INTERNATIONAL TELECOMMUNICATION UNION TELECOMMUNICATION STANDARDIZATION SECTOR STUDY GROUP 19 TD 405 Rev.1 (GEN/19) - PUBLIC English only STUDY PERIOD 2005-2008 Original: English Question(s): 1/19 Geneva, 19-27 July 2006 TEMPORARY DOCUMENT Source: Rapporteur, Q.1/19 Title: Report on Question 1/19 Meeting in Geneva, 19-27 July 2006 Table of Contents 1 Organization of Meeting ............................................................................................... 2 1.1 Meeting Identification, Chairmanship and Participation................................ 2 1.2 Meeting Agenda ............................................................................................. 2 2 Key Results ................................................................................................................... 2 2.1 Work Items Progressed................................................................................... 2 3 Meeting Documentation ............................................................................................... 2 4 Liaison Statements ........................................................................................................ 2 5 Recommendation Status and Work Plan ...................................................................... 2 5.1 Future Work.................................................................................................... 2 6 Detailed Report of Discussions .................................................................................... 3 6.1 Opening Plenary ............................................................................................. 3 6.2 General Items.................................................................................................. 3 6.3 Functional Network Architecture for Systems Beyond IMT-2000 (Q.FNAB) ....................................................................................................... 4 6.4 Review of Work Plan for Planned Deliverables ............................................. 4 6.5 Closing Plenary of Q.1/SSG ........................................................................... 4 6.6 Review of Meeting Report. ............................................................................ 4 7 Acknowledgements....................................................................................................... 4 Annex 1 – Work Plan ............................................................................................................... 5 Annex 2 – List of documents ................................................................................................... 9 Attention: This is a document submitted to the work of ITU-T and as such is intended for use by the Member States of ITU, by ITUT Sector Members and Associates, and their respective staff and collaborators in their ITU-related work. It is made publicly available for information purposes but shall not be redistributed without the prior written consent of ITU. Copyright on this document is owned by the author, unless otherwise mentioned. This document is not an ITU-T Recommendation, an ITU publication, or part thereof. -2TD 405 Rev.1 (GEN/19) - PUBLIC 1 1.1 Organization of Meeting Meeting Identification, Chairmanship and Participation This is the report of a meeting of Q.1/19: Service and network capability requirements and network architecture. Q.1/19 met in Geneva, during the SG19 Meeting, 19-27 July 2006. The meeting was chaired by Mr. Bruno Ramos, Q.1/19 Rapporteur, and by Mr. Atsushi Minokuchi, Co-Editor of Q.FNAB. The meeting was attended by 12 participants from 7 countries. 1.2 Meeting Agenda The Meeting Agenda was published in Temporary Document TD-385 R1. It was reviewed and approved. 2 2.1 Key Results Work Items Progressed Discussions and elaboration of the 5th Draft of ITU-T PDNR: Functional Network Architecture for Systems Beyond IMT-2000 (Q.FNAB), based on the Delayed Contributions D.42, D.62, D.65 and D.66. Reviewed, and agreed to the work plan for Q.1/19. 3 Meeting Documentation Documents considered at this meeting are listed in Annex 2. All documents are available at: http://www.itu.int/md/T05-SG19-060719/sum/en 4 Liaison Statements The meeting resulted in the preparation, with Q.2/19, Q.5/19 and Q.6/13, of one Liaison Statement to ITU-R WP 8F (TD 401 R1). This LS is a response to the LS from WP 8F. The LS from WP 8F contains the draft document towards PDNR ITU-R M. [IP CHAR] from WP 8F Bangkok meeting. It was reviewed by Q.1/19 and during a joint meeting of Q.2/19, Q.5/19, and Q.6/13. 5 Recommendation Status and Work Plan Status and Work Plan for Recommendations and other deliverables under the responsibility of this Question are summarized in Annex 1. 5.1 Future Work The next activity of Question 1/19 will be in the form of two Rapporteur Meetings before the next SG19 Meeting, as described bellow: -3TD 405 Rev.1 (GEN/19) - PUBLIC 1st Rapporteur Meeting (e-meeting) Duration: 10-24 October 2006 At: http://forum.itu.int/jive/index.jspa?categoryID=2 Terms of Reference: To progress the work on Q.FNAB. 2nd Rapporteur Meeting (e-meeting or face-to-face meeting) Duration (e-meeting)*: 9-23 January 2007 (e-meeting) Duration (face-to-face)*: (during SG 19 Rapporteur [NGN-GSI Event], January 2007) At*: T.B.D Terms of Reference: To progress the work on Q.FNAB. *: the decision if this meeting should be an e-meeting or a face-to-face meeting will be decided during the 1st Rapporteur Meeting, take into account budget aspects. SG 19 Meeting Duration: 19-26 April 2007 At: Geneva Terms of Reference: To finish the work on Q.FNAB. 6 Detailed Report of Discussions Q.1/19 met during 24-26 July 2006. 