Annual Program Review Update *Be sure to include information from all three campuses. Program: Maintenance Department _____________________________ Date: January 10, 2008 r 2 11 09 Name Tim Flanagan Email/Phone tim-flanagan@redwoods.edu / 476-4387 (Lead Contact) Tim Flanagan 1. State your program’s mission and it’s relation to the mission of the college. Our goal is to provide a safe, clean and up-to-date facility that will allow our students a distraction-free and rewarding education experience; to support a commitment to proactive planning and inspection together with a comprehensive scheduled maintenance program. 2. Program Changes Have there been any changes in your program or area since your last Program Review? No ___ (go to next question) Yes __X__ Describe the changes below: We have developed a new position, Delivery Driver/Warehouse. This person delivers mail and supplies to various locations, including off campus sites. He delivers to the Arcata Instructional Site, and Eureka Downtown Instructional Site. He also makes deliveries and pick ups at the Post Office, County Office of Education, and other locations as needed. Works with the Warehouse/Mailroom Clerk to perform a variety of work in the operation and maintenance of a central warehouse, including inventory replenishment and control. 3. Program Trends If applicable, describe how external or internal changes are impacting your program and describe efforts within your area to address these impacts. Include supporting data from Institutional Research or other sources in your discussion. New regulations by outside agencies are having an impact on our operation by requiring strict controls and monitoring. The State Water Resources Control Board requires us to develop a Sewer System Management Plan, and a Storm Water Management Plan. These plans will require ongoing monitoring and controls. Construction projects, even those that are contracted out, require a significant amount of time and resources from this department. Our staff is involved in providing information on existing buildings and infrastructure. The recent Dental remodel required coordination between the contractor and our staff for system tie-ins such as water, sewer, fire alarm, and energy management system. The current parking lot project has required the same coordination. - 1 - 4. Budget Resources List your department’s budget for the following categories in the table below. Restricted funds have a sponsor/grantor/donor (federal, state, local government, etc). The funds are restricted by the sponsor/grantor/donor. Everything else (including action plans) is unrestricted. Category Supply and printing budget Equipment replacement and repair budget Professional Development Work-study funding Additional Budget Items Other: utilities Postage and Delivery, Maintenance Service Contract Unrestricted Funds $2,000 $380,087 Restricted Funds 0 2,242 $2,100 0 $7,000 (short term staff) $913,784 (water, gas, electric, garbage) $11,000 0 0 0 0 0 Is the funding for these areas adequate? No If not, describe the impact of unaddressed needs on your program outcomes and ability to serve students and the community. As the facilities age they become more costly to maintain. The ability to maintain proper indoor air quality is more difficult due to the deteriorating condition of heating and ventilation equipment. Many lighting systems are beyond their useful life and require more resources to keep operational. There is also an increase in the need for more lighting to increase safety. Many of our vehicles are old and need more maintenance or replacement. We travel to all the sites for the District so good reliable vehicles are a must if we are to maintain safe, clean, and up-to-date facilities. 5. Staff Resources Complete the Classified Staff Employment Grid below (please list full- and part-time staff). This does not include faculty, managers, or administrative positions. If a staff position is shared with other areas, estimate the fraction of their workload dedicated to your area. Staff Employed in the Program Assigned Area Full-time staff Maintenance and (classified and Operations management) (give number) 27 Part-time staff (give number) 0 Gains over Prior Year 2 Losses over Prior Year (give reason: retirement, reassignment, health, etc.) Do you need more full-time or part-time classified staff? If yes, explain why. Yes - 2 - The department is in need of a Locksmith, two Maintenance Mechanics, an Electrician, and a Warehouse/Mailroom Clerk. The Warehouse/Mailroom Clerk position is currently vacant. This is a critical position for the timely processing and delivery of campus mail and supplies. The locksmith duties are currently being done by our electrician. An additional electrician would allow us to do more preventative maintenance. Advancements in technology and instructional delivery require more electrical equipment to be installed and maintained. The District currently has only one Maintenance Mechanic who in licensed to operate our sewer plant. When he is on vacation or otherwise unavailable we have to rely on an outside temporary employee to cover for us. This individual has a full time job so he may no be available when we need him. If we had a problem at the Plant and no one was available to cover we would have significant liability. We discharge to Humboldt Bay so the possibility of environmental contamination is very high. When we violate our permit to operate the plant we are assessed monetary penalties from the Regional Water Quality Control Board. These penalties are a minimum $3,000 for each violation. Last year we were assessed penalties of $72,000 for violations relative to the operation of our sewer plant over a period of several years. 