1 2 3 4 5 SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET NOT FOR CONSTRUCTION SHEET LIST November 18, 2011 C B Police Service & Installation Security/ S5 Guardmount/Armory Mobility/Supply ECC/ BDOC Training/Quality Confinement Investigation/ S2 Command/ Orderly Back of House Restrooms & General Support Break Room & Front of House Restrooms Operations & Training/ S3 Building Rendering 1 - Rendering Building Example 1 - Floor Plan Building Example 2 - Rendering Building Example 2 - Floor Plan Building Example 2 - Floor Plan Room Finish Schedule Room Finish Schedule Door Schedule Window Schedule Jacobs Project No.: A 100% DESIGN 100% DESIGN 911 Central Parkway N., Suite 425 San Antonio, TX 78323 501 North Broadway, St. Louis, Missouri 63102-2121 SECURITY FORCE OPERATIONS BUILDING FACILITIES DYNAMIC PROTOTYPES DESIGN FOR SECURITY FORCE OPERATIONS BUILDING A-101 A-102 A-103 A-104 A-105 A-106 A-107 A-108 A-109 A-110 A-111 A-201 A-202 A-203 A-204 A-205 A-301 A-302 A-303 A-304 Sheet Name AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) FACILITIES DYNAMIC PROTOTYPES DESIGN FOR: D AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) Sheet Number FDWD0262 Drawing Title: Cover Sheet Date: 18 NOVEMBER 2011 Designed By: JN/MRB/OF Drawing No.: JN/MRB/OF Drawn By: Checked By: JS G-000 1 3 2 4 5 SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET GENERAL NOTES 1. 2. 3. 4. 5. 6. D EVERY WALL IS GENERIC UNLESS SPECIFICALLY NOTED EVERY WALL IS A PLACE HOLDER AS THE MODULES ARE COMBINED TO CREATE A FACILITY, DISCRETION SHOULD BE USED AS TO WHICH WALLS NEED TO BE MOVED, ADDED OR REMOVED IF NO WALL IS PRESENT, IT IS THE DESIGN INTENT TO LEAVE THAT SPACE OPEN TO ADJACENT SPACES WITHIN THE FACILITY ALL FURNITURE IS A PLACE HOLDER UNLESS SPECIFICALLY NOTED ALL MODULES HAVE BEEN ORGANIZED BASED ON A 15' GRID. FLOOR FINISH LEGEND CEILING LEGEND CARPET 2X2 ACOUSTICAL TILE EPOXY PAINT PAINTED GYP. BOARD SEALED CONCRETE CONCRETE VCT TILE SECURED GYP. BOARD NOT FOR CONSTRUCTION 911 Central Parkway N., Suite 425 San Antonio, TX 78323 501 North Broadway, St. Louis, Missouri 63102-2121 CERAMIC TILE Chief's Office 1.01 150 SF HALF-WALL PARTITIONS Plans Office 1.02 121 SF Counter Area at Lobby 1.07 60 SF Installation Security Office 1.03 121 SF Files/ Equipment/ Supply Storage 1.08 98 SF CASED OPENING C Computer Storage 1.09 100 SF Reports & Analysis 1.04 151 SF 1 Module 1 - Police Service & Installation Security/ S5 - Floor Plan 1/8" = 1'-0" Open Office Area 1.05 1117 SF Chief's Office 1.01 150 SF 9' - 0" 9' - 0" B 8' - 0" Plans Office 1.02 121 SF Waiting Room 1.06 121 SF Counter Area at Lobby 1.07 60 SF 10' - 0" 9' - 0" 100% DESIGN PASS-THROUGH WINDOW SECURITY FORCE OPERATIONS BUILDING Open Office Area 1.05 1117 SF AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) FACILITIES DYNAMIC PROTOTYPES DESIGN FOR: Waiting Room 1.06 121 SF 9' - 0" Files/ Equipment/ Supply Storage 1.08 98 SF Installation Security Office 1.03 121 SF 9' - 0" Reports & Analysis 1.04 151 SF 9' - 0" Computer Storage 1.09 100 SF 0 Module 1 - Police Station & Installation Security/ S5 - Reflected Ceiling Plan 2 1/8" = 1'-0" A 4' 8' 16' SCALE: 1/8 " = 1' 3 Module 1 - Police Service & Installation Security/ S5 - Axon. Jacobs Project No.: FDWD0262 Drawing Title: Police Service & Installation Security/ S5 Date: 18 NOVEMBER 2011 Designed By: JN/MRB/OF Drawing No.: JN/MRB/OF Drawn By: Checked By: JS A-101 1 3 2 4 5 SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET GENERAL NOTES 1. 2. 3. COMPACT STORAGE: PROVIDE ADEQUATE CLEARANCE ABOVE FOR SPRINKLER SYSTEM 4. 5. 6. CARPET 2X2 ACOUSTICAL TILE EPOXY PAINT PAINTED GYP. BOARD SEALED CONCRETE CONCRETE VCT TILE SECURED GYP. BOARD NOT FOR CONSTRUCTION 911 Central Parkway N., Suite 425 San Antonio, TX 78323 501 North Broadway, St. Louis, Missouri 63102-2121 CERAMIC TILE NCOIC Armory Office 2.03 119 SF Guardmount Area 2.01 736 SF Circulation 2.04 36 SF Restroom 2.05 54 SF CASED OPENING EXPANDABLE WEAPON RACKS (TYP.) PASS-THROUGH WINDOW (TYP.) Issue Windows 2.09 165 SF Weapons Cleaning Area 2.10 113 SF C Transient Weapons Storage 2.11 100 SF SERVICE MAT 1 Personal Weapons Storage 2.12 64 SF Module 2 - Guardmount & Armory - Floor Plan 1/8" = 1'-0" Guardmount Area 2.01 736 SF Ammunition Storage 2.02 150 SF 10' - 0" 10' - 0" 11' - 6" NCOIC Armory Office 2.03 119 SF 10' - 0" B Restroom 2.05 54 SF Gear Lockers 2.06 919 SF 11' - 6" 100% DESIGN CASED OPENING SECURITY FORCE OPERATIONS BUILDING Weapons Storage 2.08 300 SF Weapons Issue Area 2.07 211 SF Gear Lockers 2.06 919 SF CEILING LEGEND AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) FACILITIES DYNAMIC PROTOTYPES DESIGN FOR: D Ammunition Storage 2.02 150 SF EVERY WALL IS GENERIC UNLESS SPECIFICALLY NOTED EVERY WALL IS A PLACE HOLDER AS THE MODULES ARE COMBINED TO CREATE A FACILITY, DISCRETION SHOULD BE USED AS TO WHICH WALLS NEED TO BE MOVED, ADDED OR REMOVED IF NO WALL IS PRESENT, IT IS THE DESIGN INTENT TO LEAVE THAT SPACE OPEN TO ADJACENT SPACES WITHIN THE FACILITY ALL FURNITURE IS A PLACE HOLDER UNLESS SPECIFICALLY NOTED ALL MODULES HAVE BEEN ORGANIZED BASED ON A 15' GRID. FLOOR FINISH LEGEND Weapons Storage 2.08 300 SF 9' - 0" 10' - 0" 10' - 0" 10' - 0" 9' - 0" 0 Transient Weapons Weapons Issue Weapons Cleaning Area Storage Area 2.10 2.11 2.07 113 SF 100 SF 211 SF A 4' 8' 16' SCALE: 1/8 " = 1' Personal Weapons Storage 2.12 64 SF Jacobs Project No.: FDWD0262 Drawing Title: 2 Module 2 - Guardmount & Armory - Reflected Ceiling Plan 1/8" = 1'-0" 3 Module 2 - Guardmount & Armory Guardmount/Armory Date: 18 NOVEMBER 2011 Designed By: JN/MRB/OF Drawing No.: JN/MRB/OF Drawn By: Checked By: JS A-102 1 3 2 4 5 SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET GENERAL NOTES 1. 