SA 1V FE :1. FO 5H R SL OP E GROU N 3" 18" 4000 PSI CEMENT CONCRETE (SEE MASSDOT SPECIFICATIONS FOR DESIGN REQUIREMENTS), OR PRECAST OR CAST IN-PLACE (OPTIONAL) OR GRANITE, IF SPECIFIED D ELE VATIO N 6" MINIMUM 18" MAXIMUM 1" BEVEL SEE NOTE #1 GRAVEL BACKFILL Massachusetts Department of Transportation BATTER 4% "H" Construction Standard Details BACKFILL ELEVATION 12" 0.5 "H" "D" 4000 PSI CEMENT CONCRETE (SEE MASSDOT SPECIFICATIONS FOR DESIGN REQUIREMENTS) 4'-0" MIN GRAVEL BACKFILL 12" MIN Highway Division "W" JUNE 2014 12" The Commonwealth of Massachusetts Deval L. Patrick Governor Richard A. Davey Secretary & CEO Frank DePaola, P.E. Administrator Prepared by The Massachusetts Department of Transportation - Highway Division June 2014 lll. <~ 35: ig 0 :;:o G) .w:::o Q~ en~ • 1"'1 ....II. ~ 1"'1 0 ""'" 0 ...... N~""~ I'Tl~ c z­ c"'T'I c....O G) m:z c:-1 :::D-1 Om •en :Do :::!c oo l>'TI m::t: m~z Q ~tl HVi ©) ~0 ~ i l9cs=2l @?2)9 22cs s:~~ ~2,9 7,il~ ==ll©J -.....'~ ~~ ;~ ~@?2J .s·E ~ §==j] h~ @?2) cs=2l ' £...__ _ BASE COURSE ~-- ' - - - - - - CEMENT CONCRETE LIMITS VERTICAL CURB 6" REVEAL EXCEPT ON BRIDGES TREATMENT VARIES 3. ANY DESIGNATED CEMENT CONCRETE THAT IS ACCEPTABLE UNDER SECTION M4 OF THE STANDARD SPECIFICATIONS MAY BE USED; ALL TEST REQUIREMENTS ARE WAIVED. HOT MIX ASPHALT SHALL NOT TO BE USED AS A SUBSTITUTE. 2. CUT NEAT LINE 6" FROM CURB LINE AND REMOVE BASE AND GRAVEL. REPLACE WITH CEMENT CONCRETE. 1. THIS PROCEDURE IS APPLICABLE ONLY IF CURB IS TO BE SET AFTER BASE COURSE IS IN PLACE PRIOR TO BINDER AND TOP PLACEMENT. NOTES: CUT LINE GRAVEL SUBBASE _ _ _____. HMA BINDER COURSE HMA SURFACE COURSE H 0 ::0 ....a." U'l::o • 0 1"'1 0')~ 0~ ~ 1"'1 0 ~ 0 ..... "'1"'1 rTJ~ c z­ c"T'I c....O C)m --I Z-t C)­ z C) m~z • :s:: f ~"' ~\,J cnm r--1 o::I: "'Co me co m., ccn ©) ~ atJ g(S"2) ··~~ ©2>=il , ~~ ~~~ ~tS H~ §=iJ ~~ ;!:~~ ~@2) '§:5 =il§ @2) (S"2) -.......'-,, ' ' 2. 1. NOTES: -: VARIES TREATMENT SETTING OF EDGING SEE NOTES 1 & 2 CEMENT CONCRETE GRAVEL SUB-BASE THE ANGLE IS TO BE A MINIMUM OF 60° FROM VERTICAL UNDER ALL CONDITIONS. THE REVEAL IS TO BE A MAXIMUM OF 4" UNDER ALL CONDITIONS, HOT MIX ASPHALT SHALL NOT TO BE USED AS A SUBSTITUTE. ANY DESIGNATED CEMENT CONCRETE THAT IS ACCEPTABLE TO THE DEPARTMENT UNDER SECTION M4 OF THE STANDARD SPECIFICATIONS; ALL TEST REQUIREMENTS ARE WAIVED . SLOPED EDGING BASE COURSE BINDER COURSE SURFACE COURSE 4" REVEAL MAX. HEIGHT