I jl ] HABOON ... " ~ ^ H a rb o u r a n d E n g in e e rin g C o n s u lta n ts P R O JE C TS M A D E B Y H A E C O N IN T H E T R A N S P O R T A T IO N S E C T O R IN Z E E B R U G G E (Belgium) 121246 January 1983 HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091) 26 50 94 TELEX 12586 HAECON B vav/Atr- ---H A E C O N N .V . H arb o u r and Engineering Consultants Deinsesteenweg 110 B - 9 8 1 0 G ent Belgium T e l.. (0 9 1 ) 2 6 .5 0 .9 4 . Telex 1 2 5 8 6 H A E C O N B U ÜL/ t' \J n.v. H a rb o u r an d E n g in e e rin g C o n s u lta n ts TABLE OF CONTENTS Part 1 : Design studies fo r the extension o f the outer-harbour at Zeebrugge (1 9 7 6 - 1981) Part 2 : Advisory services by H A E C O N fo r the construction o f the N ew outer-harbour at Zeebrugge (1 9 8 1 -...) Part 3 HAECON N.V. : DEINSESTEENWEG 110 Miscellaneous projects in the p o rt o f Zeebrugge (1 9 6 8 -...) 9810 GENT (Belgium) TEL. : (091) 26 50 94 TELEX 12586 HAECON B 1. Design studies fo r the extension o f the outer-harbour at Zeebrugge (1 9 7 6 - 1981) r _n_Lr-v R H a rb o u r an d E n g in e e rin g C o n s u lta n ts IN T R O D U C T IO N From 1 97 6 to 1981 the engineering office Haecon-Zeebrugge made the design studies fo r the harbour extension in Zeebrugge This extension is necessary to ensure access to the new sea-lock which has been under construction since 1 97 1. In M ay 1 9 7 6 , the G overnm ent decided to install an L N G te r­ minal w ith in this extension. W ork began in January 1 9 7 7 and is effected w ith a flexib le contract which ensures a continuous interaction between the contractors, the study office and the client. Acceptance o f the w o rk is estimated fo r the end o f 1985. Ships w ill be able to have access to the new lock fro m 1 98 3. The total construction cost estim ated is about 1 ,5 0 0 ,0 0 0 ,0 0 0 US $. The w o rk involves the construction o f o u ter-po rt breakw ater in the N o rth Sea w ith a total length o f about 1 1.5 km . This w ill require 1 ,8 0 0 ,0 0 0 tons o f gravel, 1 1 ,7 8 0 ,0 0 0 tons o f stones and 6 4 ,0 0 0 concrete blocks o f 2 5 tons. The project also requires dredging o f about 1 2 0 ,0 0 0 ,0 0 0 m 3 o f w hich 8 ,5 0 0 ,0 0 0 m 3 were used fo r restoration o f the beaches on the Belgian east coast, one o f the biggest operations o f its kind in the w o rld . A m ong the specific problems to be solved, one can m ention : - interaction o f the harbour structures on the Scheldt estuary, - silting o f the existing entrance channel to Zeebrugge, - cross-currents up to fo u r knots at the harbour entrance, - p o rt safety problems w ith simultaneous tra ffic of LNG ships, passenger ves­ sels, container ships and explosives. HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 TELEX 12586 HAECON B OFFSHORE N E A R • SHORE ONSHORE â \ HK seism ic borehole calibration bot t om sam pling seismic profiling lithology eone resistance r L I T I M E SECT I ONS TIME SECTIONS tlx ) t(x) TIME MAPS TIME t(x.y) MAPS t ( x,y ) VELOCITIES V ( l) INTER PR ETATIO N DEPTH DEPTH SECTIONS DEPTH z ( x.y ) KEY S EC TIO N ARRAYS J MAPS THICKNESS) MAP S DEPTH OF A S E L E C T E D HORIZON THICKNESS OF A S E L E C T E D BED ( isopachs ) ( isobaths ) 'M F ig . 0 G eneral scheme o f the in te rp r e ta tio n flo w o f th e in te g ra te d g e o te c h n ic a l and se ism ic data and p re s e n ta tio n mode o f the re s u lts . 1. 18/11 (j l I W B Œ M ... H a rb o u r an d E n g in e e rin g C o n s u lta n ts G E O T E C H N IC A L S U R V E Y S Location Zeebrugge (Belgium ) C lient T ijd e lijk e Vereniging Zeebouw - Zeezand S tart o f th e S tu d y : Septem ber 197 6 End o f the Study O ctober 1981 B rief description o f the project : The decision to develop the outer harbour o f Zeebrugge, which involves the con­ struction o f an L N G -term in al and entails the dredging o f approach channels and the protection o f the east coast, has form ed the incentive fo r an a p p lication -o ri­ entated seismic survey, integrated in to a m arine engineering investigation program m e. In its reconnaissance stage, the geotechnical investigation fo r the o u ter harbour con­ sisted o f the follow ing consecutive phases: seismic p ro filin g (7 5 km ) offshore conepenetration testing, offshore drilling w ith associated laboratory testing o f disturbed and undisturbed samples (classification tests, stress and d efo rm ation tests) backed by parallel onshore cone-penetration testing and drilling. Subsequent detailed investi­ gations involve additional drilling and cone-penetration testing, pressiometer testing, borehole logging and laboratory testing. T o interprétate the results o f the core pene­ tratio n tests, the vibrocoring dow n to 4 or 5 m was very useful. Average drilling and geotechnical testing depth am ounts to 15 to 3 0 m below seabed, w ith a few additional offshore and onshore deep boreholes ranging between 6 5 and 1 00 m below seabed or soil level. The approach channel area and the eastern near-shore area have been covered by a seismic survey (3 4 5 km ) drilling. and an associated program m e o f vibrocoring and offshore T he total num ber o f vibrocores am ounts to about 2 5 0 . Sedim ent transport investigations involved radioactive tracer studies and b o tto m sedim ent density deter­ minations. The results o f the intensive geotechnical survey showed th a t it was necessary to exe­ cute a soil replacem ent fo r about 8 km o f the breakwaters. The w eak top layers (4 to 6 m) are dredged and the trench is filled w ith coarse sea-sand. The q u ality o f the dum ped sand was controlled : in the earlier stage by density measurements (+ laboratory testing) and CPT later on by CPT's (continued „.) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 TELEX 12586 HAECON B ■ Intorfön s ABOON r il^ H a rb o u r an d E n g in e e rin g C o n s u lta n ts G E O T E C H N IC A L S U R V E Y S page 2 When necessary, the dum ped sand is com pacted by vib ratio n . A fte r com paction CPT's are executed again. Seismic w o rk provides the lateral exploration pow er which p o in t investigations like boreholes lack. On the other hand, borehole data, seabed coring and penetration testing provide the necessary clues fo r id en tificatio n o f observed seismic events and fo r raising any am biguity inherent in the seismic m ethod. The vertical tim e dimension o f seismic profiles can be converted in to depth by suitable borehole control and seismic velo city models, com piled from refraction data and w ellshooting. Services : d e fin itio n , supervision and in terp retatio n o f all tests, Special technical features: This comprehensive geotechnical survey fo r the offshore extension o f Zeebrugge harbour illustrates some possibilities and lim itations o f seismic p ro filin g in Belgian offshore areas and proves a striking example o f its successful integration in geotech­ nical investigations. , Miscellaneous remarks : This general geotechnical investigation program me was carried out by Haecon-Zeebrugge. World Bank Sym bols : Fields o f specialization : K 5 0 0 , K 5 0 4 , K 5 1 0 , K 5 1 1 Types o f services : 1b, 1c, 1e, 1 f, 3g, 3 k , 4b , 4d, Level o f e ffo rt : class 4 (over 2 0 0 m an-months) HAECON N.V. s DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091) 26 50 94 TELEX 12586 HAECON B ["■I [KM^DOíMl H a rb o u r an d E n g in e e rin g C o n s u lta n ts S U R V E Y O F S E A B O T T O M -L IT H O LO G Y Location Z E E B R U G G E (Belgium ) C lient T ijd e lijk e Vereniging Zeebouw -Zeezand. S ta rt o f the study 197 5 End o f the study 1981 B rief description o f the project : The survey o f sea b o tto m -lith o lo g y forms extension o f Zeebrugge. part o f the design studies fo r the po rt A b o u t 6 0 0 Shipek bottom-sam ples are taken fo r the qualitative and q uantitative description o f the sea-floor. Samples are sedim entologically described in situ and sent up to the laboratory fo r ana­ lysis o f grain-size distribu tion , organic co n ten t and field density. Continuous lithological surveys are perform ed using a natural rad io activity gauge. Vibrocorings up to a depth o f 5 m are executed fo r the lithological depth distributions o f loose sediments. The cores are analysed w ith a gam ma-densimetric array to deter­ mine the density o f the cores w ith o u t opening them . Services survey b o tto m - sampling continuous survey o f lithology vibro - coring research analysis o f samples use o f the gam ma-densimetric array Special technical features developm ent o f a natural radio-activity gauge use o f gam ma-densimetric array. Miscellaneous remarks World Bank Symbols : This study was carried o ut by Haecon - Zeebrugge Field o f specialization : T R -K 5 0 5 Types o f services : 1b, 1i Level o f e ffo rt : class 1 (less than 20 man-months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 TELEX 12586 HAECON B ca LJ o H a rb o u r a n d E n g in e e rin g C o n s u lta n ts M A S T E R P L A N H A R B O U R E X T E N S IO N Location : ZEEBRUGGE (Belgium) C lient : T ijd e lijk e Vereniging Zeebouw - Zeezand Start o f the study : 1976 End o f the study : 1981 Brief description o f the project : A t present Zeebrugge is Belgium's m ajor coastal harbour. On a lim ited area very diversified po rt users co-exist : containers, a fishing po rt, a crude oil term in al, a yacht harbour, quays fo r general cargo (including exp lo ­ sives), as well as a car ferry term in al. A LN G term inal is planned. The study program me fo r the extension o f the Haecon-Zeebrugge, had, as prim e objectives : Port o f Zeebrugge entrusted to 1 1. T o assure access to the lock and the deepening o f the p o rt w ith a view to receiving fu lly laden 1 2 5 ,0 0 0 td w . ships. 