2. 3. 4. D 5. 6. Maintenance Supply 3.01 400 SF EVERY WALL IS GENERIC UNLESS SPECIFICALLY NOTED EVERY WALL IS A PLACE HOLDER AS THE MODULES ARE COMBINED TO CREATE A FACILITY, DISCRETION SHOULD BE USED AS TO WHICH WALLS NEED TO BE MOVED, ADDED OR REMOVED IF NO WALL IS PRESENT, IT IS THE DESIGN INTENT TO LEAVE THAT SPACE OPEN TO ADJACENT SPACES WITHIN THE FACILITY ALL FURNITURE IS A PLACE HOLDER UNLESS SPECIFICALLY NOTED ALL MODULES HAVE BEEN ORGANIZED BASED ON A 15' GRID. FLOOR FINISH LEGEND CEILING LEGEND CARPET 2X2 ACOUSTICAL TILE EPOXY PAINT PAINTED GYP. BOARD SEALED CONCRETE CONCRETE VCT TILE SECURED GYP. BOARD NOT FOR CONSTRUCTION 911 Central Parkway N., Suite 425 San Antonio, TX 78323 501 North Broadway, St. Louis, Missouri 63102-2121 CERAMIC TILE OPEN SPACE TO UNLOAD PALLETS SHELVING (TYP.) EQ Advisor Resource Office 3.05 120 SF Circulation 3.07 185 SF Open Office Area 3.02 224 SF Supply Room 3.04 1205 SF Hazmat Storage 3.06 143 SF PASS-THROUGH WINDOW 1 Module 3 - Mobility and Supply - Floor Plan 1/8" = 1'-0" 9' - 0" 11' - 6" Maintenance Supply 3.01 400 SF B 9' - 0" Open Office Area 3.02 224 SF Logistics Officer 3.03 120 SF Supply Room 3.04 1205 SF 9' - 0" 9' - 0" Advisor Resource Office 3.05 120 SF 11' - 6" Hazmat Storage 3.06 143 SF 0 2 Module 3 - Mobility and Supply - Reflected Ceiling Plan 1/8" = 1'-0" 3 Module 3 - Mobility and Supply - Axon 4' 8' 16' SCALE: 1/8 " = 1' Jacobs Project No.: A 100% DESIGN AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) FACILITIES DYNAMIC PROTOTYPES DESIGN FOR: C EQ Logistics Officer 3.03 120 SF SECURITY FORCE OPERATIONS BUILDING EQ EQ FDWD0262 Drawing Title: Mobility/Supply Date: 18 NOVEMBER 2011 Designed By: JN/MRB/OF Drawing No.: JN/MRB/OF Drawn By: Checked By: JS A-103 1 3 2 4 5 SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET GENERAL NOTES 1. 2. 3. 4. 6" RAISED FLOOR D 5. 6. CEILING LEGEND CARPET 2X2 ACOUSTICAL TILE EPOXY PAINT PAINTED GYP. BOARD SEALED CONCRETE CONCRETE VCT TILE SECURED GYP. BOARD NOT FOR CONSTRUCTION 911 Central Parkway N., Suite 425 San Antonio, TX 78323 501 North Broadway, St. Louis, Missouri 63102-2121 CERAMIC TILE Waiting Area 4.05 139 SF Comunication Center 4.04 288 SF Restroom 4.19 58 SF 4' - 0" Server Room 4.02 83 SF UP Break Room 4.12 133 SF Flight Sergeant 4.10 120 SF Interview Room B 4.07 73 SF Corridor 4.09 510 SF 4' - 0" Restroom 4.08 50 SF Interview Room A 4.06 73 SF Storage 4.17 90 SF DUI 4.14 92 SF Holding Cell A 4.15 92 SF AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) FACILITIES DYNAMIC PROTOTYPES DESIGN FOR: Man Trap 4.16 138 SF Flight Chief 4.11 178 SF Holding Cell B 4.18 90 SF C Patrol Room 4.13 164 SF 1 FIXED SEATING (TYP.) Module 4 - ECC/ BDOC - Floor Plan 1/8" = 1'-0" Battle Staff Room 4.03 144 SF Waiting Area 4.05 139 SF 9' - 0" OPEN TO STRUCTURE ABOVE 9' - 6" 9' - 6" OPEN TO STRUCTURE ABOVE B 9' - 0" Interview Room A 4.06 73 SF Restroom 4.19 58 SF Interview Room B 4.07 73 SF Comunication Center 4.04 288 SF 9' - 6" Restroom 4.08 50 SF Corridor 4.09 510 SF 9' - 0" Flight Sergeant 4.10 120 SF Break Room 9' - 0" 4.12 133 SF 9' - 0" 9' - 0" 9' - 0" Man Trap 4.16 138 SF 9' - 0" 9' - 0" Flight Chief 4.11 178 SF DUI 4.14 92 SF Patrol Room 4.13 164 SF 9' - 0" 9' - 0" 100% DESIGN Battle Staff Room 4.03 144 SF SECURITY FORCE OPERATIONS BUILDING Alarm Room 4.01 126 SF EVERY WALL IS GENERIC UNLESS SPECIFICALLY NOTED EVERY WALL IS A PLACE HOLDER AS THE MODULES ARE COMBINED TO CREATE A FACILITY, DISCRETION SHOULD BE USED AS TO WHICH WALLS NEED TO BE MOVED, ADDED OR REMOVED IF NO WALL IS PRESENT, IT IS THE DESIGN INTENT TO LEAVE THAT SPACE OPEN TO ADJACENT SPACES WITHIN THE FACILITY ALL FURNITURE IS A PLACE HOLDER UNLESS SPECIFICALLY NOTED ALL MODULES HAVE BEEN ORGANIZED BASED ON A 15' GRID. FLOOR FINISH LEGEND Storage 4.17 90 SF Holding Cell B 4.18 90 SF Holding Cell A 4.15 92 SF 0 4' 8' 16' SCALE: 1/8 " = 1' Jacobs Project No.: A FDWD0262 Drawing Title: 2 Module 4 - ECC/ BDOC - Reflected Ceiling Plan 1/8" = 1'-0" 3 Module 4 - ECC/ BDOC - Axon. ECC/ BDOC Date: 18 NOVEMBER 2011 Designed By: JN/MRB/OF Drawing No.: JN/MRB/OF Drawn By: Checked By: JS A-104 1 3 2 4 5 SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET GENERAL NOTES Superintendant 5.02 154 SF Training Officer Office 5.01 154 SF 1. 2. 3. Classroom A 5.03 752 SF WALL MOUNTED TV 4. D 5. 6. EVERY WALL IS GENERIC UNLESS SPECIFICALLY NOTED EVERY WALL IS A PLACE HOLDER AS THE MODULES ARE COMBINED TO CREATE A FACILITY, DISCRETION SHOULD BE USED AS TO WHICH WALLS NEED TO BE MOVED, ADDED OR REMOVED IF NO WALL IS PRESENT, IT IS THE DESIGN INTENT TO LEAVE THAT SPACE OPEN TO ADJACENT SPACES WITHIN THE FACILITY ALL FURNITURE IS A PLACE HOLDER UNLESS SPECIFICALLY NOTED ALL MODULES HAVE BEEN ORGANIZED BASED ON A 15' GRID. FLOOR FINISH LEGEND CEILING LEGEND CARPET 2X2 ACOUSTICAL TILE EPOXY PAINT PAINTED GYP. BOARD SEALED CONCRETE CONCRETE VCT TILE SECURED GYP. BOARD NOT FOR CONSTRUCTION 911 Central Parkway N., Suite 425 San Antonio, TX 78323 501 North Broadway, St. Louis, Missouri 63102-2121 CERAMIC TILE Quality Control NCOIC Office 5.04 120 SF Private Testing Room A 5.05 77 SF ROOM SEPARATION WALL PANELS Private Testing Room B 5.06 77 SF Shared Office 5.07 132 SF Study Carrells 5.08 117 SF WALL MOUNTED TV Classroom B 5.13 752 SF Files/Office Equipment/ Supply 5.14 165 