TD 236 R1 (GEN/19) PUBLIC STUDY GROUP 19 English only Original: English

advertisement
INTERNATIONAL TELECOMMUNICATION UNION
TELECOMMUNICATION
STANDARDIZATION SECTOR
STUDY GROUP 19
TD 236 R1 (GEN/19) PUBLIC
English only
STUDY PERIOD 2005-2008
Original: English
Question(s):
1/19
Geneva, 5-9 September 2005
TEMPORARY DOCUMENT
Source:
Acting Rapporteur, Q.1/19
Title:
Report on Question 1/19 Meeting in Geneva (5-9 September 2005)
Table of Contents
1
Organization of Meeting ............................................................................................... 2
1.1
Meeting Identification, Chairmanship and Participation................................ 2
1.2
Meeting Agenda ............................................................................................. 2
2
Key Results ................................................................................................................... 2
2.1
Work Items Progressed................................................................................... 2
3
Meeting Documentation ............................................................................................... 2
4
Liaison Statements ........................................................................................................ 2
5
Recommendation Status and Work Plan ...................................................................... 2
5.1
Future Work.................................................................................................... 2
6
Detailed Report of Discussions .................................................................................... 2
6.1
Opening Plenary ............................................................................................. 3
6.2
General Items (TD 115, 117, 181, 184, 187, 188, 189, 192, 193, 194, 195,
215, 218) ......................................................................................................... 3
6.3
Functional Network Architecture for Systems Beyond IMT-2000
(Q.FNAB) (D 23; TD 217) ............................................................................. 4
6.4
Review of Work Plan for Planned Deliverables............................................. 5
6.5
Closing Plenary of Q.1/SSG ........................................................................... 5
6.6
Review of Meeting Report. ............................................................................ 5
7
Acknowledgements....................................................................................................... 5
Annex 1 – Work Plan ............................................................................................................... 6
Annex 2 – List of documents ................................................................................................... 9
Attention: This is a document submitted to the work of ITU-T and as such is intended for use by the Member States of ITU, by ITUT Sector Members and Associates, and their respective staff and collaborators in their ITU-related work. It is made publicly available
for information purposes but shall not be redistributed without the prior written consent of ITU. Copyright on this document is owned
by the author, unless otherwise mentioned. This document is not an ITU-T Recommendation, an ITU publication, or part thereof.
-2TD 236 R1 PUBLIC (GEN/19)
1
1.1
Organization of Meeting
Meeting Identification, Chairmanship and Participation
This is the report of a meeting of Q.1/19: Service and network capability requirements and network
architecture.
Q.1/19 met in Geneva on 6-8 September 2005. The meeting was chaired by Mr. Atsushi Minokuchi,
Q.FNAB co-editor, as was approved in the opening plenary, due to the absence of Mr. Bruno
Ramos, Q.1/19 Rapporteur. The meeting was attended by about 10 delegates from 6 countries.
1.2
Meeting Agenda
The Meeting Agenda was published in Temporary Document TD-218R1. It was reviewed and
approved.
2
2.1
Key Results
Work Items Progressed

Developed the draft of the ITU-T PDNR: Functional Network Architecture for Systems Beyond
IMT-2000, Q.FNAB, version 4.0 (Revision 1) (TD-217R2).

Reviewed, and agreed to the work plan for Q.1/19 that has changed the timing for Q.FNAB
from 4Q2005 to 3Q2006.
3
Meeting Documentation
Documents considered at this meeting are listed in Annex 2. All documents are available at
http://www.itu.int/md/meeting.asp?lang=&type=meetingdesc&parent=T05-SG19-050905
4
Liaison Statements
The meeting resulted in the preparation of no Liaison Statements.
5
Recommendation Status and Work Plan
Status and Work Plan for Recommendations and other deliverables under the responsibility of this
Question are summarized in Annex 1.
5.1
Future Work
The next activity of Question 1/19 will be in the form of e-meeting during 8-22 November 2005 at
http://forum.itu.int/jive/index.jspa?categoryID=2. The Terms of Reference for this meeting are as
follows:

6
To progress the work on Q.FNAB.
Detailed Report of Discussions
Q.1/19 met during 6-8 September 2005. A total of 9 people participated in this discussion. The list
of participants is included as Annex 3 of this report. The agreed agenda for the Q.1/19 meeting is in
Temporary Document TD-218R1.
-3TD 236 R1 PUBLIC (GEN/19)
6.1
Opening Plenary
The Q.1/19 session was called to order at 9:00hrs on 6 September. The proposed agenda for the
Q.1/19 plenary was approved. The terms of reference for this meeting are to continue the work as
assigned to this question (former Q.1/SSG). All input documents assigned to Q.1/19 discussion
were distributed to work items as shown in Temporary Document TD-218R1.
6.2
General Items (TD 115, 117, 181, 184, 187, 188, 189, 192, 193, 194, 195, 215, 218)
The following provides a brief summary of the discussions on and dispositions of input documents
that were assigned to the work item “General Items.”
TD-115 (Response to SG19 Liaison Statement on Trial of Public Access to SG 19
Documentation) – TSAG endorses the Study Group 19 proposal in its liaison statement on “Trial
of Public Access to SG19 Documentation” with a number of amendments. TSAG agrees that how
to proceed further can be decided at the end of 2006. TSAG looks forward to hearing reports, which
include subjective aspects, regarding the effectiveness of this trial from Study Group 19. noted.
TD-117 (LS to ITU-T Study Groups on work on Telecommunications for Disaster Relief and
Early Warning and an Action Plan) – TSAG D.9 proposed that more technical standards could be
created in support of Telecommunications for Disaster Relief (TDR) and Early Warning (EW). The
Action Plan as agreed at TSAG in its meeting 14-18 March 2005 is attached. TSAG encourages all
Study Groups to review their work programme for work in TDR/EW, as applicable and to provide
TSAG and Study Group 2 with a feedback. noted.
TD-181 (Project Co-ordination and Release Planning for NGN) – Study Group 13 continues to
work on an interactive ITU-T Web site for NGN and to request each Study Group to provide details
of its existing Recommendations or Recommendations under development that would fit within the
scope of NGN. Study Group 13 also requests that each Study Group provide a single contact point
for NGN Release planning. In the discussion the group pointed out that Q.1702 and Q.1703 could
be relevant. But the group also pointed out that this information has already been sent to Study
Group 13 by TD120 as a reply to the same request from Study Group 13 and agreed that any further
liaison statement is not needed at this moment.
TD-184 (Liaison statement on the first OCAF Focus Group deliverable, Carrier Grade Open
Environment (CGOE) reference model) – The objective of the Open Communications
Architecture Forum (OCAF) Focus Group under the Study Group 13 is to agree on specifications
for a set of components for a new carrier grade open platform that will accelerate deployment of
NGN infrastructure and services. Regarding its first deliverable “Carrier Grade Open Environment
(CGOE) reference model,” Study Groups are invited to comment, propose for enhancement, or
indicate interest. noted.
TD-187 (Response to liaison on general security policy for secure mobile end-to-end data
communication) – Q.9/17 explains X.msec3 further in response to the liaison from Study Group
19. X.msec3 focuses on mobile environment and can support NGN evolution, since for value added
security service, conceptions and key techniques in X.msec3 can be applied to both fixed and
mobile environment. noted.
TD-188 (Report of the 7th FGNGN meeting) – The 7th FGNGN meeting report and the current
draft of the NGN Release 1 scope document are attached for information. The Q.1 acting rapporteur
pointed out that this temporary document is obsolete because TD 215 is now available. noted.
TD-189 (Outputs from the 7th ITU-T NGN Focus Group meeting) – The NGN Release 1 scope
document and the NGN Release 1 requirement document as of the end of the 7th FGNGN meeting
are attached. FGNGN acknowledges the lead role of Study Group 19 in harmonizing mobility
-4TD 236 R1 PUBLIC (GEN/19)
related concepts and terminology with other parts of the ITU-T and requests guidance from Study
Group 19 on mobility related issues. noted.
TD-192 (Reply to LS on Work on Telecommunications for Disaster Relief and Early Warning
and an Action Plan) – In response to the request from TSAG that all ITU-T Study Groups are
expected to increase their activities for TDR and EW and that an ITU-T Action Plan for TDR and
EW is to be established, Study Group 16 provides TSAG and SG2 with a first feedback on the
actions taken and improvements suggested to the Action Plan. The current possible contribution to
the Action Plan from Study Group 16 is attached. noted.
