» highway 7 west Issue 1 | 2013 your Community Liaison Carrie Slattery Tel: 905.886.6767 Ext. 1129 Cell: 289.716.0091 Email: carrie.slattery@york.ca How to subscribe for email updates 1. Visit vivanext.com 2. C lick on ‘Sign up for updates’ box on right side 3. Provide your contact info 4. Select the ‘Highway 7 W’ box and any others of interest 5. Click on ‘Send’ Bus rapidway connection to TTC subway at VMC exciting changes coming to Vaughan The next generation of rapid transit is coming to Vaughan, helping to shape this growing community. Rapidways are being built along Highway 7 West, and then extended to parts of Bathurst Street and Centre Street [see map on reverse]. Vaughan’s rapidway will feature dedicated lanes for viva vehicles in the centre of the road and 13 beautiful new vivastations. In total the rapidway will extend 15.9 kilometres from Yonge Street past Highway 400 to Helen Street. Rapidway construction will be completed in two phases, with the first phase from Edgeley Boulevard to just east of Keele Street at Bowes Road,in the centre of the Vaughan Metropolitan Centre development area. This first phase will be completed in conjunction with the Toronto-York Spadina Subway Extension [TYSSE], GO transit and other regional transit. Follow us on twitter. Find us on facebook. Read our blog. Go to vivanext.com. The subway extension from Downsview Station to Highway 7 is scheduled to be in service in 2016, including a new subway station west of Jane Street on the north side of Highway 7. Phase 2 of construction is scheduled to be complete by 2018, and will include a rapidway on Highway 7 from west of Highway 400 at Helen Street to Yonge Street, including parts of Bathurst Street and Centre Street. The rapidway project includes attractive landscaping and wider sidewalks, setting the stage for pedestrian-friendly and mixed-use development and establishing the area as an attractive destination for residents, businesses and visitors to live, work and visit. project construction timeline 2011 2012 2013 Oct-Dec Jan-Mar Apr-Jun Jul-Sep Oct-Dec 2014 Jan-Mar Apr-Jun Jul-Sep Oct-Dec 2015 Jan-Mar Apr-Jun Jul-Sep Oct-Dec Jan-Mar Apr-Jun Jul-Sep Oct-Dec 2016 2017 Jan-Dec Jan-Dec Jan-Dec 2018 Construction extending Spadina Subway from Downsview Station to Vaughan Millway Avenue closed for subway station construction Rapidway phase 1 construction: Edgeley Blvd. to Bowes Rd. Rapidway pre-construction: Edgeley Blvd. to Bowes Rd. Rapidway phase 2 construction: West of Edgeley Blvd. to Helen St., and east of Bowes Rd. to Yonge St. Schedule subject to change. *subject to change For vivanext project information, rapidway and subway connect at VMC and to sign up for construction updates: vivanext.com Creditsto ne Road Steet t Yonge St ee Centre Street Bathurst oad Bowes R Keele Str eet 0 Boulevard Millway A venue Jane Stre et Edgeley vivastation Highway 407 Highway 407 Spa dina Su Dufferin Ste et Highway 7 N Steeles Avenue Finch Avenue Road Highway 7 d Bowes Roa t Barnes Court TTC Doughton Road Sheppard Avenue Map not to scale Keele Stree Portage Parkway TTC Creditstone Jane Stre et Edgeley B oulevard Highway 4 00 TTC Highway 7 ay bw Weston Ro ad Helen St reet Development will continue in the Vaughan Metropolitan Centre area – identified as a key growth corridor in Regional and municipal long-term plans. Highway 40 Pine Vall ey Drive For information about the City of Vaughan’s VMC development area: vaughan.ca/metrocentre Weston R o ad For Spadina Subway extension general information and subway station designs: spadina.ttc.ca Ansley Gr ove Road For those travelling in and around Vaughan, transit is about to become more connected, and more convenient. The rapidway vivastation at VMC will connect to both the subway station and an inter-regional bus terminal. Its appearance echoes the other rapidway vivastations, but with a modified roof design to accommodate longer and wider platforms. Customers and pedestrians at this busy transit hub will be able to connect to different transit services via elevators and stairs from the vivastation platform to an underground concourse. Vaughan is attracting new development to this area and transit will be ready to move everyone with speed, comfort and style. vivaNext rapid transit on Highway 7 West, 2012-2016 vivaNext rapid transit on Highway 7 West, 2015-2018 subway extension from Downsview Station in Toronto, 2011-2016 VMC development area designated by City of Vaughan Highway 407 vivanext.com