SF C AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) FACILITIES DYNAMIC PROTOTYPES DESIGN FOR: MARKER BOARD Classroom Storage 5.15 130 SF Central Circulation Conference 5.11 Area 316 SF 5.12 145 SF 1 Module 5 - Training & Quality - Floor Plan 1/8" = 1'-0" Private Testing Room B 5.06 77 SF Private Testing Room A 5.05 77 SF 9' - 0" Training Officer Office 5.01 154 SF 9' - 0" Superintendant 5.02 154 SF Classroom A 5.03 752 SF 9' - 0" 9' - 0" B Quality Control NCOIC Office 5.04 120 SF 12' - 0" 9' - 0" 9' - 0" Shared Office 5.07 132 SF Study Carrells 5.08 117 SF 9' - 0" 9' - 0" Classroom B 5.13 752 SF 9' - 0" 100% DESIGN Storage 5.10 55 SF SECURITY FORCE OPERATIONS BUILDING Open Office Area 5.09 407 SF 12' - 0" Storage 5.10 55 SF Open Office Area 5.09 407 SF 8' - 0" 9' - 0" 9' - 0" Classroom Storage 5.15 130 SF 0 4' 8' 16' SCALE: 1/8 " = 1' Circulation 5.11 316 SF A Central Conference Area 5.12 145 SF Jacobs Project No.: Files/Office Equipment/ Supply 5.14 165 SF FDWD0262 Drawing Title: Training/Quality 2 Module 5 - Training & Quality - Reflected Ceiling Plan 1/8" = 1'-0" 3 Module 5 - Training & Quality Axon. Date: 18 NOVEMBER 2011 Designed By: JN/MRB/OF Drawing No.: JN/MRB/OF Drawn By: Checked By: JS A-105 1 3 2 Waiting 6.01 131 SF 9 LOCKERS PASS-THROUGH WINDOW SP 6.02 68 SF 4 5 SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET Admin. Processing 6.03 182 SF Storage 6.04 127 SF GENERAL NOTES SP 6.02 68 SF Waiting 6.01 131 SF Storage 6.04 127 SF Admin. Processing 6.03 182 SF Janitor's Closet 6.05 73 SF D Visitation/Training Room 6.13 125 SF Guard Room 6.15 112 SF PHONE Corridor 6.14 166 SF WASHER/ DRYER 6 LOCKERS Male Shower 6.12 68 SF Corridor 6.19 75 SF Male Cell 6.11 80 SF Restroom 6.06 64 SF 6 LOCKERS Female Shower 6.07 68 SF PASS-THROUGH WINDOW Corridor 6.18 75 SF 1. 2. 3. Female Cell 6.08 80 SF 4. 9' - 0" Corridor 6.14 166 SF Visitation/Training Room 6.13 125 SF Restroom 6.06 64 SF Guard Room 6.15 112 SF 9' - 0" Corridor 6.18 75 SF 9' - 0" 5. 6. FLOOR FINISH LEGEND 9' - 0" Male Cell 6.11 80 SF Female Cell 6.08 80 SF 9' - 0" 9' - 0" NOT FOR CONSTRUCTION EVERY WALL IS GENERIC UNLESS SPECIFICALLY NOTED EVERY WALL IS A PLACE HOLDER AS THE MODULES ARE COMBINED TO CREATE A FACILITY, DISCRETION SHOULD BE USED AS TO WHICH WALLS NEED TO BE MOVED, ADDED OR REMOVED IF NO WALL IS PRESENT, IT IS THE DESIGN INTENT TO LEAVE THAT SPACE OPEN TO ADJACENT SPACES WITHIN THE FACILITY ALL FURNITURE IS A PLACE HOLDER UNLESS SPECIFICALLY NOTED ALL MODULES HAVE BEEN ORGANIZED BASED ON A 15' GRID. 911 Central Parkway N., Suite 425 San Antonio, TX 78323 501 North Broadway, St. Louis, Missouri 63102-2121 CEILING LEGEND CARPET 2X2 ACOUSTICAL TILE EPOXY PAINT PAINTED GYP. BOARD SEALED CONCRETE CONCRETE VCT TILE SECURED GYP. BOARD PHONE Male Segregated Cell 6.10 80 SF Outdoor Yard 6.17 258 SF TV CLERESTORY WINDOWS Day/Recreation Room 6.16 144 SF Female Segregated Cell 6.09 80 SF 9' - 0" Female Segregated Cell 6.09 80 SF 9' - 0" Corridor 6.21 39 SF CHAIN LINK FENCE Day/Recreation Room 6.16 144 SF Corridor 6.19 75 SF Corridor 6.20 39 SF CONFINEMENT MODULE NOTES 1. 2. 3. C 4. 1 Module 6 - Confinement - Floor Plan 1/8" = 1'-0" 2 Module 6 - Confinement - Reflected Ceiling Plan 1/8" = 1'-0" USE CORRECTIONAL LIGHTING (TAMPER PROOF LENSES/BALLASTS). PROVIDE AN EXTERIOR LOCKED "KNOX BOX" IF BUILT AS A STAND ALONE FACILITY. FIRE ESCAPE ELECTRONIC RELEASE DOORS TO OUTDOOR RECRETIONAL YARD WILL BE CONNECTED TO ECC/ BDOC'S BACKUP GENERATOR. USE SECURITY HARDWARE (SCREWS/BOLTS) THROUGHOUT. ADMIN/ PROCESSING 1. PROVIDE ACCESS CONTROL PANEL TO CONTROL SALLY PORT AND OUTDOOR RECREATIONAL YARD EXIT DOORS. 2. PROVIDE REDUNDANT DISPLAY APPLICABILITY (RDA) TO CONTROL SALLY PORT DOORS FROM ADMIN. & GUARD ROOM. 3. PROVIDE LOCKABLE, WALL-MOUNTED KEY BOX & SMALL LOCKABLE SECURITY DRAWER/SAFE. 4. USE ONE WAY GLASS ON WINDOWS TO PREVENT CONFINEES'/VISITORS' VIEW TO STAFF. 5. OPTIONAL. USE ACOUSTICAL TILES IN CEILING. GUARD ROOM 1. PROVIDE LOCKABLE, WALL-MOUNTED KEY BOX & LOCKABLE MEDICINE STORAGE BOX. 2. PROVIDE AN ON/OFF SWITCH FOR THE PHONE IN THE VISITATION/ TRAINING ROOM. 3. USE ONE WAY GLASS TO PREVENT CONFINEES' VIEW TO STAFF. 4. OPTIONAL. USE ACOUSTICAL TILES IN CEILING. DAY/ RECREATION ROOM 1. IN COLD-WEATHER CLIMATES, PROVIDE EXTRA SPACE FOR EXERCISE EQUIPMENT. 2. DOORS SHOULD NOT SWING IN. CONFINEMENT CELLS 1. PROVIDE AN ON/OFF SWITCH OUTSIDE OF THE CELL TO CONTROL THE ELECTRICAL OUTLET WITHIN THE CELL. 2. PROVIDE A METAL DEMOUNTABLE BED (WALL AND/OR FLOOR MOUNTED), DESK, SHELF, AND BREAKAWAY CLOTHES HOOK IN EACH CELL. 3. USE SECURITY ONE-PIECE SAFETY MIRRORS. 4. USE ALL IN ONE TOILET, BUBBLER, AND SINK. 5. USE EMERGENCY LIGHTING (BACKUP POWERED) AND TAMPER-PROOF (DETENTION) LIGHTING. 6. CELL DOORS SHOULD NOT HAVE ONE WAY GLASS AND CAN EITHER SLIDE OR OPEN OUT. 7. DO NOT USE BASEBOARDS. B CORRIDORS 1. BETWEEN THE MALE AND FEMALE CELLS, USE SLIDING, POCKET, OR BIFOLD DOORS. THE PRIMARY FUNCTION OF THIS DOOR IS FOR SOUND ABATEMENT. SHOWERS 1. USE BREAKAWAY CLOTHES HOOKS. SALLY PORT 1. ENSURE SALLY PORT IS LONG AND WIDE ENOUGH FOR AN EMS STRETCHER/GURNEY TO PASS THROUGH. 100% DESIGN Corridor 6.21 39 SF Corridor 6.20 39 SF CERAMIC TILE Male Segregated Cell 6.10 80 SF SECURITY FORCE OPERATIONS BUILDING WATER FOUNTAIN AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) FACILITIES DYNAMIC PROTOTYPES DESIGN FOR: ONE WAY WINDOW IN CONFINEMENT CELL DOORS (TYP.) DOORS 1. INSTITUTION SHOWER DOORS ARE CENTERED HALF-DOORS (TOP AND BOTTOM OPEN). 