STUDY GROUP 19 TD 405 Rev.1 (GEN/19) - PUBLIC English only Original: English

advertisement
INTERNATIONAL TELECOMMUNICATION UNION
TELECOMMUNICATION
STANDARDIZATION SECTOR
STUDY GROUP 19
TD 405 Rev.1 (GEN/19) - PUBLIC
English only
STUDY PERIOD 2005-2008
Original: English
Question(s):
1/19
Geneva, 19-27 July 2006
TEMPORARY DOCUMENT
Source:
Rapporteur, Q.1/19
Title:
Report on Question 1/19 Meeting in Geneva, 19-27 July 2006
Table of Contents
1
Organization of Meeting ............................................................................................... 2
1.1
Meeting Identification, Chairmanship and Participation................................ 2
1.2
Meeting Agenda ............................................................................................. 2
2
Key Results ................................................................................................................... 2
2.1
Work Items Progressed................................................................................... 2
3
Meeting Documentation ............................................................................................... 2
4
Liaison Statements ........................................................................................................ 2
5
Recommendation Status and Work Plan ...................................................................... 2
5.1
Future Work.................................................................................................... 2
6
Detailed Report of Discussions .................................................................................... 3
6.1
Opening Plenary ............................................................................................. 3
6.2
General Items.................................................................................................. 3
6.3
Functional Network Architecture for Systems Beyond IMT-2000
(Q.FNAB) ....................................................................................................... 4
6.4
Review of Work Plan for Planned Deliverables ............................................. 4
6.5
Closing Plenary of Q.1/SSG ........................................................................... 4
6.6
Review of Meeting Report. ............................................................................ 4
7
Acknowledgements....................................................................................................... 4
Annex 1 – Work Plan ............................................................................................................... 5
Annex 2 – List of documents ................................................................................................... 9
Attention: This is a document submitted to the work of ITU-T and as such is intended for use by the Member States of ITU, by ITUT Sector Members and Associates, and their respective staff and collaborators in their ITU-related work. It is made publicly available
for information purposes but shall not be redistributed without the prior written consent of ITU. Copyright on this document is owned
by the author, unless otherwise mentioned. This document is not an ITU-T Recommendation, an ITU publication, or part thereof.
-2TD 405 Rev.1 (GEN/19) - PUBLIC
1
1.1
Organization of Meeting
Meeting Identification, Chairmanship and Participation
This is the report of a meeting of Q.1/19: Service and network capability requirements and network
architecture.
Q.1/19 met in Geneva, during the SG19 Meeting, 19-27 July 2006. The meeting was chaired by Mr.
Bruno Ramos, Q.1/19 Rapporteur, and by Mr. Atsushi Minokuchi, Co-Editor of Q.FNAB.
The meeting was attended by 12 participants from 7 countries.
1.2
Meeting Agenda
The Meeting Agenda was published in Temporary Document TD-385 R1. It was reviewed and
approved.
2
2.1
Key Results
Work Items Progressed

Discussions and elaboration of the 5th Draft of ITU-T PDNR: Functional Network Architecture
for Systems Beyond IMT-2000 (Q.FNAB), based on the Delayed Contributions D.42, D.62,
D.65 and D.66.

