.5 0.94 6% 0.93 2% 0.88 12% 0.88 100% 839 0 0 Perm 160 Perm 1 1 1 1 0 1825 0.560 1043 0.92 2% 30 697 15.8 0.92 2% 0 0 3328 0.974 3328 32 30 245 5.6 0.90 1% 170 4 4 4 4 0.92 2% 0.86 1% 389 custom 0 0 Split 3 3 1 1 4 4 723 2.0 None 5.0 11.0 0 21.8 0.18 0.90 91.2 0.0 91.2 F 178.7 F 127 0 2.0 None 5.0 11.0 0 21.8 0.18 0.68 14.0 202.9 216.9 F 3 4.0 4.0 11.0 11.0 0.0 24.0 24.0 0.0% 20.0% 20.0% 18.0 18.0 3.0 3.0 3.0 3.0 0.0 -2.0 -2.0 4.0 4.0 4.0 Lead Lead 30 2.0 None 0 Perm 3 0 1 1 4.0 4.0 11.0 11.0 0.0 47.0 47.0 0.0% 39.2% 39.2% 40.0 40.0 3.0 3.0 4.0 4.0 0.0 -3.0 -3.0 4.0 4.0 4.0 Lead Lead 4.0 4.0 11.0 11.0 0.0 47.0 47.0 0.0% 39.2% 39.2% 40.0 40.0 3.0 3.0 4.0 4.0 0.0 -3.0 -3.0 4.0 4.0 4.0 Lead Lead 2.0 None 2.0 2.0 C-Max C-Max 2.0 2.0 C-Max C-Max 20.0 0.17 1.24 165.6 115.2 280.8 F 280.8 F ~315 56.2 0.47 0.93 43.4 30.5 74.0 E 74.0 E 348 56.2 0.47 0.91 84.2 0.0 84.2 F R 4.0 4.0 4.0 24.0 24.0 24.0 32.0 32.0 32.0 26.7% 26.7% 26.7% 24.0 24.0 24.0 4.0 4.0 4.0 4.0 4.0 4.0 0.0 0.0 0.0 8.0 8.0 8.0 Lag Lag Lag 2.0 None 5.0 11.0 0 0.91 4% AF 0 custom 0.92 2% T 343 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Existing 2035 PM 105 Synchro 7 Page 1 Casey Overpass 2163: Arborway Ramps & New Washington St CMM McMahon SBR NWR 372 1900 14 1900 0 0 25 0 10 1900 0 1 25 1611 0 Yes 1611 2 30 167 3.8 0.79 1% 0.81 0% 0.92 2% 488 0 11 custom 1872 1872 2 4 4 1 4.0 24.0 0.0 32.0 0.0% 26.7% 24.0 4.0 4.0 0.0 0.0 4.0 8.0 Lag 1.0 15.0 17.0 14% 15.0 2.0 0.0 2.0 None 5.0 11.0 0 21.8 0.18 0.04 39.3 0.0 39.3 D 2.0 None 6.0 7.0 20 R 4.0 11.0 47.0 39.2% 40.0 3.0 4.0 -3.0 4.0 Lead 2.0 C-Max 56.2 0.47 0.56 28.3 1.7 30.0 C 43.4 D 246 ø2 AF 1 6/25/2012 T SBT D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Existing 2035 PM Lag 7 Synchro 7 Page 2 Casey Overpass 2163: Arborway Ramps & New Washington St Lane Group Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT #248 617 209 0 0 0 0.81 EBR 133 EBR2 200 591 0 321 0 1.44 Existing 2035 PM 6/25/2012 WBL WBT #445 165 WBR NBL 581 100 5 0 1.50 NBT m#505 248 900 111 0 0 1.06 NBR SBL2 SBL #276 175 0 0 0 0.91 2163: Arborway Ramps & New Washington St D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 69 (58%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 150 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.24 Intersection Signal Delay: 141.6 Intersection LOS: F Intersection Capacity Utilization 100.2% ICU Level of Service G Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 3 Casey Overpass 2163: Arborway Ramps & New Washington St Lane Group Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio SBT 365 87 SBR 878 0 229 0 0.75 NWR 24 Existing 2035 PM 6/25/2012 ø2 322 0 0 0 0.03 D R AF T Intersection Summary CMM McMahon Synchro 7 Page 4 Casey Overpass 253: South St & New Washington CMM McMahon 6/25/2012 EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 163 1900 0 147 1900 0 29 1900 0 87 1900 0 0 1900 0 758 1900 3421 291 1900 0 0 0 Yes 0 555 1900 3554 0.537 1922 0 1900 0 0 Yes 0 1900 886 0.634 584 10 1900 0 0 0 1900 1718 0.830 1461 0 Yes 0 3421 0 Yes 0.81 1% 42 30 846 19.2 0.92 0% 0.69 0% 0.73 100% 12 30 267 6.1 0.92 100% 0.83 100% 0.84 0% 30 202 4.6 0.92 1% 0.92 0% 0.92 0% 56 30 328 7.5 0.95 1% 0.90 1% 414 0 0 Perm 52 0 0 D.P+P 4 1 4 707 0 0 1121 0 0 Perm T EBL 14 1 14 1 10.0 10.0 18.0 18.0 0.0 35.0 35.0 0.0% 29.2% 29.2% 30.0 30.0 4.0 4.0 1.0 1.0 0.0 -1.0 0.0 4.0 4.0 5.0 Lead Lead 18.0 22.0 0.0 22.0 69.0 0.0% 18.3% 57.5% 20.0 2.0 0.0 0.0 2.0 0.0 4.0 4.0 5.0 Lag 30.0 38.0 0.0 47.0 0.0% 39.2% 42.0 4.0 1.0 0.0 0.0 4.0 5.0 Lead 2.0 None 2.0 None 3 3 3 3 3 R 10.0 10.0 18.0 18.0 35.0 35.0 29.2% 29.2% 30.0 30.0 4.0 4.0 1.0 1.0 -1.0 0.0 4.0 5.0 Lead Lead 3 AF 3 3 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Existing 2035 PM 2.0 None 2.0 None 30.0 0.25 1.04 96.5 10.3 106.9 F 106.9 F ~322 #523 766 2.0 None 30.0 0.25 0.34 38.3 0.1 38.4 D 38.4 D 26 65 187 0.0 0.0% 0.0 4.0 0.0 0.0% 0.0 4.0 2.0 C-Max 65.4 0.54 0.56 14.6 6.7 21.3 C 21.3 C 176 223 122 49.3 0.41 0.78 32.5 9.7 42.2 D 42.2 D 438 m410 248 Synchro 7 Page 1 Casey Overpass 253: South St & New Washington CMM McMahon 6/25/2012 T ø2 AF 2 Lag R 6.0 16.0 16.0 13% 14.0 2.0 0.0 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Existing 2035 PM 3.0 None 4.0 10.0 25 Synchro 7 Page 2 Casey Overpass 253: South St & New Washington Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT 397 0 11 0 1.07 Existing 2035 PM 6/25/2012 EBR WBL WBT 155 0 3 0 0.34 WBR NBL NBT 1293 0 529 0 0.93 NBR SBL SBT 1439 298 0 0 0.98 SBR 253: South St & New Washington D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 72 (60%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 105 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.04 Intersection Signal Delay: 47.4 Intersection LOS: D Intersection Capacity Utilization 86.3% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 3 Casey Overpass 253: South St & New Washington Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing 2035 PM 6/25/2012 ø2 D R AF T Intersection Summary CMM McMahon Synchro 7 Page 4 Casey Overpass 1712: Washington St & MBTA Busway #2 CMM McMahon 6/25/2012 WBL WBR NBT NBR SBL SBT 0 1900 0 0 1900 0 644 1900 3421 23 1900 0 6 1900 0 0 0 Yes 3421 0 Yes 0 903 1900 3545 0.949 3364 30 333 7.6 0.95 1% 0 0.92 0% 14 30 181 4.1 0.94 1% 0.82 100% 0.75 100% 0 713 0 0 Perm 1 297 2 AF 1 12.0 20.0 0.0 103.0 0.0% 85.8% 98.0 4.0 1.0 0.0 -1.0 4.0 4.0 Lead 12.0 12.0 20.0 20.0 0.0 103.0 103.0 0.0% 85.8% 85.8% 98.0 98.0 4.0 4.0 1.0 1.0 0.0 -1.0 -1.0 4.0 4.0 4.0 Lead Lead 4.0 17.0 17.0 14% 15.0 2.0 0.0 2.0 C-Max 2.0 2.0 C-Max C-Max 2.0 None 5.0 10.0 50 103.2 0.86 0.24 2.8 0.0 2.8 A 2.8 A 71 82 101 103.2 0.86 0.33 1.0 0.2 1.2 A 1.2 A 10 m31 253 R 0.0 4.0 959 1 1 1 1 0.0 0.0% ø2 T 30 377 8.6 0.92 0% D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Existing 2035 PM Lag Synchro 7 Page 1 Casey Overpass 1712: Washington St & MBTA Busway #2 Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio WBL WBR NBT 2944 0 0 0 0.24 NBR Existing 2035 PM 6/25/2012 SBL SBT 2893 954 0 0 0.49 ø2 1712: Washington St & MBTA Busway #2 D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 24 (20%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 40 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.33 Intersection Signal Delay: 1.9 Intersection LOS: A Intersection Capacity Utilization 32.5% ICU Level of Service A Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 2 Casey Overpass 2272: Washington St & Ukraine Way CMM McMahon 6/25/2012 WBL WBR NBT NBR SBL SBT 207 1900 1787 0.950 1787 327 1900 1599 397 1900 3317 269 1900 0 346 1900 1863 1599 Yes 448 3317 0 Yes 542 1900 1787 0.164 309 1863 30 388 8.8 0.85 2% 265 0.73 1% 448 Perm 3 0.89 1% 0.86 1% 748 0 630 D.P+P 4 1 4 1 3 3 1 407 14 2 14 AF 3 126 30 1282 29.1 0.89 3% ø2 T 30 293 6.7 0.78 1% 4.0 20.0 0.0 43.0 73.0 0.0% 35.8% 60.8% 40.0 3.0 0.0 0.0 1.0 0.0 4.0 4.0 4.0 Lag 7.0 24.0 24.0 20% 22.0 2.0 0.0 3.0 None 3.0 None 7.0 13.0 30 R 10.0 10.0 12.0 17.0 17.0 19.0 23.0 23.0 30.0 19.2% 19.2% 25.0% 19.0 19.0 26.0 3.0 3.0 3.0 1.0 1.0 1.0 0.0 0.0 0.0 4.0 4.0 4.0 Lead Lead Lead D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Existing 2035 PM 2.0 None 18.8 0.16 0.95 88.1 25.4 113.4 F 80.5 F 183 m#268 213 2.0 2.0 None C-Max 18.8 0.16 0.71 16.2 44.7 61.0 E 86 141 37.0 0.31 0.67 35.5 1.6 37.0 D 37.0 D 248 #330 1202 76.0 0.63 0.93 49.9 8.2 58.1 E 294 #582 Lag 80.0 0.67 0.33 7.4 0.3 7.7 A 38.3 D 94 133 308 Synchro 7 Page 1 Casey Overpass 2272: Washington St & Ukraine Way Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio WBL 283 29 0 0 1.04 WBR 630 213 0 0 1.07 NBT 1111 0 195 0 0.82 Existing 2035 PM 6/25/2012 NBR SBL 676 1 38 0 0.99 SBT 1230 334 0 0 0.45 ø2 2272: Washington St & Ukraine Way D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 0 (0%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.95 Intersection Signal Delay: 50.0 Intersection LOS: D Intersection Capacity Utilization 71.1% ICU Level of Service C Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 2 Casey Overpass 249: Hyde Park Ave & Walk Hill St CMM McMahon 6/25/2012 WBL WBR NBT NBR SBL SBT 40 1900 0 1 25 1651 0.991 1651 239 1900 0 0 25 0 620 1900 22 1900 0 0 25 0 1150 1900 0 Yes 3514 367 1900 200 1 25 1770 0.950 1770 3539 30 828 18.8 0.95 2% 356 0.83 2% 4 30 478 10.9 0.95 2% 0.65 2% 0.87 2% 0 687 0 1 422 Prot 4 1 4 3539 1211 14 AF 3 3 10.0 18.0 0.0 33.0 0.0% 27.5% 28.0 4.0 1.0 0.0 0.0 4.0 5.0 Lead 2 14 34.0 39.0 0.0 39.0 72.0 0.0% 32.5% 60.0% 34.0 4.0 1.0 0.0 0.0 0.0 4.0 5.0 5.0 