2. USE SOLID MINIMUM INSTITUTION RATED DOORS TRHOUGHOUT. CELL AND CORRIDOR DOORS SHOULD BE MAXIMUM SECURITY RATED. WALL CONSTRUCTION 1. THE ENTIRE CONFINEMENT AREA FOOTPRINT NEEDS TO BE SOLID SECURITY RATED TO LEVEL 1 CONFINEMENT WALLS. THE WALLS SHOULD BE 8-INCH THICK CONCRETE MASONRY UNITS WITH CELLS FILLED FULL HEIGHT WITH GROUT CONFORMING TO ASTM C476; VERTICAL REINFORCEMENT NOT REQUIRED FOR SECURITY; EXTEND WALL TO UNDERSIDE OF STRUCTURE. CRITERIA DOES NOT PRECLUDE THE USE OF OTHER MATERIALS MORE READILY AVAILABLE IN THE LOCAL MARKET PROVIDED THEY MEET OR EXCEED THE BASIC REQUIREMENTS. CEILING CONSTRUCTIONDV 1. THE CELL CEILING SYSTEM SHALL BE CAST-IN-PLACE CONCRETE WITH A MINIMUM THICKNESS OF 5 INCHES OF REINFORCED CONRETE WITH 6X6 - W1.4 X W1.4 WELDED WIRE FABRIC. SLAB AREA EXPOSED TO THE CELL SHALL HAVE A STEEL TROWEL FINISH. THE ENTIRE CONFINEMENT AREA CAN BE MADE THIS WAY OR THE CIRCUMFERENCE OF THE AREA WOULD NEED TO HAVE 14 GAUGE STEEL PLATE FROM FLOOR TO DECK (TO PREVENT CONFINEES ACCESS TO THE ENTIRE SECURITY FORCES COMPLEX CEILING AND ESCAPE VIA A DIFFERENT ROOM IN THE BUILDING). A 0 4' 8' 16' SCALE: 1/8 " = 1' Jacobs Project No.: FDWD0262 Drawing Title: Confinement Date: 3 Module 6 - Confinement - Axon. 18 NOVEMBER 2011 Designed By: JN/MRB/OF Drawing No.: JN/MRB/OF Drawn By: Checked By: JS A-106 1 3 2 4 5 SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET GENERAL NOTES 1. 2. 3. 4. D 5. 6. CEILING LEGEND CARPET 2X2 ACOUSTICAL TILE EPOXY PAINT PAINTED GYP. BOARD SEALED CONCRETE CONCRETE VCT TILE SECURED GYP. BOARD NOT FOR CONSTRUCTION 911 Central Parkway N., Suite 425 San Antonio, TX 78323 501 North Broadway, St. Louis, Missouri 63102-2121 CERAMIC TILE Intel (S2) Office 7.02 120 SF Evidence Storage Vault 7.01 175 SF MARKER BOARDS PASS-THROUGH WINDOW Open Office/ Conference Area 7.06 372 SF Waiting Area 7.08 83 SF Interview 1 7.07 110 SF 2 Interview 2 7.09 95 SF Module 7 - Investigation/ S2 - Floor Plan 1/8" = 1'-0" Evidence Storage Vault 7.01 175 SF Intel (S2) Office 7.02 120 SF 9' - 0" B Files/ Equipment/ Supply Storage 7.03 107 SF 9' - 0" 9' - 0" NCOIC Investigations 7.05 120 SF 100% DESIGN WEAPON STORAGE LOCKERS AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) FACILITIES DYNAMIC PROTOTYPES DESIGN FOR: Corridor 7.04 61 SF SECURITY FORCE OPERATIONS BUILDING NCOIC Investigations 7.05 120 SF Files/ Equipment/ Supply Storage 7.03 107 SF C EVERY WALL IS GENERIC UNLESS SPECIFICALLY NOTED EVERY WALL IS A PLACE HOLDER AS THE MODULES ARE COMBINED TO CREATE A FACILITY, DISCRETION SHOULD BE USED AS TO WHICH WALLS NEED TO BE MOVED, ADDED OR REMOVED IF NO WALL IS PRESENT, IT IS THE DESIGN INTENT TO LEAVE THAT SPACE OPEN TO ADJACENT SPACES WITHIN THE FACILITY ALL FURNITURE IS A PLACE HOLDER UNLESS SPECIFICALLY NOTED ALL MODULES HAVE BEEN ORGANIZED BASED ON A 15' GRID. FLOOR FINISH LEGEND 9' - 0" Open Office/ Conference Area 7.06 372 SF 9' - 0" 9' - 0" 9' - 0" 0 Interview 1 7.07 110 SF Waiting Area 7.08 83 SF 4' Interview 2 7.09 95 SF 8' SCALE: 1/8 " = 1' Jacobs Project No.: A 3 Module 7 - Investigation/ S2 - Reflected Ceiling Plan 1/8" = 1'-0" 16' 1 Module 7 - Investigation/ S2 - Axon. FDWD0262 Drawing Title: Investigation/ S2 Date: 18 NOVEMBER 2011 Designed By: JN/MRB/OF Drawing No.: JN/MRB/OF Drawn By: Checked By: JS A-107 1 3 2 4 5 SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET GENERAL NOTES 1. 2. 3. 4. D 5. 6. Open Office Area 8.02 642 SF Files/ Office Equipment/ Supply Storage 8.01 58 SF 2X2 ACOUSTICAL TILE EPOXY PAINT PAINTED GYP. BOARD SEALED CONCRETE CONCRETE VCT TILE SECURED GYP. BOARD NOT FOR CONSTRUCTION 911 Central Parkway N., Suite 425 San Antonio, TX 78323 501 North Broadway, St. Louis, Missouri 63102-2121 CERAMIC TILE First Sergeant 8.03 153 SF MARKER BOARD WALL MOUNTED TV Module - 8 Command and Orderly 1/8" = 1'-0" 9' - 0" Open Office Area 8.02 642 SF B 9' - 0" Files/ Office Equipment/ Supply Storage 8.01 58 SF 9' - 0" Files/ Office Equipment/ Supply Storage 8.06 160 SF 9' - 0" First Sergeant 8.03 153 SF 9' - 0" Waiting Area/ Secretary 8.04 220 SF 9' - 0" SFM 8.07 182 SF 10' - 6" Commander 8.08 289 SF 9' - 0" 100% DESIGN Command Conference Room 8.09 410 SF SECURITY FORCE OPERATIONS BUILDING Commander 8.08 289 SF SFM 8.07 182 SF 1 CARPET AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) FACILITIES DYNAMIC PROTOTYPES DESIGN FOR: C CEILING LEGEND Corridor 8.05 142 SF Waiting Area/ Secretary 8.04 220 SF Files/ Office Equipment/ Supply Storage 8.06 160 SF EVERY WALL IS GENERIC UNLESS SPECIFICALLY NOTED EVERY WALL IS A PLACE HOLDER AS THE MODULES ARE COMBINED TO CREATE A FACILITY, DISCRETION SHOULD BE USED AS TO WHICH WALLS NEED TO BE MOVED, ADDED OR REMOVED IF NO WALL IS PRESENT, IT IS THE DESIGN INTENT TO LEAVE THAT SPACE OPEN TO ADJACENT SPACES WITHIN THE FACILITY ALL FURNITURE IS A PLACE HOLDER UNLESS SPECIFICALLY NOTED ALL MODULES HAVE BEEN ORGANIZED BASED ON A 15' GRID. FLOOR FINISH LEGEND 10' - 0" Command Conference Room 8.09 410 SF 0 4' 8' 16' SCALE: 1/8 " = 1' 2 A Module 8- Command and Orderly - Reflected Ceiling Plan 1/8" = 1'-0" 3 Module 8 - Command and Orderly Jacobs Project No.: FDWD0262 Drawing Title: Command/ Orderly Date: 18 NOVEMBER 2011 Designed By: JN/MRB/OF Drawing No.: JN/MRB/OF Drawn By: Checked By: JS A-108 1 3 2 4 5 SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET GENERAL NOTES 1. 2. 3. 4. 5. 