6. Work Study Resources Work study students employed in the program Gains over Prior Assigned Area How many? “Type” of Maintenance and (give number) workstudy(federal, Year Operations 6 Calworks, EOPS) same 2-federal 4-Community Service Losses over Prior Year Do you need more work study student help? If yes, explain why. No 7. Facilities and Technology Are facilities adequate for achieving the outcomes of this department/program? ( ) Yes ( X ) No If No was checked, complete the following grid for each space that does not meet the needs of this department/program: List space (classroom, instructional, office) name/number: Check if any of the following are not adequate: () ( ) ADA ( ) Number ( X) Technology Ventilation / access of seats / (computers, room temp work stations projectors, internet) ( ) Other (briefly describe): Describe the specific action and estimated cost (if available) to make this space adequate for your needs: We will need a new computer for use by staff when we develop our electronic work requests. Warehouse needs a new monitor, and office needs a new printer, copier, and scanner. - 3 - Estimated cost is $2,000 If applicable, list the average number of discipline/program sections scheduled in this room each semester, and the total number of students enrolled in these sections. Sections: Students: - 4 - 8. Equipment Is the available equipment adequate to achieve the outcomes of the department/program? ( ) Yes (X ) No If No was checked in Item 8, complete the following grid for each piece of equipment being requested for this department/program: Equipment Approximate Price Two new vans for Maintenance Mechanics $48,000 Number of students using equipment each semester (if applicable) N/A New pick up truck for Gardeners $20,000 N/A Reliable transportation is critical to deliver services both on and off campus New drain snake machine $4,000 N/A Three new portable generators $6,000 N/A Allow staff to maintain drains and saves department money by not contracting work These will allow us to keep vital equipment running in the event of power outages Describe how the equipment allows achievement of program outcomes Reliable transportation is critical to deliver services both on and off campus Equipment Repair Is the equipment used for your department/program in need of repair, which is outside your current budget allotment? This does not include classroom specific equipment repair described in the facilities section. ( ) Yes ( X) No If Yes was checked, provide the following information to justify a budget allotment request: Equipment requiring repair Repair Cost / Annual maintenance cost Number of students using equipment each semester (if applicable) - 5 - Describe how the equipment allows achievement of program outcomes 9. Faculty Resource Needs (If applicable) If applicable, complete the Faculty Employment Grids below (please list full- and part-time faculty numbers in separate rows): Faculty Load Distribution in the Program Discipline Name (e.g., Counseling, EOPS, Library) Total Load for fall 2007 term % of Total Load by FullTime Faculty % of Total Load by Part-Time Faculty % Change from fall 2006 % Change from fall 2005 Explanations and Additional Information (e.g., retirement, reassignment, etc.) a. If you are requesting a full-time faculty position develop an attachment to this report that addresses the following criteria (as listed in AR 305.03) • The ratio of full-time to associate faculty • Current availability of associate faculty • Relation to program review recommendations • Effect on diversity of the faculty • Effect on academic offerings and ability to serve students and the community • Effect on the vitality and future direction of a program and/or the college • Effect on student learning b. If your Associate Faculty needs are not being met, describe your efforts to recruit Associate faculty and/or describe barriers or limitations that prevent retaining or recruiting Associate Faculty 10. Learning Outcomes Assessment Report List all expected program-level outcomes, whether you have completed the assessment loop or not. For each outcome, identify the means of assessment and the criteria for success. Summarize the data that have been collected in the ‘Assessment Results’ column. If no data have been collected and analyzed for a particular outcome, use the ‘Assessment Results’ column to clarify when these data will be collected and analyzed. In the fourth column, indicate how the assessment results are being used to improve the program. Program Outcomes (may be operational for some student service and administrative areas) Means of Assessment and Performance Criteria Assessment Results Summary Use of Results Improve exterior lighting at Del Norte Campus Lighting survey conducted on September 2, 2008 Several areas did not meet the minimum illumination level Improved safety and security - 6 - Improve exterior lighting at all District facilities Improve security at all campus facilities Conduct lighting surveys Del Norte and Mendocino have consulted with Security companies and obtained quotes for security cameras. Eureka has consulted with a security consultant to install cameras in the parking lot FY 08/09 Improved safety and security Mendocino has a quote Improved safety and for installing security security cameras, needs funding. $8,588.74 Eureka is installing cameras as part of the parking lot improvement project List all course-level student learning outcomes for which some assessment activity (assessment, analysis, or use of results) has taken place since the most recent program review, and complete the table below as appropriate Student Learning Outcomes (course-level) Means of Assessment and Performance Criteria Assessment Results Summary Use of Results Discuss the extent to which part-time faculty (if applicable) have been involved in the dialogue about assessing student learning outcomes: - 7 - 11. Curriculum Update (if applicable) Identify curricular revisions and innovations undertaken a. in the last year. b. planned for the coming year. Complete the grid below Course Year Course Outline Last Updated Year Next Update Expected Was the course added or deleted? If the proposed course outlines updates from last year’s annual update (or comprehensive review) were not completed, please explain why. 12. Communication Are the current lines of administrative, faculty, and staff communication adequate to meet the needs of this department/program? Describe representative example of effective or ineffective communication. While we have always had good open communication in this department it can be improved. We can improve our communication by conducting regular staff meetings. We have not had very many meetings this past year but plan to improve. We have recently hired a new Director of Maintenance, and together we will establish a staff meeting schedule. I have also consulted with our insurance company to help us with regular safety trainings. We already have credits with Keenan to cover the cost of training days. 13. Action Plans List any action plans submitted since your last annual update. Describe the status of the plans. If they were approved, describe how they have improved your department/program. 