Facilities Planning Committee May 15, 2015 FPPO Summer Projets List - 2015 Priority/ Strategic Plan Generated By Fund Source SP 4.1 IT Unfunded SP 4.2 IT Unfunded 1.B / SP4.4 Critical needs: health & safety issue. Critical needs: This project is 1.C / SP4.4 a health & safety issue. Un-funded Un-funded Timeline Summer (MayAugust) Summer (MayAugust) 2015-16 2015-16 Project Status Replace Fiber and end of life switches in critical locations during summer Fiber and switches are critical to College IT infrastructure $273,000 IT infrastructure Replace end of life VOIP Phone system, routers and broken phones Phone system is critical to College infrastructure $50,000 IT infrastructure Numerous fire sprinkler repairs are needed to comply with State Fire Marshall requirements. $ 75,000 Plumbing Replace restroom Partitions in the Watsonville Center The restrooms located in the Watsonville Center have exceeded their life cycle due to heavy use and graffiti/vandalism and need to be replaced $ 50,000 Repair Two large eucalyptus trees behind Bldg. 700 show signs of failure and require removal for safety purposes. $ 10,000 Repair $75,000 Repair 30,000 Repair $50,000 Repair 1.D / SP4 Un-funded 1.E / SP4 Critical needs: This project is a health & safety issue. Un-funded 2015-2016 Tree removal/trimming - Horticulture 1.F / SP4 Health & Safety issue Un-funded 2015-2016 Resurface Tennis Courts 1.J / SP 4.4 Critical Needs 2015-16 Tree removal - Bldg. 700 Broad cracking may contribute to unsafe playing conditions $ Un-funded 2015-2016 Dumpster Pad Un-funded 2015-2016 Bldg. 1000 Re-roof - partial repair 1.K/ SP 4.4 Critical Needs Un-funded Type College-wide fire sprinkler system repairs. Critical needs: This project is a health & safety issue. 1.G Funds Needed 2015-2016 H.W. 1000/2000 Roof Leak The flat top roof area of bldg. 1000 has reached the end of its useful life and requires replacement. $ $ Total $ 100,000 Roof 75,000 Roof 788,000