TD-193 (LS on Multimedia Service Mobility) – This liaison statement from Study Group 16
informs that Q.29/16 has started work on requirements with regard to the deployment of
Multimedia Service mobility within NGN. Study Group 16 requests Q.2/19, Q.5/19, and Q.6/13 to
give a feedback to Q.29/16 and to give its view about a common implementation of this issue.
noted.
TD-194 (LS on V.15x-series applicability to PSTN/ISDN emulation/simulation services) –
Q.11/16 has developed Recommendations that address the transport of voice band modems over IP
networks. Q.11/16 requests that, in the definition of access and PSTN/ISDN emulation/simulation
services in the NGN, Recommendations V.150.1, V.151, V.152 and T.38 (for facsimile) be
considered. noted.
TD-195 (LS on ISUP/BICC enhancement for VED) – Q.16/16 is currently defining a “VED for
mobile networks”. ISUP/BICC should be enhanced to carry VED related information. On the other
hand, a contribution describing the relevant coding and procedures has been presented to Q.3/11,
but has been put on hold waiting for Study Group 19, as the lead group for mobile, for the support
of this work. Q.18/16 asks Study Group 19 to confirm the need to enhance ISUP/BICC to carry
VED related information. NTT DoCoMo commented that since Q.1 is now discussing network
architecture, that Q.1 is not in a relevant position to comment on this topic. NTT DoCoMo further
commented that this enhancement has possible impacts on existing systems and that it needs to be
carefully handled by Q.3 where experts of 3GPP/3GPP2 are working.
TD-215 (Report of the 8th FGNGN meeting) – The 8th FGNGN meeting report and the current
draft of the NGN Release 1 scope document are attached for information. Since no comments were
raised from the floor, the Q.1 acting rapporteur requested participants to take time and to look
through the documents. The document was revisited afterwards, but no comments were raised.
noted.
TD-218 (Draft agenda for Q.1/19) – This temporary document is a draft agenda for Q.1/19. TD
218 was revised into TD 218R1 by adding three documents to be handled. The group reviewed and
agreed to TD 218R1.
6.3
Functional Network Architecture for Systems Beyond IMT-2000 (Q.FNAB) (D 23; TD
217)
Based on input contributions and discussions at the meeting, Q.FNAB version 4.0 (Revision 1) was
developed and made available as TD 217R2.
The Q.FNAB version 4.0 (Revision 1) is based on the Q.FNAB version 3.0 (TD 217) and the
modifications proposed by Delayed Contribution 23 (D-23) and the comments received during the
sessions of Q.1/19.
The following provides a brief summary of the discussions on and dispositions of input documents
that were assigned to the work item “Q.FNAB”.
D-23 (Network function for Q.FNAB) – This delayed contribution is from Korea.
-5TD 236 R1 PUBLIC (GEN/19)
< Discussion notes are in the version of this document behind TIES.>
TD-217 (Draft Recommendation Q.FNAB (version 3.0)) – This temporary document is the latest
version of Q.FNAB, which is the output from the last Study Group 19 meeting during 3-6 May
2005 and which was used as the base text for the current Q.1/19 sessions. After discussion of D 23,
the Q.FNAB version 4.0 (TD217R1) was drafted. This was further reviewed and the Q.FNAB
version 4.0 (Revision 1) (TD217R2) was drafted including comments that would clarify issues to be
solved. The Q.FNAB version 4.0 (Revision 1) (TD217R2) was reviewed and agreed to.
6.4
Review of Work Plan for Planned Deliverables
Based on the comments received during the Q.1/19 meeting, Stage 2 Recommendation Q.FNAB
(Functional network architecture for systems beyond IMT 2000), version 4.0 (Revision 1), was
developed.
It was agreed that one electronic meeting should be held to progress the work on Q.FNAB before
the next SG 19 Meeting. The planned Q.1/19 Rapporteur’s Electronic Meeting is scheduled for 8-22
November 2005. And besides it was agreed that the timing for Q.FNAB should be 3Q2006 instead
of 4Q2005 due to the lack of maturity of the current Q.FNAB. The group pointed out that elements
of Q.FNAB, including the whole architecture, security functionalities, or service platform
functionalities are still missing and commented that Q.FNAB needs to be revisited to consider
consistency with NGN work. The detailed work plan for Q.FNAB is provided in Annex 1.
6.5
Closing Plenary of Q.1/SSG
Q.1/19 held its closing plenary at 9:00hrs on Thursday, 8 September 2005. This report, including all
annexes, and the latest draft of ITU-T PDNR Q.FNAB version 4.0 (Revision 1) (TD-217R2) were
reviewed and agreed to. The delegates were thanked for their participation in the Q.1/19 activities at
this meeting. Q1/19 discussion meeting was closed at 10:15 hrs.
6.6
Review of Meeting Report.
The draft meeting report in TD-236 was reviewed and approved as TD–236R1.
7
Acknowledgements