Reviewed, and agreed to the work plan for Q.1/19.
3
Meeting Documentation
Documents considered at this meeting are listed in Annex 2.
All documents are available at:
http://www.itu.int/md/T05-SG19-060719/sum/en
4
Liaison Statements
The meeting resulted in the preparation, with Q.2/19, Q.5/19 and Q.6/13, of one Liaison Statement
to ITU-R WP 8F (TD 401 R1).
This LS is a response to the LS from WP 8F.
The LS from WP 8F contains the draft document towards PDNR ITU-R M. [IP CHAR] from WP
8F Bangkok meeting. It was reviewed by Q.1/19 and during a joint meeting of Q.2/19, Q.5/19, and
Q.6/13.
5
Recommendation Status and Work Plan
Status and Work Plan for Recommendations and other deliverables under the responsibility of this
Question are summarized in Annex 1.
5.1
Future Work
The next activity of Question 1/19 will be in the form of two Rapporteur Meetings before the next
SG19 Meeting, as described bellow:
-3TD 405 Rev.1 (GEN/19) - PUBLIC
1st Rapporteur Meeting (e-meeting)
Duration:
10-24 October 2006
At:
http://forum.itu.int/jive/index.jspa?categoryID=2
Terms of Reference:
To progress the work on Q.FNAB.
2nd Rapporteur Meeting (e-meeting or face-to-face meeting)
Duration (e-meeting)*:
9-23 January 2007 (e-meeting)
Duration (face-to-face)*:
(during SG 19 Rapporteur [NGN-GSI Event], January 2007)
At*:
T.B.D
Terms of Reference:
To progress the work on Q.FNAB.
*: the decision if this meeting should be an e-meeting or a face-to-face meeting will be decided
during the 1st Rapporteur Meeting, take into account budget aspects.
SG 19 Meeting
Duration:
19-26 April 2007
At:
Geneva
Terms of Reference:
To finish the work on Q.FNAB.
6
Detailed Report of Discussions
Q.1/19 met during 24-26 July 2006.
6.1
Opening Plenary
The Q.1/19 session was called to order at 11:00hrs on 24 July. The proposed agenda for the Q.1/19
plenary was adopted and approved. The terms of reference for this meeting are to continue the work
as assigned to this question.
6.2
General Items
The following provides a brief summary of the discussions on and dispositions of input documents
that were assigned to the work item “General Items.”
Work item
4a) General Items
Documents
TD GEN: 321; 323, 324, 326, 328, 338, 343, 345R1, 347R1, 351
TD 321: Timetable for the meeting of ITU-T Study Group 19 “Mobile Telecommunication
Networks” (Geneva, 19-27 July 2006). For information.
TD 323: NGN and satellite work; and Intersector Coordination Group on Satellite (ICG-SAT)
Matters. For information.
TD 324: Requirements and framework for CGOE components. For information.
TD 326: LS on NGN Protocol Sets. For information.
-4TD 405 Rev.1 (GEN/19) - PUBLIC
TD 328: Development of a PDNR ITU-R M.[IP CHAR] “Key technical and operational
requirements for access technologies to support IP applications over mobile systems” in response to
Question ITU-R 223-1/8. The Q.1/19 Meeting has prepared a LS in response to WP 8F, in
collaboration with Q.2/19, Q.5/19, and Q.6/13. The LS is in TD 401R1.
TD 338: TD 338 is a LS from ITU-T SG17 titled “Summary of ITU-T Study Groups Security
Related Activities”.
<Discussion notes are in the version of this document behind TIES.>
TD 343: LS on new working arrangement in SG 16 for ETS/TDR/EW and progress report. For
information.
TD 345R1: LS on NGN Work Item on Media Coding Requirements for the NGN. For
information.
TD 347R1: TISPAN NGN Release 1. For information.
TD 351: SG 4 Report and Request in its role as Lead SG on Telecommunication Management.
<Discussion notes are in the version of this document behind TIES.>
6.3
Functional Network Architecture for Systems Beyond IMT-2000 (Q.FNAB)
Work item
4b) Q.FNAB
Documents
D.42; D.62; D.65; D.66; TD 357
The Q.FNAB version 4.0 (Revision 1) is in TD 357.
<Discussion notes are in the version of this document behind TIES.>
The Q.FNAB v.5.0 is in TD 403.
6.4
Review of Work Plan for Planned Deliverables
The Work Plan for Q.1/19 was reviewed and is provided in Annex 1.
6.5
Closing Plenary of Q.1/SSG
Q.1/19 held its closing plenary at 16:00hrs on Wednesday, 26 July 2006. This report, including all
annexes, was reviewed and agreed to. The delegates were thanked for their participation in the
Q.1/19 activities at this meeting. Q1/19 discussion meeting was closed at 17:30 hrs.
6.6
Review of Meeting Report.
The draft meeting report in TD-405 was reviewed and approved as TD–405 R1.
7
Acknowledgements

Participants - for their participation at this meeting.