Lag 7.0 22.0 22.0 18% 20.0 2.0 0.0 3.0 None 7.0 13.0 25 R 15.0 20.0 26.0 21.7% 21.0 4.0 1.0 0.0 5.0 Lead 0 Yes ø2 T 154 30 111 2.5 0.59 0% 3514 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Existing 2035 PM 2.0 None 2.0 C-Max 3.0 None 19.2 0.16 0.91 54.9 0.0 54.9 D 54.9 D 158 38.6 0.32 0.61 39.7 0.0 39.7 D 39.7 D 266 34.0 0.28 0.84 52.4 0.0 52.4 D 312 Lag 77.6 0.65 0.53 22.1 0.0 22.1 C 29.9 C 323 Synchro 7 Page 1 Casey Overpass 249: Hyde Park Ave & Walk Hill St Lane Group Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio WBL 116 31 WBR 416 0 0 0 0.86 Existing 2035 PM 6/25/2012 NBT #345 398 NBR 1134 0 0 0 0.61 SBL m#434 200 502 0 0 0 0.84 SBT 480 748 ø2 2289 0 0 0 0.53 249: Hyde Park Ave & Walk Hill St D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 50 (42%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.91 Intersection Signal Delay: 35.8 Intersection LOS: D Intersection Capacity Utilization 75.6% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 2 Casey Overpass 2162: Hyde Park Ave & Ukraine Way CMM McMahon 6/25/2012 EBR NBL NBT SBT SBR 247 1900 1770 0.950 1770 564 1900 1583 315 1900 0 964 1900 3433 219 1900 0 1583 Yes 440 0 553 1900 3501 0.527 1879 3433 0 Yes 0.88 0% 30 828 18.8 0.91 2% 28 30 489 11.1 0.86 2% 0.78 2% 966 1402 0 14 1 14 1 30 293 6.7 0.78 2% 317 3 613 0 Perm D.P+P 4 3 1 3 4 2 AF 3 0.92 2% ø2 T EBL R 8.0 8.0 4.0 12.0 16.0 16.0 12.0 20.0 41.0 41.0 12.0 58.0 46.0 34.2% 34.2% 10.0% 48.3% 38.3% 36.0 36.0 8.0 41.0 4.0 4.0 4.0 4.0 1.0 1.0 0.0 1.0 0.0 0.0 -1.0 0.0 0.0 5.0 5.0 3.0 5.0 5.0 Lead Lead Lag Lead D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Existing 2035 PM 2.0 None 2.0 None 26.6 0.22 0.81 33.8 3.8 37.6 D 60.5 E 204 m215 213 26.6 0.22 0.88 24.5 47.8 72.3 E 368 m444 2.0 None 2.0 C-Max 65.8 0.55 2.11dl 33.5 2.0 35.5 D 35.5 D 230 #282 748 0.0 0.0% 7.0 21.0 21.0 18% 19.0 2.0 0.0 0.0 4.0 Lag 3.0 None 7.0 12.0 35 58.8 0.49 0.83 29.5 0.5 29.9 C 29.9 C 505 #748 409 Synchro 7 Page 1 Casey Overpass 2162: Hyde Park Ave & Ukraine Way Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL 531 136 0 0 0.80 EBR 783 221 0 0 1.09 NBL Existing 2035 PM 6/25/2012 NBT 1125 0 67 0 0.91 SBT 1696 0 63 0 0.86 SBR ø2 2162: Hyde Park Ave & Ukraine Way D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 54 (45%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay: 40.2 Intersection LOS: D Intersection Capacity Utilization 84.3% ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. dl Defacto Left Lane. Recode with 1 though lane as a left lane. CMM McMahon Synchro 7 Page 2 Casey Overpass 1759: Hyde Park Ave & Tower St CMM McMahon 6/25/2012 EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 22 1900 0 14 1900 0 17 1900 0 0 1900 0 862 1900 3564 12 1900 0 18 1900 0 0 0 Yes 0 3564 0 Yes 0 1108 1900 3571 0.924 3303 0 1900 0 0 Yes 0 1900 1755 0.830 1503 15 1900 0 0 0 1900 875 0.845 763 0.79 100% 16 30 94 2.1 0.92 100% 0.88 100% 0.44 0% 20 30 283 6.4 0.92 0% 0.70 0% 0.92 0% 2 30 201 4.6 0.89 1% 0.69 0% 0.85 0% 30 440 10.0 0.92 1% 0.92 0% 44 0 0 Perm 60 0 0 986 0 0 Perm 1225 0 0 Perm 3 3 3 3 3 18.0 18.0 22.0 22.0 0.0 25.0 25.0 0.0% 20.8% 20.8% 21.0 21.0 3.0 3.0 1.0 1.0 0.0 0.0 0.0 4.0 4.0 4.0 2.0 None 2.0 None 18.0 0.15 0.34 49.3 0.0 49.3 D 49.3 D 27 m59 14 1 2.0 None 1 15.0 15.0 23.0 23.0 0.0 73.0 73.0 0.0% 60.8% 60.8% 67.0 67.0 4.0 4.0 2.0 2.0 0.0 -2.0 -2.0 4.0 4.0 4.0 Lead Lead 2.0 None 2.0 C-Max 2.0 2.0 C-Max C-Max 18.0 0.15 0.25 34.8 0.0 34.8 C 34.8 C 27 69 203 76.4 0.64 0.43 11.2 0.0 11.2 B 11.2 B 180 200 121 76.4 0.64 0.58 8.0 0.1 8.1 A 8.1 A 91 121 360 0.0 0.0% 0.0 4.0 0 Yes 1 1 1 15.0 23.0 0.0 73.0 0.0% 60.8% 67.0 4.0 2.0 0.0 -2.0 4.0 4.0 Lead R 18.0 18.0 22.0 22.0 25.0 25.0 20.8% 20.8% 21.0 21.0 3.0 3.0 1.0 1.0 0.0 0.0 4.0 4.0 3 1 AF 3 3 T EBL D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Existing 2035 PM 0.0 0.0% 0.0 4.0 Synchro 7 Page 1 Casey Overpass 1759: Hyde Park Ave & Tower St CMM McMahon 6/25/2012 T ø2 AF 2 Lag R 12.0 22.0 22.0 18% 20.0 2.0 0.0 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Existing 2035 PM 3.0 None 12.0 8.0 120 Synchro 7 Page 2 Casey Overpass 1759: Hyde Park Ave & Tower St Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT 147 0 0 0 0.30 Existing 2035 PM 6/25/2012 EBR WBL WBT 280 0 0 0 0.21 WBR NBL NBT 2270 0 0 0 0.43 NBR SBL SBT 2103 107 0 0 0.61 SBR 1759: Hyde Park Ave & Tower St D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 30 (25%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 80 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.58 Intersection Signal Delay: 10.9 Intersection LOS: B Intersection Capacity Utilization 65.1% ICU Level of Service C Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 3 Casey Overpass 1759: Hyde Park Ave & Tower St Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing 2035 PM 6/25/2012 ø2 D R AF T Intersection Summary CMM McMahon Synchro 7 Page 4 Casey Overpass 2303: Hyde Park Ave & Fitzgerald Parking Lot CMM McMahon 6/25/2012 EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 0 1900 0 0 1900 0 7 1900 0 20 1900 0 21 1900 0 20 1900 0 0 Yes 0 0 Yes 0 0 Yes 0 1086 1900 3497 0.894 3129 16 1900 0 0 865 1900 3438 0.877 3018 7 1900 0 0 0 1900 1684 0.989 1684 0.92 0% 30 125 2.8 0.92 0% 0.92 0% 0.75 0% 30 30 187 4.3 0.92 0% 0.66 0% 0.75 100% 3 30 440 10.0 0.90 2% 0.46 0% 0.58 0% 3 30 118 2.7 0.89 1% 0.67 100% 0 0 0 0 Perm 39 0 0 Perm 1004 0 0 Perm 1278 0 3 0.0 4.0 0.0 0.0% 8.0 8.0 13.0 13.0 0.0 14.0 14.0 0.0% 11.7% 11.7% 10.0 10.0 3.0 3.0 1.0 1.0 0.0 0.0 0.0 4.0 4.0 4.0 0.0 4.0 45 1 2.0 Max 0 Yes 1 1 1 1 15.0 15.0 23.0 23.0 0.0 84.0 84.0 0.0% 70.0% 70.0% 78.0 78.0 4.0 4.0 2.0 2.0 0.0 -2.0 -2.0 4.0 4.0 4.0 Lead Lead 15.0 15.0 23.0 23.0 0.0 84.0 84.0 0.0% 70.0% 70.0% 78.0 78.0 4.0 4.0 2.0 2.0 0.0 -2.0 -2.0 4.0 4.0 4.0 Lead Lead 2.0 Max 2.0 2.0 C-Max C-Max 2.0 2.0 C-Max C-Max 10.0 0.08 0.23 26.2 0.0 26.2 C 26.2 C 7 42 107 81.0 0.68 0.49 2.9 0.0 2.9 A 2.9 A 20 22 360 81.0 0.68 0.60 5.4 0.7 6.1 A 6.1 A 154 m188 38 R 0.0 0.0% 3 1 1 1 AF 3 3 T EBL D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Existing 2035 PM 0.0 0.0% 0.0 4.0 Synchro 7 Page 1 Casey Overpass 2303: Hyde Park Ave & Fitzgerald Parking Lot CMM McMahon 6/25/2012 T ø2 AF 2 Lag R 12.0 22.0 22.0 18% 20.0 2.0 0.0 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Existing 2035 PM 3.0 None 12.0 7.0 100 Synchro 7 Page 2 Casey Overpass 2303: Hyde Park Ave & Fitzgerald Parking Lot Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL Existing 2035 PM 6/25/2012 WBT 168 0 0 0 0.23 WBR NBL NBT 2038 0 0 0 0.49 NBR SBL SBT 2113 455 0 0 0.77 SBR 2303: Hyde Park Ave & Fitzgerald Parking Lot D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 28 (23%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 70 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.60 Intersection Signal Delay: 5.1 Intersection LOS: A Intersection Capacity Utilization 58.1% ICU Level of Service B Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 3 Casey Overpass 2303: Hyde Park Ave & Fitzgerald Parking Lot Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Existing 2035 PM 6/25/2012 ø2 D R AF T Intersection Summary CMM McMahon Synchro 7 Page 4 Casey Overpass 2164: New Washington & Washington St CMM McMahon 6/25/2012 EBL EBR EBR2 WBL WBT WBR NBL NBT SBL SBT SBR 232 1900 0 1 25 1687 0.950 1687 195 1900 330 1 25 1599 124 1900 253 1900 0 0 25 0 266 1900 73 1900 0 0 25 0 118 1900 0 0 25 0 473 1900 745 1900 253 1900 200 1 25 1583 1599 1599 Yes 143 0 Yes 0 3497 0.533 1883 78 1900 0 0 25 0 0.90 3% 30 270 6.1 0.94 2% 0.87 1% 0.92 1% 14 30 352 8.0 0.96 7% 264 224 143 custom custom custom 2 2 2 2 2 2 2 2 2 0 Split 3 0.87 1% 642 3 0.81 3% 0 0 D.P+P 4 1 4 AF 0.88 7% 1599 T 0 3331 0.979 3331 3 3 R 4.0 4.0 4.0 8.0 8.0 21.0 21.0 21.0 27.0 27.0 25.0 25.0 25.0 30.0 30.0 20.8% 20.8% 20.8% 25.0% 25.0% 20.0 20.0 20.0 25.0 25.0 4.0 4.0 4.0 4.0 4.0 1.0 1.0 1.0 1.0 1.0 0.0 0.0 0.0 -4.0 0.0 5.0 5.0 5.0 1.0 5.0 Lag Lag Lag Lead Lead D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Existing 2035 PM 2.0 None 7.0 6.0 0 19.8 0.16 0.95 78.0 0.0 78.0 E 2.0 None 7.0 6.0 0 19.8 0.16 0.85 61.4 0.0 61.4 E 2.0 None 7.0 6.0 0 19.8 0.16 0.37 5.6 0.0 5.6 A 186 151 6 2.0 None 9.0 10.0 0 2.0 None 9.0 10.0 0 24.4 0.20 0.93 67.4 0.0 67.4 E 67.4 E 252 634 0 3526 0.699 2480 0.74 0% 30 323 7.3 0.94 2% 0 Perm 14 14 898 1583 Yes 278 0.91 2% 278 custom 1 1 1 1 12 12 8.0 8.0 8.0 13.0 18.0 18.0 0.0 13.0 65.0 52.0 52.0 77.0 0.0% 10.8% 54.2% 43.3% 43.3% 64.2% 11.0 47.0 47.0 2.0 4.0 