Baseline Document Change Announcement
Restoration of Existing Structure
BDC11S-12
December 12, 2011
SUBJECT:
Revision to Subsections 651.04, 652.04 and 653.04 of the 2007 Standard
Specifications
Subsections 651.04, 652.04 and 653.04 have been revised by deleting the payment for restoration of
existing structure since such payments are not made for similar work elsewhere in Specifications.
The following revisions have been incorporated into the Standard Input SI2007 as of December 12,
2011.
651.04 MEASUREMENT AND PAYMENT
THE LAST PARAGRAPH IS DELETED.
652.04 MEASUREMENT AND PAYMENT
THE LAST PARAGRAPH IS DELETED.
653.04 MEASUREMENT AND PAYMENT
THE LAST PARAGRAPH IS DELETED.
Implementation Code R (ROUTINE)
Changes must be implemented in all applicable Department projects scheduled for Final Design Submission
at least one month after the date of the BDC announcement. This will allow designers to make necessary
plan, specifications, and estimate/proposal changes without requiring the need for an addenda or
postponement of advertisement or receipt of bids.
BDC11S-12 Page 2 of 2
Recommended By:
Approved By:
ORIGINAL SIGNED
ORIGINAL SIGNED
Walter McGrosky
Director,
Capital Program Support
Richard T. Hammer
Assistant Commissioner,
Capital Program Management