Information Technology Analysis Hydro-Quebec Management Presentation October 30th 2004 Table of Contents Analysis Methodology Objectives and Scope of Analysis Executive Summary measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 1 x Analysis Methodology measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 2 Benchmark Methodology Overview Kickoff Data Collection Data Validation and Normalization Database Analysis Peer Comparison Executive Action Plan Results The methodology employed by Gartner analysts enables a composite overview of IT performance to be collected and evaluated against peer organizations. A six-phase process is undertaken, starting with data collection of workload and cost information for each functional area chosen. Once collected, this information is verified, corrected and normalized to ensure valid and equitable comparisons to other organizations with similar sizes, business functions, architectures and configurations. A key component of this analysis is the utilization of one key metric for each functional area that leads to the formation of the Executive Report. measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 3 Analysis Methodology Client Workload Client Costs Comparison of Key Metrics Applications Development and Support Mainframe Systems Midrange Systems Distributed Computing Networks (Voice and Data) IT Help Desk Packaged Enterprise Applications Total IT Expenditure Database The Rapid Assessment for Total IT Expenditure provides a comparison of an enterprise’s key metrics with those of enterprises with similar workload drivers drawn from the Rapid Assessment for Total IT Expenditure database. measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 4 Methodology Quantitative and Qualitative Data Database Validation and Normalization Process Productivity Measurements General Observations Key Issues Efficiency Measurements Recommendations Models Quality Measurements Data Collection Comparative Analysis Insights Unique to Your Business measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 5 Individual Analysis Consensus Model Concepts Hardware Software Application Code MIPS Extensions Personnel Transmission Disaster Recovery Calls/Minutes Gigabytes Devices Call Volume Cost Workload measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 6 About the Total IT Expenditure Assessment The Rapid Assessment for Total IT Expenditure provides a health check for H-Q’s IT environment. This is a high-level look at the current environment and covers a 12-month time period. A number of functional areas have been evaluated. For each functional area selected in this analysis, a composite peer group is formed for comparison purposes. The enterprises selected have key workload characteristics similar to those of H-Q. Each functional area has a different selected peer group. The selection of the different peer groups enables Gartner Measurement to compare H-Q with other enterprises based on key metrics. These key metrics are used to provide an indication of the cost-efficiency of the H-Q IS organization. measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 7 About the Total IT Expenditure Assessment The metrics listed for the areas selected for inclusion by Hydro-Quebec represent a portion of the aggregated metrics for each key IT functional area that we believe will provide the “health check” information that CIOs and senior IT managers require, at a minimum, to develop an IT baseline for those functional areas. These metrics set the stage for a consistent methodology enabling the accurate identification of costs and workload attributes as well as an internal and external comparative analysis to determine how well each of the selected functional areas is performing. measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 8 Chart of Accounts Distributed & Help Desk Costs Assets Hardware Labor Servers Clients Peripherals Network Software Operating systems COTS Applications Utilities Management Operations Technical services Planning and process management Database management Service desk Administration Finance administration Management IS Equipment Agent Equipment measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 9 Objectivesxand Scope measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 10 Objectives of the Analysis To establish a baseline for IT expenditures and cost-efficiency To provide a comparative analysis of expenditures against other enterprises with similar workloads, complexity and performance characteristics To provide a “health check” of the IT services delivered to the IT end-user community To identify potential opportunities for increased IT efficiency To offer recommendations to increase IT efficiency and effectiveness To create a foundation for a continuous measurement program measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 11 Scope Functional Areas Studied IT Help Desk Distributed Computing Benchmark analysis covers the period from January 2003 to December 2003. $60.9M of Hydro-Quebec’s expenditures have been included in the consensus model. measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 12 Scope Peer groups Chosen on basis of comparable workload