2. T o determ ine and prepare the areas fo r unloading, storage and regasification o f the L N G . A p a rt from the tw o objectives m entioned, Haecon-Zeebrugge has also to ascertain th a t the extension plans are flexib le so th a t fu tu re extensions or adaptations o f the outer harbour are possible. The way in w hich the works can con trib u te to obtaining a b etter zoning o f the p o rt activities has also to be studied. Whatever the geographical position o f a po rt may be, a rational zoning o f the port avoiding dispersion and m ixing o f d iffe re n t tra ffic , is an im p o rta n t con d itio n fo r the proper exp lo itation of the po rt. This is w h y the Haecon-Zeebrugge studies analyse the possibilities o f regrouping the energy berths (oil tankers, m ethane tankers), in one area o f the po rt, the containers in another area, the ro ll-o n /ro ll-o ff berths in a th ird area, and so on. The extension o f the p o rt allows a m ore distinct sep­ aration o f the tra ffic and th a t can only im prove efficiency o f loading and unloading operations and o f safety measures. On the other hand, taking in to account th a t Zeebrugge is the only Belgian p o rt located o ff the N orth Sea, the land which w ill be gained fro m the sea has an im ­ po rtan t p o rt vocation.The design o f dykes and entrance channels and the plans fo r road access must therefore be such, th a t the creation o f a new potential fo r quick ship handling is n o t obstructed but, on the con trary, can be realised in an optim um w ay. W ith this objective, Haecon has so far elaborated various plans fo r linking the po rt w ith the hinterland, w ith road and rail plans as well as plans fo r transport by pipeline. The organization of the general road entrance to the p o rt was the object o f a thorough study in 1 9 7 8 -1 9 7 9 . T h e existing and fu tu re p o rt tra ffic had in no way to be detrim ental to tourist activities (excessive noise, site tra ffic on coast roads etc ...). World Bank Sym bols : Fields o f specialization : T R -K 1 0 1 , K 1 0 2 , K 2 0 1 , K 4 0 5 , K 5 1 4 Types o f services : 2c, 5e Level o f e ffo rt ; class 1 (less than 2 0 man months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 TELEX 12586 HAECON B C EN TR A L W ORK A R EA Location Z E E B R U G G E (Belgium ) Client T ijd e lijk e Vereniging Zeebouw - Zeezand Start o f the study 197 6 End o f the study 1979 B rief description o f the project : In order to build the outer-harbour breakwaters fo r the Zeebrugge P ort Extension, huge quantities o f sand, gravel, quarry rock, concrete, ... have to be handled by pur­ pose-built workships, dumpers and cranes. Design quantities fo r the central w o rk area were : design throughput : . arrival : 3 4 .0 0 0 t/w e e k . leaving : to barges : 3 3 .0 0 0 t/w e e k to construction fro n t : 2 7 .0 0 0 t/w e e k design stockpile : 6 8 0 .0 0 0 ton area : 3 5 ha Finally the follow ing organisation scheme was adopted : supply by 20-to n road-trucks and 1 100-to n trains, the trucks and railway-wagons are weighed auto m atically when entering and leaving the site - the railway-wagons do n o t have to stop. the trucks unload the stockpiles shovels and bulldozers clean-up around the stockpiles, the railway-wagons once weighed are marshalled, and then unloaded by h yd rau ­ lic grab crane, fro m the stockpiles 3 5-to n site-dumpers are loaded by hydraulic grab cranes and bring the rock to the service-port w h a rf or to the breakw ater construction fro n t. Services planning and design (start Septem ber 1 97 6) detailed design (start January 1978) supervision o f construction (start July 7 8 ; end Septem ­ ber 7 9 ). (C ontinued ...) ca H a rb o u r an d E n g in e e rin g C o n s u lta n ts C EN TR A L W ORK A R EA page 2 Special technical features : autom atic weighing system As the site fin ally study has been chosen was necessary in p artly upon order to marshland, a detailed geological preclude unacceptable settlem ents fo r the incom ing wagons. The w o rkyard has to be operational 24 hours a day. A special lighting system has to be conceived. As the w o rkyard is near a densely populated area, special features have to be provided to decrease noise and dust. Miscellaneous remarks World Bank Sym bols : : T he study was carried o ut by H A E C O N - Zeebrugge Fields o f specialization : T R -K 5 1 0 , K 5 1 1 Types o f services : 1b, 1c, 1e, 1g, 3 k , 4a, 4b , 4g, 5b Level o f e ffo rt : class 3 (between 1 0 0 and 2 0 0 man months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 TELEX 12586 HAECON B Fig. 26 View from the wheelhouse o f the manoeuvring simulator. Fig. 25 Sectional perspective drawing o f the manoeuvring simulator. E M H O T I H a rb o u r an d E n g in e e rin g C o n s u lta n ts N A U T IC A L S T U D IE S Location : Zeebrugge (Belgium ) C lient : T ijd e lijk e Vereniging Zeebouw -Zeezand S tart o f the study : 1 97 6 End o f the study : 1981 B rief description o f the project : In the design o f the po rt o f Zeebrugge, special atten tio n was paid to nautical aspects. The manoeuvring o f the ships into the p o rt and their m ooring had to be considered w ith great care. T o this end, experim ents on models were effected. T w o types o f models were used: 1. a physical model fo r free sailing ships, by which the purely physical aspects of navigation were exam ined ; 2. a manoeuvring sim ulator w hich should show how the p ilo t interprets the physi­ cal configurations, which allows an op tim u m choice to be made. The sim ulator was first o f all perfected and tested. A sim ulation was then effected fo r d iffe re n t cases ; - a sensitivity study fo r three possible extension lengths o f the o u te r harbour. - a detailed analysis of the final entrance to the po rt, resulting from the model fo r free - sailing ships. - a com plem entary study o f the little-kn o w n phenomena in some very particular cases (gate force winds, emergency m anoeuvring and special coercions) in the in te r­ m ediate situations when the breakwaters are still under construction. In-situ measurements o f ship manoeuvres in Zeebrugge gave additional data. Miscellaneous remarks : - T h e data used fo r these models resulted fro m hydraulic tests in the laboratory. - This studies were carried o ut by Haecon-Zeebrugge. World Bank Sym bols : Field o f specialization : T R -K 1 0 1 a K 1 0 1 d ,K 5 0 7 ,K 5 1 1 ,K 5 1 5 ,K 5 1 6 ,K 6 0 2 ,K 6 0 4 Types o f services : 3g# 5e Level o f e ffo rt : class 2 (between 2 0 and 100 man months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 TELEX 12586 HAECON B H W f iD O N H a rb o u r a n d E n g in e e rin g C o n s u lta n ts L .N .G . D O C K Location : Z E E B R U G G E (Belgium ) C lient : T ijd e lijk e Vereniging Start o f the study : 1 97 6 End o f the study : 1981 B rief description o f the project Zeebouw -Zeezand : In M ay 197 6 the Belgian G overnm ent appointed Zeebrugge as the Belgian im p o rt harbour fo r the L N G -con tract concluded between Sonatrach (Algeria) and Distri- gas (Belgium ). In Septem ber 197 6 H A E C O N -Z E E B R U G G E was entrusted w ith the study o f im ­ plantation and general lay-out o f the term in al. Services During the years 1 9 7 6 - 1 9 7 8 several alternatives were conceived taking in to consi­ deration, execution tim e , simultaneous construction o f both harbour and term in al, safety requirem ents, navigational demands and the influence o f the term inal on port activities. A detailed soil investigation program m e, hydraulic and wave d iffra c tio n tests, tw o - and three dimensional wave tan k tests, m athem atical calculations and a sim ulation prog­ ramme o f the LNG-vessel manoeuvres, were p art o f this study. As a result o f a new decision on the internal LN G -term in al concept (a con ven tio ­ nal land-based term inal instead o f a sem i-prefabricated system ), the lay-o u t study was adjusted and com pleted w ith vessel m ovem ent calculations, long wave resonance tests. World Bank Sym bols : Fields o f specialization : T R -K 5 1 1 .K 5 1 3 Types o f services : 1], 3g, 3 i, 4a, 4c, 4g, 5e, 7a Level o f e ffo rt : class 1 (less than 2 0 man months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 TELEX 12586 HAECON B M o lT T l t a H a rb o u r an d E n g in e e rin g C o n s u lta n ts D R E D G IN G W O R K S Location : Zeebrugge (Belgium ) C lient : T ijd e lijk e Vereniging Zeebouw -Zeezand S tart o f the study : 197 6 End o f the study : 1981 B rief description o f the project : The works fo r the extension o f the outer harbour o f Zeebrugge w ill require, among other operations, the dredging o f 1 2 0 ,0 0 0 ,0 0 0 m 3 , in order to ensure access to the po rt fo r ships o f 1 2 5 ,0 0 0 tdw . Services : In order to make an optim um choice concerning the access channel linking the p o rt of Zeebrugge to the main shipping-lanes in the N o rth Sea, an inventory o f the various possible access routes was established. A fte r an initial rough grading, three channels were chosen and were studied in detail. T he op tim u m choice results fro m the analysis o f the follo w in g elements : dredging works fo r the realization o f the channel dredging works fo r the m aintenance o f the channel the qualities and inconveniences o f the three routes from a nautical p o in t o f view the num ber o f wrecks to bring up the nature o f the m aterial to be dredged the possibility o f reusing the dredged m aterial fo r the beach nourishm ent w o rk on the east coast. A provisional cross-section was then established, responding to the fo llo w in g requi­ rements : tra ffic in both directions must be possible in the channel the channel must be accessible to the design ships the norms and safety margins must be respected Using all these elements as a basis, a com parative study o f costsdeterm ines the op­ tim u m choice o f the route and allows the calculation o f the cubic volum e and the costs o f the dredging. Miscellaneous remarks World Bank Symbols : : The study was carried o u t by H A E C O N -Z E E B R U G G E Fields o f specialization : T R -K 5 0 6 Types o f services : 1d, 1e, 4a Level o f e ffo rt : class 2 (between 2 0 and 100 man m onths) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 TELEX 12586 HAECON B Ol B e to n p e n e tra tie u itv u lla a g D i e n s t w e g in b eto n B e to n b lo kk e n d ik te 0.50 m 3/ m 2 0 .50m 3.00 x 2 . 