Replacement for page 119 AGENDA ITEM BACKGROUND TO: GOVERNING BOARD DATE FROM: PRESIDENT March 5, 2012 SUBJECT: 2012-13 Budget Reduction Plans REASON FOR BOARD CONSIDERATION ENCLOSURE(S) ITEM NUMBER Page 1 of 4 INFORMATION D.2 BACKGROUND: The structural deficit for Cabrillo for 2012-13 is currently projected at $5.6 million. One of the major components of the structural deficit is the built in increases in expenses that the college must budget each year. The college is planning to utilize $2.3 in operating funds to bridge the 2012-13 deficit leaving a deficit balance of $3.2 for 2012-13. The college has set a budget reduction target of $2.5 million for the 2012-13 Preliminary Budget. The first phase of budget planning, including 2.5 million in reductions will be complete by May. All permanent reductions identified in the first phase will be included in the 2012-13 Preliminary Budget approved by the Governing Board in June 2012. Phase I reduction plans were presented and discussed with individuals impacted, department meetings, Cabinet, Administrative Council, Managers and College Planning Council meetings. The Services Program Review and Advisory Committee (SPRAC) has received all plans included in the attachments. SPRAC feedback will be presented to the College Planning Council as soon as possible. The budget reduction plans attached will come to the Governing Board for approval on April 2. Phase I Unrestricted General Fund Reductions $938,864 Restricted Fund Reductions $128,731 Children’s Center Fund TBD Administrator Initiating Item: Victoria Lewis Academic and Professional Matter If yes, Faculty Senate Agreement Senate President Signature Yes No Yes No Final Disposition Governing Board March 5, 2012 Phase I Budget Criteria III.B II.E III.C III.C II.E III.C III.C III.C III.C III.C III.C 2012-13 Budget Reductions Description Impact PCN # If Lottery funds reduce from the Move DE-Blackboard fees off GF state, then the DE-CMS costs to Instructional Lottery funds. would revert to the general fund. None: Moves the GF portion of these two employees off the GF and onto the CEED contract/cont ed Program Spec - CEED budget None: Moves the GF portion of these two employees off the GF and onto the CEED contract/cont ed Program Spec - CEED budget None: Moves the GF portion of these two employees off the GF and onto the CEED contract/cont ed Office Specialist CEED budget Requires faculty director; reassign Public Safety Director 1 FT CJ faculty to 50% faculty PS management: $140,885 (incl director: adjunct backfill $25,500 bene) @ $1700/TU Children Center Director Reassign 1 ECE FT faculty to management: $93,019; state faculty director @ 100% backfill; funded, moves fulltime faculty off $51,000 adjunct backfill. Savings general fund into state funds. depends upon which FT faculty serves as faculty director. Computer lab LIA from 10 mo None: computer lab is closed in 100% to 9 mo 100% summer Division Offices will reduce from 2 IDAs to 1 IDA with 1 centralized IDA; reducing from 10 to 6. 3 IDA - Division Offices positions are vacant. IDA - Division Offices same as above IDA - Division Offices same as above same as above; unknown which PCN will be eliminated depending IDA - Division Offices upon seniority unknown Total FTE % of Contract Total GF Savings $18,840 713503 0.5 50% $36,175 713502 0.5 50% $27,844 713504 0.0565 6% $9,404 426005 1 100% $117,518 441519 402506 $40,000 0.08 450505 420505 460507 O:\Board Items VP Admin folder\2012 Board Items\3_March 2012\2012-13 Budget Reductions\2012-13BudgetReductionsPhaseI_Instructionp2.xlsx $5,776 $79,982 $64,943 $58,449 $67,283 $507,374 Governing Board March 5, 2012 2012-13 Budget Reductions Phase I Budget Criteria III. C III. C III. C III. C III. C III. C III. C CMP Goal E Description IT Computer Systems Maint. Tech Eliminate 2 IT coordinators/ Add a SQL Database Admin@ range 53 (net) UPS Reduce Postage Budget M & O Operating Reductions IT Operating budget reduction Renegotiated Audit Contract Impact Vacant position- Reduction of services to Watsonville and Aptos Realigning responsibilities of staff, increase efficiencies to address student needs Consolidate accounts to achieve savings Cost saving measures employed Cost saving measures employed Cost saving measures employed None Renegotiate Cell Tower Leasesgenerate new revenue Reduction of 2012-13 Deficit None Total III. C Eliminate Outreach Coordinator III. C Eliminate 2 Admissions and Records Assistant II Board Goals Eliminate 1 Financial Aid Program Specialists PCN # FTE % of Contract Total Savings 401205 0.5 50% $40,577 321002/321024 1 100% $112,650 $7,500 $30,000 $10,000 $5,000 $7,000 Student Services Will reduced services to prospective 801503 students and high schools Reorganization of the Watsonville Center Staff. Will merge FA and A&R staff into one location and cross train staff to help 821008/821020/821022 all students. Use money from FA Program Specialist position to fund a FA Advisor, this position will allow us to get awards out to 813116 students faster. $30,000 $242,727 0.46 50% $41,642 2 100% $140,178 1 100% $6,943 (net @ unfilled rate) $188,763 Total Unrestricted General Fund Reductions O:\Board Items VP Admin folder\2012 Board Items\3_March 2012\2012-13 Budget Reductions\2012-13BudgetReductionsPhase IAdminSvcsp3-4.xlsx $938,864 Governing Board March 5, 2012 2012-13 Budget Reductions Phase I Restricted General Fund- Categorical Impact Budget Criteria Description Student Services- Stroke Center III. B III. B Eliminate Director of Student Health Center Reduce Stroke Center Counselor PCN # FTE % of Contract Total Savings Requires Faculty director; reassign NP faculty to director; backfill with contract NP hours and add psychological counseling hours Reduce SC counselor position to 50%. All faculty positions in the Stroke Center are now 50%. 861002 1 100% $101,567 448003 0.25 25% $27,164 Total--Restricted General Fund-Categorical $128,731 Children's Center Fund Instruction- Children's Center Eliminate Children's Center III. C management position See Instruction Reduction List 441519 1 Total--Children's Center Fund Total Reductions--ALL FUNDS O:\Board Items VP Admin folder\2012 Board Items\3_March 2012\2012-13 Budget Reductions\2012-13BudgetReductionsPhase IAdminSvcsp3-4.xlsx 100% TBD TBD $1,067,595