vivaNext vision Improved accessibility along Davis Drive will lead new development

advertisement
vivaNext vision
Improved accessibility along Davis Drive will lead new development
and economic revitalization.
One of the first vivaNext rapidways to be built is the east-west Davis Drive rapidway in Newmarket.
Extending from Yonge Street to the Southlake Regional Health Centre, it will dramatically improve
accessibility for Viva riders including Southlake staff, patients, visitors and volunteers. This is especially
important considering their new state-of-the-art cancer centre will open in 2010 with the capacity to
accommodate 52,000 patient visits each year for treatment.
During construction of the Davis Drive rapidway, sound design principles – including green, open
spaces – will create an attractive environment for new development.
As growth and mixed-use urban transformation occurs along Davis Drive, there will be a focus on
building upwards rather than outwards. This will reduce live-work-play distances, encourage more
pedestrian traffic, and limit urban sprawl.
Markham will be a major connection point
and key destination place along Highway 7.
The vivaNext plan includes a network of several rapidways across York Region, including the east-west
Highway 7 rapidway, which will extend from Highway 50 in Vaughan to Reesor Road in Markham. Over the
next 20 years, almost 300,000 jobs will be located within one kilometre of Highway 7, resulting in almost
ten million annual transit trips.
Viva riders travelling along Highway 7 will be able to make seamless and convenient connections in
Markham with GO Transit commuter rail and express buses, YRT local bus services, and other transit
systems operating in neighbouring regions. Bicycle racks will also be available for those who choose to
cycle from that point.
In addition to being a major connection point, Markham will become a key destination place. It will host the
first transit-pedestrian mall in the GTA, and become a world-class mixed-use urban centre with businesses,
residences, shops, restaurants, theatres and a 10-acre world-class park for people to enjoy without having
to drive to get there.
Vaughan Metropolitan Centre’s easy access to great transit service
will transform it into a major centre of activity.
The funded Spadina subway extension that is part of the vivaNext plan will extend from Downsview
Station to the Vaughan Metropolitan Centre. Located along the east-west Highway 7 rapidway, Vaughan
Metropolitan Centre will provide subway riders with a seamless and convenient point of connection
with Viva and other transit systems.
Vaughan Metropolitan Centre’s centralized location and easy access to great transit service will
transform it into a major centre of activity for local residents and businesses.
Mixed-use transit-oriented development along the area’s proposed tree-lined “main street” avenue,
which will bisect a ring-road system, will include business offices, residences, entertainment and
cultural facilities, and pedestrian shopping areas. It is expected to be the largest and most ambitious
development project in the area’s history.
Richmond Hill/Langstaff Urban Growth Centre will be a major transit hub
and focal point of transit-oriented development.
The proposed Yonge subway extension that is also part of the vivaNext plan will extend from Finch Station
to the Richmond Hill/Langstaff Urban Growth Centre at Highway 7. The Centre will be a major transit
hub where subway riders will be able to make seamless and convenient connections with Viva, GO Transit,
YRT and other transit systems operating in neighbouring regions.
As a major transit hub, the strategically located Centre will be the focal point of mixed-use transit-oriented
development that incorporates high quality urban design, signature architecture and attractive public
spaces. Everything from prestige business and professional offices to high-density residential units, shopping
and entertainment will all be found in and around this very busy and vibrant area.
The Environmental Project Report for the Yonge subway extension has been approved following
extensive public consultation. York Region is currently working with Metrolinx, TTC and the City of Toronto
to secure funding for its construction.
artwork 24 x 35 in
artwork 24 x 35 in
**Will connect to Bloor-Danforth subway
Se
ne
ca
Finch Avenue
Downsview
Station
Finch
Station
Sheppard Avenue
MARKHAM
14
th
Don Mills
Station
Highway 7
Ga
ls
wo
M rthy
ain
St
.M
ar
kh
am
W
oo
te
M nW
ar
k ay
Bu ham
rO S
ak tou
ffv
ille
Ho
sp
it
York Du
rham Lin al
e
y Road
404
Ea
gl
e
Highway 9
M
cC
ow
an
Kenned
Highway
Sa
va Mul
ge
oc
k
So
ut
hl
ak
e
Hu
ro
nH
ei
Le
sli ghts
e
Pa
Lo rksi
ng de
fo M rd
ain
G
Br
ist ree
nL
ol
an
e
East Gwillimbury
GO Station
Ke
nn
ed
y
AUROR A
De
nis
on
Wellington St. E.
He
Go
nd
lf L Wel
Or
er
ink lin
so
gt char
n
s
on
dH
eig
ht
s
GO Transit Rail Lines
E
St sna
ee le
s
Re
Bl
ga
tta oom
Bayview
ing
Avenue
to
n
Ki
ng
Terminals
404
Je
ffe
rs
on
Proposed Yonge Subway Extension
treet
19
th
-G
am
bl
e
reet
Proposed Light Rail Transit**
Highway
Leslie S
El B
gin e
M rna
ill rd
s
Yonge S
t
Funded Rapid Transit* (2015-2020)
M
cN
ico
ll
lls Road
M
Cr
ajo
os
rM
by
ac
ke
nz
ie
Bathurs
t Street
Spadina Subway Extension
Street
treet
y 400
Future Rapid Transit*
li e
Les
Richmond Hill
Centre
Ba 1
W
nt 6t
el
ry hdr
-S Ca
ick
co rr
tt vil
Ba
le
yv
iew
Ch
alm
Va er
lle s S
W yme ou
es d th
Pa
Le t Be e
rk
sli av
e er
Ea
Cr
ee
st
Be
k
Al av
ls
ta er
W te P Cre
oo a ek
db rk
ine wa
y
To
wn
Ce
nt
C
e
W d
re
ar ar
Bl
de la
vd
n
n
.