that maps to Hydro-Quebec’s scope of support, defined differently for each service being benchmarked Each peer group chosen based on its workload profile: IT Help Desk – Number of inbound calls, including abandoned, and the overall complexity of the environment as defined by the type of calls taken Distributed Computing – Number of end users supported, number of devices in the LAN environment and complexity of the environment measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 13 Executivex Summary measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 14 Key Summary Observations Overall, costs are 22.9% lower than what the peer groups would spend to support the same workload ($60,892K vs. $79,010K). Costs are lower than the previous benchmark in the 2 areas reviewed. Networking costs have been removed from the analysis Overall personnel costs compare favorably with the workload peer group. But there is considerable variance in staffing levels. Total FTE counts are 21.8% higher than the workload peer (365.8 FTEs vs. 300.3 FTEs). Total FTE costs in the areas reviewed are 3.4% lower ($29,610K vs. $30,650K). Average cost per FTE is 21% lower than the workload peer group ($80,944 vs. $102,053) In addition, Hydro Quebec uses a 35 hour workweek, which could account for up to a 12% differential in total headcount, since most organizations in the data base and the peer groups utilize a 40 hour workweek. The workload peer group is made up of primarily US companies since these provided the best workload match. The variance does not take into account the difference between US and Canadian salaries. measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 15 Key Summary Observations Complexity is high in the Distributed Computing area and has increased since the last analysis (11 vs. 8.8 in ’99). Best Practices scores are higher than the database average in most areas. Operations management is a strength and inventory management is a weakness. End User satisfaction is very good and much improved over the previous analysis. measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 16 Total Cost by Technical Area Observations The aggregate IT consensus model costs for Hydro-Quebec for those modules included in the analysis (at $60.9M vs. $79M) are $18.1M (or 22.9%) lower than what the composite peer group would spend to perform Hydro-Quebec’s Technical Area Comparison workload. Lower Costs Distributed Computing -24.70% H-Q -2.50% 0% -5 % -1 0% -1 5% -2 0% -2 5% Alignment -3 0% IT Help Desk measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 17 Total Cost by Technical Area $90,000 $79M Overall costs are $18.1M lower than the Peer would use to support the same workload. $80,000 $70,000 $60.9M $60,000 $50,000 $40,000 $30,000 $20,000 $10,000 $0 H-Q PEER Distributed Computing $54,753 $72,713 IT Help Desk $6,139 $6,297 measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 18 Total Cost by IS Cost Category Observations Hydro-Quebec’s spending, by category, varies from the peers as show below: Cost Category Comparison Occupancy Outsourcer 169.09% -78.48% Transmission 167.91% H-Q Hardware -33.83% 20 0% -21.74% 15 0% Software Alignment 10 0% -3.39% 50 % Personnel 0% -5 0% -1 00 % Significantly lower costs by total dollar value measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 19 Total Cost by IS Component $90,000 $79M $80,000 $70,000 $60.9M $60,000 $50,000 $40,000 $30,000 $20,000 $10,000 $0 H-Q PEER Occupancy $2,598 $965 Outsourcer $1,760 $8,181 $205 $76 Personnel $29,610 $30,650 Software $5,328 $6,808 Hardware $21,392 $32,330 Transmission measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 20 Total Full-Time Equivalents by Area Observations The total number of full-time equivalent (FTE) personnel within the IT areas measured is 21.8% higher than the peer group FTE staff that would be required to support Hydro-Quebec’s workload. Total FTEs H-Q Peer Variance 365.8 300.3 21.8% higher FTE Count Comparison IT Help Desk 40.8% H-Q 45 % 40 % 35 % 30 % 25 % 20 % 15 % 10 % 18.0% 5% 0% Distributed Computing measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 21 Total Full-Time Equivalents by Area 400.0 The charts numbers are inhouse FTEs. The workload peer has outsourcing which includes labor. Hydro-Quebec also has outsourced services which includes labor. The equivalent FTEs outsourced for the workload peers are roughly: Help 350.0 300.3 FTEs 300.0 250.0 23.3% higher 200.0 150.0 Desk : 7.3 FTEs Distributed 365.8 FTEs : 26.6 FTEs Final normalized FTE count for the workload peer is: 334.2 100.0 50.0 FTEs IT Help Desk Distributed Computing H-Q PEER 71.0 50.38 294.9 249.95 measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 22 Total Cost per Call - Cost Overview Help Desk Cost Comparisons $30 $21 $24 $20 $15 $20 $20 $21 $25 $10 $5 $0 HQ04 measurement Hydro-Quebec Management Presentation 15 October 2004 HQ99 Peer Util DBA HQ is in alignment with the 1999 analysis HQ is in alignment with the peer group HQ is 16.7% lower than the utility peer group HQ is in alignment with the database average Entire contents © 2002 Gartner, Inc. Page 23 Total Cost per User - Cost Overview Distributed Cost Comparisons $1,500 $2,343 $2,000 $2,381 $2,500 $3,000 $3,000 $3,161 $3,332 $3,500 $1,000 $500 $0 HQ04 measurement Hydro-Quebec Management Presentation 15 October 2004 HQ99 Peer Util DBA HQ is 29% lower than the 1999 analysis HQ is 25% lower than the peer group HQ is 21% lower than the utility peer group HQ is in alignment with the database average Entire contents © 2002 Gartner, Inc. Page 24 Best Practice Overview Best Practice Comparisons Hydro-Quebec vs. DBA 6.1 vs. 5.3 Overall Average 6.9 vs. 5.6 Technology Planning and Process Management Total 2.7 vs. 3.4 -0.7 1.3 Training Total 7.2 vs. 5.4 Customer Service Total 5.4 vs. 5.5 Asset Administration Total 6.8 vs. 5.9 Operational Management Total 7.4 vs. 5.9 Change Management Total -1.0 0.8 -0.5 0.0 DBA 1.8 -0.02 -0.1 0.9 1.6 0.5 1.0 1.5 2.0 This chart shows how Hydro-Quebec compares to the database average in each of the primary Best Practice areas. Negative scores are below the database average and the positive score is above average. The numbers on the left are the actual scores of H-Q and the corresponding dB average. measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 25 Observations What’s Good Hydro-Quebec has done a good job in taking real action to address the previous benchmark’s issues and have made improvements across the board. Costs Overall cost performance is better than, or in alignment with, all the peers and the database average. Cost has improved over the previous assessment (’99 ITOA) and come into better alignment with the peer groups and database average. Support Quality User satisfaction has significantly improved over the previous assessment. The current environment seems more stable than in recent years and is contributing to this. Currently the quality scores shown a marked improvement in quality of services and user satisfaction and exceed the database average in all major areas. Users consider the Help Desk their Best Source of Technical Support as well as their Best Source of ‘How To’ Support. This is uncommon with most organizations. measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 26 Observations What’s Good Best Practices There are a number of areas that can be considered best practices in the HydroQuebec IT organization. Customer Service scores are strong with a score of 7.2 vs. 5.4 for the db. This has helped to reduce costs in the help desk area with superior leveraging of technologies and processes. Operation Management scores are strong and considered a best practice as well at 6.8 vs. 5.9 for the db. Strengths include security and standards compliance. Security efforts are a best practice with a score of 7.5 vs. 3.8 for the db. Most organizations are not as thorough where security is concerned. Overall Change Management score is very good with a score of 7.4 vs. 5.9 for the db. Processes and technologies are superior in this area, contributing to overall lower costs while sustaining higher quality scores. Change management technology and change management processes are very strong with scores of 6.1 vs. 3.9 and 9.0 vs. 6.9 respectively for the db. Combine this with superior deskside support (as identified by end users) and this area can be considered a best practice for Hydro-Quebec (Change management includes Processes, Deployment, Retirement & Moves, Technology). measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 27 Observations What’s Good End Users The majority of end user’s prefer the help desk. – 60% say that it is the best source of technical support vs. 52% for the workload peer, 58% for the utility peer and 50% for the db. – 77% say that it is the best source of ‘how to’ support vs. 18% for the workload peer, 21% for the utility peer and 23% for the db. – This directly contributes to reduced downtime and lost productivity for the given complexity. measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 28 Observations What to Review As can be expected, there is always room for improvement. The following pages list the more significant points to review and address going forward. There are several areas where Hydro-Quebec could gain significant improvement in processes, automation and integration. Asset Administration with a score of 5.4 vs. 5.5 for the db. Hardware Inventory Management score is a 4.2 vs. 5.5 for the db. Software Inventory Management score is a 4.2 vs. 4.0 for the db. Lifecycle Management score is a 5.5 vs. 5.7 for the db. All training with a score of 2.7 vs. 3.4 for the db. End User Training score is a 1.7 vs. 2.7 for the db. IS Training score is a 3.7 vs. 4.1 for the db. measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 29 Observations What to Review Staffing levels remain higher than all the peers and database average. This is a driver of direct costs. Overall Help Desk cost per FTE is lower than the peers and database average. $73,829 vs. $87,942 for the workload peer, which is 16% lower 71.0 FTEs vs. 50.4 FTEs for the workload peer, which is 41% higher Overall costs are 18.2% higher at $5,238K vs. $4,431K Overall Distributed cost per FTE is lower than the peers and database average. $82,656 vs. $104,897 for the workload peer, which is 21% lower 294.9 FTEs vs. 249.9 FTEs for the workload peer, which is 18% higher