4.0 0.0 1.0 1.0 0.0 -4.0 0.0 -4.0 0.0 0.0 4.0 -2.0 5.0 1.0 5.0 5.0 Lag Lead Lead 2.0 None 55.8 0.46 0.64 14.9 0.0 14.9 B 14.9 B 62 2.0 2.0 C-Max C-Max 7.0 7.0 3.0 3.0 0 0 47.8 0.40 0.91 46.6 0.0 46.6 D 36.7 D 347 72.6 0.60 0.26 4.7 0.0 4.7 A 22 Synchro 7 Page 1 Casey Overpass 2164: New Washington & Washington St Lane Group Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL #346 EBR #280 EBR2 26 281 0 0 0 0.94 330 267 0 0 0 0.84 330 386 0 0 0 0.37 WBL Existing 2035 PM 6/25/2012 WBT #361 272 WBR NBL 705 0 0 0 0.91 NBT 91 190 984 0 0 0 0.64 SBL SBT #483 243 988 0 0 0 0.91 SBR m72 200 1070 0 0 0 0.26 2164: New Washington & Washington St D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 46 (38%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.95 Intersection Signal Delay: 42.5 Intersection LOS: D Intersection Capacity Utilization 85.1% ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 2 Casey Overpass 9: Route 203 & Cemetery Rd CMM McMahon 6/25/2012 EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 4 1900 0 0 1900 0 1 1900 0 8 1900 0 622 1900 0 0 Yes 0 0 Yes 0 3 1900 1765 0.729 1346 46 1900 0 0 4 1900 1815 0.797 1490 2 1900 0 0 Yes 820 1900 3403 0.954 3247 307 1900 0 0 1454 1900 3539 0.952 3370 0.92 0% 30 447 10.2 0.92 2% 0.92 0% 0.92 0% 99 30 127 2.9 0.92 2% 0.92 1% 0.80 0% 2 30 152 3.5 0.80 0% 0.80 0% 0.99 2% 6 30 130 3.0 0.99 0% 0.99 2% 1584 0 0 Perm 1226 0 0 Perm 17 0 0 Perm 677 0 0 Perm 1 1 1 1 1 4.0 None 4.0 None 36.0 0.48 0.98 38.7 0.0 38.7 D 38.7 D 360 #532 367 1618 0 0 2 2 8.0 8.0 24.0 24.0 0.0 34.0 34.0 0.0% 45.3% 45.3% 29.0 29.0 4.0 4.0 1.0 1.0 0.0 0.0 0.0 4.0 5.0 5.0 Lag Lag 8.0 8.0 24.0 24.0 0.0 34.0 34.0 0.0% 45.3% 45.3% 29.0 29.0 4.0 4.0 1.0 1.0 0.0 0.0 0.0 4.0 5.0 5.0 Lag Lag 4.0 None 4.0 None 4.0 None 4.0 None 36.0 0.48 0.76 18.4 0.0 18.4 B 18.4 B 215 295 47 1610 0 0 4.0 None 29.0 0.39 0.03 13.4 0.0 13.4 B 13.4 B 4 14 72 577 0 0 0 Yes 2 2 2 8.0 8.0 24.0 24.0 0.0 41.0 41.0 0.0% 54.7% 54.7% 36.0 36.0 4.0 4.0 1.0 1.0 0.0 0.0 0.0 4.0 5.0 5.0 Lead Lead R 8.0 8.0 24.0 24.0 41.0 41.0 54.7% 54.7% 36.0 36.0 4.0 4.0 1.0 1.0 0.0 0.0 5.0 5.0 Lead Lead 1 2 2 2 AF 1 1 T EBL D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Existing 2035 PM 0.0 0.0% 0.0 4.0 4.0 None 29.0 0.39 1.29 169.7 0.0 169.7 F 169.7 F ~412 #615 50 524 0 0 Synchro 7 Page 1 Casey Overpass 9: Route 203 & Cemetery Rd Lane Group Storage Cap Reductn Reduced v/c Ratio EBL EBT 0 0.98 Existing 2035 PM 6/25/2012 EBR WBL WBT 0 0.76 WBR NBL NBT 0 0.03 NBR SBL SBT 0 1.29 SBR 9: Route 203 & Cemetery Rd D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 75 Actuated Cycle Length: 75 Natural Cycle: 110 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.29 Intersection Signal Delay: 56.8 Intersection LOS: E Intersection Capacity Utilization 95.4% ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. CMM McMahon Synchro 7 Page 2 AT-GRADE 2035 (PROJECTED 2035 TRAFFIC VOLUMES ON AT-GRADE STREET NETWORK) Casey Arborway 2163: Arborway & South St CMM McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 11 0 0 25 0 1207 1900 11 426 1900 11 100 1 25 1531 0 1900 11 0 0 25 0 1887 1900 11 281 1900 11 0 0 25 0 643 1900 11 328 1900 11 50 0 25 0 12 1900 11 0 0 25 0 4916 1531 No 0 4813 100 1900 10 100 1 25 1478 0.208 324 235 1900 11 0 297 1900 10 70 1 25 1685 0.432 766 0.92 2% 35 224 4.4 0.87 2% 0.94 2% 0.92 2% 35 677 13.2 0.95 2% 0 1387 453 Free 0 2313 1 0 No 0.86 2% 0.97 0% 0 306 pm+pt 3 34 6.0 10.0 10.0 12.5% 6.0 3.0 1.0 4.0 Lead 1 Free 4.0 0.0 0.0% 0.0 0.0% R 0.0 0.0% 10.0 40.0 40.0 50.0% 36.0 3.0 1.0 4.0 4.0 3.0 C-Max 22.0 14.0 90 36.0 0.45 0.63 12.5 0.0 12.5 B 9.5 A 79 107 144 80.0 1.00 0.30 0.4 0.0 0.4 A 0 0 4.0 10.0 40.0 40.0 50.0% 36.0 3.0 1.0 4.0 3.0 C-Max 22.0 14.0 90 36.0 0.45 1.07 47.9 0.0 47.9 D 47.9 D ~446 m#166 597 3208 3208 0.0 0.0% 4.0 0.92 2% 0.89 14% 1064 0 112 Perm 34 0.0 0.0% 4.0 4.0 61 m47 36.0 0.45 0.74 9.2 62.4 71.6 E 60.2 E 114 m94 139 1665 1665 0 No 35 152 3.0 0.83 10% 0.92 0% 296 0 4 40.0 50.0% 3.0 None 32.0 0.40 0.82 20.2 0.6 20.8 C 0 No 35 219 4.3 0.91 4% T 4813 AF 4916 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) At Grade 2035 AM 4 10.0 29.0 30.0 37.5% 26.0 3.0 1.0 4.0 Lag 3.0 None 12.0 13.0 30 26.0 0.32 1.07 139.8 0.0 139.8 F ~63 #160 10.0 29.0 30.0 37.5% 26.0 3.0 1.0 4.0 Lag 0.0 0.0% 4.0 3.0 None 12.0 13.0 30 26.0 0.32 0.55 26.8 0.1 26.9 C 57.9 E 120 177 72 Synchro 7 Page 1 Casey Arborway 2163: Arborway & South St Lane Group Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL At Grade 2035 AM 6/25/2012 EBT 2212 0 0 0 0.63 EBR 100 1531 0 59 0 0.31 WBL WBT WBR 2166 0 0 0 1.07 NBL 70 375 6 0 0 0.83 NBT 1444 503 0 0 1.13 NBR SBL 100 105 0 0 0 1.07 SBT SBR 541 0 15 0 0.56 2163: Arborway & South St D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 0 (0%), Referenced to phase 1:EBWB, Start of Green, Master Intersection Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.07 Intersection Signal Delay: 39.5 Intersection LOS: D Intersection Capacity Utilization 89.3% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 2 Casey Arborway 253: South St & Washington St CMM McMahon 6/25/2012 EBL EBR NBL NBT SBT SBR 234 1900 1735 0.965 1720 100 1900 0 98 1900 0 453 1900 3283 195 1900 0 0 Yes 0 1021 1900 3553 0.737 2631 3283 0 Yes 9 0.91 2% 408 0 0 pm+pt 4 14 8.0 10.0 14.0 17.5% 12.0 2.0 0.0 4.0 Lag 2.0 None 0.0 0.0% 4.0 0.95 1% 0.91 5% 9 0.91 1% 1183 712 0 14 1 38.0 47.5% 5.0 R 3 3 9.0 14.0 23.0 28.8% 18.0 4.0 1.0 5.0 Lead 78 30 219 5.0 15.0 20.0 24.0 30.0% 19.0 4.0 1.0 5.0 Lead T 9 0.86 1% 30 201 4.6 ø2 2 6.0 19.0 19.0 24% 17.0 2.0 0.0 AF 23 30 846 19.2 9 0.80 1% D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn At Grade 2035 AM 2.0 None 2.0 C-Max 18.0 0.22 1.00 76.7 0.6 77.3 E 77.3 E 195 #311 766 39.4 0.49 0.85 22.1 6.0 28.0 C 28.0 C 56 #494 121 30.4 0.38 0.55 17.4 1.6 19.0 B 19.0 B 56 #150 139 408 0 1399 152 1296 386 0.0 0.0% 4.0 Lag 3.0 None 7.0 10.0 30 Synchro 7 Page 1 Casey Arborway 253: South St & Washington St Lane Group Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL 1 0 1.00 EBR At Grade 2035 AM 6/25/2012 NBL NBT 173 0 0.96 SBT 0 0 0.78 SBR ø2 253: South St & Washington St D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 55 (69%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.00 Intersection Signal Delay: 34.0 Intersection LOS: C Intersection Capacity Utilization 82.0% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. CMM McMahon Synchro 7 Page 2 Casey Arborway 25: Washington St & MBTA Busway #2 CMM McMahon 6/25/2012 WBL WBR NBT NBR SBL SBT 30 1900 902 0.950 902 6 1900 808 1053 1900 1863 0 1900 0 0 1900 0 524 1900 3505 808 Yes 8 1863 0 Yes 0 3505 38 0.80 100% 8 Free 2 30 339 7.7 0.95 2% 0.95 2% 0.96 2% 30 116 2.6 0.96 3% 1108 0 0 546 1 1 T 35 82 1.6 0.80 100% Free 3.0 None 6.0 10.0 35 12.4 0.16 0.27 34.0 0.0 34.0 C 28.1 C 17 m29 2 4.0 259 0 0 80.0 1.00 0.01 0.0 0.0 0.0 A 0 m0 808 0 0 7.0 53.0 53.0 66.3% 49.0 3.0 1.0 4.0 Lead AF 0.0 0.0% 7.0 53.0 53.0 66.3% 49.0 3.0 1.0 4.0 Lead 0.0 0.0% 0.0 0.0% 4.0 4.0 R 7.0 24.0 27.0 33.8% 23.0 3.0 1.0 4.0 Lag 3.0 C-Max 39.0 10.0 0 65.6 0.82 0.73 9.2 0.1 9.2 A 9.2 A 370 #600 259 3.0 C-Max 39.0 10.0 0 65.6 0.82 0.19 0.7 0.1 0.8 A 0.8 A 25 m5 36 1528 0 30 2874 1181 0 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2035 AM Synchro 7 Page 1 Casey Arborway 25: Washington St & MBTA Busway #2 Lane Group Storage Cap Reductn Reduced v/c Ratio WBL 0 0.15 WBR 0 0.01 NBT 0 0.74 At Grade 2035 AM 6/25/2012 NBR SBL SBT 0 0.32 25: Washington St & MBTA Busway #2 D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 32 (40%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.73 Intersection Signal Delay: 7.1 Intersection LOS: A Intersection Capacity Utilization 67.9% ICU Level of Service C Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 2 Casey Arborway 2272: Washington St & Ukraine Way CMM McMahon 6/25/2012 WBL WBR NBT NBR SBL SBT 189 1900 1770 0.950 1770 598 1900 1599 434 1900 1759 197 1900 1583 251 1900 1696 1599 Yes 664 1759 1583 Yes 240 308 1900 1787 0.404 760 10.0 17.0 17.0 21.3% 13.0 3.0 1.0 4.0 Lead 2.0 None 664 Prot 3 10.0 17.0 17.0 21.3% 13.0 3.0 1.0 4.0 Lead 452 12.2 0.15 0.76 42.9 0.0 42.9 D 25.5 C 113 m129 213 288 0 0 0.82 2% 0.93 1% 240 Perm 331 pm+pt 4 14 7.0 17.0 17.0 21.3% 14.0 3.0 0.0 4.0 Lag 1 12.0 19.0 28.0 35.0% 24.0 3.0 1.0 4.0 Lead 1 12.0 19.0 28.0 35.0% 24.0 3.0 1.0 4.0 Lead 2.0 2.0 2.0 None C-Max C-Max 12.2 0.15 0.82 15.7 4.4 20.1 C 111 m131 816 94 0 1696 30 388 8.8 0.91 12% 276 14 2 T 3 0.90 1% ø2 4.0 18.0 18.0 23% 16.0 2.0 0.0 AF 205 30 1282 29.1 0.96 8% R 30 293 6.7 0.92 2% D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2035 AM 45.0 56.3% 4.0 Lag 3.0 None 43.4 0.54 0.47 13.8 0.0 13.8 B 9.7 A 135 212 1202 43.4 0.54 0.25 2.1 0.0 2.1 A 55.8 0.70 0.48 8.2 0.0 8.2 A 0 23 59 78 955 0 0 969 0 0 703 0 0 2.0 None 5.0 11.0 0 59.8 0.75 0.22 3.2 0.0 3.2 A 5.9 A 48 42 308 1264 0 0 Synchro 7 Page 1 Casey Arborway 2272: Washington St & Ukraine Way Lane Group Storage Cap Reductn Reduced v/c Ratio WBL 0 0.71 WBR 0 0.92 NBT 0 0.47 At Grade 2035 AM 6/25/2012 NBR 0 0.25 SBL 0 0.47 SBT 0 0.22 ø2 Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 0 (0%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.82 Intersection Signal Delay: 15.0 Intersection LOS: B Intersection Capacity Utilization 66.5% ICU Level of Service C Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. 