14. Department Goals Report List goals the department will attempt to accomplish in the next three years. Each year, you will be asked to update the Goals Report to make adjustments to the goals the program enters this year. College Strategic Plan Goal Division Goal Department Goals FY2008-11 Develop and manage human, physical, and financial resources to effectively support the learning environment To provide and maintain a well trained staff capable of supporting and enhancing the positive learning environment throughout the district Increase efficiency and maintain professional standards - 8 - Develop and manage human, physical, and financial resources to effectively support the learning environment Develop and manage human, physical, and financial resources to effectively support the learning environment Develop and manage human, physical, and financial resources to effectively support the learning environment To provide a safe and clean working and learning environment which enhances and supports fully the quality of the environment where instruction is being offered To proudly continue to provide the highest level of service for the entire district Ensure properly maintained facilities To provide and maintain a well trained staff capable of supporting and enhancing the positive learning environment throughout the district Develop and manage plans to effectively respond to state mandates Ensure a safe learning environment 15. Quality Improvement Plan (QIP) The QIP is intended to assist the program in thinking and planning for a minimum of the next three years. Many factors that influence the implementation of the department/program’s plans can and do change over time. Each year, you will be asked to update the QIP to make adjustments to the plans the program enters this year. Because this document will be used to inform planning processes, it is very important that all the requested information be provided. The form has been designed to elicit the information needed for this process. Each “block” on the form is for a single recommendation; thus, the department/program should complete all the fields for each of the recommendations. - 9 - Quality Improvement Plan Category Department Goal the Action is Connected Recommendation Number and Title Descriptions To increase efficiency and maintain professional standards 1. Electronic Work Orders Planned Implementation Date March 2009 Estimated Completion Date on-going Action/Tasks Estimated Cost(s) Develop electronic work request form Train staff to use new system Inform and train district on new procedures Quicker response to work orders Staff and Faculty are able to track status of work request Only staff time Who is responsible? Tim Flanagan, Garry Patrick, TSS staff Consequence if not funded Staff and Faculty will have a difficult time tracking work order status Measure of Success/Desired Outcome External Accreditation Recommendations (if applicable) - 10 - Quality Improvement Plan Category Department Goal the Action is Connected Recommendation Number and Title Descriptions Ensure properly maintained facilities Planned Implementation Date 2. Repair Heating and Ventilation on Applied Technology May 2009 Estimated Completion Date August 2009 Action/Tasks 1. Contract with Engineering firm to write specifications 2. Bid project 3. Repair and replace HVAC equipment on AT building Better indoor air quality for students and staff $100,000 Funding is secured through the State Scheduled Maintenance Program Tim Flanagan and Garry Patrick Measure of Success/Desired Outcome Estimated Cost(s) Who is responsible? Consequence if not funded Continued deterioration of equipment and poor indoor air quality External Accreditation Recommendations (if applicable) - 11 - Quality Improvement Plan Category Department Goal the Action is Connected Recommendation Number and Title Descriptions Ensure a safe learning environment Planned Implementation Date 3. New Exterior Lighting and Security Cameras May 2009 Estimated Completion Date August 2010 Action/Tasks 1. Complete light surveys 2. Consult with staff and private consultants on camera needs and locations 3. Install additional lights and cameras Measure of Success/Desired Outcome Estimated Cost(s) A more secure campus setting Higher satisfaction with facilities from staff and students $40,000 Who is responsible? Tim Flanagan and Garry Patrick Consequence if not funded Staff and students would be at greater risk due to poor lighting and less security External Accreditation Recommendations (if applicable) - 12 - Quality Improvement Plan Category Department Goal the Action is Connected Recommendation Number and Title Planned Implementation Date Descriptions Develop and manage plans to effectively respond to state mandates 4. Sewer System and Storm Water Management Plans 2010 Estimated Completion Date On-going Action/Tasks 1. Develop written plans for sewer and storm management 2. Include participation from students, staff, and public 3. Continually manage plans to control systems Measure of Success/Desired Outcome Estimated Cost(s) Compliance with State mandated reporting and monitoring $50,000 Who is responsible? Tim Flanagan and Garry Patrick Consequence if not funded We would be fined for not have the required plans External Accreditation Recommendations (if applicable) - 13 -