Highway 7 Rapidways Public Consultation Centres: June 17 and 18, 2008 rapid growth…increasing traffic congestion Georgina 1,505,000 935,000 Newmarket Regional Centre 610,000 East Gwillimbury 345,000 1986 1996 2001 Newmarket 2031 Aurora King WhitchurchStouffville Richmond Hill Centre Richmond Hill Markham Centre Vaughan Corporate Centre Vaughan Markham 800,000 455,000 150,000 1986 290,000 1996 2001 2031 2 one transit vehicle replaces 70 cars 3 enhanced urban environment Increased transit ridership Vibrant mix of residential, commercial and employment land use Evolving transit villages 4 york region intensification study Second level intensification numbers are preliminary and include recent applications 85,000 units required to reach 40% target do not represent the full Regional intensification potential Highway 7 Intensification Zones 5 york region intensification matrix (2006-2031) Regional Centres Regional Corridors Local Centres Other Major Corridors Local Infill Total Units (1) % of Intensification 25,640 14,490 26,140 7,720 11,350 85,340 30% 17% 31% 9% 13% 100% 6 the proposed rapid transit network 7 vivaNext capital construction projects 2008-2015 8 vivaNext design elements 9 dedicated rapidways Six through lanes with left turn lanes Dedicated centre lane rapidways Fully landscaped boulevards and median planting Dedicated bike lanes 10 transit corridor intersections Enhancing public safety and access for drivers, transit riders, pedestrians and cyclists 11 managing traffic movements at Intersections First Signal Phase: Left turn and U turns only, no other traffic movements Second Signal Phase: Corridor general traffic, Viva rapid transit and pedestrians Third Signal Phase: Cross street general traffic and pedestrians 12 managing mid-block traffic movements Inbound Access Access from Rapid transit corridor to side streets and properties between signalized intersections Outbound Access: Access to Rapid transit corridor from side streets between signalized intersections 13 vivastations 14 vivastations 15 placemaking opportunities 16 landscaped boulevards and medians 17 pedestrian-friendly streets 18 pedestrian-friendly streets 19 highway 7 – h3 project status EA completed March 2007 Conceptual design complete Property requirements defined Preliminary engineering ongoing 20 highway 7 – h3 rapidway alignment 21 highway 7 – richmond hill terminal to silver linden drive 22 highway 7 – doncrest road to valleymede drive 23 highway 7 – west beaver creek to highway 404 24 highway 7 – highway 404 to cochrane drive 25 highway 7 – montgomery court to south town centre boulevard 26 highway 7 – montgomery court to south town centre boulevard (4 lane alternative) 27 highway 7 – south town centre boulevard to cedarland drive 28 enterprise drive – warden avenue to birchmount road 29 markham centre – market drive to unionville go station 30 next steps Public Meeting #1 (June 17 & 18, 2008) Property owner consultation (Summer 2008) Public Meetings #2 and #3 (Fall 2008) Construction starts on Civic Mall (Fall 2009) 31 thank you…….Q&A 32