2272: Washington St & Ukraine Way D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 2 Casey Arborway 249: Hyde Park Ave & Walk Hill St CMM McMahon 6/25/2012 WBL WBR NBT NBR SBL SBT 14 1900 0 1 25 1638 0.998 1638 371 1900 0 0 25 0 1035 1900 27 1900 0 0 25 0 530 1900 0 Yes 3515 205 1900 200 1 25 1770 0.950 1770 439 0.89 1% 5 30 478 10.9 0.92 2% 0.59 4% 0.85 2% 0 1171 0 1 241 Prot 4 10.0 18.0 28.0 35.0% 23.0 4.0 1.0 5.0 Lead 4.0 12.0 17.0 21.3% 15.0 2.0 0.0 2.0 Lag 8.0 0.10 0.81 18.8 0.0 18.8 B 18.8 B 10 9 31 0.0 0.0% R 2.0 None 0.0 0.0% 4.0 3505 3505 30 828 18.8 0.94 3% 564 14 AF 3 8.0 13.0 13.0 16.3% 8.0 4.0 1.0 5.0 Lead 0 Yes ø2 T 417 30 111 2.5 0.65 0% 3515 4.0 2.0 C-Max 3.0 None 32.7 0.41 0.81 32.1 0.0 32.1 C 32.1 C ~370 #497 398 14.1 0.18 0.77 45.8 0.0 45.8 D D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) At Grade 2035 AM 129 #196 45.0 56.3% 2 7.0 22.0 22.0 28% 20.0 2.0 0.0 5.0 Lag 3.0 None 7.0 13.0 30 48.8 0.61 0.26 13.0 0.0 13.0 B 22.8 C 106 146 748 200 Synchro 7 Page 1 Casey Arborway 249: Hyde Park Ave & Walk Hill St Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio WBL 539 0 0 0 0.81 WBR At Grade 2035 AM 6/25/2012 NBT 1439 0 0 0 0.81 NBR SBL 332 0 0 0 0.73 SBT 2133 0 0 0 0.26 ø2 249: Hyde Park Ave & Walk Hill St D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 0 (0%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.81 Intersection Signal Delay: 26.6 Intersection LOS: C Intersection Capacity Utilization 76.2% ICU Level of Service D Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. CMM McMahon Synchro 7 Page 2 Casey Arborway 2162: Hyde Park Ave & Ukraine Way CMM McMahon 6/25/2012 EBL EBR NBL NBT SBT SBR 210 1900 1770 0.950 1770 295 1900 1599 610 1900 0 441 1900 3363 177 1900 0 1599 Yes 339 0 800 1900 3479 0.568 2019 3363 0 Yes 0.87 1% 0.93 1% 30 828 18.8 0.89 2% 74 30 489 11.1 0.86 3% 0.87 2% 716 0 14 1 8.0 16.0 18.0 22.5% 13.0 4.0 1.0 5.0 Lead 8.0 16.0 18.0 22.5% 13.0 4.0 1.0 5.0 Lead 0 pm+pt 4 14 7.0 12.0 16.0 20.0% 12.0 4.0 0.0 4.0 Lag 1555 3 339 Prot 3 2.0 None 2.0 None 12.6 0.16 0.88 65.4 0.0 65.4 E 35.9 D 129 #234 213 12.6 0.16 0.63 14.2 0.4 14.6 B 288 0 0 544 32 0 41 111 2 T 12.0 20.0 28.0 35.0% 23.0 4.0 1.0 5.0 Lead ø2 4.0 18.0 18.0 23% 16.0 2.0 0.0 AF 244 44.0 55.0% 5.0 R 30 293 6.7 0.86 2% D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2035 AM 2.0 None 2.0 C-Max 52.4 0.66 1.15dl 44.3 0.0 44.3 D 44.3 D ~273 #417 748 41.4 0.52 0.40 12.9 0.0 12.9 B 12.9 B 83 151 409 1524 0 0 1778 0 0 0.0 0.0% 4.0 Lag 2.0 None 5.0 11.0 0 Synchro 7 Page 1 Casey Arborway 2162: Hyde Park Ave & Ukraine Way Lane Group Storage Cap Reductn Reduced v/c Ratio EBL 0 0.85 EBR 0 0.66 NBL At Grade 2035 AM 6/25/2012 NBT 0 1.02 SBT 0 0.40 SBR ø2 2162: Hyde Park Ave & Ukraine Way D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 0 (0%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.02 Intersection Signal Delay: 34.7 Intersection LOS: C Intersection Capacity Utilization 81.8% ICU Level of Service D Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. dl Defacto Left Lane. Recode with 1 though lane as a left lane. CMM McMahon Synchro 7 Page 2 Casey Arborway 1759: Hyde Park Ave & Tower St CMM McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 24 1900 0 18 1900 0 9 1900 0 0 1900 0 937 1900 3533 9 1900 0 6 1900 0 0 0 Yes 0 3533 0 Yes 0 544 1900 3537 0.928 3286 0 1900 0 0 Yes 0 1900 1711 0.906 1580 16 1900 0 0 0 1900 866 0.827 735 0.67 100% 32 30 94 2.1 0.92 100% 0.56 100% 0.56 0% 25 30 283 6.4 0.92 0% 0.63 0% 0.92 0% 2 30 201 4.6 0.86 2% 0.75 0% 0.50 0% 30 440 10.0 0.91 2% 0.92 0% 68 0 0 Perm 41 0 0 1102 0 0 Perm 610 0 3 2.0 None 2.0 None 8.0 13.0 17.0 21.3% 13.0 3.0 1.0 4.0 1 AF 8.0 13.0 17.0 21.3% 13.0 3.0 1.0 4.0 3 3 8.0 13.0 17.0 21.3% 13.0 3.0 1.0 4.0 0.0 0.0% 4.0 R 3 8.0 13.0 17.0 21.3% 13.0 3.0 1.0 4.0 2.0 None 0.0 0.0% 0.0 0.0% 4.0 4.0 15.0 23.0 41.0 51.3% 35.0 4.0 2.0 6.0 Lead 0 Yes 1 T 0 Perm 0.0 0.0% 4.0 1 15.0 23.0 41.0 51.3% 35.0 4.0 2.0 4.0 Lead 15.0 23.0 41.0 51.3% 35.0 4.0 2.0 6.0 Lead 2.0 None 2.0 C-Max 2.0 2.0 C-Max C-Max 9.8 0.12 0.58 39.8 0.0 39.8 D 39.8 D 26 71 14 9.8 0.12 0.19 19.2 0.0 19.2 B 19.2 B 7 34 203 50.6 0.63 0.49 12.3 0.0 12.4 B 12.4 B 193 m232 121 50.6 0.63 0.29 10.6 0.0 10.6 B 10.6 B 97 107 360 146 0 0 278 0 0 2236 0 69 2079 0 0 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2035 AM 0.0 0.0% 4.0 Synchro 7 Page 1 Casey Arborway 1759: Hyde Park Ave & Tower St CMM McMahon 6/25/2012 ø2 T 2 AF 12.0 22.0 22.0 28% 20.0 2.0 0.0 3.0 None 12.0 8.0 60 R Lag D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2035 AM Synchro 7 Page 2 Casey Arborway 1759: Hyde Park Ave & Tower St Lane Group Storage Cap Reductn Reduced v/c Ratio EBL EBT 0 0.47 At Grade 2035 AM 6/25/2012 EBR WBL WBT 0 0.15 WBR NBL NBT 0 0.51 NBR SBL SBT 0 0.29 SBR Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 16 (20%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.58 Intersection Signal Delay: 12.9 Intersection LOS: B Intersection Capacity Utilization 41.2% ICU Level of Service A Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. 1759: Hyde Park Ave & Tower St D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 3 Casey Arborway 1759: Hyde Park Ave & Tower St Lane Group Storage Cap Reductn Reduced v/c Ratio At Grade 2035 AM 6/25/2012 ø2 D R AF T Intersection Summary CMM McMahon Synchro 7 Page 4 Casey Arborway 2303: Hyde Park Ave & Fitzgerald Parking Lot CMM McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 0 1900 0 0 1900 0 1 1900 0 4 1900 0 21 1900 0 2 1900 0 0 Yes 0 0 Yes 0 0 Yes 0 539 1900 3296 0.953 3141 28 1900 0 0 935 1900 3389 0.917 3114 2 1900 0 0 0 1900 1678 0.990 1678 0.92 0% 30 125 2.8 0.92 0% 0.92 0% 0.92 0% 4 30 187 4.3 0.92 0% 0.92 0% 0.58 100% 1 30 440 10.0 0.89 3% 0.46 0% 0.85 0% 12 30 207 4.7 0.95 2% 0.70 100% 0 0 0 0 Perm 5 0 0 Perm 1091 0 0 Perm 609 0 0.0 0.0% 0.0 0.0% 4.0 4.0 4.0 R 0.0 0.0% 2.0 None 45 8.0 13.0 13.0 16.3% 9.0 3.0 1.0 4.0 1 1 15.0 23.0 45.0 56.3% 39.0 4.0 2.0 4.0 Lead AF 3 8.0 13.0 13.0 16.3% 9.0 3.0 1.0 4.0 0.0 0.0% 4.0 15.0 23.0 45.0 56.3% 39.0 4.0 2.0 6.0 Lead 0 Yes 1 T 3 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2035 AM 0.0 0.0% 4.0 1 15.0 23.0 45.0 56.3% 39.0 4.0 2.0 4.0 Lead 15.0 23.0 45.0 56.3% 39.0 4.0 2.0 6.0 Lead 2.0 None 2.0 2.0 C-Max C-Max 2.0 2.0 C-Max C-Max 8.0 0.10 0.03 23.6 0.0 23.6 C 23.6 C 0 11 107 60.8 0.76 0.46 2.0 0.1 2.1 A 2.1 A 8 17 360 60.8 0.76 0.25 3.7 0.0 3.7 A 3.7 A 9 m87 127 192 0 0 2367 231 0 2390 0 0 0.0 0.0% 4.0 Synchro 7 Page 1 Casey Arborway 2303: Hyde Park Ave & Fitzgerald Parking Lot CMM McMahon 6/25/2012 ø2 T 2 AF 12.0 22.0 22.0 28% 20.0 2.0 0.0 3.0 None 12.0 8.0 40 R Lag D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2035 AM Synchro 7 Page 2 Casey Arborway 2303: Hyde Park Ave & Fitzgerald Parking Lot Lane Group Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL At Grade 2035 AM 6/25/2012 WBT 0 0.03 WBR NBL NBT 0 0.51 NBR SBL SBT 0 0.25 SBR Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 28 (35%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.46 Intersection Signal Delay: 2.7 Intersection LOS: A Intersection Capacity Utilization 55.9% ICU Level of Service B Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. 