5 0 x 2.00 B e to n b lo k k e n 3.0 0 x 2.50 x 2.00 »13.00 ♦1000 ♦ 8.00 OWS. = 2 * 6.00 ♦5.50 W erkfront '.'■‘•'.'Ir Q.00=Z G L W S .= Z *0 .3 2 - 3 .5 0 T V ( 2 - 300 kg ) of 1 - 3 t o n ° jt 4.50 ......... •7.00 Z in k s tu k ontw. b r e e d t e 30.00 ♦ 30.00 TV Z in k s tu k ontw. b r e e d t e W IO T ... H a rb o u r an d E n g in e e rin g C o n s u lta n ts B R E A K W A T E R D E S IG N : S T A B IL IT Y A N A L Y S IS Location : ZEEBRUGGE C lient ; T ijd e lijk e Vereniging Zeebouw -Zeezand S tart o f the study : 1 97 6 End o f the study : 1981 B rief description o f the project (Belgium ) : T o ensure access to the new sea-lock in Zeebrugge, 1 1,5 km o f breakw ater have to be constructed in the N o rth Sea. W ithin the general fram ew o rk o f the studies carried out by H A E C O N -Z E E B R U G G E the breakw ater design occupies a central position o f im portance. In this design several stages have to be passed through. The overall stab ility analysis is one o f the most im p o rtan t stages in the design developm ent. Services : T o begin this stab ility analysis the m aterial characteristics should be determ ined. There is a difference between the rubble-m ound layers and the soil layers. The cha­ racteristics o f the soil layers are determ ined according to test procedures, generally accepted in soil mechanics. The determ ination o f the characteristics o f the rubblem ound layers is based on literature and experience. Several situations have to be regarded : norm al conditions . overall-stability LLW S . stab ility analysis during construction phase exceptional conditions . exceptional LW w ith o u t wave action . stab ility analysis under wave-attack . earthquake For each situation the required safety coefficien t is determ ined in accordance w ith the principal, The M inistry o f Public Works The stab ility analysis under wave-attack demands the determ ination o f the design wave and the knowledge o f the pore pressure during wave attack ; in the rubble-m ound layers, in the soil layers. (C o n tin u ed ...) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 TELEX 12586 HAECON B ca HAB30N ... H a rb o u r an d E n g in e e rin g C o n s u lta n ts B R E A K W A T E R D E S IG N : S T A B IL IT Y A N A L Y S IS page 2 Special technical problems : A special aspect of the stab ility analysis was the study o f the liquefaction problem . The average density o f natural sand and the dum ped sand o f the soil replacem ent have to be specified. The density o f these layers should be greater than the control density in order to avoid liquefaction. As the harbour o f Zeebrugge is constructed in a zone w ith strong tidal currents, erosion o f the soil layers along the breakwaters is expected. Special precautions have to be taken to avoid erosion influencing the overall-stability. World Bank Symbols : Fields o f specialization :T R -K 5 1 0 , K 5 1 1 Types o f services : 4a, 4b , 4c, 4d , 4g, 5b , 5e Level o f e ffo rt : class 4 (over 2 0 0 man months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091) 26 50 94 TELEX 12586 HAECON B W ÊÊÊL K C 5; u ca H a rb o u r an d E n g in e e rin g C o n s u lta n ts B R E A K W A T E R D E S IG N O F T H E P R IM A R Y A R M O U R Location : Zeebrugge (Belgium) C lient : T ijd e lijk e Vereniging Zeebouw -Zeezand S tart o f the study : 1976 End o f the study : 1981 B rief description o f the project : Breakwaters are necessary to divert current and wave action so th a t the access to the new 1 2 5 ,0 0 0 tdw . sea lock is ensured and loading and unloading vessels is possible in the outer harbour. Breakwaters are thus an essential part o f the extension works, and the nautical standards influence th e ir shape and location. F urtherm ore, the works should respond to stability requirem ents, both during the construction and final stages - requirements determ ined by the local wave clim ate, the tides and the currents. F in ally, one must look fo r a structure w hich is as economical as possible, and execution techniques and material characteristics have to be considered. Services : T w o type o f breakwaters were studied and com pared on the basis o f costs, construc­ tion modes, risks and delays. One was a wedge- shaped typ e, the o th e r was a vertical wall type. These studies proved th a t the wedge shaped type is preferable to the vertical wall type. T o set up the prim ary arm our o f the breakw ater, cubic concrete blocks were used. The u nit w eight o f these blocks, the height o f the crest, the w eight o f the rock core core com ponent , as well as the height o f the access road are determ ined by means o f the follo w in g criteria : - the breakw ater must be conceived in such a w ay th a t it supports w ith o u t damages the centennial wave He - 6 .5 0 m under these same conditions the breakw ater may be overtopped, provided no damage is caused to the construction. it has to be possible to use the feeder road fo r 8 0 % o f the tim e. The theoretical cross-section responding to these criteria has been studied in detail in the Central H ydraulic Laboratory in France at M aisons-A lfort, where it has been tested in tw o-dim ensional and three-dim ensional scale models. Miscellaneous remarks : This study was carried by Haecon-Zeebrugge. World Bank Symbols ; Fields o f specialization : T R -K 5 1 0 , K 5 1 1, Types o f services : 1d, 1e, 1f, 1g, 1j, 3 k , 4a, 4 b , 4c, 4 d , 4g, Level o f e ffo rt : class 4 (over 2 0 0 man-months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091) 26 50 94 TELEX 12586 HAECON B ca M o H a rb o u r an d E n g in e e rin g C o n s u lta n ts B E A C H P R O T E C T IO N Location : Belgian coast between Zeebrugge and the Dutch fro n tie r C lient : T ijd e lijk e Vereniging Zeebouw -Zeezand Start o f the study : 1976 End o f the study : 1981 B rief description o f the project : For over half a century the east coast o f Belgium has been threatened w ith erosion. In 1976 certain areas o f the beach were no more than 2 5 m w ide at low tid e, w hile at high tide the waves were eroding the base o f the coastal d yke. Restoration and protection o f this section o f the coast was indispensable. T he follo w in g execution program me in 3 phases was carried o ut : 1. In a first stage the beaches o f the east coast were restored w ith a supply o f about 8 ,5 0 0 ,0 0 0 m3 o f sand (one o f the largest beach restorations ever realised) which increased the average w id th from 100 m to 2 5 0 m at low tide. The m ost suitable sand was found 2 0 km o ff the shore o f Zeebrugge and was brought by dredger in to the po rt from where the pum ping equipm ent and pipelines assured the d istri­ bution o f the sand (production o f about 2 0 0 ,0 0 0 m 3 /w e e k ). The sand supplying plan was determ ined w ith in the total fram ew o rk o f the p o rt extension. 2. On a parallel w ith the execution o f these works, studies are in progress w ith a view to determ ining the long-term methods of protection by trying to dim inish the lateral currents. Am ong other things, the influence o f several types and of several im plantations of breakwaters along the coast were analyzed w ith the help o f a m athem atical model which allows the calculation o f the evolution o f the coast under the influence o f waves and currents (erosion, sand- fillin g , sedimen­ ta tio n , transport). On the other hand, a total refilling o f the A ppelzak was also studied, which w ould require about 7 ,0 0 0 ,0 0 0 m 3 , a q u a n tity made available by the enorm ous dredging carried o ut fo r the new p o rt and its access channels. 3. In 1 97 6, since the beginning o f the studies, a program me fo r the observation of the coast was put into operation. Numerous site measurements fo llo w the evo­ lution o f the beaches over the years and w ill make it possible to indicate when intervention is necessary. (C o n tin u ed ...) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091) 26 50 94 TELEX 12586 HAECON B B E A C H P R O T E C T IO N Page 2 Services : - collecting and in terp retatio n basic data - d efin itio n and fo llo w -u p o f laboratory tests - d efin itio n and fo llo w -u p in situ tests - design o f the beach restoration, supervision o f the w o rk Special technical features : In order to determ ine the developm ent o f currents, the transport flo w , the capacities o f transport and the dynam ic evolution o f the coast, the most m odern techniques were put into operation : radioactive and fluorescent tracers, sim ulation o f sedim ent transport by m athem atical m odel, refraction calculations by com pu ter, hydraulic sim ulation on physical models w ith fixed b o tto m com bined w ith comprehensive mea­ surements on site. Miscellaneous remarks : The restoration o f the beaches must be studied w ith in the general c o n tex t o f the po rt extension at Zeebrugge. The fu tu re p o rt is going to decrease the increasing tidal cur­ rents in the A ppelzak fro m 10 to 2 0 %, w hile those o f the ebb tide w ill hardly be influen ced . World Bank Symbols : Field o f specialization : K 5 1 7 Types o f services : 1a, 1d, 1e, 1g, 3 k , 4a, 4 c , 4g, 5b, Level o f e ffo rt : class 2 (fro m 2 0 to 10 0 m an-months) W E M H a rb o u r and E n g in e e rin g C o n s u lta n ts YACHT HARBOURS Locations Belgian coast between Z E E B R U G G E and the D U T C H F R O N T IE R . C lient T ijd e lijk e Vereniging Zeebouw -Zeezand Start o f the study 1978 End o f the study 197 8 B rief description o f the project : As the existing yacht harbour w ith in the Zeebrugge p o rt boundaries w ill be incom pa­ tible w ith a large p o rt trading dangerous goods, the transfer o f the yacht harbour to a new site outside the p o rt premises is envisaged. Services : Pre-projects fo r a yacht-harbour on three sites between Zee­ brugge and K nokke Estim ation o f building and maintenance costs. Evaluation o f th e ir siting w ith respect to the regional deve­ lo p m ent plan. Miscellaneous remarks - : T he location adjacent to the enlarged harbour o f Zeebrugge was preferred by the M inistry oin view o f its sheltered location, reduced costs, inland connections, and expected revitalization o f the im m ediate area. - This study was carried o u t by Haecon-Zeebrugge. World Bank Sym bols : Field o f specialization : T R -K 5 1 8 , Types o f services : 2c, 3b, 4a, Level o f e ffo rt : class 1 (less than 2 0 m an-months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 TELEX 12586 HAECON B ca HABOON .. H a rb o u r an d E n g in e e rin g C o n s u lta n ts S E D IM E N T T R A N S P O R T S T U D IE S BY M E A N S O F R A D IO A C T IV E T R A C E R S Location Z E E B R U G G E (Belgium ) C lient T ijd e lijk e Vereniging Zeebouw -Zeezand. Start o f the study 1977 End o f the study 1979 B rief description o f the project: In 197 9 the M in istry o f Public Works commissioned H A E C O N -Z E E B R U G G E w ith the design o f a new outer harbour in Zeebrugge. The studies on sedim ent transport described on this page form part o f those design studies. To study and perform a q uantitative m easurement o f the sedim ent transport rate in situ, artificial radio-active tracers are used. A fte r injection in the natural system, they are detected w ith highly sensitive scintillation-counters, w hich also give the a m ount o f radioactivity. These techniques are used both on the sea-bottom (b o ttom -tran sp o rt o f sand m ixed or n o t m ixed w ith m ud) and the dispersion in the seawater (suspension tracer) These experim ents are o f application in dredging works, po llu tio n problems o f d u m ­ ping dredged spoil, evaluation o f production o f w inning pits fo r sand and global sediment m igration both qu an titatively and qualitatively. Services - : survey : detection in the sea o f the tracers - research : dispersion calculations - engineering : planning o f dreging works - regional developm ent : po llu tio n o f mudbanks World Bank Symbols : Fields o f specialization : T R -K 5 0 5 , K 5 0 6 , Types o f services : 1b, 1i, Level o f e ffo rt : class 3 ( from 100 to 2 0 0 m an-months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 TELEX 12586 HAECON B ca HA o o. H a rb o u r a n d E n g in e e rin g C o n s u lta n ts S E D IM E N T T R A N S P O R T S T U D IE S O F S U S P E N S IO N IN SE A Location Z E E B R U G G E (Belgium) C lient T ijd e lijk e Vereniging Zeebouw - Zeezand S tart o f the study 197 5 End o f the study 1981 B rief description o f the project T o evaluate sedim ent transport in suspension by tidal currents and by waves, some 4 0 0 0 water-samples were taken at several stations and at d iffe re n t levels. S im u lta­ neous current-intensity measurements, w ater-depth soundings, w in d -in ten sity and wave-clim ate registrations are perform ed. All survey-operations cover the whole t i ­ dal cycle. Calculations are perform ed on resulting water-discharge and sedim ent transport. Ero­ sion and sedim entation fluxes are com puted. The mean suspension concentration in seawater is calculated fo r d iffe re n t wave-climates. This allows calibration o f sedim ent transport form ulae, to determ ine the erosion or sedim entation areas and to evaluate the erosion and sedim entation rates. Services : survey . water-sampling . echo-sounding . w ave/w ind registration . w ater-velocity measurements - research - com pu ter assistance : Miscellaneous remarks World Bank Symbols suspension - samples - analysis : calculation o f discharges (liquid and solid) This study was carried o ut by Haecon - Zeebrugge Field o f Specialization : T R -K 5 0 5 Types o f services : 1i, 1j, 3 i, 8e Level o f e ffo rt : class 1 (less than 2 0 man months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091) 26 50 94 TELEX 12586 HAECON B ca nkAB30N H a rb o u r an d E n g in e e rin g C o n s u lta n ts IN -S IT U M E A S U R E M E N T O F T H E D E N S IT Y O F LO O SE M U D D E P O S IT S Location : Z E E B R U G G E (Belgium ) C lient : T ijd e lijk e Vereniging Zeebouw -Zeezand. Start o f the study : 1979 End o f the study : 1981 Brief description o f the project : The in situ measurements o f the density o f loose mud deposits form p art o f the de­ sign studies fo r the Zeebrugge harbour extension. Backscatter radioactivity gauges are used in the field to measure density profiles in loose m ud deposits o f the approach-channel and in the inner harbour. Knowledge o f these density-profiles found secondary application in the dredging o p tim izatio n and in the d eterm in atio n o f the exact nautical depth. All these data are used to draw a three-dim ensional dredging and navigation chart. Services - survey : hydrographic survey o f loose mud deposits in the field ; - regional developm ent planning ; - research ; - engineering : estim ation of production o f dredgers. Special technical features : Assistance w ith the final developm ent o f the radioactive density gauge J T D 3 (O R IS Saclay). Miscellaneous remarks World Bank Symbols : : These measurements were made by Haecon-Zeebrugge Fields o f specialization : T R -K 5 0 5 , K 5 0 6 , Types o f services : 1b, 1 i, 3g, 4b, Level o f e ffo rt : class 3 ( between 100 and 2 0 0 man-monthsi HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 TELEX 12586 HAECON B H a rb o u r a n d E n g in e e rin g C o n s u lta n ts P H Y S IC A L P R O P E R T IE S O F M U D A N D S A N D S E D IM E N T S Location Z E E B R U G G E (Belgium) C lient T ijd e lijk e Vereniging Zeebouw -Zeezand. Start o f the study 1 97 9 End o f the study may 1 9 7 9 B rief description o f the project : The physical properties o f m ud and sand sediments are o f special interest fo r the stab ility studies, erosion and sedim entation research which form part of the design studies fo r the Zeebrugge harbour extension. M ost o f physical properties o f mud are analysed w ith interest fo r fail-velocity o f mud particles, rigidity and viscosity, equilibrium slopes, and fin a lly fo r critical shear ve­ locities under wave and current action fo r erosion. These parameters are also analysed fo r sandy sediments. A ll experim ents are perform ed in the laboratory. These parameters are o f special interest fo r stability studies, erosion and sedim enta­ tio n research. Services - research - engineering - com puter assistance rheological properties o f mud flu m e experim ents stability o f m ud slopes consolidation phenomena calculation o f erosion rates Miscellaneous remarks : This study was made by Haecon - Zeebrugge. World Bank Symbols Field o f specialization : T R -K 5 0 5 Types o f services i i i , 1j, 4 b , 8b Level o f e ffo rt : class 1 {less than 2 0 man-months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091) 26 50 94 TELEX 12586 HAECON B ca M H a rb o u r a n d E n g in e e rin g C o n s u lta n ts L A Y -O U T O F T H E E A S T E R N O U T E R H A R B O U R Location : Z E E B R U G G E (Belgium) C lient : T ijd e lijk e Vereniging Zeebouw -Zeezand. S tart o f the study : 1978 End o f the study : 1978 V; Brief description o f the project : H A E C O N -Z E E B R U G G E , being in charge o f the conception and lay-out o f the new outer harbour o f Zeebrugge, studied in detail the effects o f the im p lan tatio n o f a dangerous goods term inal w ith in the existing po rt. T o com pare its ideas w ith those o f an independent m arine safety exp ert, Lloyd's Register of Shipping was asked in 1 9 7 8 to give its views on the arrangements incor­ porated in the design o f the harbour and the L N G -term in al. Being an e xp ert on po rt and shipping safety m atters, Lloyd's Register reviewed H A E C ON's proposals in the light o f existing and foreseeable regulations and current safety thinking. H A E C O N 's lay-out was approved, provided a num ber o f operational measures are ta ­ ken when the operation o f the term inal w ill start. Services : H A E C O N 'S involvem ent in this safety study may to sum marized as follow s : - form u latio n and discussion o f the terms o f reference ; - supervision o f the study, supply o f all relevant data ; - translation o f the conclusions in to the design o f the harbour extension. World Bank Symbols : Fields o f specialization : T R -K 1 0 1 , K 5 0 3 , K 5 0 7 , K 5 0 8 , K 5 0 9 , K 5 1 0 , K 5 1 1 , Types o f services : 3 k , 5e, Level o f effo rt : class 1 (less than 2 0 man-months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 TELEX 12586 HAECON B 2. A dvisory services by H A E C O N fo r the construction o f the new o u ter-harbour at Zeebrugge (1 9 8 1 -......) \ J L ii V1 '— »X A X / U VI n.v. H a rb o u r an d E n g in e e rin g C o