Ten Year TCO List: 2015-16 Priority/Stra tegic Plan Generated By State Scheduled Fund Source Maintenanc e Funds Requested Timeline Project 1.A/ SP 4.4 Critical needs: health SS Carryover & safety issue. 2015-16 SAC Student Senate Moves 1.B / SP 4.4 Critical needs: health Parking Fund & safety issue. 2015-16 Sheriff's office trailer repairs 1.C/ SP4.4 Critical needs: health & safety issue. Scheduled Maintenance 2015-16 Replace existing HVAC systems 1.D/ SP4.4 Critical needs: health & safety issue. Scheduled Maintenance 2015-16 Replace existing HVAC systems Prop 39 Yr. 3 of 5 2014-18 GF/SM 2015-16 2.A / SP2 Water conservation SM? 2015-16 Watsonville: convert to concrete patio 2.B / SP4 Instructional Need Un-funded 2015-16 Smart Classrooms Bldg. 400 1.H / SP 4.4 Energy 1.I / SP 4.4 Critical needs: health & safety issue. Replace Upper Campus, HPS lights on exterior pedestrian walkways Provide and install handrails for Gym Bleachers Status Relocate Student Senate and Clubs to allow for one stop access Dry rot has caused damage to the Sheriff's office trailer and removal and replacment of the siding is needed HVAC controls & equipment repair/replacement 1400 Bldg. CTC HVAC controls & equipment repair/replacement 1500 Bldg. Children's Center Part of Prop 39 (five year horizon): lighting, HVAC, and energy reduction projects There is currently no handrail on the ends of the bleachers in the gymnasium, which is a health and safety issue Grounds staff travel three times a week to Watsonville Center. Replacement of the lawn areas would reduce the frequency of travel and conserve water. Bldg. 400 has many classrooms in need of technology and basic repair upgrades (3-4 classrooms) Funds Needed Type $40,000 Renovation $12,000 Repair $ 486,813 HVAC $ 792,743 HVAC $ 200,000 Energy $ 50,000 Renovation $ 25,000 Renovation $ 250,000 Renovation 2.C / SP 4.2 Van replacement GF 2015-16 Improve Student Access Premature van failure. Many vehicles were purchased in the 1990's; annual budget allows for purchase of 1.25 vehicles. The van is used by Student Services, Instruction, etc. Critical needs: This 2.D / SP4.4 project is a health & safety issue. GF 2015-16 Building 500 – Gutter Repair. A leak in the gutter above the stairs to the 500 Building has created a slip and fall hazard and requires repair prior to the next rainfall. $ 2,000 Repair Critical needs: This 2.E / SP4.4 project is a health & safety issue. Parking Fund 2015-16 Cameras focused on elevators. Cameras will assist in elevator surveillance needs so as to reduce vandalism and unauthorized access to facilities. $ 6,500 Renovation $ 30,000 Transportation updated 9/3/15 O:\Administrative Services\TotalCostofOwnership\090315TenYearFacilitiesPlan.xlsx FPPO Districtwide 2015-16 Ten Year TCO List: 2015-16 Critical needs: This 2.F / SP4.4 project is a health & safety issue. Partial funding TBD fund 41 Critical needs: This 2.G / SP4.4 project is a health & safety issue. Critical needs: This 2.H/SP4.4 project is a health & safety issue. 2.I/SP4.4 Facilities Master Plan Ongoing; (One-time funds of $200K available) 2015-16 Parking lot repairs Parking Lot, Instruction Program Plan for HAWK, Foundation Donation 2015-16 Baseball infield requires upgrades to maintain Baseball Infield Artificial regulation field. Artificial turf has been Turf identified as the remedy. Facilities General fund $30K; Fdn $25K; Instruction PP $20K GF 2015-16 715 Renovation Student Funds; One Time Funds $ 200,000 Parking lot $ 75,000 Renovation Classroom upgrade and renovation work needed to allow computer and smart classroom activity. $ 38,400 Renovation 2015-16 Space Planning: Welcome Center and 1000 Learning Resource Center Per the FMP, relocate student clubs and senate to facilitate student service welcome center. Tutoring in Bldg. 1000 requires space reallocation to facilitate access. $ 200,000 Renovation Numerous restrooms on the Aptos campus have been observed to have reached the end of their useful life 440, 500, 600, 700 and 1000 restrooms would need to be addressed immediately. $ 250,000 Repair Critical needs: This 3.A / SP4.4 project is a health & safety issue. Un-funded 2015-16 Replace restroom Partitions on the Aptos Campus Phase I 3.B / SP4.4 Water conservation Scheduled Maintenance 2015-16 Replace Sprinkler heads North West campus Drip irrigation reduces water consumption $ 50,000 Fire Protection GF 2015-16 Smoke Free Environment For initial surveillance and signage $ 45,000 Other 1000 Bldg. MLC & ILC renovation/lighting improvements Some MLC space was lost to shared space with the relocation of ASC (formerly DSPS). Lighting has been partially installed outside to increase study space. In the ILC, nearby classrooms and hallways are being used to increase space during peak hours. (Cost estimate only - provided by instruction and depends on the space available.) $ 150,000 Renovation $ 2,903,456 $ 350,000 $ $ 218,500 300,000 $ 1,410,967 $ $ 2,279,467 623,989 3.C / SP 5 Institutional Responsibilities 4.A / SP4.4 Instructional Need Un-funded 2015-16 2015-16 Subtotal Available Funding Diff bet SM funds needed/ $249,433 allocation GF Parking SM $218,500 $1,425,000 Prop 39 Unfunded Fdn Donation $200,000 $1,450,000 $25,000 $14,033 General Fund (Existing Ongoing Allocation) Parking Fund Prop 39 Funds One Time Unrestricted GF & Scheduled Maintenance Funding Estimated Available Funds Funding needed: updated 9/3/15 O:\Administrative Services\TotalCostofOwnership\090315TenYearFacilitiesPlan.xlsx FPPO Districtwide 2015-16