2303: Hyde Park Ave & Fitzgerald Parking Lot D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 3 Casey Arborway 2303: Hyde Park Ave & Fitzgerald Parking Lot Lane Group Storage Cap Reductn Reduced v/c Ratio At Grade 2035 AM 6/25/2012 ø2 D R AF T Intersection Summary CMM McMahon Synchro 7 Page 4 Casey Arborway 2164: Arborway & Washington St CMM McMahon 6/25/2012 EBT EBR WBT WBR NBL NBT NBR NBR2 SBL SBT SBR2 NEL2 1406 1900 11 1949 1900 11 126 1900 11 13 1900 11 3073 0 0 4813 0 3323 1432 0 No 55 1900 10 100 1 25 1589 0.202 338 340 1900 11 3323 0 1900 11 100 1 25 1432 4803 93 1900 10 50 1 25 1668 0.283 497 196 1900 11 4813 272 1900 11 0 0 25 0 649 1900 11 4803 229 1900 11 100 0 25 0 3073 0 No 872 0.950 872 35 677 13.2 0.87 2% 0.80 2% 35 177 3.4 0.95 2% 0.80 2% 0.88 1% 1902 0 2392 0 106 pm+pt 3 4 5.0 9.0 9.0 11.3% 5.0 3.0 1.0 4.0 Lead 1 0.0 0.0% 10.0 35.0 35.0 43.8% 31.0 3.0 1.0 4.0 3.0 C-Max 16.0 14.0 30 36.6 0.46 0.87 18.7 0.0 18.7 B 18.7 B ~165 m#414 597 0.0 0.0% R 10.0 35.0 35.0 43.8% 31.0 3.0 1.0 4.0 4.0 3.0 C-Max 16.0 14.0 30 36.6 0.46 1.09 64.0 0.0 64.0 E 64.0 E ~558 m#582 97 4.0 2.0 None 23.8 0.30 0.48 18.7 0.0 18.7 B 10 31 0 0.92 2% 0.92 9% 0.59 6% 213 Perm 0 93 pm+pt 3 4 5.0 9.0 9.0 11.3% 5.0 3.0 1.0 4.0 Lead T 35 181 3.5 0.82 5% 791 AF 1 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) At Grade 2035 AM 4 7.0 22.0 22.0 27.5% 18.0 3.0 1.0 4.0 Lag 3.0 None 5.0 13.0 20 19.8 0.25 0.96 47.5 0.0 47.5 D 40.6 D ~232 #281 101 4 7.0 22.0 22.0 27.5% 18.0 3.0 1.0 4.0 Lag 0.0 0.0% 4.0 3.0 None 5.0 13.0 20 19.8 0.25 0.60 25.7 0.0 25.7 C 2.0 None 90 #149 32 41 23.8 0.30 0.52 30.7 0.0 30.7 C 35 323 6.3 0.84 11% 0.92 4% 0.92 100% 542 0 14 Prot 8 4 7.0 22.0 22.0 27.5% 18.0 3.0 1.0 4.0 Lag 3.0 None 5.0 13.0 20 19.8 0.25 0.71 34.7 0.0 34.7 C 34.1 C 134 175 243 0.0 0.0% 4.0 8.0 14.0 14.0 17.5% 8.0 3.0 3.0 6.0 2.0 None 8.0 0.10 0.16 37.7 0.0 37.7 D 7 24 Synchro 7 Page 1 Casey Arborway 2164: Arborway & Washington St CMM McMahon 6/25/2012 SWL 20 1900 11 0 1 25 872 0.950 872 T 0.92 100% R 8.0 14.0 14.0 17.5% 8.0 3.0 3.0 6.0 AF 22 Prot 8 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) At Grade 2035 AM 2.0 None 8.0 0.10 0.25 41.0 0.0 41.0 D 10 33 Synchro 7 Page 2 Casey Arborway 2164: Arborway & Washington St Lane Group Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBT EBR 2197 0 0 0 0.87 At Grade 2035 AM 6/25/2012 WBT WBR 2202 0 0 0 1.09 NBL 50 221 0 0 0 0.48 NBT 823 0 0 0 0.96 NBR 100 354 0 0 0 0.60 NBR2 SBL 100 178 0 0 0 0.52 SBT 760 0 0 0 0.71 SBR2 NEL2 87 0 0 0 0.16 2164: Arborway & Washington St D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 0 (0%), Referenced to phase 1:EBWB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.09 Intersection Signal Delay: 42.3 Intersection LOS: D Intersection Capacity Utilization 82.5% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 3 Casey Arborway 2164: Arborway & Washington St Lane Group Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio At Grade 2035 AM 6/25/2012 SWL 87 0 0 0 0.25 D R AF T Intersection Summary CMM McMahon Synchro 7 Page 4 Casey Arborway 3: Arborway & Forest Hills Drive CMM McMahon 6/25/2012 EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 587 1900 10 180 1 25 1652 0.950 1652 723 1900 11 14 1900 11 0 0 25 0 39 1900 10 100 1 25 1652 0.316 549 1202 1900 11 50 1900 11 0 1 25 0 80 1900 11 0 0 25 0 5 1900 11 22 1900 11 0 0 25 0 1 1900 11 0 0 No 0 1718 0.788 1419 580 1900 11 100 1 25 1531 0 No 1745 0.732 1335 5 1900 11 0 0 25 0 0.88 2% 0.83 0% 35 176 3.4 0.83 0% 0.83 0% 0.91 2% 35 241 4.7 0.91 2% 0 0 Perm 108 0 0 Perm 7.0 32.0 32.0 40.0% 28.0 3.0 1.0 4.0 Lead 3.0 None 13.0 15.0 20 28.0 0.35 1.14 114.5 0.0 114.5 F ~411 #611 0 No 35 188 3.7 0.89 2% 0.89 1% 0.88 2% 828 0 44 Perm 13 65.0 81.3% 4.0 61.0 0.76 0.32 3.2 0.0 3.2 A 52.6 D 8 71 108 3401 3401 35 348 6.8 0.88 2% 1423 AF 660 Prot 3 3412 1 0.0 0.0% 1 7.0 31.0 33.0 41.3% 29.0 3.0 1.0 4.0 R 0.89 2% 3412 T EBL D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) At Grade 2035 AM 4.0 7.0 31.0 33.0 41.3% 29.0 3.0 1.0 4.0 3.0 3.0 C-Max C-Max 12.0 12.0 15.0 15.0 20 20 29.0 29.0 0.36 0.36 0.22 1.15 9.9 91.5 0.0 49.5 9.9 140.9 A F 137.0 F 8 ~439 m10 m#462 268 0.0 0.0% 4.0 4 7.0 15.0 15.0 18.8% 11.0 3.0 1.0 4.0 Lag 3.0 None 5.0 6.0 20 4 7.0 15.0 15.0 18.8% 11.0 3.0 1.0 4.0 Lag 3.0 None 5.0 6.0 20 11.0 0.14 0.59 46.8 0.0 46.8 D 46.8 D 51 #95 96 25 1531 Yes 539 0.91 2% 637 Perm 4 0.0 0.0% 4.0 4 7.0 15.0 15.0 18.8% 11.0 3.0 1.0 4.0 Lag 3.0 None 5.0 6.0 20 7.0 15.0 15.0 18.8% 11.0 3.0 1.0 4.0 Lag 3.0 None 5.0 6.0 20 11.0 0.14 0.13 32.2 0.0 32.2 C 31.7 C 11 33 161 4 7.0 15.0 15.0 18.8% 11.0 3.0 1.0 4.0 Lag 3.0 None 5.0 6.0 20 11.0 0.14 0.94 31.7 0.0 31.7 C 46 #259 Synchro 7 Page 1 Casey Arborway 3: Arborway & Forest Hills Drive Lane Group Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL 180 578 0 0 0 1.14 EBT At Grade 2035 AM 6/25/2012 EBR 2602 0 0 0 0.32 WBL 100 199 0 0 0 0.22 WBT WBR NBL 1233 109 0 0 1.27 NBT 184 0 0 0 0.59 NBR SBL SBT 195 0 0 0 0.13 SBR 100 675 0 0 0 0.94 3: Arborway & Forest Hills Drive D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 30 (38%), Referenced to phase 1:EBWB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.15 Intersection Signal Delay: 81.9 Intersection LOS: F Intersection Capacity Utilization 89.0% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 2 Casey Arborway 13: Arborway & East Bow Tie CMM McMahon 6/25/2012 EBU EBL EBT WBT WBR SBL SBR 262 1900 11 0 1900 11 250 1 25 0 1324 1900 11 1959 1900 11 3421 3421 0 1900 11 0 0 25 0 0 1900 11 0 0 25 0 0 1900 11 0 0 25 0 0 3421 3421 0 Yes 0 0 Yes 0.92 0.92 35 373 7.3 0.87 35 478 9.3 0.95 0.92 285 Prot 3 0 1522 2062 0 13 1 2.0 None 7.0 10.0 10 19.5 0.24 0.68 28.4 0.0 28.4 C 0.0 0.0% 65.0 81.3% 4.0 142 m182 10.0 24.0 40.0 50.0% 36.0 3.0 1.0 4.0 Lag 4.0 0.92 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% 4.0 4.0 4.0 2 4.0 15.0 15.0 19% 13.0 2.0 0.0 Lead 2.0 C-Max 76.2 49.5 0.95 0.62 0.47 0.97 1.2 31.2 0.0 0.0 1.2 31.2 A C 5.5 31.2 A C 0 516 45 m#666 293 398 ø2 T 35 121 2.4 0.92 AF 10.0 25.0 25.0 31.3% 21.0 3.0 1.0 4.0 R 1711 0.950 1711 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) At Grade 2035 AM 2.0 None 7.0 6.0 10 41 250 Synchro 7 Page 1 Casey Arborway 13: Arborway & East Bow Tie Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBU 449 0 0 0 0.63 EBL At Grade 2035 AM 6/25/2012 EBT 3233 229 0 0 0.51 WBT 2116 0 0 0 0.97 WBR SBL SBR ø2 AF 13: Arborway & East Bow Tie D R Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 0 (0%), Referenced to phase 1:EBWB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.97 Intersection Signal Delay: 19.2 Intersection LOS: B Intersection Capacity Utilization 57.5% ICU Level of Service B Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 2 Casey Arborway 11: Arborway & West Bow Tie CMM McMahon 6/25/2012 EBL EBT WBU WBT WBR SBL SBR 0 1900 11 0 0 25 0 1244 1900 11 1807 1900 11 0 1900 11 0 0 25 0 0 1900 11 0 0 25 0 0 1900 11 0 0 25 0 0 4916 389 1900 11 350 1 25 1711 0.950 1711 0 Yes 0 0 Yes 0.92 35 192 3.7 0.87 0 1430 0.92 1 4.0 35 419 8.2 0.95 0.92 1902 0 12 10.0 31.0 35.0 80.0 43.8% 100.0% 31.0 3.0 1.0 4.0 4.0 Lag R 0.0 0.0% 10.0 22.0 45.0 56.3% 41.0 3.0 1.0 4.0 Lead 3421 2.0 C-Max 42.8 0.54 0.54 13.6 0.0 13.6 B 13.6 B 169 200 112 2631 0 0 35 115 2.2 0.92 0.92 0 0 AF 423 Prot 2 3421 T 4916 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2035 AM 2.0 None 29.2 0.36 0.68 15.8 0.0 15.8 B 189 m185 350 663 0 0 80.0 1.00 0.56 1.8 0.0 1.8 A 4.4 A 6 m2 339 0.0 0.0% 0.0 0.0% 0.0 0.0% 4.0 4.0 4.0 35 3394 0 0 Synchro 7 Page 1 Casey Arborway 11: Arborway & West Bow Tie Lane Group Storage Cap Reductn Reduced v/c Ratio EBL EBT 0 0.54 At Grade 2035 AM 6/25/2012 WBU 0 0.64 WBT 0 0.56 WBR SBL SBR Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 68 (85%), Referenced to phase 1:EBWB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.68 Intersection Signal Delay: 7.9 Intersection LOS: A Intersection Capacity Utilization 53.3% ICU Level of Service A Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. 