6. D EVERY WALL IS GENERIC UNLESS SPECIFICALLY NOTED EVERY WALL IS A PLACE HOLDER AS THE MODULES ARE COMBINED TO CREATE A FACILITY, DISCRETION SHOULD BE USED AS TO WHICH WALLS NEED TO BE MOVED, ADDED OR REMOVED IF NO WALL IS PRESENT, IT IS THE DESIGN INTENT TO LEAVE THAT SPACE OPEN TO ADJACENT SPACES WITHIN THE FACILITY ALL FURNITURE IS A PLACE HOLDER UNLESS SPECIFICALLY NOTED ALL MODULES HAVE BEEN ORGANIZED BASED ON A 15' GRID. NOT FOR CONSTRUCTION 911 Central Parkway N., Suite 425 San Antonio, TX 78323 501 North Broadway, St. Louis, Missouri 63102-2121 FLOOR FINISH LEGEND CARPET EPOXY PAINT SEALED CONCRETE VCT TILE CERAMIC TILE CEILING LEGEND 2X2 ACOUSTICAL TILE SECURED GYP. BOARD C 1 Module 9A - Back of House Restrooms - Axon. 6 Module 9B - General Support - Axon. B BENCH (TYP.) 9' - 0" 9' - 0" Female Restroom 9A.2 404 SF Male Restroom 9A.1 404 SF Mechanical Room 9B.1 860 SF 9' - 0" Mechanical Room 9B.1 860 SF Female Restroom 9A.2 404 SF Male Restroom 9A.1 404 SF 100% DESIGN AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) FACILITIES DYNAMIC PROTOTYPES DESIGN FOR: CONCRETE SECURITY FORCE OPERATIONS BUILDING PAINTED GYP. BOARD 9' - 0" 9' - 0" Janitor 9A.3 69 SF Janitor 9A.3 69 SF 3 Module 9A - Back of House Restrooms - Floor Plan 1/8" = 1'-0" 4 General Office Storage 9B.2 215 SF Module 9A - Back of House Restrooms - Reflected Ceiling Plan 1/8" = 1'-0" Electrical/ Comm. Equipment Storage 9B.3 192 SF General Office Storage 9B.2 215 SF 9' - 0" Electrical/ Comm. Equipment Storage 9B.3 192 SF 0 4' 8' SCALE: 1/8 " = 1' Jacobs Project No.: A 16' FDWD0262 Drawing Title: 2 Module 9B - General Support - Floor Plan 1/8" = 1'-0" 5 Module 9B - General Support - Reflected Ceiling Plan 1/8" = 1'-0" Back of House Restrooms & General Support Date: 18 NOVEMBER 2011 Designed By: JN/MRB/OF Drawing No.: JN/MRB/OF Drawn By: Checked By: JS A-109 1 3 2 4 5 SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET D 5. 6. CARPET 2X2 ACOUSTICAL TILE EPOXY PAINT PAINTED GYP. BOARD SEALED CONCRETE CONCRETE VCT TILE SECURED GYP. BOARD NOT FOR CONSTRUCTION 911 Central Parkway N., Suite 425 San Antonio, TX 78323 501 North Broadway, St. Louis, Missouri 63102-2121 CERAMIC TILE C 3 Module 9C - Break Room - Axon. 6 Module 9D - Front of House Restrooms - Axon. B 9' - 0" 9' - 0" Break Room 9C.1 564 SF Restroom 9D.1 56 SF Break Room 9C.1 564 SF Restroom 9D.1 56 SF 100% DESIGN 4. EVERY WALL IS GENERIC UNLESS SPECIFICALLY NOTED EVERY WALL IS A PLACE HOLDER AS THE MODULES ARE COMBINED TO CREATE A FACILITY, DISCRETION SHOULD BE USED AS TO WHICH WALLS NEED TO BE MOVED, ADDED OR REMOVED IF NO WALL IS PRESENT, IT IS THE DESIGN INTENT TO LEAVE THAT SPACE OPEN TO ADJACENT SPACES WITHIN THE FACILITY ALL FURNITURE IS A PLACE HOLDER UNLESS SPECIFICALLY NOTED ALL MODULES HAVE BEEN ORGANIZED BASED ON A 15' GRID. CEILING LEGEND SECURITY FORCE OPERATIONS BUILDING 1. 2. 3. FLOOR FINISH LEGEND AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) FACILITIES DYNAMIC PROTOTYPES DESIGN FOR: GENERAL NOTES 10' - 0" 2 Module 9C - Break Room - Floor Plan 1/8" = 1'-0" Module 9C - Break Room - Reflected Ceiling Plan 4 1/8" = 1'-0" 1 Module 9D - Front of House Restrooms - Floor Plan 1/8" = 1'-0" Module 9D - Front of House Restrooms Reflected Ceiling Plan 5 1/8" = 1'-0" 0 4' 8' SCALE: 1/8 " = 1' Jacobs Project No.: A 16' FDWD0262 Drawing Title: Break Room & Front of House Restrooms Date: 18 NOVEMBER 2011 Designed By: JN/MRB/OF Drawing No.: JN/MRB/OF Drawn By: Checked By: JS A-110 1 3 2 4 5 SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET GENERAL NOTES 1. 2. 3. 4. 5. 6. D S3 Officer 10.01 125 SF EVERY WALL IS GENERIC UNLESS SPECIFICALLY NOTED EVERY WALL IS A PLACE HOLDER AS THE MODULES ARE COMBINED TO CREATE A FACILITY, DISCRETION SHOULD BE USED AS TO WHICH WALLS NEED TO BE MOVED, ADDED OR REMOVED IF NO WALL IS PRESENT, IT IS THE DESIGN INTENT TO LEAVE THAT SPACE OPEN TO ADJACENT SPACES WITHIN THE FACILITY ALL FURNITURE IS A PLACE HOLDER UNLESS SPECIFICALLY NOTED ALL MODULES HAVE BEEN ORGANIZED BASED ON A 15' GRID. FLOOR FINISH LEGEND CEILING LEGEND CARPET 2X2 ACOUSTICAL TILE EPOXY PAINT PAINTED GYP. BOARD SEALED CONCRETE CONCRETE VCT TILE SECURED GYP. BOARD NOT FOR CONSTRUCTION 911 Central Parkway N., Suite 425 San Antonio, TX 78323 501 North Broadway, St. Louis, Missouri 63102-2121 CERAMIC TILE S3 SMGT 10.02 127 SF C Assistant S3 PMD MSGT 10.06 10.05 127 SF 124 SF 1 Module 10 - Operations & Training/ S3 1/8" = 1'-0" S3 Officer 10.01 125 SF 9' - 0" S3 SMGT 10.02 127 SF 9' - 0" B 10' - 0" 9' - 0" Work Stations 10.03 100 SF 9' - 0" Assistant S3 MSGT 10.05 124 SF 100% DESIGN Work Stations 10.03 100 SF AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) FACILITIES DYNAMIC PROTOTYPES DESIGN FOR: Planning Area 10.04 233 SF SECURITY FORCE OPERATIONS BUILDING MARKER BOARD Planning Area 10.04 233 SF 9' - 0" PMD 10.06 127 SF 0 4' 8' 16' SCALE: 1/8 " = 1' 2 A Module 10 - Operations & Training - Reflected Ceiling Plan 1/8" = 1'-0" 3 Module 10 - Operations & Training/ S3 - Axon. Jacobs Project No.: FDWD0262 Drawing Title: Operations & Training/ S3 Date: 18 NOVEMBER 2011 Designed By: JN/MRB/OF Drawing No.: JN/MRB/OF Drawn By: Checked By: JS A-111 1 2 3 4 5 SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET C B NOT FOR CONSTRUCTION 911 Central Parkway N., Suite 425 San Antonio, TX 78323 501 North Broadway, St. Louis, Missouri 63102-2121 Jacobs Project No.: A 100% DESIGN D THIS BUILDING LAYOUT IS PROVIDED TO ILLUSTRATE ONE POSSIBLE WAY OF ARRANGING THE INDIVIDUAL MODULES. IT IS NOT INTENDED TO CONSTITUTE A FINAL DESIGN. SECURITY FORCE OPERATIONS BUILDING 1. AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) FACILITIES DYNAMIC PROTOTYPES DESIGN FOR: BUILDING