n s u lta n ts IN T R O D U C T IO N The extension o f the o uter harbour o f Zeebrugge is necessary to ensure access to the new sea-lock which has been under construction since 1 97 1. In M ay 1 9 7 6 , the G overn­ m ent decided to install an L N G term inal w ith in this extension. W ork began in January 197 7. Acceptance o f the w o rk is estim ated fo r the end of 1 98 5. Ships w ill be able to have access to the new lock fro m 1 98 3. T he to ta l construc­ tion cost estim ated is about 1 ,5 0 0 ,0 0 0 ,0 0 0 US $. T he w o rk involves the construction o f dykes in the N orth Sea w ith a to ta l length o f about 11.5 km. This will require 1 ,8 0 0 ,0 0 0 tons o f gravel, 1 1 ,7 8 0 ,0 0 0 tons o f stones and 6 4 ,0 0 0 concrete blocks o f 2 5 tons. The project also requires dredging o f about 1 2 0 ,0 0 0 ,0 0 0 m 3 o f which 8 ,5 0 0 ,0 0 0 m 3 were used fo r restoration o f the beaches on the Belgian east coast, which is one o f the biggest operations o f its kind in the w orld. Engineering design fo r this construction project was made by Haecon-Zeebrugge during the years 1 9 7 6 -1 9 8 1 . In July 1981 Haecon was entrusted by the M in istry o f Public Works w ith global supervision and the role o f technical adviser. HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091) 26 50 94 TELEX 12586 HAECON B E ] HAEDON ... " ^ T* H a rb o u r an d E n g in e e rin g C o n s u lta n ts F O L L O W -U P : P H Y S IC A L A N D M A T H E M A T IC A L M O D E L S Location : Zeebrugge (Belgium) C lient : M inistry o f Public Works Start o f the study : July 1981 End o f the study : Brief description o f the project : The construction o f the new o u ter harbour in Zeebrugge is a 1 ,5 0 0 ,0 0 0 ,0 0 0 US$ project. It is evident th a t the design has been tested on m athem atical and physical models and is still con tin u ally being tested and im proved. W ith in the general super­ vision tasks w ith which H A E C O N was entrusted in 1981 by the M in istry o f Public Works, H A E C O N is p articularly in charge o f the follo w -up o f physical model tests in the hydraulic laboratory o f Borgerhout (Belgium ) and Maison A lfo r t (France) and o f the m athem atical model tests carried o ut by the University o f Liège (Belgium ). HAECON developed also m athem atical models of hydraulic and sedimentolgical phenom ena, such as d iffra c tio n , refraction, erosion due to tide and wave action, e tc ..... World Bank Symbols : Fields o f specialization : K 5 0 0 ,K 5 0 4 ,K 5 1 0 ,K 5 1 1 ,K 5 1 2 ,K 5 1 3 ,K 5 1 6 Types o f services : 1d, 1j,3g,4a,5b ,5d ,5e,8b Level o f e ffo rt '-class 3 (between 20 and 10 0 man months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091) 26 50 94 TELEX 12586 HAECON B ca AB30N r ¡ ~ H a rb o u r a n d E n g in e e rin g C o n s u lta n ts F O L L O W -U P : B EA C H E V O L U T IO N Location : BETW EEN C lient : M in istry o f Start o f the study : July 1981 End o f the study : Z E E B R U G G E A N D T H E D U T C H F R O N T IE R Public Works Brief description o f the project : In the period 1 97 7 - 1 97 9 an im p o rtan t beach nourishm ent o f about 8 .5 m illio n m 3 o f sand was realized on the Belgian East Coast, between the harbour o f Zeebrugge and the Belgian Dutch fro ntier. W ithin the fram ew o rk o f the advisory tasks, w ith which H A E C O N was commissioned a general beach observation program m e is executed. Services : The programme includes aerial, hydrographic and topographic surveys. The data are com pited by H A E C O N and stored in a com pu ter database. Through com pu ter pro­ cessing plans and cross-sections o f beach and foreshore are drawn auto m atically. The variation o f d iffe re n t coastal parameters as a function o f tim e are calculated. These calculations enable H A E C O N to evaluate the coastal state at d iffe re n t tim e-intervals. O th er in-situ measurements are carried o u t to study transport mechanisms under d iffe re n t w eather conditions and to v erify eolean transport rates. These measurements allo w H A E C O N to calibrate the m athem atical coastal models in order to foresee adequate protectio n measures should beach evolution prove th a t new protective options should be taken . T he studies are still in progress. World Bank Symbols : Fields o f specialization : K 5 1 7 Types o f services : 1a,1d,1e,1g,3k,4a,4b,4g,5b ,8b Level o f e ffo rt : class 2 (from 2 0 to 100 man months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 TELEX 12586 HAECON B RL&¿ ¿rftp,'-••':. w » ■»«adeíl . ; jl« J v - IH M ■ it ' /V ' '^ '- fe I I : B ■¿s. IB - r ^-v : y- - i — 1• I ■ •**:.% & .£ jSE - • , V W 3 & ■■■..■-■■ -' r tS W * - :*-»- s d E S L » T ia c r a n r i ■ rr=r— :! Îr-^S Bpz%ÏJS?"EDjáSís L r^ "l î S h t ir ^ ./. u r- /,-J ï ' ¿SSgiigimtr -iffsti+rtrm w P ai f is ' m . HAB33N .. H a rb o u r an d E n g in e e rin g C o n s u lta n ts S U P E R V IS IO N : B R E A K W A T E R D E S IG N A N D C O N S T R U C T IO N Location : Z E E B R U G G E (Belgium ) C lient : M inistry o f Public Works S tart o f the study : July 1981 End o f the study : Brief description o f the project : Since 1 97 6 the new outer harbour o f Zeebrugge has been under construction. This includes the setting-out o f about 1 1 .5 km o f breakwaters in the N o rth Sea. In 1981 the M inistry o f Public W orks commissioned H A E C O N w ith the task o f supervising the con­ struction works. Services : The jo b does n o t m erely consist o f supervising the realization o f existing plans, b ut also includes the revision o f these plans, the follo w -up o f laboratory tests, the im plem en­ tatio n o f special measures against sea-bed erosion, the optim alisation o f the breakw ater cross-sections, and the study o f execution methods. One of the most im p o rtan t items o f this supervision is the com parison o f the design criteria w ith the evolution on the site w hilst the breakwaters are being constructed. Miscellaneous remarks : Some results o f H A E C O N 's advisory services can be p articularly m entioned : a substantial reduction (up to « 10 % ) in construction costs on the breakw ater could be obtained through revisions to the cross-section ; the follo w -up o f the fou n d atio n works o f the breakw ater has p erm itted their succesful realization ; a substantial reduction in the volum e o f core protection & filte r layers against sea-bed erosion. W orld Bank Sym bols : Fields o f specialization : T R -K 5 1 0 .K 5 1 1 .K 5 1 6 Types o f services: 3g .3h ,4a,4 b ,4d ,4f,5b ,5e Level o f efforts : class 4 (over 2 0 0 man months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 TELEX 12586 HAECON B B U D O îl H a rb o u r an d E n g in e e rin g C o n s u lta n ts O P T IM IZ A T IO N O F M A IN T E N A N C E D R E D G IN G Location : ENTRANCE CHANNELS AT ZEEBRUGGE C lient : M inistry o f Public Works S tart o f the study : July 1981 End o f the study : B rief description o f the project : Once the most im p o rtan t po rt extension works have been com pleted, the approach channels must be m aintained by systematic dredging works. M oreover Zeebrugge has at the m om ent, one o f the highest sedim ent loadings in the w o rld , m ore than 6 0 m illion tons o f m u d /year. During the follo w -up of the works, H A E C O N is investigating the feasibility o f upgra­ ding the dredging program me as a w hole. This study is, carried o u t in close associa­ tion w ith sedimentological studies which determ ine numerous criteria. Services : » elem entary survey o f mud parameters (rheology) ; transport calculations, direction and q u an tity (transfer functions) o f the sedim entflu x ; data-processing o f echo-soundings to track plots fo r m aintenance dredging, forecasting sedimentological tendences fo r the coastal zone; study o f the existing dredging methods and the feasibility o f upgrading the dred­ ging program me. World Bank Symbols : Fields o f specialization : T R -K 5 0 5 , K 5 0 6 Types o f sen/ices : 1b,1c,1d,1g,5e,7a,7b Level o f e ffo rt ^class 2 (from 2 0 to 100 man months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091) 26 50 94 TELEX 12586 HAECON B U L lV VJ n.v. H a rb o u r an d E n g in e e rin g C o n s u lta n ts B A S IC R H E O L O G IC A L R E S E A R C H O F M U D S E D IM E N T S IN E S T U A R IA A N D SE A Location : Z E E B R U G G E (Belgium ) C lient : M inistry o f Public Works S tart o f the study : July 1981 End o f the study : B rief description o f the project : In 1981 the M in istry o f Public W orks commissioned H A E C O N w ith a general advisory role fo r the new outer harbour under construction in Zeebrugge. The studies described on this page form part o f those advisory services. Bingham plastic behaviour o f mud sediments is analysed and applied to erosion. These properties are analysed in the laboratory and can be calculated fro m in situ data on the com position and density o f the m ud. The studies also investigate the dispersion o f dredged spoil dum ped at sea. Services : research : laboratory study engineering : . stability o f m ud bottom s erosion o f mud bottom s com puter support : interp retatio n o f analysis, results World Bank Symbols : Fields o f specialization : T R -K 5 0 6 , K 5 0 5 Types o f services : 1 b ,1 j,3 i,3 k ,4 b Level o f e ffo rt : class 2 (fro m 2 0 to 10 0 man months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 TELEX 12586 HAECON B I~ m ~1 [tM H D O íM -.