11: Arborway & West Bow Tie D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 2 Casey Arborway 9: Arborway & Cemetery Rd CMM McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 131 1900 10 150 1 25 1685 0.085 151 619 1900 11 0 1900 11 0 0 25 0 5 1900 11 0 0 25 0 1264 1900 16 774 1900 11 0 0 25 0 4 1900 12 0 0 25 0 3 1900 12 0 1900 12 0 0 25 0 229 1900 12 0 0 25 0 2 1900 12 23 1900 12 0 0 25 0 0 Yes 0 0 Yes 0 0 Yes 0 3421 3795 0.954 3620 280 35 97 1.9 35 348 6.8 0.89 2% 0.89 0% 0.93 20% 0.93 2% 147 pm+pt 4 14 3.0 7.0 7.0 8.8% 3.0 3.0 1.0 4.0 Lag 696 0 0 Perm 2196 14 5.0 3.0 None 51.0 0.64 0.95 89.9 0.0 89.9 F 52 #99 150 154 1 0.80 25% 0 0 Perm 1 0.0 0.0% 1 8.0 21.0 52.0 65.0% 47.0 4.0 1.0 5.0 R 59.0 73.8% 0.93 1% 4.0 8.0 21.0 52.0 65.0% 47.0 4.0 1.0 5.0 54.0 0.68 0.30 5.9 0.3 6.2 A 20.8 C 51 84 268 4.0 4.0 C-Max C-Max 47.0 0.59 0.98 30.0 141.0 171.0 F 171.0 F 465 #703 17 2309 2242 0.0 0.0% 4.0 3 8.0 19.0 21.0 26.3% 16.0 4.0 1.0 5.0 Lead Yes 4.0 None 0.80 0% 1 0.80 0% 9 0 296 0 Yes 0.92 1% 0.92 0% 0.92 0% 0 Perm 276 0 3 8.0 19.0 21.0 26.3% 16.0 4.0 1.0 5.0 Lead Yes 4.0 None 16.0 0.20 0.03 26.3 0.0 26.3 C 26.3 C 4 14 176 1780 0.741 1379 6 35 140 2.7 35 256 5.0 AF 0.89 0% 1623 0.887 1479 T 3421 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) At Grade 2035 AM 3 0.0 0.0% 4.0 3 8.0 19.0 21.0 26.3% 16.0 4.0 1.0 5.0 Lead Yes 4.0 None 8.0 19.0 21.0 26.3% 16.0 4.0 1.0 5.0 Lead Yes 4.0 None 16.0 0.20 0.98 83.9 0.8 84.7 F 84.7 F 136 #289 60 0.0 0.0% 4.0 281 Synchro 7 Page 1 Casey Arborway 9: Arborway & Cemetery Rd Lane Group Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL 0 0 0 0.95 At Grade 2035 AM 6/25/2012 EBT 972 0 0 0.52 EBR WBL WBT 0 585 0 1.33 WBR NBL NBT 0 0 0 0.03 NBR SBL SBT 0 1 0 0.99 SBR 9: Arborway & Cemetery Rd D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 80 Offset: 8 (10%), Referenced to phase 1:EBWB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.98 Intersection Signal Delay: 125.4 Intersection LOS: F Intersection Capacity Utilization 110.4% ICU Level of Service H Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. CMM McMahon Synchro 7 Page 2 Casey Arborway 2163: Arborway & South St CMM McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 11 0 0 25 0 1855 1900 11 687 1900 11 100 1 25 1531 0 1900 11 0 0 25 0 1611 1900 11 226 1900 11 0 0 25 0 217 1900 11 326 1900 11 50 0 25 0 14 1900 11 0 0 25 0 4916 1531 No 0 4827 131 1900 11 100 1 25 1558 0.294 482 372 1900 11 0 195 1900 10 100 1 25 1685 0.164 291 0.92 2% 35 235 4.6 0.94 2% 0.92 2% 0.92 2% 35 677 13.2 0.86 2% 0 1973 747 Free 0 2121 0.0 0.0% 1 1 10.0 48.0 57.0 47.5% 53.0 3.0 1.0 4.0 3.0 C-Max 30.0 14.0 60 53.0 0.44 0.91 27.9 0.8 28.7 C 21.1 C 280 437 155 0 No 0.91 2% 0.76 0% 0 257 pm+pt 3 4 7.0 21.0 21.0 17.5% 17.0 3.0 1.0 4.0 Lead 0.0 0.0% 0.0 0.0% 4.0 120.0 1.00 0.49 0.6 0.3 1.0 A 0 m0 4.0 1 1 10.0 48.0 57.0 47.5% 53.0 3.0 1.0 4.0 3.0 C-Max 30.0 14.0 60 53.0 0.44 0.99 31.6 3.2 34.8 C 34.8 C 306 m#310 597 3066 3066 0.0 0.0% 4.0 3.0 None 55.0 0.46 0.82 40.9 15.9 56.7 E 93 149 0 No 35 228 4.4 0.94 6% 0.93 2% 0.88 12% 582 0 149 Perm T 4827 AF Free R 4.0 4916 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) At Grade 2035 PM 4 10.0 37.0 42.0 35.0% 38.0 3.0 1.0 4.0 Lag 2.0 None 20.0 13.0 30 39.3 0.33 0.58 25.1 14.0 39.1 D 44.5 D 182 199 148 1793 1793 0 No 35 152 3.0 0.79 2% 0.81 0% 488 0 4 0.0 0.0% 4.0 4 10.0 37.0 42.0 35.0% 38.0 3.0 1.0 4.0 Lag 2.0 None 20.0 13.0 30 39.3 0.33 0.94 99.4 0.0 99.4 F 114 #245 10.0 37.0 42.0 35.0% 38.0 3.0 1.0 4.0 Lag 0.0 0.0% 4.0 2.0 None 20.0 13.0 30 39.3 0.33 0.83 51.3 0.0 51.3 D 62.5 E 354 411 72 Synchro 7 Page 1 Casey Arborway 2163: Arborway & South St Lane Group Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL At Grade 2035 PM 6/25/2012 EBT 2171 53 0 0 0.93 EBR 100 1531 0 300 0 0.61 WBL WBT WBR 2132 11 28 0 1.01 NBL 100 334 65 48 0 0.96 NBT 1005 407 0 0 0.97 NBR SBL 100 158 0 0 0 0.94 SBT SBR 588 0 0 0 0.83 2163: Arborway & South St D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 0 (0%), Referenced to phase 1:EBWB, Start of Green, Master Intersection Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.99 Intersection Signal Delay: 33.0 Intersection LOS: C Intersection Capacity Utilization 77.4% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 2 Casey Arborway 253: South St & Washington St CMM McMahon 6/25/2012 EBL EBR NBL NBT SBT SBR 163 1900 1726 0.976 1726 147 1900 0 87 1900 0 758 1900 3421 291 1900 0 0 Yes 0 565 1900 3524 0.566 2009 3421 0 Yes 30 198 4.5 0.92 2% 57 30 228 5.2 0.95 1% 0.90 1% 718 1121 0 14 1 0.84 0% 414 0 0 pm+pt 4 14 8.0 10.0 10.0 8.3% 8.0 2.0 0.0 4.0 Lag 3 2.0 None 0.0 0.0% 4.0 58.0 48.3% 5.0 R 8.0 10.0 43.0 35.8% 41.0 2.0 0.0 2.0 Lead 30.0 38.0 48.0 40.0% 43.0 4.0 1.0 5.0 Lead 2 T 0.69 0% ø2 6.0 19.0 19.0 16% 17.0 2.0 0.0 AF 48 30 846 19.2 0.81 0% D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2035 PM 2.0 None 2.0 C-Max 30.8 0.26 0.87 55.2 0.1 55.3 E 55.3 E 275 307 766 65.8 0.55 0.62 17.2 2.6 19.8 B 19.8 B 164 206 118 60.8 0.51 0.64 20.0 0.7 20.8 C 20.8 C 259 #448 148 621 0 7 1165 34 316 1762 316 0 0.0 0.0% 4.0 Lag 3.0 None 7.0 10.0 25 Synchro 7 Page 1 Casey Arborway 253: South St & Washington St Lane Group Storage Cap Reductn Reduced v/c Ratio EBL 0 0.67 EBR At Grade 2035 PM 6/25/2012 NBL NBT 0 0.85 SBT 0 0.78 SBR ø2 253: South St & Washington St D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 68 (57%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.87 Intersection Signal Delay: 26.8 Intersection LOS: C Intersection Capacity Utilization 85.0% ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. CMM McMahon Synchro 7 Page 2 Casey Arborway 25: Washington St & MBTA Busway #2 CMM McMahon 6/25/2012 WBL WBR NBT NBR SBL SBT 29 1900 902 0.950 902 10 1900 808 644 1900 1863 0 1900 0 0 1900 0 880 1900 3574 808 Yes 11 1863 0 Yes 0 3574 32 0.92 100% 11 Free 2 30 310 7.0 0.92 2% 0.92 2% 0.92 2% 30 139 3.2 0.92 1% 700 0 0 957 1 1 T 30 105 2.4 0.92 100% Free 3.0 None 6.0 10.0 50 12.4 0.21 0.17 17.7 0.0 17.7 B 13.2 B 9 m21 25 4.0 241 0 0 60.0 1.00 0.01 0.0 0.0 0.0 A 0 m0 808 0 0 7.0 24.0 40.0 66.7% 36.0 3.0 1.0 4.0 Lead AF 0.0 0.0% 7.0 24.0 40.0 66.7% 36.0 3.0 1.0 4.0 Lead 0.0 0.0% 0.0 0.0% 4.0 4.0 R 7.0 20.0 20.0 33.3% 16.0 3.0 1.0 4.0 Lag 3.0 C-Max 6.0 10.0 0 45.6 0.76 0.49 6.1 0.0 6.1 A 6.1 A 141 228 230 3.0 C-Max 6.0 10.0 0 45.6 0.76 0.35 3.2 0.1 3.3 A 3.3 A 75 78 59 1416 0 0 2716 528 0 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2035 PM Synchro 7 Page 1 Casey Arborway 25: Washington St & MBTA Busway #2 Lane Group Storage Cap Reductn Reduced v/c Ratio WBL 0 0.13 WBR 0 0.01 NBT 0 0.49 At Grade 2035 PM 6/25/2012 NBR SBL SBT 0 0.44 Intersection Summary Area Type: Other Cycle Length: 60 Actuated Cycle Length: 60 Offset: 14 (23%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.49 Intersection Signal Delay: 4.7 Intersection LOS: A Intersection Capacity Utilization 46.4% ICU Level of Service A Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. 25: Washington St & MBTA Busway #2 D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 2 Casey Arborway 2272: Washington St & Ukraine Way CMM McMahon 6/25/2012 WBL WBR NBT NBR SBL SBT 207 1900 1787 0.950 1787 327 1900 1599 397 1900 1792 269 1900 1599 346 1900 1759 1599 Yes 448 1792 1599 Yes 285 542 1900 1787 0.334 628 0.73 1% 448 Perm 446 3 2.0 None 0.86 1% 302 Perm 630 pm+pt 4 14 7.0 20.0 37.0 30.8% 34.0 3.0 0.0 4.0 Lag 1 3 10.0 17.0 29.0 24.2% 25.0 3.0 1.0 4.0 Lead 12.0 19.0 30.0 25.0% 26.0 3.0 1.0 4.0 Lead 1 12.0 19.0 30.0 25.0% 26.0 3.0 1.0 4.0 Lead R 10.0 17.0 29.0 24.2% 25.0 3.0 1.0 4.0 Lead 0.89 1% 2.0 2.0 2.0 None C-Max C-Max 21.2 0.18 0.84 56.9 20.8 77.7 E 41.3 D 208 262 213 21.2 0.18 0.69 14.6 5.1 19.7 B 372 100 0 688 175 0 92 121 1759 30 388 8.8 0.85 8% 407 14 2 T 265 30 1282 29.1 0.89 6% ø2 4.0 24.0 24.0 20% 16.0 4.0 4.0 AF 30 293 6.7 0.78 1% D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2035 PM 67.0 55.8% 4.0 Lag 3.0 None 53.8 0.45 0.55 28.5 0.0 28.5 C 18.8 B 252 368 1202 53.8 0.45 0.35 4.3 0.2 4.6 A 86.8 0.72 0.82 17.4 1.5 18.9 B 7 60 67 241 804 0 0 874 0 149 773 0 45 2.0 None 5.0 11.0 0 90.8 0.76 0.31 3.0 0.0 3.0 A 12.6 B 32 39 308 1331 0 0 Synchro 7 Page 1 Casey Arborway 2272: Washington St & Ukraine Way Lane Group Storage Cap Reductn Reduced v/c Ratio WBL 0 0.97 WBR 0 0.87 NBT 0 0.55 At Grade 2035 PM 6/25/2012 NBR 0 0.42 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 9 (8%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.84 Intersection Signal Delay: 22.7 Intersection Capacity Utilization 72.4% Analysis Period (min) 15 SBT 0 0.31 ø2 Intersection LOS: C ICU Level of Service C 2272: Washington St & Ukraine Way D R AF T Splits and Phases: SBL 0 0.87 CMM McMahon Synchro 7 Page 2 Casey Arborway 249: Hyde Park Ave & Walk Hill St CMM McMahon 6/25/2012 WBL WBR NBT NBR SBL SBT 40 1900 0 1 25 1651 0.991 1651 239 1900 0 0 25 0 620 1900 22 1900 0 0 25 0 1150 1900 0 Yes 3514 367 1900 200 1 25 1770 0.950 1770 356 0.83 2% 4 30 478 10.9 0.95 2% 0.65 2% 0.87 2% 0 687 0 1 422 Prot 4 10.0 18.0 35.0 29.2% 30.0 4.0 1.0 5.0 Lead 4.0 10.0 40.0 33.3% 38.0 2.0 0.0 2.0 Lag 17.5 0.15 0.97 69.3 0.0 69.3 E 69.3 E 168 125 31 0.0 0.0% R 2.0 None 0.0 0.0% 4.0 3539 3539 30 828 18.8 0.95 2% 1211 14 AF 3 8.0 16.0 23.0 19.2% 18.0 4.0 1.0 5.0 Lead 0 Yes ø2 T 149 30 111 2.5 