Mr. Atsushi Minokuchi, from NTT DoCoMo, for work as Co-Editor of Q.FNAB.
-5TD 405 Rev.1 (GEN/19) - PUBLIC
Annex 1 – Work Plan
Rec.
ST
Question
SG
Timing Priority
M
M
M
Pages Liaison Area
Q.1701
Q.1711
Supplemen
t 30 to QSeries
Recommen
dations
R
R
R
1/19
1/19
1/19
19
19
19
27
29
15,37
15,37
15,37
Q.FIFB
N
1/19
19
TBD
H
ITU-T SGs
2, 11, 12,
13, 16,
ITU-R WP
8D and 8F
(WGVision),
ITU-D
SGs, SDOs
(TTA,
TTC,
ETSI, TIA,
ATIS,
ARIB,
CCSA)
Q.FNAB
N
1/19
19
2Q 2007
H
ITU-T
15,37
SGs 2, 11,
12, 13, 16,
ITU-R
WP 8D
and 8F
(WGVision),
ITU-D
SGs,
SDOs
(TTA,
Domain
References* Subject
99
99
00
Framework for IMT-2000 networks
COM 11-R 116 Network functional model for IMT-2000
Specifications of International Mobile
Telecommunications-2000
15,37
27
27
Long-term high-level network functional information
flows for beyond IMT 2000 systems
Long-term high-level network architecture for
systems beyond IMT 2000, including definition of
functional entities (FEs), allocation of functional
capabilities to FEs, and interfaces model among Fes
-6TD 405 Rev.1 (GEN/19) - PUBLIC
Rec.
ST
Question
SG
Timing Priority
Pages Liaison Area
Domain
References* Subject
TTC,
ETSI,
TIA,
ATIS,
ARIB,
CCSA)
*) In this column the term “published” means that the previous approved version of the relevant Recommendation is available from the ITU.
-7TD 405 Rev.1 (GEN/19) - PUBLIC
Proposed Work Plan for Q.FNAB
Date
2004
September
1st -15th
Q.1/SSG Meeting
(electronic mtg)
December
13-17
[9th SSG Meeting]
1st SG 19 Meeting
2005
March
8-22th
Deliv. 2
Q.FNAB
Meeting Schedule
Q.1/19 Meeting
(electronic mtg)
May
3-6
2nd SG 19 Meeting
July
5-19
Q.1/19 Meeting
(electronic mtg)
cancelled
Developing
1st Draft
|

2nd Draft

Developing
2nd Draft
v 2.1

3rd Draft

September
5-9
3rd SG 19 Meeting
November
8-22
Q.1/19 Meeting
(electronic mtg)
cancelled

4th Draft

2006
January
23-27
4th SG 19 Meeting

Discussions

May
23-6 June
July
19-27
Q.1/19 Meeting
(electronic mtg)
cancelled
5th SG 19 Meeting

5th Draft
v 5.0
October
10-24
Q.1/19 Meeting
(electronic mtg)

6th Draft
v 6.0
2007
January
Q.1/19 Meeting
(T.B.D)

7th Draft
v 7.0
-8TD 405 Rev.1 (GEN/19) - PUBLIC
April
19-26
6th SG 19 Meeting

8th Draft
v 8.0
AAP
Terms of Reference for proposed Q.1/19 Rapporteur’s Meetings:
To continue the work on Q.FNAB.
-9TD 405 Rev.1 (GEN/19) - PUBLIC
Annex 2 – List of documents
Work item
Documents
4a) General Items
TD GEN: 321; 323, 324, 326, 328, 338, 343, 345R1, 347R1, 351
4b) Q.FNAB
D.42; D.62; D.65; D.66; TD 357
4c) Work Plan
322-GEN
_____________
Download