|J" H a rb o u r a n d E n g in e e rin g C o n s u lta n ts M A T H E M A T IC A L D E S C R IP T IO N A N D P R E D IC T IO N O F S E D IM E N T T R A N S P O R T IN S U S P E N S IO N Location Z E E B R U G G E (Belgium ) C lient M in istry o f Public Works Start o f the study 1981 End o f the study 198 2 Brief description o f the project : In 1981 the M in istry o f Public W orks commissioned H A E C O N w ith a general advisory role fo r the new outer harbour under construction at Zeebrugge. The studies on sediment transport described on this page form part o f those services. On the base o f data obtained fro m in situ measurements o f w ater v elo c ity, suspensionconcentration, w a te r depth, w ave-activity, etc., a model is set up fo r calibration and prediction o f sedim ent-transport when one o f the influencing parameters is changed. The model is based on the spectral analysis o f periodic signals, indicative o f m ost tid alphenomena . The model is most useful when civil works tend to set up changes in the b o tto m m o r­ phology or the current pattern o f an area. Services : com pu ter support research regional developm ent planning World Bank Sym bols : Fields o f specialization : K 5 0 5 Types o f services : 1i,3i,8c Level o f e ffo rt : class 1 (less than 20 man months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 TELEX 12586 HAECON B Mr.EiTVRRRT 09 22 APRIL. 1982 S . f l . WRTt:RBFRG TRIO CONTA I NCR UITVRRENG SCHAAL. ; i/20000 5CM = i KM LI \U VI n.v. H a rb o u r an d E n g in e e rin g C o n s u lta n ts N A U T IC A L S T U D IE S Location : Zeebrugge (Belgium) C lient : M inistry o f Public W orks Start o f the study : July 1981 End o f the study : B rief description o f the project : In June 1 9 8 1 , the Coastal Service o f the Belgian M inistry o f Public W orks entrusted H A E C O N w ith a global programme o f m arine observation and technical assistance in and around the harbour at Zeebrugge. Am ongst these duties, H A E C O N had to investigate, advise and guarantee the p o rt approaches fo r the existing and projected shipping. Services 1. studies : carried-out by the Dutch m arine research service, M A R IN , at th e ir h y ­ draulic laboratory in Wageningen. A series o f trial runs on the ship sim ulator analyzed the manoeuvres made by LNG-carriers, the V L C C 'S , and the trio -c o n ta i­ ner ships during the d iffe re n t stages o f enchroachm ent, as defined by the extension o f the peripheral breakwaters seaward. H A E C O N supervised the trial specifica­ tions and analyzed the results. H A E C O N also investigated the existing tra ffic pattern and incorporated this in to its reports. 2. survey runs in-situ recorded on-board in-and outgoing ships by the oceanogra­ phic survey office o f T V Z 2 on behalf o f the client. H A E C O N is responsible fo r all data processing and technical interp retatio n o f these test-runs. 3. navigational aids fo r the harbour : repositioning a n d /o r renewal o f navigation buoys a n d /o r light beacons. H A E C O N works here d irectly fo r the client, advising on particular topics, and studying in-depth when requested. World Bank Sym bols : Fields o f s p e c ia liz a tio n :T R -K 1 0 1 a ,K 1 0 1 d ,K 5 0 7 ,K 5 1 1 ,K 5 1 5 ,K 6 0 2 ,K 6 0 4 Types o f services : 3g, 5e, 8b Level o f e ffo rt: class 2 (fro m 2 0 to 100 man months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091) 26 50 94 TELEX 12586 HAECON B ca nk H a rb o u r a n d E n g in e e rin g C o n s u lta n ts E V A L U A T IO N B E A C H P R O T E C T IO N P L A N Location : OOSTENDE C lient : M in istry o f Public Works Start o f the study : 1 98 2 End o f the study : 1 98 2 B rief description o f the project : A t present, during storm conditions, waves freq u ently overtop the existing sea d yke in Ostend. Haecon was asked to evaluate a coastal defence plan, proposed by the Belgian M inistry o f Public Works. Services First o f all Haecon exam ined if present wave-overtopping o f the seadike can be effec­ tively prevented. t Secondly, H A E C O N is investigating if such coastal defence works m ight cause addi­ tional maintenance dredging o f the harbour entrance ; alternative solutions, reducing littoral transport towards the harbour, are being com pared. World Bank Sym bols : Fields o f specialization: K 517 Types o f services: 3g,3k,4a,5c Level o f e ffo rt : class 1 (less than 2 0 man months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091) 26 50 94 TELEX 12586 HAECON B CD IHUDM H a rb o u r a n d E n g in e e rin g C o n s u lta n ts C O M P U T E R ,P R O C E S S IN G P H Y S IC A L D A T A Location : Z E E B R U G G E (Belgium ) C lient : M inistry o f Public Works S tart o f the study : July 1981 End o f the study B rief description o f the project : The collection and storage, processing and interp retatio n o f physical data fo r the con­ struction works o f the new outer harbour in Zeebrugge form p art o f the global su­ pervision task w ith which H A E C O N has been entrusted. Services : H A E C O N writes specifications o f the survey methods, processes the recorded data w ith its specially-developed softw are, perform s the statistical analysis and synthesis o f the results, draws com parative plans and diagrams and writes reports, discussing these results w ith those o f the physical data. Follow ing aspects are treated : currents, tidal levels, waves, m eteorological data, seiches, bathym etric data, sedim ent transport, sea bed parameters, topographic and hydrographic data o f the beaches near Zeebrugge, pore w ater pressure measurements in foundation soils. The concentrated data is fu rth e r used in nautical, hydraulic, sedimentological and geotechnical analysis. The design parameters are perm anently checked and o p tim ized . H A E C O N does the same collecting, processing and interp retatio n jo b fo r data about the construction itself (quantities o f used materials, .... ). World Bank Symbols : Fields o f specialization :K 5 0 0 , K 5 0 4 , K 5 1 0 , K 5 1 1 , K 5 1 2 , K 5 1 3 , K 5 1 6 Types o f sen/ices : 1a, 1d, 1e, 1f, 1g, 3g, 4a, 4b , 4c, 4 d , 4e, 4 f , 4g, 5b, 5c, 5d, 5e, 8b Level o f e ffo rt : class 4 (over 2 0 0 man months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 TELEX 12586 HAECON B Miscellaneous projects in the p o rt o f Zeebrugge ( 1 9 6 8 - ......) o H a rb o u r a n d E n g in e e rin g C o n s u lta n ts IN T R O D U C T IO N A p a rt fro m the design o f the outer harbour - made by Haecon-Zeebrugge in the years 1 97 6 - 1981 - and the advisory services fo r the outer harbour construction - w ith which Haecon was entrusted fro m July 1981 onwards - Haecon was also in charge o f se­ veral other projects in Zeebrugge. We m ention here, in particular, three regional planning studies : project Zeestad, requested by the Zeestad-prom otors in '6 8 -'6 9 , S ym arinfra, study requested by the M in istry o f Regional Developm ent L ay-out Zeebrugge western outer harbour, master plan fo r the Bruges H arbour A u th o rity (M B Z ) Haecon was also responsible fo r the pre-design o f a new b u lk cargo-handling fa c ility (1 9 8 1 ), fo r the design (1 9 8 0 ) and installation (1 9 8 3 ) o f a new harbour approachaid. Fu rth er details are given o f these miscellaneous studies on the fo llo w in g pages. HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 TELEX 12586 HAECON B PROJECT " Z E E S T A D " 1968-1969 225.000 after 4 years I a fter 8 years 125.000 t BRUGGE ANTWERPEN ÜBS charmai 10 15 ■ I harbour areas b illi fu tu r areas □ urban areas 20km G ENT • • ca H a rb o u r a n d E n g in e e rin g C o n s u lta n ts ZEESTAD (S tud y fo r a p o rt in deep water) Location : Zeebrugge (Belgium ) C lien t : Zeestad consortium , G hent (Belgium) Start o f the study : 196 8 End o f th e study : 196 9 B rief description o f the project : The idea "Z eestad " originated from a study on the accessibility o f the Westerschelde estuary to 1 2 5 ,0 0 0 td w ships. T o provide this access enorm ous quantities would have to be dredged. Dredging operations are located in three areas : a. across the "Vlaam se B anken" towards the deep waters o f the N o rth Sea ; b. in the estuary; c. on the sand bars of the Westerschelde. Most o f the dredging is located in the Westerschelde estuary. The econom ic solution o f such w o rk depends on the p ro x im ity o f dum ping areas fo r the dredged sediments. T he idea o f using dredging fo r expanding the p o rt of Zeebrugge originated fo r this reason. F u rtherm ore, it appeared beneficial to align the dykes so as to safeguard the growth o f Zeebrugge, hence directing natural currents to con trib u te to the maintenance o f the dredged channel in the estuary. The backfilling o f dredged sand behind the dykes will allo w reclam ation o f large areas fro m the sea. Part o f the reclaimed te rrito ry must be reserved fo r the p ort. T h e rest becomes avai­ lable fo r the creation o f a residential and recreation area, the location o f which should be such th a t the touristic value o f the existing seaside resorts is integrally preserved. T o fu lfil this requirem ent the creation o f a lagoon between the actual coast and the land reclaimed from the sea is being considered. However, once it is decided to realize such a costly project, it is w o rth studying if it is not possible to make the p o rt accessible to ships of 2 2 5 ,0 0 0 td w . Analysis proved such w ould require only a lim ited additional cost ( fo r a dredging supplem ent relatively reduced across the "Vlaam se B anken" ) and w ould give considerable benefit. Thus the "Zeestad" project was progressively evolved, as shown on the follo w in g pages. Services- : Feasibility study carried out by a m ulti-disciplinary team w ith the collaboration of engineers, jurists, economists and specialists in matters o f tow n planning and ecology. (C o n tin u ed HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 ) TELEX 12586 HAECON B PROJECT " Z E E S T A D ' 1968 - 1969 HT'JTITTTrr - T l ' P i " ' ) ' r T r i v Ç j i T r r n ,r ' r n ,r : , ! V • LuLuIij Umil rawmrroiTmTim- — iT n T iT iT iT n ’ï'p m ’n T ; / . ; — -rm -r-rrm . - H arbour area Residential and touristic area 4 5 km ’ V A R IA N T [■ G IHfêHXU ... H a rb o u r an d E n g in e e rin g C o n s u lta n ts ZEESTAD page 2 Special technical features : T he prime advantage o f the "Zeestad ''p ro ject w ould have been to ensure, in the im m ediate futu re as well as in the long term , the expansion o f all the Belgian m ari­ tim e ports. In fact : - the accessibility of the A n tw e rp com plex (Baalhoek) w ould have increased, and during the second five-year period o f the operations, it w ould extend to 1 2 5 ,0 0 0 td w . ships ; - at the same tim e G h ent w ould have been accessible fo r 1 2 5 ,0 0 0 td w . ships ; - "Zeestad ” w ould have been able to accept ships up to 2 2 5 ,0 0 0 tdw . - this being towards the end o f the first five-year stage o f the operations. Thanks to "Zeestad ", Belgium w ould have had at its disposal a p o rt in the open sea w ith easy access, which w ould have allowed container ships and bulk carriers to be loaded and unloaded extrem ely quickly (independent o f the rise o f the rivers and the locks). Zeestad w ould have made Belgium d irectly accessible to m am m o th tankers. Miscellaneous remarks : T he " Zeestad " project was n o t realized in the form presented in the years 1 9 6 8 -1 9 6 9 but it was at the basis o f all discussions, studies and extension plans elaborated since then fo r the m aritim e developm ent o f the Belgian coast. World Bank Symbols : Fields o f specialization : K 5 0 4 , K 5 0 6 , K 5 1 1 , Types o f services : 3b, 3d , 3g, 3 i, Level o f e ffo rt : class 2 (fro m 2 0 to 100 m an-months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 TELEX 12586 HAECON B B E L G IU M OFFSHORE S Y M A R IN F R A 1 9 7 3 -1 9 7 5 W ALCHER V / it £ '/ / / 'dr o o g te v a n «CHOONEVE1XL V .-.J .5-1, Zeebrugge /• NETHERLANDj Blankenberge &>' 0 C /'S ¿ 's '7'J , / '¿ ( V ../ tj'£&t’*> /t ' / ' L -' .1 / a* Oostende /A B E L G IU M Nieuw poort Koksijde De Panne Legend 6,0 0 m 10 .00 m 17,50 m 2 5 .0 0 m Dunkerque FRANCE EN Border beigian continental shelf Locations for power plant islands Areas for deepwater harbour islands . R eference B A S IC C H A R T F LE M IS H B A N K S ca s. H a rb o u r an d E n g in e e rin g C o n s u lta n ts S Y M A R IN F R A Possible infrastructures in the Belgian m aritim e regions Location : B E L G IA N C O A S T C lient : Sym arinfra / L .L . & N. De M eyer S tart o f the study : 1973 End o f the study : 1 97 5 Brief description o f the project : Towards the end o f 1 97 3 a study syndicate was form ed by the D ep artm en t fo r indu­ strial p ro m o tio n (fviinistry o f Econom ic A ffa irs), the N ational Investm ent C om pany (a state holding of the M inistry o f Finance) and the com pany L .L . & N. De M eyer N .V . The object was to study the possible infrastructures in the Belgian m aritim e regions, from which originated the name o f the syndicate: Sym arinfra. Haecon collaborated in this study as technical advisor fo r L .L . & N. De M eyer N .V . The study was requested by the Secretary o f State fo r Flemish Regional Econom y. As much as fo r industrialization as fo r energy supply, m aritim e regions can play an im p o rtan t role in the national econom y. In particular, S ym arinfra studied the possi­ bilities o f im planting electric power stations (the sea furnishing the necessary cooling water) and a L N G term inal (to receive the liquified natural gas th a t Belgium intends to im p o rt fro m Algeria, follo w in g contracts concluded between the respective govern­ ments). These areas o f im p o rt and energy production can serve as attractio n poles fo r other industries, no tably when using the heat lost through electricity pro d u ctio n , and when using the cold o f the im ported liquid L N G at minus 165° C. On the o th e r hand, the m aritim e regions are of national im portance fro m a touristic and agronom ic p o in t of view. As a result, the ecological im pact cannot be neglected when selecting solutions. H A E C O N concentrated on the possibilities o f p o rt extension at Zeebrugge and the technical feasibility of an island o ff the coast, serving as a basis fo r an electric powerstation ,or fo r a m ethane gas term in al. The technical aspects fo r the construction o f an artificial island were studied. The analysis revealed 4 preferred zones (fro m a technical p o in t o f view ) fo r the location o f an island serving as a basis fo r electric power-stations, and tw o preferred areas fo r islands designed fo r receiving ships w ith a 3 0 m . draught. The influence o f the island on the currents, on the beaches and on the navigable channels was analyzed. The cost and the tim e required fo r construction o f the island were studied. For seven sites selected as possible locations fo r a nuclear pow er-station, the legal and ecological aspects were studied. A com parative evaluation was established. HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091) 26 50 94 TELEX 12586 HAECON B S Y M A R IN F R A Page 2 W ith regard to the po rt o f Zeebrugge, the study showed th a t an extension o f the outer harbour was necessary in order to ensure access to the new lock under construc­ tion since 1 97 1. A series o f prelim in ary plans were made and tested in the hydraulic laboratory. The tests made it possible to conclude th a t an extension o f the p o rt was technically feasible. T he possible activities involved in this extension were studied. The cost o f the operation was estim ated. Miscellaneous remarks : These studies have been achieved w ith in the estim ated duration and served as a basis in establishing the governmental policy in relation to the p o rt o f Zeebrugge.; W orld Bank Symbols : Field o f specialization : T R -K 5 1 0 , K 5 1 1 , Types o f services : 3 b , 3g, 3i Level o f e ffo rt : class 1 (less than 2 0 aian-m onths) s H a rb o u r a n d E n g in e e rin g C o n s u lta n ts T E C H N IC A L A S S IS T A N C E : P O R T O P E R A T IO N S Locations : C lient • Port o f Zeebrugge Maatschappij der BrugseZeevaartinrichtingen, Brugge/Bel­ gium. Start o f the study : End o f the study : 1981 Brief description o f the project : Technical assistance fo r the harbour a u th o rity. The specific problems to be studied are drawn-up m o n th ly meetings o f the harbour a u th o rity (M aatschappij der Brugse Zeevaartinrichtingen) and the consultant (Haecon). Services - In 1981 : and 1 9 8 2 a tra ffic sim ulation o f the p o rt has been set up, in order to gauge the influence o f certain safety measures (fo r the L N G carriers) on the fre ­ quency o f berth occupation and possible queueing delays fo r other incom ing ships. - In 1 98 3 an analysis w ill be made o f all functions and duties o f the control office fo r p o rt operations; World Bank Symbols : Fields o f specialization : T R -K 1 0 1 d , K 5 0 3 , K 5 0 7 , K 5 1 5 , K 5 1 6 b , K 6 0 2 Types o f services '• 3g, 5e Level o f e ffo rt : class 1 (less than 2 0 man -months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091) 26 50 94 TELEX 12586 HAECON B ca o n . H a rb o u r an d E n g in e e rin g C o n s u lta n ts H A R B O U R A P P R O A C H A ID Z E E B R U G G E (Belgium) Location C lient M inistry o f Public Works Start o f the study 1979 End o f the study 198 3 Brief description o f the project : Design and installation of a guiding system fo r large ships com ing in (or leaving) Zeebrugge harbour. The guiding-system comprises : - 7 mobile stations which are placed by the p ilo t on-board ship w h ilst sailing in or o ut of p o rt, w ith 2 mobiles in reserve - 3 rem ote stations (Ranging Processors) im planted at 3 key coastal locations - 1 control station th a t allows the position, speed, and the d rift off-course to be measu red - 1 reference station out at sea The control station sets, via standard telephone lines, the call-code w ith the m obile stations, to which the rem ote stations must also be tuned (Ranging Processors). The la tte r measure the distance between the m obile stations and each o f the 3 rem ote stations on-land. These three distances are sent down the telephone line to the control station which defines the position, speed, and the deviation o ff mid-course in the navigation channel, and the actual course being sailed. This data is sent to the 3 ranging-processors, which in turn pipe it through to the m obile stations. The course can be then be tracked on the screen display o f a m o ­ bile station, in o th er words on-board the incom ing ship. To tal value o f the works and studies is estimated at some 4 0 m illio n Belgian Francs. Miscellaneous remarks - - : C lient is the contracting firm T V Z 2 , a consortium responsible fo r the harbour extension at Zeebrugge. The ow ner is the M inistry o f Public W orks and the opera­ ting body w ill be the M inistry o f Transport. H A E C O N assumed leadership and full design, follo w -up and supervision o f instal­ lation. M otorola SA o f France were subcontracted fo r delivery o f all electronic equipm ent. World Bank Symbols : Fields o f specialization : T R -K 1 0 1 b , K 503 , K 5 1 5 , K 5 1 6 b , Types o f services :'3 b , 3g, 5a, 5c, 5d, 8b, Level o f e ffo rt ; class 3 (fro m 100 - 2 0 0 man-months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 TELEX 12586 HAECON B GD ÍHWBDQM ... H a rb o u r a n d E n g in e e rin g C o n s u lta n ts S E AB U L K T E R M IN A L Location Z E E B R U G G E (Belgium) C