NOTES FDWD0262 Drawing Title: Building Rendering 1 Rendering Date: 18 NOVEMBER 2011 Designed By: JN/MRB/OF Drawing No.: JN/MRB/OF Drawn By: Checked By: JS A-201 1 3 2 4 5 SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET INDIVIDUAL MODULES Module 1: Police Service & Installation/ S5 Module 2: Guardmount/ Armory Module 3: Mobility/ Supply Module 4: ECC/ BDOC Module 5: Training/ Quality Module 7: Investigation/ S2 Module 8: Command/ Orderly Module 9B: General Support Module 9A: Back of House Restrooms Module 9C: Break Room Module 9D: Front of House Restrooms Module 10: Operations & Training/ S3 NOT FOR CONSTRUCTION 911 Central Parkway N., Suite 425 San Antonio, TX 78323 501 North Broadway, St. Louis, Missouri 63102-2121 D SCALE: 1/32" = 1'0" Transient Weapons Storage Restroom NCOIC Office Restroom Alarm Room Flight Sergeant Flight Chief Server Room Chief's Office Plans Office Installation Security Office Personal Weapons Storage Training Officer Reports & Analysis Issue Weapons Superintendent Ammunition Storage Quality Control Officer AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) FACILITIES DYNAMIC PROTOTYPES DESIGN FOR: Weapons Issue Area Weapons Cleaning Area Shared Office Private Testing Room B Break Room C Comunication Center Patrol Room Gear Lockers Study Carrels DUI Guardmount Holding Cell A Interview Room A Open Office Area Open Office Area Corridor STORAGE Classrooms Man Trap Interview Room B Waiting Area Files/Equip/Supply Computer Storage Holding Cell B Central Conference Area Waiting Area Files/Equipment/ Supply Classroom Storage Storage Restroom Corridor Entry Lobby Files/Storage B Janitor First Sergeant Office S3 Officer S3 SMGT Evidence Storage Vault Intel (S2) Office Open Office Area Maintenance Supply Open Office Area Female Restroom Command Conference Room Male Restroom NCOIC Investigations General Office Storage Work Stations Files/ Equipment/ Supply Storage Planning Area Advisor Resource Office Logistics Officer Waiting Assistant S3 MSGT Electrical/ Comm. Equipment Storage 100% DESIGN Private Testing Room A SECURITY FORCE OPERATIONS BUILDING Battle Staff Room PMD Open Office/ Conference Area Commander's Office Files/Equip/Supply Break Room Restroom SFM Office 0 8' 16' Mechanical Room 32' 64' SCALE: 1/32 " = 1' Interview 2 Waiting Area Interview 1 0 Mechanical Room 4' 8' 16' SCALE: 1/8 " = 1' Entry Vestibule Jacobs Project No.: A FDWD0262 Drawing Title: BUILDING NOTES 1. Building Example 1 - Floor Plan 1 1/8" = 1'-0" THIS BUILDING LAYOUT IS PROVIDED TO ILLUSTRATE ONE POSSIBLE WAY OF ARRANGING THE INDIVIDUAL MODULES. IT IS NOT INTENDED TO CONSTITUTE A FINAL DESIGN. Building Example 1 Floor Plan Hazmat Storage Supply Room Date: 18 NOVEMBER 2011 Designed By: JN/MRB/OF Drawing No.: JN/MRB/OF Drawn By: Checked By: JS A-202 1 2 3 4 5 SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET C B NOT FOR CONSTRUCTION 911 Central Parkway N., Suite 425 San Antonio, TX 78323 501 North Broadway, St. Louis, Missouri 63102-2121 Jacobs Project No.: A 100% DESIGN D THIS BUILDING LAYOUT IS PROVIDED TO ILLUSTRATE ONE POSSIBLE WAY OF ARRANGING THE INDIVIDUAL MODULES. IT IS NOT INTENDED TO CONSTITUTE A FINAL DESIGN. SECURITY FORCE OPERATIONS BUILDING 1. AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) FACILITIES DYNAMIC PROTOTYPES DESIGN FOR: BUILDING NOTES FDWD0262 Drawing Title: Building Example 2 Rendering Date: 18 NOVEMBER 2011 Designed By: JN/MRB/OF Drawing No.: JN/MRB/OF Drawn By: Checked By: JS A-203 1 3 2 4 5 SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET INDIVIDUAL MODULES Module 1: Police Service & Installation/ S5 Module 2: Guardmount/ Armory Module 3: Mobility/ Supply Module 4: ECC/ BDOC Module 5: Training/ Quality Module 6: Confinement Module 7: Investigation/ S2 Module 8: Command/ Orderly Module 9B: General Support Module 9A: Back of House Restrooms Module 9C: Break Room Module 9D: Front of House Restrooms Module 10: Operations & Training/ S3 NOT FOR CONSTRUCTION 911 Central Parkway N., Suite 425 San Antonio, TX 78323 501 North Broadway, St. Louis, Missouri 63102-2121 D SCALE: 1/32" = 1'0" 2 A-205 1 A-205 1 A-204 BUILDING NOTES 3 Building Example 2 1" = 20'-0" Room Restroom Restroom Electrical First Sergeant Server Room Alarm Room Flight Chief Command Conference Room Flight Sergeant Waiting Area Interview 1 Interview 2 B Battle Staff Room Mechanical Female Restroom Central Conference Area Patrol Room Open Office/ Conference Area Break Room Commander Comunication Center Janitor's Closet Storage Open Office Area Male Restroom NCOIC Investigations Corridor Files/ Equipment/ Supply Storage Corridor Assistant S3 MSGT 100% DESIGN C SECURITY FORCE OPERATIONS BUILDING THIS BUILDING LAYOUT IS PROVIDED TO ILLUSTRATE ONE POSSIBLE WAY OF ARRANGING THE INDIVIDUAL MODULES. IT IS NOT INTENDED TO CONSTITUTE A FINAL DESIGN. AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) FACILITIES DYNAMIC PROTOTYPES DESIGN FOR: 1. Work Stations Holding Cell A S3 Officer DUI SFM Interview Room A Study Carrells Intel (S2) Office Shared Office Private Testing Room B Waiting Area Evidence Storage Vault Planning Area Man Trap Corridor Waiting Area/ Secretary Corridor PMD Quality Control NCOIC Office Private Testing Room A Break Room Janitor's Closet Storage S3 SMGT Files/ Office Equipment/ Supply Storage Holding Cell B Interview Room B Superintendant Training Officer Office COMM. Corridor 32' 64' SCALE: 1/32 " = 1' 0 Mechanical Room 40' SCALE: 1" = 20' Restroom Storage 20' 0 8' 16' Storage 4' 8' 16' SCALE: 1/8 " = 1' Files/ Office Equipment/ Supply Storage A 0' Jacobs Project No.: Entry Vestibule FDWD0262 Drawing Title: Building Example 2 Floor Plan Date: Building Example 2 - Enlarged Floor Plan A 1 1/8" = 1'-0" 18 NOVEMBER 2011 Designed By: JN/MRB/OF Drawing No.: JN/MRB/OF Drawn By: Checked By: JS A-204 1 3 2 4 5 SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET NOT FOR CONSTRUCTION BUILDING NOTES 1. D Corridor Classroom Storage THIS BUILDING LAYOUT IS PROVIDED TO ILLUSTRATE ONE POSSIBLE WAY OF ARRANGING THE INDIVIDUAL MODULES. IT IS NOT INTENDED TO CONSTITUTE A FINAL DESIGN. 