6.1 Opening Plenary The Q.1/19 session was called to order at 11:00hrs on 24 July. The proposed agenda for the Q.1/19 plenary was adopted and approved. The terms of reference for this meeting are to continue the work as assigned to this question. 6.2 General Items The following provides a brief summary of the discussions on and dispositions of input documents that were assigned to the work item “General Items.” Work item 4a) General Items Documents TD GEN: 321; 323, 324, 326, 328, 338, 343, 345R1, 347R1, 351 TD 321: Timetable for the meeting of ITU-T Study Group 19 “Mobile Telecommunication Networks” (Geneva, 19-27 July 2006). For information. TD 323: NGN and satellite work; and Intersector Coordination Group on Satellite (ICG-SAT) Matters. For information. TD 324: Requirements and framework for CGOE components. For information. TD 326: LS on NGN Protocol Sets. For information. -4TD 405 Rev.1 (GEN/19) - PUBLIC TD 328: Development of a PDNR ITU-R M.[IP CHAR] “Key technical and operational requirements for access technologies to support IP applications over mobile systems” in response to Question ITU-R 223-1/8. The Q.1/19 Meeting has prepared a LS in response to WP 8F, in collaboration with Q.2/19, Q.5/19, and Q.6/13. The LS is in TD 401R1. TD 338: TD 338 is a LS from ITU-T SG17 titled “Summary of ITU-T Study Groups Security Related Activities”. <Discussion notes are in the version of this document behind TIES.> TD 343: LS on new working arrangement in SG 16 for ETS/TDR/EW and progress report. For information. TD 345R1: LS on NGN Work Item on Media Coding Requirements for the NGN. For information. TD 347R1: TISPAN NGN Release 1. For information. TD 351: SG 4 Report and Request in its role as Lead SG on Telecommunication Management. <Discussion notes are in the version of this document behind TIES.> 6.3 Functional Network Architecture for Systems Beyond IMT-2000 (Q.FNAB) Work item 4b) Q.FNAB Documents D.42; D.62; D.65; D.66; TD 357 The Q.FNAB version 4.0 (Revision 1) is in TD 357. <Discussion notes are in the version of this document behind TIES.> The Q.FNAB v.5.0 is in TD 403. 6.4 Review of Work Plan for Planned Deliverables The Work Plan for Q.1/19 was reviewed and is provided in Annex 1. 6.5 Closing Plenary of Q.1/SSG Q.1/19 held its closing plenary at 16:00hrs on Wednesday, 26 July 2006. This report, including all annexes, was reviewed and agreed to. The delegates were thanked for their participation in the Q.1/19 activities at this meeting. Q1/19 discussion meeting was closed at 17:30 hrs. 6.6 Review of Meeting Report. The draft meeting report in TD-405 was reviewed and approved as TD–405 R1. 7 Acknowledgements Participants - for their participation at this meeting. Mr. Atsushi Minokuchi, from NTT DoCoMo, for work as Co-Editor of Q.FNAB. -5TD 405 Rev.1 (GEN/19) - PUBLIC Annex 1 – Work Plan Rec. ST Question SG Timing Priority M M M Pages Liaison Area Q.1701 Q.1711 Supplemen t 30 to QSeries Recommen dations R R R 1/19 1/19 1/19 19 19 19 27 29 15,37 15,37 15,37 Q.FIFB N 1/19 19 TBD H ITU-T SGs 2, 11, 12, 13, 16, ITU-R WP 8D and 8F (WGVision), ITU-D SGs, SDOs (TTA, TTC, ETSI, TIA, ATIS, ARIB, CCSA) Q.FNAB N 1/19 19 2Q 2007 H ITU-T 15,37 SGs 2, 11, 12, 13, 16, ITU-R WP 8D and 8F (WGVision), ITU-D SGs, SDOs (TTA, Domain References* Subject 99 99 00 Framework for IMT-2000 networks COM 11-R 116 Network functional model for IMT-2000 Specifications of International Mobile Telecommunications-2000 15,37 27 27 Long-term high-level network functional information flows for beyond IMT 2000 systems Long-term high-level network architecture for systems beyond IMT 2000, including definition of functional entities (FEs), allocation of functional capabilities to FEs, and interfaces model among Fes -6TD 405 Rev.1 (GEN/19) - PUBLIC Rec. ST Question SG Timing Priority Pages Liaison Area Domain References* Subject TTC, ETSI, TIA, ATIS, ARIB, CCSA) *) In this column the term “published” means that the previous approved version of the relevant Recommendation is available from the ITU. -7TD 405 Rev.1 (GEN/19) - PUBLIC Proposed Work Plan for Q.FNAB Date 2004 September 1st -15th Q.1/SSG Meeting (electronic mtg) December 13-17 [9th SSG Meeting] 1st SG 19 Meeting 2005 March 8-22th Deliv. 2 Q.FNAB Meeting Schedule Q.1/19 Meeting (electronic mtg) May 3-6 2nd SG 19 Meeting July 5-19 Q.1/19 Meeting (electronic mtg) cancelled Developing 1st Draft | 2nd Draft Developing 2nd Draft v 2.1 3rd Draft September 5-9 3rd SG 19 Meeting November 8-22 Q.1/19 Meeting (electronic mtg) cancelled 4th Draft 2006 January 23-27 4th SG 19 Meeting Discussions May 23-6 June July 19-27 Q.1/19 Meeting (electronic mtg) cancelled 5th SG 19 Meeting 5th Draft v 5.0 October 10-24 Q.1/19 Meeting (electronic mtg) 6th Draft v 6.0 2007 January Q.1/19 Meeting (T.B.D) 7th Draft v 7.0 -8TD 405 Rev.1 (GEN/19) - PUBLIC April 19-26 6th SG 19 Meeting 8th Draft v 8.0 AAP Terms of Reference for proposed Q.1/19 Rapporteur’s Meetings: To continue the work on Q.FNAB. -9TD 405 Rev.1 (GEN/19) - PUBLIC Annex 2 – List of documents Work item Documents 4a) General Items TD GEN: 321; 323, 324, 326, 328, 338, 343, 345R1, 347R1, 351 4b) Q.FNAB D.42; D.62; D.65; D.66; TD 357 4c) Work Plan 322-GEN _____________