lient N V Seabulk, Brugge (Belgium) Start o f the study February 1981 End o f the study July 1981 Brief description o f the project : Bulk cargo term inal in the inner harbour at Zeebrugge. The project foresees a yard throu g h pu t o f 8 m illion tons/year after 5 years, made up o f steam coals, coking coal, iron ore and phosphates, increasing to 16 m illion tons year a fte r 15 years. T o ta l in ­ vestment fo r the project is valued at around 3 .9 thousand m illio n Belgian francs (1981 prices), to be realized in phases over several years. Services : pre-study Special technical features : The stockpiling areas w ould be spread over some 3 2 2 .0 0 0 m 2 . T he ironore stockpiles, 14 to 16 m high, exercise a great load on the pavem ent structure and the subgrade. Since the ground was characterized by a very variable and w eakly-layered structure, this posed serious problem s. The detailed geotechnical study investigated various solutions to guarantee the pavem ent structure. The environm ental study served as a basis fo r an ecological appraisal o f possible hazards or hinderance to the local co m m u n ity. A rolling stock survey was also made o f the ship pallets and railw ay wagons curren tly used fo r bulk cargo tra ffic to and from the p o rt. The fu tu re trends in wagon types, and the distributio n o f arrival and loading patterns/day were also exam ined. The latter served to determ ine the requirem ents fo r the loading and off-loading equ ip ­ m ent, as well as fo r form ing a basis fo r a com puter sim ulation, th a t was used to optim ilize the num ber o f transit utilities and to set th e ir w o rkin g capacities. The technical pre-study investigated several variants fo r the heavy-duty m achinery (cranes, stacker-reclaimers, ...), defined possible autom izations, pre-weighing, and representative sampling. T he power supply and distribution over the yard, civil works, and maintenance o f all equ ip m en t were also foreseen. Based on this study one could lastly carry-ou t an econom ic analysis to finalize the staff quotas needed, the levels o f management, the phasing o f construction, as well as the investm ent, start-up and com m ercialization o f the term inal. Miscellaneous remarks : The study was carried out by the jo in t venture H A E C O N -S E C A R . World Bank Sym bols : Fields of specialization: T R -K 1 0 1 a ,K 1 0 1 d ,K 1 0 1 e ,K 1 0 3 ,K 5 0 1 ,K 5 0 8 ,K 5 1 3 , K 516 b . Types o f services - 3b ,3g ,3h ,3 i,4a ,4b ,4f. Level o f effort: class 2 (between 2 0 and 100 m an-months) HAECON N.V. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091) 26 50 94 TELEX 12586 HAECON B H a rb o u r a n d E n g in e e rin g C o n s u lta n ts T R A N S P O R T A T IO N S E C TO R S T U D IE S M A D E B Y H A E C O N IN Z E E B R U G G E (Belgium) Regional planning studies 1 9 6 8 -1 9 6 9 : Zeestad 1 9 7 3 -1 9 7 5 : Sym arinfra Studies made by H A E C O N -Z E E B R U G G E (1 9 7 6 - 1981) Design studies fo r the extension o f the outer- harbour at Zeebrugge. HAECON N.V. 1976 Preproject harbour extension 1 9 7 6 - 1981 Geotechnical surveys 1 9 7 6 - 1981 Survey o f sea-bottom lithology 1 9 7 6 - 1981 Sedim ent transport - studies o f suspension in sea 1 9 7 6 - 1981 Master plan harbour extension 1 9 7 6 -1 9 7 7 Central w o rk area 1 9 7 6 -1 9 7 7 W ork harbour lay-out. 1 9 7 6 -1 9 7 7 Sandasphalt - breakwaters. 1 9 7 6 - 1981 Nautical studies 1976 - 1981 LN G -dock 1 9 7 6 - 1981 Dredging works 1 9 7 6 -1 9 8 1 Breakwater design : stab ility analysis 1976 - 1981 B reakw ater : design o f the prim ary arm our 1 97 6 - 1981 Beach protection 1 9 7 6 -1 9 8 1 Y a c h t harbours 1977 - 1 9 7 9 Sedim ent transport studies by means o f radio-active tracers 1 9 7 9 -1 9 8 1 In situ measurement o f the density o f loose m ud deposits 1979 Physical properties o f m ud and sand sediments 1979 Lay-out eastern outer harbour 1981 Western w o rk area.. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091) 26 50 94 TELEX 12586 HAECON B T R A N S P O R T A T IO N S E C T O R S T U D IE S M A D E B Y H A E C O N IN Z E E B R U G G E (Belgium ) A dvisory services by H A E C O N fo r the construction o f the new o u ter-harbour at Zeebrugge ( 1 9 8 1 - . . . . ) 1 9 8 1 -.... : C o m p uter processing : physical data 1 9 8 1 -.... : Follow -up : physical and m athem atical models 1 9 8 1 -.... : F o llo w -u p : beach evolution 1 9 8 1 -.... : Supervision : breakw ater design and construction 1 9 8 1 -.... : O p tim iza tio n o f m aintenance dredging 1981 - . . . . : Basic rheological research o f m ud sediments in estuaria and sea 1 9 8 1 -.... : Nautical studies 1981 - 1 9 8 2 : M athem atical 1982 : Ostend - evaluation beach protection plan 1 9 8 2 -.... : Dock fo r dangerous goods. description and prediction o f sedim ent transport in suspension s H a rb o u r an d E n g in e e rin g C o n s u lta n ts T R A N S P O R T A T IO N S E C TO R S T U D IE S M A D E B Y H A E C O N IN Z E E B R U G G E (B E L G IU M ) Miscellaneous projects : HAECON N.V. 1 9 7 9 -1 9 8 3 : H arbour approach aid 1981 : SeabuIk term inal 1981 : Technical assistance : p o rt operations 1982 - . . . : Lay-out Zeebrugge western o u ter harbour. DEINSESTEENWEG 110 9810 GENT (Belgium) TEL. : (091 ) 26 50 94 TELEX 12586 HAECON B W O R L D B A N K S Y M B O L S W O R L D BAN K SYM B OLS T R A N S P O R T A T IO N SECTOR Fields of specialization T R -K 1 0 0 General T R -K 1 0 1 N ational/regional m u ltim o d al transportation planning T R -K 1 0 1 a T ra ffic /O rig in - destination surveys T R -K 1 0 1 b In fo rm atio n systems T R -K 1 0 1 d T ransportation models T R -K 1 0 1 e Policies and investm ent programs T R -K 1 0 2 Interm odal transportation technology T R -K 1 0 3 Interm odal freigh t term inals T R -K 2 0 0 Road transportation facilities T R -K 2 0 3 : N ew structures, reconstruction T R -K 2 0 3 a : Bridges T R -K 2 0 3 b : Tunnels T R -K 2 0 3 c : Interchanges T R -K 2 0 3 d : Ferry structures T R -K 4 0 0 Rail transportation T R -K 4 0 1 : Demand forecasting and investm ent planning T R -K 4 0 7 : Structures T R -K 4 0 7 b : Tunnels W O R L D BANK SYM BO LS T R A N S P O R T A T IO N SECTOR Fields of specialization T R -K 5 0 0 : T R -K 5 0 1 T R -K 5 0 2 T R -K 5 0 3 T R -K 5 0 4 T R -K 5 0 5 T R -K 5 0 6 T R -K 5 0 7 T R -K 5 0 8 T R -K 5 0 9 T R -K 5 1 0 T R -K 5 1 1 T R -K 5 1 2 T R -K 5 1 3 T R -K 5 1 4 T R -K 5 1 5 T R -K 5 1 6 T R -K 5 1 6 a T R -K 5 1 6 b T R -K 5 1 7 Seaports and river ports Dem and forecasting and investm ent planning Financial analysis, costing and tariffs M anagem ent and organizational developm ent Harbours, piers, wharves Port m aintenance Dredging and reclam ation Port operations Warehouses and storage Bulk cargo handing facilities O ffshore facilities Deep sea ports C ontainer ports B ulk (w et and d ry ) ports Cargo handling operations Navigational aids C o m p uter applications In fo rm atio n systems Port operations Beach protection T R -K 6 0 0 : Shipping T R -K 6 0 2 T R -K 6 0 4 T R -K 6 0 4 a T R -K 6 0 4 b T R -K 6 0 4 c T R -K 6 0 4 d T R -K 6 0 5 T R -K 6 0 5 a T R -K 6 0 5 b T R -K 6 0 5 c T R -K 6 0 5 d T R -K 6 0 5 e T R -K 6 0 5 g : : : : : : : : : : : : : Managem ent and operations Vessels Tankers, bulk/general cargo vessels, etc. Coastal shipping vessels Inland w aterw ay vessels Ferries Shipbuilding and repairing Shipbuilding Ship maintenance and repairing Shipyards D ry docks Floating docks M arine engineering W O R L D BAN K SYM B OLS T R A N S P O R T A T IO N SECTOR T R -K 7 0 0 Inland waterw ays T R -K 7 0 1 Dem and forecasting and investm ent planning T R -K 7 0 2 M anagem ent and organizational developm ent T R -K 7 0 3 River regulation and control T R -K 7 0 4 Dredging and reclam ation T R -K 7 0 5 Navigation locks and dams T R -K 7 0 6 Canals T R -K 7 0 7 Ports T R -K 7 0 8 Jetties T R -K 7 0 9 Maintenance T R -K 7 1 0 Navigational aids T R -K 7 1 1 Dockyards and vessel repair facilities Level o f e ffo rt Class 1 : Fee less then US $ 1 0 0 ,0 0 0 or 2 0 man months Class 2 : Fee fro m US $ 1 0 0 ,0 0 0 to US $ 5 0 0 ,0 0 0 or fro m 2 0 man m onths to Class 3 : Class 4 : 1 00 man months Fee fro m US $ 5 0 0 ,0 0 0 to US 1 ,0 0 0 ,0 0 0 o r fro m 1 00 man m onths to 2 0 0 man months Fee over US $ 1 ,0 0 0 ,0 0 0 or over 2 0 0 man months W O R L D B A N K SYM B O LS T R A N S P O R T A T IO N SECTOR Types of services 1a Aerial surveys, satellite imagery 1b Geological surveys, 1c Geophysical surveys, 1e Hydrological surveys, ig 1f Topographic surveys, 1i Oceonography 1j 2c Laboratory tests, 3a Planning studies, Soil surveys, Regional developm ent plans 3b Feasibility studies, 3c M ark et studies 3d Econom ic studies, 3e Financial studies. T a r iff studies 3f 3g 3h Technical studies, 3i Environm ental studies 3j 3k Sociological studies, Research design/evaluation, Operations studies. 4a Design-architectural, engineering, industrial etc. 4b Soil mechanics and fou n d atio n engineering, 4c 4d Hydraulics studies and engineering, Earthquake engineering, 4e Sabo (landslide pro tectio n ) engineering, 4f Q u a n tity surveying, cost estim ation, Estim ation, preparation o f contract docum ents and bid evaluation, 4g 5b Supervision/inspection o f construction, 5e Technical assistance and advisory services, 7a Operations and m aintenance, 7b M aintenance planning, In fo rm atio n systems and co m p u ter processing, 8b 8c C om puter technology, 9f Training and technology transfer, G H E N T - WES-T ¿ E X if ~3~Æ DRONGEN DRONGEN j^ETRUS 1 H R IS T U S D R É E £ - GHENT-WEST E5 - EXIT 13 HABXN ENGINEERING DEINSESTEENWEG 110 TEL 091/26.50.94 CONSULTANTS B 9810 GENT (DRONGEN) TELEX : 12 586 Haecon B