911 Central Parkway N., Suite 425 San Antonio, TX 78323 501 North Broadway, St. Louis, Missouri 63102-2121 Files/Office Equipment/ Supply Waiting Room Open Office Area Files/ Equipment/ Supply Storage Maintenance Supply Computer Storage Classroom B Guardmount Area Circulation Advisor Resource Office Logistics Officer Gear Lockers Issue Windows Ammunition Storage C Transient Weapons Storage Chief's Office NCOIC Armory Office Personal Weapons Storage Restroom 1 Classroom A Plans Office Installation Security Office Security Manager's Office Hazmat Storage Building Example 2 - Enlarged Floor Plan B 1/8" = 1'-0" B Outdoor Yard Male Segregate Confinement Cell 1 Male Confinement Male Shower Cell 1 Corridor Corridor Day/Recreation Room Visitation/Training Room Waiting SP Admin. Processing Guard Room 0 Corridor Corridor A Female Female Shower Confinement Cell 1 Janitor's Closet Restroom Building Example 2 - Enlarged Floor Plan C 1/8" = 1'-0" 8' Storage Jacobs Project No.: 16' FDWD0262 Drawing Title: Building Example 2 Floor Plan Date: 2 4' SCALE: 1/8 " = 1' Corridor MECHANICAL ROOM Female Segregate Confinement Cell 1 100% DESIGN Weapons Cleaning Area SECURITY FORCE OPERATIONS BUILDING Open Office Area Supply Room AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) FACILITIES DYNAMIC PROTOTYPES DESIGN FOR: Weapons Issue Area 18 NOVEMBER 2011 Designed By: JN/MRB/OF Drawing No.: JN/MRB/OF Drawn By: Checked By: JS A-205 1 3 2 4 5 SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET B RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-2 PT-1 PT-2 PT-1 PT-1 PT-1 PT-1 PT-1 PT-3 PT-2 PT-4 PT-4 PT-4 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-2 PT-1 PT-1 PT-4 PT-4 PT-4 PT-4 PT-2 PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 150 SF 120 SF 120 SF 150 SF 1100 SF 120 SF 60 SF 100 SF 100 SF 150 SF 121 SF 121 SF 151 SF 1117 SF 121 SF 60 SF 98 SF 100 SF Module 2: Guardmount/Armory 2.01 Guardmount Area 2.02 Ammunition Storage 2.03 NCOIC Armory Office 2.04 Circulation 2.05 Restroom SC-1 SC-1 CPT-1 EFP-1 CFT-1 RB-1 RB-1 RB-1 CB-1 EWP-1 PT-1 PT-1 CWT-1 / CWT-2 EWP-1 EWP-1 PT-1 EWP-1 PT-1 PT-1 EWP-1 PT-1 PT-1 PT-1 CWT-1 / CWT-2 EWP-1 EWP-3 PT-1 PT-1 EWP-1 PT-1 PT-1 740 SF 150 SF 120 SF 0 SF 60 SF 736 SF 150 SF 119 SF 36 SF 54 SF RB-1 RB-1 RB-1 EWP-1 PT-1 PT-1 PT-1 CWT-1 / CWT-2 EWP-2 EWP-3 PT-2 EWP-1 PT-1 PT-1 GYP. GYP. GYP. GYP. GYP. EFP-1 EFP-1 EFP-1 EFP-1 SC-1 SC-1 SC-1 EWP-2 PT-1 PT-4 PT-1 CWT-1 / CWT-2 EWP-1 EWP-1 PT-1 PT-1 EWP-1 PT-1 PT-1 GYP. GYP. GYP. GYP. GYP. GYP. GYP. 920 SF 220 SF 300 SF 160 SF 120 SF 100 SF 64 SF 919 SF 211 SF 300 SF 165 SF 113 SF 100 SF 64 SF Module 3: Mobility/Supply 3.01 Maintenance Supply 3.02 Open Office Area 3.03 Logistics Officer 3.04 Supply Room 3.05 Advisor Resource Office 3.06 Hazmat Storage 3.07 Circulation SC-1 CPT-1 CPT-1 SC-1 CPT-1 SC-1 CPT-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 PT-3 PT-1 PT-1 PT-1 PT-4 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-2 PT-1 PT-1 PT-1 PT-1 - ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 400 SF 220 SF 120 SF 1200 SF 120 SF 140 SF 0 SF 400 SF 224 SF 120 SF 1205 SF 120 SF 143 SF 185 SF Module 4: ECC / BDOC 4.01 Alarm Room 4.02 Server Room 4.03 Battle Staff Room 4.04 Comunication Center 4.05 Waiting Area 4.06 Interview Room A 4.07 Interview Room B 4.08 Restroom 4.09 Corridor VCT-1 VCT-1 CPT-1 CPT-1 VCT-1 EFP-1 EFP-1 EFP-1 EFP-1 RB-1 RB-1 RB-1 RB-1 RB-1 - PT-1 PT-1 PT-1 PT-1 PT-3 EWP-1 EWP-1 EWP-1 EWP-1 PT-1 PT-1 PT-2 PT-1 PT-1 EWP-1 EWP-1 EWP-1 EWP-1 PT-1 PT-1 PT-1 PT-1 PT-1 EWP-1 EWP-1 EWP-1 EWP-1 PT-1 PT-1 PT-1 PT-2 PT-4 EWP-1 EWP-1 EWP-1 EWP-1 OPEN OPEN ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 120 SF 80 SF 150 SF 300 SF 140 SF 80 SF 80 SF 80 SF 0 SF 126 SF 83 SF 144 SF 288 SF 139 SF 73 SF 73 SF 50 SF 510 SF CPT-1 CPT-1 VCT-1 CPT-1 EFP-1 EFP-1 EFP-1 VCT-1 EFP-1 CT-3 RB-1 RB-1 RB-1 RB-1 RB-1 CB-1 PT-1 PT-1 PT-1 PT-1 EWP-1 EWP-1 EWP-1 PT-1 EWP-1 CWT-1 / CWT-2 PT-1 PT-1 PT-1 PT-3 EWP-1 EWP-1 EWP-1 PT-1 EWP-1 CWT-1 / CWT-2 PT-1 PT-3 PT-1 PT-1 EWP-1 EWP-1 EWP-1 PT-1 EWP-1 CWT-1 / CWT-2 PT-4 PT-4 PT-2 PT-3 EWP-1 EWP-1 EWP-1 PT-1 EWP-1 CWT-1 / CWT-2 ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 SEC. GYP. SEC. GYP. SEC. GYP. SEC. GYP. ACT-1 120 SF 200 SF 140 SF 150 SF 90 SF 90 SF 140 SF 90 SF 90 SF 60 SF 120 SF 178 SF 133 SF 164 SF 92 SF 92 SF 138 SF 90 SF 90 SF 58 SF CPT-1 CPT-1 CPT-1 CPT-1 CPT-1 CPT-1 CPT-1 CPT-1 CPT-1 CPT-1 CPT-1 CPT-1 CPT-1 VCT-1 VCT-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 WT PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-3 PT-4 PT-1 PT-4 PT-3 PT-1 PT-4 PT-1 PT-2 PT-3 PT-4 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-2 PT-1 PT-1 PT-1 PT-4 PT-1 PT-3 PT-3 PT-1 PT-1 PT-4 PT-1 PT-3 PT-1 PT-1 PT-2 PT-3 PT-1 PT-1 ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 GYP. ACT-1 ACT-1 ACT-1 150 SF 150 SF 750 SF 120 SF 80 SF 80 SF 130 SF 120 SF 400 SF 50 SF 0 SF 150 SF 750 SF 160 SF 130 SF 154 SF 