Trails, unlike sidewalks, are pathways separated
from the street but linked to the larger walkway
system. In Massachusetts they have many
dimensions. This plan focuses on the paved trials
that serve, or have the potential to serve, pedestrians
as well as bicyclists, skaters, and other users of nonmotorized modes of transportation. The primary
issue related to these trails is their connection to
adjacent activity centers or destinations of interest
(such as transit, schools, and public open space).
There are also issues posed by joint use of the
pathway by pedestrians of several types and other
trail users.
The MDC Charles River Reservation trail system is one of the oldest in the
United States.
Massachusetts Pedestrian Transportation Plan
8-21
Prototypes: Trails
Planning Issues
Trails are often built along former rail rights-of-way
or along historic routes that never developed into
roadways. Because they are often separated from the
roadway system they may pass through the backs
of commercial districts and behind houses. This
“backyard” alignment can create access, security, and
privacy issues while also providing opportunities for
trails to provide direct connections for walkers.
Connections through adjacent parking lots and
woodlands, and from dead-end streets will provide
increased opportunities to access the trail and use it
for transportation purposes.
Trail Through Residential Area
Trail Through Commercial Area
Often the most challenging issues in planning trails
and their connections is obtaining concurrence and
appropriate easements from neighboring property
owners. Involving property owners early in trail
planning and design can help to address their
concerns about the new facility. Where neighborhood
or commercial property connections are opposed
after consultation, it may be possible to design the
facility for future provision of these connections as
opinions change with experience.
Successful trails and paths appear to be self-policing,
particularly when they are well used. All trails must
be designed to admit emergency vehicles.
Downtown Trail or Riverwalk
school
5 minutes
0.4km/0.25 miles
town hall
play
ground
river or bay
pond
street
trail
crossing behind
houses;
address
privacy
issues
8-22
potential
walk to
school
route
multiple
access
points
needed
access to
links to
natural areas adjacent
along route
commercial
districts
security
through
unpopulated
areas
access to trail/
road crossings
multi- access to and
location of trail
track along urban
and potential
trail
waterfront
space for multitrack trail
Massachusetts Pedestrian Transportation Plan
Prototypes: Trails
Trail Design Issues
Most trails have multiple users including
pedestrians, bicyclists, and skaters, all sharing a
single path. On some trails there are posted rules and
guidelines that users follow to provide courteous and
safe passage. These measures, along with other trail
design and management practices, can minimize
user conflicts.
There is not yet a national consensus on trail design.
In settings that will attract much use, it is wise to
provide adequate width at the outset. If it can be
accommodated in the right-of-way, recommended
trail width should be 3.0 meters (10 feet) or more of
paved cross section for heavily used trails, plus a
further 1 meter offset from pavement edge to poles
and trees.
Where possible, heavily used trail systems should
provide completely separate paths for bicycles and
walking-only trails for pedestrians. If necessary, a
center line can be used in circumstances such as
curves and heavy use areas. Connecting trails also
need to be designed to provide safety and security
for trail users and abutting property owners.
additional
right-of-way
may be used
for separate
path
The intersections of streets and trails provide good
access points for trail users but crossings must meet
criteria for good crosswalks: well marked and
lighted, with good sight lines for approaching
motorists. Trails may widen at intersections, which
provide opportunities for locating trail services, such
as benches, drinking fountains, toilet facilities, and
informational signs.
private
property
multiple uses
within rightof-way
paved surface
right-of-way
Limited rights-of-way may be shared by many trail users.
Massachusetts Pedestrian Transportation Plan
8-23
Prototypes: Trails
Potential Improvements
❏
Develop local right-of-way inventories to
provide a basis to plan trails that have the
greatest potential to connect key destinations
and serve transportation purposes. Cities and
towns should develop trail plans with an eye
towards providing missing transportation links.
❏
Work with abutting land owners to provide
connections to adjacent commercial districts and
other important destinations. Help business
owners realize the benefits of providing access
near their shops — opportunities to capture trail
user business.
❏
Work with neighboring residents during
planning and design, and maintain the privacy
of their back yards with fencing and vegetative
screening.
❏
Establish reasonable path rules that encourage
safe and courteous use.
The Minuteman Commuter Bikeway in Arlington,
Lexington, and Bedford is heavily used, especially on
weekends. This trail connects to transit and passes
through downtown Arlington and downtown Lexington.
Norwottuck Rail Trail crossing the Connecticut River
between Hadley and Northampton.
Trail through woodland in Brookline.