d
En
te
rp
ris
e
VAU G H A N
Hi
ll
n Mi
Steeles Avenue
Cu
St
m
Cl
ee
m
ar Roy
l
er
es
k
al / L Lan
/D
Or o gs
re
ch ng taf
wr
ar br f
y
d idg
e
reet
Jane S
Highwa
27
RICHMOND HILL
Do
VAU G H A N
At
kin
so
n
Du
ffe
rin
Pr
om
en Ba
ad th
e ur
st
Ke
el
e
Highway 7
Yonge S
t
Co
m
m
er
ce
Pi
ne
Va
lle
y
An
sle
yG
ro
W
ve
es
to
n
Highway
Funded Rapid Transit* (2010-2015)
Le
ith
Hi
ll
TORONTO
Vaughan
Metropolitan
Centre
Fi
nc
Sh
hW
ep
pa
es
rd
t
W
es
t
Highway 407
H
Tr wy
an 40
sit 7
St
wa
ee
y
le
s
W
Yo
es
rk
t
Un
ive
rs
ity
Western
Gateway
Hi
gh
wa
y4
27
Hi
gh
wa
y2
7
M
ar
tin
Gr
ov
Ki
e
pl
ing
Isl
ing
to
n
He
le
n
Highway 50
vivaNext route map
Green Lane
Davis Drive
Newmarket
GO Station
NEWMARKET
Aurora Rd.
WHITCHURCHSTOUFFVILLE
Bloomington Rd.
Stouffville Rd.
MARKHAM
Major MacKenzie Drive
Cornell
Highway 407
Unionville
Station
Steeles Avenue
TORONTO
Finch Avenue
Sheppard Avenue
*Planned construction includes bus rapid transit in both dedicated rapidways and in mixed traffic
Map not to scale
vivastation design elements
roof extends up and over Viva vehicles
to keep snow and rain off while
embarking/disembarking
roof and side panels made of
reflective tinted glass for greater
visibility and comfort
arrival/departure screens
provide real-time scheduling
info plus up-to-the-minute
time, weather, news, sports
and market headlines
extended platform length can
accommodate multiple Viva
vehicles, enhancing embarking/
disembarking efficiency
full-time security
surveillance and
intercom for
emergency assistance
on platform
raised platform provides level boarding
of Viva vehicles, eliminating the
need to climb steps or lift objects
temperature and motion activated heaters in full wind
enclosure provide warmth while motion-activated entry
doors minimize heat loss
tactile pavers along
rapidway edge provide
greater safety
energy-efficient lighting
throughout for greater safety
and comfort
gently sloping ramp provides
easy wheelchair, motorized
scooter and stroller access
ample seating inside and out
provides greater personal
space and comfort
flexible cash, pass and Presto
fare machines
a world of difference
one viva vehicle can take up to
70vehicles
off the road
yonge street rapidways timeline: highway 7 to gamble road
2010
Jun
Property acquisition
underway
2011
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Negotiations
Preliminary engineering
Final design/construction
Reports to Regional Council
artwork 35 x 24 in
Construction 2012 to 2015
preliminary cross section
43.00
Right-of-way
RIVER OF LIGHTS
RIVER OF LIGHTS
CORNELL 1:45
UNIONVILLE 1:45
Property Line
Property Line
1036
Public
Sidewalk
intersection
0.30
2.00
Continuity
Strip
Rumble Strip
Left Turn Lane
2 Through Lanes
0.60 0.50
2.00
Offset
Transitway [Coloured Asphalt]
Shelter/Platform
0.30 Clearance
0.70
3.50
3.30
3.30
0.30
2 Through Lanes
3.50
3.50
4.00
0.50 0.60
3.30
3.50
Boulevard 5.40
43.00
Right-of-way
RIVER OF LIGHTS
RIVER OF LIGHTS
mid-block
0.30
Continuity
Strip
2.00
2.00
Boulevard 5.40
Public
Sidewalk
2.00
Boulevard 5.40
Public
Sidewalk
Continuity
Strip
2 Through Lanes
0.60 0.50
3.50
Rumble Strip
0.30
3.30
Transitway
[Coloured Asphalt]
3.50
Plantable Raised Median
4.00
Transitway
[Coloured Asphalt]
3.50
Rumble Strip
0.30
3.30
2 Through Lanes
0.50 0.60
3.50
Continuity
Strip
Public
Sidewalk
2.00
Boulevard 5.40
2.00
0.30
2.00
0.30
boulevard
sidewalk at typical vivastation intersection
continuity furnishing pedestrian
zone
zone
zone
information kiosk/
space for public art
intersection
crosswalk
street
light
continuity
zone
bench
road
property
line
pedestrian
light
furnishing
zone
tree
in grate
property line
pedestrian
zone
road
property
line
tree
in planter
road
continuity furnishing pedestrian
zone
zone
zone
intersections
typical vivastation intersection
traffic light
space for
public art
maintenance area
boulevard
pedestrian light
street light
rapidway
vivastation
bench
traffic signal operations
legend
first signal phase
left and u-turns
second signal phase
general traffic, pedestrians
and viva rapid transit
third signal phase
cross street general traffic
and pedestrians
regular traffic
viva
pedestrians
Download