Overall costs are 7% lower at $24,372K vs. $26,219K Salary levels remain lower than the peer groups and database average for these of the areas. Hydro Quebec uses a 35 hour workweek, which could account for up to a 12% differential in total headcount, since most organizations in the data base and the peer groups utilize a 40 hour workweek. measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 30 Strategies for Improved Performance 1. Asset Management Findings: Best practices as well as analysis show less than optimal performance in most areas of process maturity, automation and integration. Overall score is a 5.4 vs. 5.5 for the database average. Hardware inventory management is an issue with a score of 4.2 vs. 5.5 for the db. Software inventory management score is not great, though higher than the db. Lifecycle Management is issue with a score of 5.5 vs. 5.7 for the db. Non-optimal controls and tracking can have a wide-ranging impact to support, maintenance and costs. Asset Administration Comparisons 7.5 vs. 6.4 Vendor Management 5.8 vs. 5.7 Procurement 5.5 vs. 5.7 Life-Cycle Management 4.2 vs. 4.0 Software Inventory Management 4.2 vs. 5.5 Hardware Inventory Management -1.5 -1.0 -0.5 1.1 0.1 -0.2 0.2 -1.3 0.0 DBA 0.5 1.0 1.5 measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 31 Strategies for Improved Performance 1. Asset Management (Cont) Findings: Operations staff is higher than the peers and database average. This is in part due to issues around management and tracking of IT assets. Lifecycle management is basic. This contributes to: – An aging inventory and cascading of assets resulting in greater support and maintenance resource requirements (from deskside support to the help desk), – A growing inventory of disparate equipment that becomes harder and harder to track – And a negative impact to productivity as equipment fails or becomes unable to perform to even-increasing requirements. Actions: Fully funding, implementing, integrating and actually leveraging an ITIL system will greatly improve your asset management issues. Build a plan to improve key processes in critical need of improvement. These include all aspects of hardware and software inventory management, lifecycle management as well as procurement. Leverage the Governance Council in your efforts in building a consolidated and centralized asset management foundation. measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 32 Strategies for Improved Performance 2. Distributed Complexity Findings: Overall complexity has risen significantly since the previous benchmark. – Currently complexity is 11 (high) vs. 8.8 (’99). Staffing levels are higher in all areas reviewed to support the elevated complexity in the environment at current quality of support. Hardware and software complexity is higher than the database average. Low HW and SW best practice scores, describing processes and technologies, are contributing to the negative impact of the higher complexity. Hydro-Quebec has higher complexity than the average utility organization (8.8) and higher than all but 1 peer in the utility peer group. Actions: Establish enforceable enterprise-wide standards and desktop policies that are uniform, clearly defined, are in accordance with best practices and are capable of having a cost cutting impact to the enterprise. Get approval to enforce these standards and policies at the executive level, doing so will go a long way to reducing asset costs, repair costs, troubleshooting time and support demands. Leverage the Governance Council in your efforts. Investigate other ways of reducing complexity in the Distributed environment. measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 33 Strategies for Improved Performance 3. Training Findings: Training is lacking enterprise-wide for Hydro-Quebec. – 72% of users receive no training for standard desktop applications – 60% of users receive no training for alternative standard app training – 56% of users receive no training for custom business applications End user training best practice is a 1.7, which is lower than the industry low database average of 2.7 and IS training is a 3.7 vs. 4.1 for the database average. Lack of effective training will ultimately impact efficiency, productivity and drive up support costs. Percent of users recieving no training 90 80 70 60 50 40 30 20 10 0 Form al Standard Apps DBA Custom Business Apps DBA Alternative Standard Apps DBA measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 34 Strategies for Improved Performance 3. Training (Cont) Actions: Review the specific training needs of the various users and departments – Make training a priority and allocate the proper funds – Establish training programs to meet the needs of the users Best-in-class organizations spend 7 percent to 10 percent of IT payroll on training. A spending level of 5 percent can ensure a well-trained staff. Technical IT training programs typically yield 25 percent to 75 percent ROI of the initial investment. For every thousand dollars spent on training, the organization adds $250 to $750 to the bottom line. measurement Hydro-Quebec Management Presentation 15 October 2004 Entire contents © 2002 Gartner, Inc. Page 35