0.59 0% 3514 4.0 2.0 C-Max 3.0 None 40.6 0.34 0.58 37.7 0.0 37.7 D 37.7 D 260 332 398 36.7 0.31 0.78 53.3 0.0 53.3 D D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) At Grade 2035 PM 324 m393 75.0 62.5% 2 7.0 22.0 22.0 18% 20.0 2.0 0.0 5.0 Lag 3.0 None 7.0 13.0 25 79.3 0.66 0.52 16.2 0.0 16.2 B 25.7 C 307 m384 748 200 Synchro 7 Page 1 Casey Arborway 249: Hyde Park Ave & Walk Hill St Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio WBL 374 0 0 0 0.95 WBR At Grade 2035 PM 6/25/2012 NBT 1192 0 0 0 0.58 NBR SBL 561 0 0 0 0.75 SBT 2338 0 0 0 0.52 ø2 249: Hyde Park Ave & Walk Hill St D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 8 (7%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.97 Intersection Signal Delay: 34.6 Intersection LOS: C Intersection Capacity Utilization 66.8% ICU Level of Service C Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 2 Casey Arborway 2162: Hyde Park Ave & Ukraine Way CMM McMahon 6/25/2012 EBL EBR NBL NBT SBT SBR 247 1900 1770 0.950 1770 564 1900 1583 315 1900 0 964 1900 3433 219 1900 0 1583 Yes 431 0 553 1900 3501 0.503 1793 3433 0 Yes 0.92 2% 0.88 0% 30 828 18.8 0.91 2% 31 30 489 11.1 0.86 2% 0.78 2% 613 Perm 0 pm+pt 4 14 4.0 12.0 12.0 10.0% 8.0 4.0 0.0 3.0 Lag 966 1402 0 14 1 3 2.0 None 23.6 0.20 0.91 81.6 68.3 149.9 F 89.3 F 226 #291 213 369 91 0 66.0 55.0% 5.0 R 8.0 16.0 30.0 25.0% 25.0 4.0 1.0 5.0 Lead 3 8.0 16.0 30.0 25.0% 25.0 4.0 1.0 5.0 Lead 2.0 None 23.6 0.20 0.93 42.2 15.7 58.0 E 169 #435 671 65 0 12.0 20.0 54.0 45.0% 49.0 4.0 1.0 5.0 Lead 2 T 317 ø2 4.0 24.0 24.0 20% 22.0 2.0 0.0 AF 30 293 6.7 0.78 2% D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2035 PM 2.0 None 2.0 C-Max 81.4 0.68 1.43dl 17.4 0.7 18.1 B 18.1 B 152 m156 748 74.4 0.62 0.65 24.5 0.3 24.7 C 24.7 C 525 569 409 1316 0 112 2141 0 215 0.0 0.0% 4.0 Lag 2.0 None 5.0 11.0 0 Synchro 7 Page 1 Casey Arborway 2162: Hyde Park Ave & Ukraine Way Lane Group Storage Cap Reductn Reduced v/c Ratio EBL 0 1.14 EBR 0 1.01 NBL At Grade 2035 PM 6/25/2012 NBT 0 0.80 SBT 0 0.73 SBR ø2 2162: Hyde Park Ave & Ukraine Way D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 0 (0%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.93 Intersection Signal Delay: 41.0 Intersection LOS: D Intersection Capacity Utilization 84.3% ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. dl Defacto Left Lane. Recode with 1 though lane as a left lane. CMM McMahon Synchro 7 Page 2 Casey Arborway 1759: Hyde Park Ave & Tower St CMM McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 22 1900 0 14 1900 0 17 1900 0 0 1900 0 862 1900 3564 12 1900 0 18 1900 0 0 0 Yes 0 3564 0 Yes 0 1108 1900 3571 0.924 3303 0 1900 0 0 Yes 0 1900 1755 0.829 1501 15 1900 0 0 0 1900 875 0.797 720 0.79 100% 16 30 94 2.1 0.92 100% 0.88 100% 0.44 0% 18 30 283 6.4 0.92 0% 0.70 0% 0.92 0% 3 30 201 4.6 0.89 1% 0.69 0% 0.85 0% 30 440 10.0 0.92 1% 0.92 0% 44 0 0 Perm 60 0 0 986 0 0 Perm 1225 0 3 2.0 None 2.0 None 8.0 13.0 16.0 13.3% 12.0 3.0 1.0 4.0 1 AF 8.0 13.0 16.0 13.3% 12.0 3.0 1.0 4.0 3 3 8.0 13.0 16.0 13.3% 12.0 3.0 1.0 4.0 0.0 0.0% 4.0 R 3 8.0 13.0 16.0 13.3% 12.0 3.0 1.0 4.0 2.0 None 0.0 0.0% 0.0 0.0% 4.0 4.0 15.0 23.0 82.0 68.3% 76.0 4.0 2.0 4.0 Lead 0 Yes 1 T 0 Perm 0.0 0.0% 4.0 1 15.0 23.0 82.0 68.3% 76.0 4.0 2.0 4.0 Lead 15.0 23.0 82.0 68.3% 76.0 4.0 2.0 4.0 Lead 2.0 None 2.0 C-Max 2.0 2.0 C-Max C-Max 9.8 0.08 0.60 74.7 0.0 74.7 E 74.7 E 28 m62 14 9.8 0.08 0.43 47.8 0.0 47.8 D 47.8 D 32 75 203 82.6 0.69 0.40 7.7 0.0 7.7 A 7.7 A 101 183 121 82.6 0.69 0.54 2.9 0.1 2.9 A 2.9 A 31 29 360 86 0 0 166 0 0 2454 0 0 2274 130 0 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2035 PM 0.0 0.0% 4.0 Synchro 7 Page 1 Casey Arborway 1759: Hyde Park Ave & Tower St CMM McMahon 6/25/2012 ø2 T 2 AF 12.0 22.0 22.0 18% 20.0 2.0 0.0 3.0 None 7.0 13.0 120 R Lag D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2035 PM Synchro 7 Page 2 Casey Arborway 1759: Hyde Park Ave & Tower St Lane Group Storage Cap Reductn Reduced v/c Ratio EBL EBT 0 0.51 At Grade 2035 PM 6/25/2012 EBR WBL WBT 0 0.36 WBR NBL NBT 0 0.40 NBR SBL SBT 0 0.57 SBR Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 47 (39%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.60 Intersection Signal Delay: 7.5 Intersection LOS: A Intersection Capacity Utilization 56.7% ICU Level of Service B Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. 1759: Hyde Park Ave & Tower St D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 3 Casey Arborway 1759: Hyde Park Ave & Tower St Lane Group Storage Cap Reductn Reduced v/c Ratio At Grade 2035 PM 6/25/2012 ø2 D R AF T Intersection Summary CMM McMahon Synchro 7 Page 4 Casey Arborway 2303: Hyde Park Ave & Fitzgerald Parking Lot CMM McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 0 1900 0 0 1900 0 7 1900 0 20 1900 0 21 1900 0 20 1900 0 0 Yes 0 0 Yes 0 0 Yes 0 1086 1900 3497 0.892 3122 16 1900 0 0 865 1900 3438 0.875 3011 7 1900 0 0 0 1900 1690 0.987 1690 0.92 0% 30 125 2.8 0.92 0% 0.92 0% 0.92 0% 22 30 187 4.3 0.92 0% 0.92 0% 0.75 100% 2 30 440 10.0 0.90 2% 0.46 0% 0.58 0% 3 30 194 4.4 0.89 1% 0.67 100% 0 0 0 0 Perm 30 0 0 Perm 1004 0 0 Perm 1278 0 0.0 0.0% 0.0 0.0% 4.0 4.0 4.0 R 0.0 0.0% 2.0 None 45 8.0 13.0 24.0 20.0% 20.0 3.0 1.0 4.0 1 1 15.0 23.0 74.0 61.7% 68.0 4.0 2.0 4.0 Lead AF 3 8.0 13.0 24.0 20.0% 20.0 3.0 1.0 4.0 0.0 0.0% 4.0 15.0 23.0 74.0 61.7% 68.0 4.0 2.0 6.0 Lead 0 Yes 1 T 3 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2035 PM 0.0 0.0% 4.0 1 15.0 23.0 74.0 61.7% 68.0 4.0 2.0 4.0 Lead 15.0 23.0 74.0 61.7% 68.0 4.0 2.0 6.0 Lead 2.0 None 2.0 2.0 C-Max C-Max 2.0 2.0 C-Max C-Max 8.0 0.07 0.23 30.2 0.0 30.2 C 30.3 C 6 37 107 84.8 0.71 0.47 1.8 0.0 1.8 A 1.8 A 19 20 360 84.8 0.71 0.58 5.8 1.3 7.1 A 7.1 A 166 m163 114 300 0 0 2128 51 27 2207 659 0 0.0 0.0% 4.0 Synchro 7 Page 1 Casey Arborway 2303: Hyde Park Ave & Fitzgerald Parking Lot CMM McMahon 6/25/2012 ø2 T 2 AF 12.0 22.0 22.0 18% 20.0 2.0 0.0 3.0 None 7.0 13.0 100 R Lag D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2035 PM Synchro 7 Page 2 Casey Arborway 2303: Hyde Park Ave & Fitzgerald Parking Lot Lane Group Storage Cap Reductn Reduced v/c Ratio EBL EBT EBR WBL At Grade 2035 PM 6/25/2012 WBT 0 0.10 WBR NBL NBT 0 0.48 NBR SBL SBT 0 0.83 SBR Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 65 (54%), Referenced to phase 1:NBSB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.58 Intersection Signal Delay: 5.1 Intersection LOS: A Intersection Capacity Utilization 59.8% ICU Level of Service B Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. 2303: Hyde Park Ave & Fitzgerald Parking Lot D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 3 Casey Arborway 2303: Hyde Park Ave & Fitzgerald Parking Lot Lane Group Storage Cap Reductn Reduced v/c Ratio At Grade 2035 PM 6/25/2012 ø2 D R AF T Intersection Summary CMM McMahon Synchro 7 Page 4 Casey Arborway 2164: Arborway & Washington St CMM McMahon 6/25/2012 EBT EBR WBT WBR NBL NBT NBR NBR2 SBL SBT SBR2 NEL2 1935 1900 11 1466 1900 11 253 1900 11 9 1900 11 3288 0 0 4783 0 3421 1459 0 No 78 1900 10 100 1 25 1685 0.337 598 745 1900 11 3421 0 1900 11 100 1 25 1459 4798 118 1900 10 0 1 25 1636 0.108 186 294 1900 11 4783 305 1900 11 100 0 25 0 473 1900 11 4798 377 1900 11 100 0 25 0 3288 0 No 872 0.950 872 35 677 13.2 0.94 2% 0.94 2% 35 147 2.9 0.86 2% 0.81 2% 0.90 3% 2460 0 2082 0 131 pm+pt 3 4 5.0 11.0 11.0 9.2% 7.0 3.0 1.0 4.0 Lead 1 0.0 0.0% 10.0 54.0 54.0 45.0% 50.0 3.0 1.0 4.0 3.0 C-Max 36.0 14.0 30 56.4 0.47 1.09 67.6 0.0 67.6 E 67.6 E ~822 #939 597 0.0 0.0% R 10.0 54.0 54.0 45.0% 50.0 3.0 1.0 4.0 4.0 3.0 C-Max 36.0 14.0 30 56.4 0.47 0.93 36.4 3.2 39.6 D 39.6 D ~621 #668 67 4.0 3.0 None 44.0 0.37 0.86 80.5 0.0 80.5 F 0 #177 0 0.92 0% 0.92 7% 0.80 0% 320 Perm 0 98 pm+pt 3 4 5.0 11.0 11.0 9.2% 7.0 3.0 1.0 4.0 Lead T 35 193 3.8 0.94 2% 503 AF 1 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) At Grade 2035 PM 4 7.0 41.0 41.0 34.2% 37.0 3.0 1.0 4.0 Lag 3.0 None 24.0 13.0 20 37.0 0.31 0.48 28.9 0.4 29.2 C 40.0 D 132 154 113 4 7.0 41.0 41.0 34.2% 37.0 3.0 1.0 4.0 Lag 0.0 0.0% 4.0 3.0 None 24.0 13.0 20 37.0 0.31 0.71 39.3 1.0 40.4 D 3.0 None 212 332 48 76 44.0 0.37 0.35 26.9 0.0 26.9 C 35 323 6.3 0.94 2% 0.91 2% 0.92 100% 1071 0 10 Prot 8 4 7.0 41.0 41.0 34.2% 37.0 3.0 1.0 4.0 Lag 3.0 None 24.0 13.0 20 37.0 0.31 1.06 84.7 0.0 84.7 F 79.8 E ~478 #612 243 0.0 0.0% 4.0 8.0 14.0 14.0 11.7% 10.0 3.0 1.0 4.0 2.0 None 8.4 0.07 0.16 58.2 0.0 58.2 E 7 26 Synchro 7 Page 1 Casey Arborway 2164: Arborway & Washington St CMM McMahon 6/25/2012 SWL 15 1900 11 0 1 25 872 0.950 872 T 0.92 100% R 8.0 14.0 14.0 11.7% 10.0 3.0 1.0 4.0 AF 16 Prot 8 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) At Grade 2035 PM 2.0 None 8.4 0.07 0.26 63.3 0.0 63.3 E 12 36 Synchro 7 Page 2 Casey Arborway 2164: Arborway & Washington St Lane Group Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBT EBR 2253 0 0 0 1.09 At Grade 2035 PM 6/25/2012 WBT WBR 2247 45 106 0 0.97 NBL NBT 153 0 0 0 0.86 1055 186 0 0 0.58 NBR 100 450 29 0 0 0.76 NBR2 SBL 100 283 0 0 0 0.35 SBT 1014 0 0 0 1.06 SBR2 NEL2 73 0 0 0 0.14 2164: Arborway & Washington St D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 0 (0%), Referenced to phase 1:EBWB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.09 Intersection Signal Delay: 57.1 Intersection LOS: E Intersection Capacity Utilization 97.7% ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. CMM McMahon Synchro 7 Page 3 Casey Arborway 2164: Arborway & Washington St Lane Group Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio At Grade 2035 PM 6/25/2012 SWL 73 0 0 0 0.22 D R AF T Intersection Summary CMM McMahon Synchro 7 Page 4 Casey Arborway 3: Arborway & Forest Hills Drive CMM McMahon 6/25/2012 EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 580 1900 10 180 1 25 1636 0.950 1636 1403 1900 11 1 1900 11 0 0 25 0 17 1900 10 100 1 25 1668 0.107 188 837 1900 11 58 1900 11 0 0 25 0 12 1900 11 0 0 25 0 6 1900 11 39 1900 11 0 0 25 0 1 1900 11 0 0 No 0 1733 0.736 1338 631 1900 11 100 1 25 1546 0 No 1708 0.901 1570 11 1900 11 0 0 25 0 0.92 1% 0.80 0% 35 191 3.7 0.80 0% 0.80 0% 0.89 1% 35 284 5.5 0.89 1% 0 0 Perm 37 0 0 Perm 7.0 39.0 51.0 42.5% 47.0 3.0 1.0 4.0 2.0 None 20.0 15.0 20 47.0 0.39 0.97 64.5 0.0 64.5 E 514 #710 0 No 35 177 3.4 0.93 2% 0.93 0% 0.92 1% 1510 0 18 Perm 13 95.0 79.2% 4.0 94.3 0.79 0.56 3.8 0.3 4.0 A 21.7 C 86 204 97 3421 3421 35 313 6.1 0.92 1% 973 AF 624 Prot 3 3421 1 0.0 0.0% 1 7.0 39.0 44.0 36.7% 40.0 3.0 1.0 4.0 R 0.93 3% 3421 T EBL D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) At Grade 2035 PM 4.0 3.0 C-Min 20.0 15.0 20 43.3 0.36 0.26 16.8 0.0 16.8 B 4 m4 7.0 39.0 44.0 36.7% 40.0 3.0 1.0 4.0 3.0 C-Min 20.0 15.0 20 43.3 0.36 0.79 16.1 3.6 19.7 B 19.6 B 102 m93 233 0.0 0.0% 4.0 5 7.0 25.0 25.0 20.8% 21.0 3.0 1.0 4.0 2.0 None 11.0 10.0 20 5 7.0 25.0 25.0 20.8% 21.0 3.0 1.0 4.0 2.0 None 11.0 10.0 20 17.7 0.15 0.16 44.4 0.0 44.4 D 44.4 D 24 50 111 45 1546 Yes 602 0.89 1% 709 Perm 5 0.0 0.0% 4.0 5 7.0 25.0 25.0 20.8% 21.0 3.0 1.0 4.0 2.0 None 11.0 10.0 20 7.0 25.0 25.0 20.8% 21.0 3.0 1.0 4.0 2.0 None 11.0 10.0 20 17.7 0.15 0.23 46.2 674.5 720.7 F 75.3 E 30 65 204 5 7.0 25.0 25.0 20.8% 21.0 3.0 1.0 4.0 2.0 None 11.0 10.0 20 17.7 0.15 0.96 32.9 1.4 34.3 C 82 #332 Synchro 7 Page 1 Casey Arborway 3: Arborway & Forest Hills Drive Lane Group Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL 180 641 0 0 0 0.97 EBT At Grade 2035 PM 6/25/2012 EBR 2688 489 380 0 0.69 WBL 100 68 0 0 0 0.26 WBT WBR NBL 1234 178 19 0 0.92 NBT 275 0 0 0 0.13 NBR SBL SBT 234 0 234 0 45.00 SBR 100 767 0 13 0 0.94 3: Arborway & Forest Hills Drive D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 30 (25%), Referenced to phase 1:EBWB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.97 Intersection Signal Delay: 31.7 Intersection LOS: C Intersection Capacity Utilization 79.9% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 2 Casey Arborway 13: Arborway & East Bow Tie CMM McMahon 6/25/2012 EBU EBL EBT WBT WBR SBL SBR 295 1900 11 0 1900 11 250 1 25 0 1984 1900 11 1476 1900 11 3421 3421 0 1900 11 0 0 25 0 0 1900 11 0 0 25 0 0 1900 11 0 0 25 0 0 3421 3421 0 Yes 0 0 Yes 0.92 0.92 35 458 8.9 0.94 35 458 8.9 0.86 0.92 321 Prot 3 0 2111 1716 0 13 1 2.0 None 22.0 10.0 10 36.4 0.30 0.62 43.0 0.0 43.0 D 0.0 0.0% 105.0 87.5% 4.0 240 m250 10.0 24.0 69.0 57.5% 65.0 3.0 1.0 4.0 Lead 4.0 0.92 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% 4.0 4.0 4.0 72.6 0.60 0.83 22.9 7.0 29.9 C 29.9 C 350 439 378 2 4.0 15.0 15.0 13% 13.0 2.0 0.0 Lag 2.0 C-Max 116.2 0.97 0.64 5.6 0.0 5.7 A 10.6 B 116 m119 378 ø2 T 35 112 2.2 0.92 AF 10.0 36.0 36.0 30.0% 32.0 3.0 1.0 4.0 R 1711 0.950 1711 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Walk Time (s) Flash Dont Walk (s) Pedestrian Calls (#/hr) Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) At Grade 2035 PM 2.0 None 7.0 6.0 10 32 250 Synchro 7 Page 1 Casey Arborway 13: Arborway & East Bow Tie Lane Group Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBU 534 0 0 0 0.60 EBL At Grade 2035 PM 6/25/2012 EBT 3313 64 80 0 0.65 WBT 2070 34 322 0 0.98 WBR SBL SBR ø2 13: Arborway & East Bow Tie D R AF Splits and Phases: T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 0 (0%), Referenced to phase 1:EBWB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.83 Intersection Signal Delay: 18.6 Intersection LOS: B Intersection Capacity Utilization 58.2% ICU Level of Service B Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 2 Casey Arborway 11: Arborway & West Bow Tie CMM McMahon 6/25/2012 EBL EBT WBU WBT WBR SBL SBR 0 1900 11 0 0 25 0 1960 1900 11 1238 1900 11 0 1900 11 0 0 25 0 0 1900 11 0 0 25 0 0 1900 11 0 0 25 0 0 4916 582 1900 11 350 1 25 1711 0.950 1711 0 Yes 0 0 Yes 0.92 35 172 3.4 0.94 0 2085 0.92 1 4.0 35 412 8.0 0.86 0.92 1440 0 12 10.0 35.0 60.0 120.0 50.0% 100.0% 56.0 3.0 1.0 4.0 4.0 Lag R 0.0 0.0% 10.0 24.0 60.0 50.0% 56.0 3.0 1.0 4.0 Lead 3421 2.0 C-Max 59.7 0.50 0.85 31.6 0.3 31.9 C 31.9 C 534 610 92 2445 0 68 35 131 2.6 0.92 0.92 0 0 AF 633 Prot 2 3421 T 4916 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn At Grade 2035 PM 2.0 None 52.3 0.44 0.85 48.9 7.9 56.7 E 516 m536 350 798 131 0 120.0 1.00 0.42 0.1 0.0 0.1 A 17.4 B 0 m0 332 0.0 0.0% 0.0 0.0% 0.0 0.0% 4.0 4.0 4.0 51 3421 0 0 Synchro 7 Page 1 Casey Arborway 11: Arborway & West Bow Tie Lane Group Storage Cap Reductn Reduced v/c Ratio EBL EBT 0 0.88 At Grade 2035 PM 6/25/2012 WBU 0 0.95 WBT 0 0.42 WBR SBL SBR Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 5 (4%), Referenced to phase 1:EBWB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.85 Intersection Signal Delay: 24.7 Intersection LOS: C Intersection Capacity Utilization 76.8% ICU Level of Service D Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. 11: Arborway & West Bow Tie D R AF T Splits and Phases: CMM McMahon Synchro 7 Page 2 Casey Arborway 9: Arborway & Cemetery Rd CMM McMahon 6/25/2012 EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 65 1900 10 150 1 25 1685 0.098 174 1388 1900 11 0 1900 11 0 0 25 0 1 1900 11 0 0 25 0 858 1900 16 307 1900 11 0 0 25 0 8 1900 12 0 0 25 0 4 1900 12 2 1900 12 0 0 25 0 622 1900 12 0 0 25 0 3 1900 12 46 1900 12 0 0 25 0 0 Yes 0 0 Yes 0 0 Yes 0 3421 3861 0.857 3309 46 35 337 6.6 35 313 6.1 0.92 2% 0.92 0% 0.92 0% 0.92 2% 71 pm+pt 4 14 7.0 15.0 15.0 12.5% 11.0 3.0 1.0 4.0 Lag 1509 0 0 Perm 1268 14 5.0 2.0 None 53.0 0.44 0.33 24.3 0.0 24.3 C 23 m60 150 215 0.92 1% 1 0.80 0% 0 0 Perm 1 0.0 0.0% 1 7.0 20.0 46.0 38.3% 41.0 4.0 1.0 5.0 R 61.0 50.8% 2 35 153 3.0 AF 0.92 0% 4.0 7.0 20.0 46.0 38.3% 41.0 4.0 1.0 5.0 56.0 0.47 0.95 33.7 9.8 43.5 D 42.6 D 286 #723 233 3.0 3.0 C-Max C-Max 41.0 0.34 1.09 91.8 12.2 104.0 F 104.0 F ~571 #711 257 1596 1161 1813 0.776 1448 0.0 0.0% 4.0 3 7.0 20.0 59.0 49.2% 54.0 4.0 1.0 5.0 Lead 1 0.80 0% 17 0 3.0 None 3.0 None 54.0 0.45 0.03 17.1 0.0 17.1 B 17.1 B 6 18 73 653 0 Yes 0.99 1% 0.99 0% 0.99 2% 0 Perm 677 0 3 7.0 20.0 59.0 49.2% 54.0 4.0 1.0 5.0 Lead 1781 0.729 1358 4 35 181 3.5 0.80 0% T 3421 D Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) At Grade 2035 PM 3 0.0 0.0% 4.0 3 7.0 20.0 59.0 49.2% 54.0 4.0 1.0 5.0 Lead 3.0 None 7.0 20.0 59.0 49.2% 54.0 4.0 1.0 5.0 Lead 0.0 0.0% 4.0 3.0 None 54.0 0.45 1.10 100.6 0.0 100.6 F 100.6 F ~597 #831 101 613 Synchro 7 Page 1 Casey Arborway 9: Arborway & Cemetery Rd Lane Group Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL 0 0 0 0.33 At Grade 2035 PM 6/25/2012 EBT 99 0 0 1.01 EBR WBL WBT 0 30 0 1.12 WBR NBL NBT 0 0 0 0.03 NBR SBL SBT 0 0 0 1.10 SBR 9: Arborway & Cemetery Rd D R Splits and Phases: AF T Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Offset: 30 (25%), Referenced to phase 1:EBWB, Start of Green Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.10 Intersection Signal Delay: 75.6 Intersection LOS: E Intersection Capacity Utilization 106.4% ICU Level of Service G Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. CMM McMahon Synchro 7 Page 2