Participants - for their participation, contributions, and co-operation in the work on Q.FNAB at
this meeting.

Mr. Sang-Eon Kim (Korea) for his active participation in the work on Q.FNAB at this meeting.
-6TD 236 R1 PUBLIC (GEN/19)
Annex 1 – Work Plan
Rec.
ST
Question
SG
Timing Priority
M
M
M
Pages Liaison Area
Q.1701
Q.1711
Supplemen
t 30 to QSeries
Recommen
dations
R
R
R
1/19
1/19
1/19
19
19
19
27
29
15,37
15,37
15,37
Q.FIFB
N
1/19
19
TBD
H
ITU-T SGs
2, 11, 12,
13, 16,
ITU-R WP
8D and 8F
(WGVision),
ITU-D
SGs, SDOs
(TTA,
TTC,
ETSI, TIA,
ATIS,
ARIB,
CCSA)
Q.FNAB
N
1/19
19
3Q 2006
H
ITU-T
15,37
SGs 2, 11,
12, 13, 16,
ITU-R
WP 8D
and 8F
(WGVision),
ITU-D
SGs,
SDOs
(TTA,
Domain
References* Subject
99
99
00
Framework for IMT-2000 networks
COM 11-R 116 Network functional model for IMT-2000
Specifications of International Mobile
Telecommunications-2000
15,37
27
27
Long-term high-level network functional information
flows for beyond IMT 2000 systems
Long-term high-level network architecture for
systems beyond IMT 2000, including definition of
functional entities (FEs), allocation of functional
capabilities to FEs, and interfaces model among Fes
-7TD 236 R1 PUBLIC (GEN/19)
Rec.
ST
Question
SG
Timing Priority
Pages Liaison Area
Domain
References* Subject
TTC,
ETSI,
TIA,
ATIS,
ARIB,
CCSA)
*) In this column the term “published” means that the previous approved version of the relevant Recommendation is available from the ITU.
-8TD 236 R1 PUBLIC (GEN/19)
Proposed Work Plan for Q.FNAB
Date
Meeting Schedule
2004
September
1st -15th
Q.1/SSG Meeting
(electronic mtg)
December
13-17
[9th SSG Meeting]
1st SG 19 Meeting
Q.1/19 Meeting
(electronic mtg)
2005
March
8-22th
May
3-6
2nd SG 19 Meeting
July
5-19
Q.1/19 Meeting
(electronic mtg)
cancelled
September
5-9
3rd SG 19 Meeting
November
8-22
Q.1/19 Meeting
(electronic mtg)
2006
January
23-27
4th SG 19 Meeting
Deliv. 2
Q.FNAB
Developing
1st Draft
|

2nd Draft

Developing
2nd Draft
v 2.1

3rd Draft

Developing
3rd Draft
v 3.1
cancelled

4th Draft

Developing
4th Draft
v 4.1

5th Draft
Terms of Reference for proposed Q.1/19 Rapporteur’s Meetings:
To continue the work on Q.FNAB.
-9TD 236 R1 PUBLIC (GEN/19)
Annex 2 – List of documents
Doc. No.
Source
Delayed contributions
23
Korea
Title
Network function for Q.FNAB
Temporary Documents
115
TSAG meeting
Response to SG19 Liaison Statement on Trial of Public
(Geneva, 14-18 March Access to SG 19 Documentation
2005)
117
TSAG meeting
LS - Work on Telecommunications for Disaster Relief and
(Geneva, 14-18 March Early Warning and an Action Plan
2005)
181
ITU-T SG 13
(Geneva, 25 April - 6
May 2005)
Project Co-ordination and Release Planning for NGN
184
ITU-T Study Group
13 Management
Liaison statement on the first OCAF Focus Group
deliverable, Carrier Grade Open Environment (CGOE)
reference model
187
SG 17 Rapporteur
Response to liaison on general security policy for secure
Groups on Security
mobile end-to-end data communication
(Shenzhen, 11-15 July
2005)
188
FGNGN Chairman
(FGNGN meeting:
Beijing, 27 June – 1
July 2005)
Report of the 7th FGNGN meeting
189
FGNGN Chair
Outputs from the 7th ITU-T NGN Focus Group meeting
192
ITU-T SG 16
Reply to LS on Work on Telecommunications for Disaster
Relief and Early Warning and an Action Plan
193
ITU-T SG 16
(Q29/16)
LS on Multimedia Service Mobility
194
ITU-T SG 16
(Q11/16)
LS on V.15x-series applicability to PSTN/ISDN
emulation/simulation services
195
ITU-T SG 16
(Q.18/16)
LS on ISUP/BICC enhancement for VED
215
FGNGN Chair (8th
Report of the 8th FGNGN meeting
FGNGN meeting:
Geneva, 24 August – 2
September 2005)
217
Q.FNAB Co-Editor
Draft Recommendation Q.FNAB (version 3.0)
218
Acting Rapporteur,
Q.1/19
Draft agenda for Q.1/19
_____________