154 SF 752 SF 120 SF 77 SF 77 SF 132 SF 117 SF 407 SF 55 SF 316 SF 145 SF 752 SF 165 SF 130 SF 4.10 4.11 4.12 4.13 4.14 4.15 4.16 4.17 4.18 4.19 Gear Lockers Weapons Issue Area Weapons Storage Issue Windows Weapons Cleaning Area Transient Weapons Storage Personal Weapons Storage Flight Sergeant Flight Chief Break Room Patrol Room DUI Holding Cell A Man Trap Storage Holding Cell B Restroom Module 5: Training/Quality 5.01 Training Officer Office 5.02 Superintendant 5.03 Classroom A 5.04 Quality Control NCOIC Office 5.05 Private Testing Room A 5.06 Private Testing Room B 5.07 Shared Office 5.08 Study Carrells 5.09 Open Office Area 5.10 Storage 5.11 Circulation 5.12 Central Conference Area 5.13 Classroom B 5.14 Files/Office Equipment/ Supply 5.15 Classroom Storage RAMP SIDE WALL TO BE PAINTED EWP-4 01 WALLS CWT-1 CWT-2 EWP-1 EWP-2 EWP-3 EWP-4 PT-1 PT-2 PT-3 PT-4 12" X 6" CERAMIC TILE 12" X 6" CERAMIC TILE - ACCENT PAINT - EPOXY TYPICAL PAINT - EPOXY ACCENT PAINT - EPOXY ACCENT PAINT - EPOXY ACCENT PAINT - TYPICAL PAINT - ACCENT PAINT - ACCENT PAINT - ACCENT 1. MATERIALS ARE PROVIDED AS SUGGESTIONS ONLY. FINAL FINISHES SHOULD BE EVALUATED AND CHOSEN FOR EACH NEW PROJECT. NOT FOR CONSTRUCTION 911 Central Parkway N., Suite 425 San Antonio, TX 78323 501 North Broadway, St. Louis, Missouri 63102-2121 02 FLOORS CFT-1 12" X 12" CERAMIC FLOOR TILE CPT-1 2' X 2' CARPET TILE EFP-1 PAINT - EPOXY SC-1 SEALED CONCRETE VCT-1 12" X 12" VINYL COMPOSITION TILE 03 BASE CB-1 RB-1 6" CERAMIC COVE BASE 5" RUBBER BASE 04 CEILING ACT-1 2' X 2' ACOUSTICAL CEILING TILE GYP. PAINTED GYPSUM BOARD CEILING OPEN EXPOSED TO STRUCTURE SEC. GYP. PAINTED GYPSUM BOARD SECURITY CEILING 05 MILLWORK LAM-1 PLASTIC LAMINATE - HORIZONTAL SURFACES LAM-2 PLASTIC LAMINATE - VERTICAL SURFACES SS-1 SOLID SURFACE TEXTURE FINISH Jacobs Project No.: A 100% DESIGN Comments Module 1: Police Services & Installation Security/ S5 1.01 Chief's Office CPT-1 1.02 Plans Office CPT-1 1.03 Installation Security Office CPT-1 1.04 Reports & Analysis CPT-1 1.05 Open Office Area CPT-1 1.06 Waiting Room CPT-1 1.07 Counter Area at Lobby CPT-1 1.08 Files/ Equipment/ Supply Storage CPT-1 1.09 Computer Storage VCT-1 2.06 2.07 2.08 2.09 2.10 2.11 2.12 C Ceiling Finish Bim Manual Required Area Actual Area GENERAL NOTES SECURITY FORCE OPERATIONS BUILDING D Room Name Floor Finish INTERIOR FINISH COLOR AND MATERIAL SCHEDULE ITEM MATERIAL NOTES AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) FACILITIES DYNAMIC PROTOTYPES DESIGN FOR: Room Number ROOM FINISH SCHEDULE 1 FINISHES WALLS Base Plan North Plan East Plan South Plan West Finish Wall Wall Wall Wall FDWD0262 Drawing Title: Room Finish Schedule Date: 18 NOVEMBER 2011 Designed By: JN/MRB/OF Drawing No.: JN/MRB/OF Drawn By: Checked By: JS A-301 1 3 2 4 5 SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET GENERAL NOTES Room Name Floor Finish Base Finish Plan North Wall Module 6: Confinement 6.01 Waiting 6.02 SP 6.03 Admin. Processing 6.04 Storage 6.05 Janitor's Closet 6.06 Restroom 6.07 Female Shower 6.08 Female Cell 6.09 Female Segregated Cell 6.10 Male Segregated Cell 6.11 Male Cell 6.12 Male Shower 6.13 Visitation/Training Room 6.14 Corridor 6.15 Guard Room 6.16 Day/Recreation Room 6.17 Outdoor Yard 6.18 Corridor 6.19 Corridor 6.20 Corridor 6.21 Corridor EFP-1 EFP-1 CPT-1 VCT-1 VCT-1 CFT-1 CT-3 EFP-1 EFP-1 EFP-1 EFP-1 CT-3 EFP-1 EFP-1 VCT-1 EFP-1 EFP-1 EFP-1 EFP-1 EFP-1 RB-1 RB-1 RB-1 CB-1 CB-1 CB-1 RB-1 - EWP-1 EWP-1 PT-4 PT-1 PT-1 CWT-1 CWT-1 EWP-1 EWP-1 EWP-1 EWP-1 CWT-1 EWP-1 EWP-1 PT-1 EWP-1 EWP-1 EWP-1 EWP-1 EWP-1 EWP-1 EWP-1 PT-1 PT-1 PT-1 CWT-1 CWT-1 EWP-1 EWP-1 EWP-1 EWP-1 CWT-1 EWP-1 EWP-1 PT-1 EWP-1 EWP-1 EWP-1 EWP-1 EWP-1 EWP-1 EWP-1 PT-4 PT-1 PT-1 CWT-1 CWT-1 EWP-1 EWP-1 EWP-1 EWP-1 CWT-1 EWP-1 EWP-1 PT-4 EWP-3 EWP-1 EWP-1 EWP-1 EWP-1 EWP-1 EWP-1 PT-1 PT-1 PT-1 CWT-1 CWT-1 EWP-1 EWP-1 EWP-1 EWP-1 CWT-1 EWP-1 EWP-1 PT-1 EWP-1 EWP-1 EWP-1 EWP-1 EWP-1 SECURED GYP. SECURED GYP. SECURED GYP. SECURED GYP. SECURED GYP. SECURED GYP. CONCRETE CONCRETE CONCRETE CONCRETE CONCRETE CONCRETE CONCRETE CONCRETE CONCRETE CONCRETE CONCRETE CONCRETE CONCRETE CONCRETE 125 SF 100 SF 180 SF 100 SF 60 SF 60 SF 60 SF 80 SF 80 SF 80 SF 80 SF 60 SF 120 SF 120 SF 120 SF 150 SF 250 SF Module 7: Investigation/S2 7.01 Evidence Storage Vault 7.02 Intel (S2) Office 7.03 Files/ Equipment/ Supply Storage 7.04 Corridor 7.05 NCOIC Investigations 7.06 Open Office/ Conference Area 7.07 Interview 1 7.08 Waiting Area 7.09 Interview 2 VCT-1 CPT-1 VCT-1 CPT-1 CPT-1 CPT-1 VCT-1 VCT-1 VCT-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-4 PT-1 PT-1 PT-1 PT-3 PT-1 PT-4 PT-1 PT-1 PT-1 PT-1 PT-1 PT-4 PT-2 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-3 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-2 PT-1 PT-1 PT-1 ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 ACT-1 175 SF 120 SF 100 SF 120 SF 375 SF 100 SF 80 SF 100 SF 175 SF 120 SF 107 SF 61 SF 120 SF 372 SF 110 SF 83 SF 95 SF VCT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 60 SF 58 SF CPT-1 CPT-1 CPT-1 CPT-1 RB-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1/ PT-2 - ACT-1 ACT-1 ACT-1 ACT-1 650 SF 150 SF 220 SF 0 SF 642 SF 153 SF 220 SF 142 SF RB-1 PT-1 PT-4 PT-1 PT-1/ PT-2/ PT-3 PT-1 PT-1 PT-1 PT-3 PT-3 VCT-1 PT-1 / PT-2 PT-4 PT-3 PT-1/ PT-2/ PT-3 PT-1 PT-1 ACT-1 160 SF 160 SF CPT-1 CPT-1 CPT-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-4 PT-4 PT-3 PT-1 PT-1 PT-1 PT-1 PT-1 PT-2 ACT-1 ACT-1 GYP. 180 SF 300 SF 400 SF 182 SF 289 SF 410 SF CT-3 CB-1 GYP. 400 SF 404 SF RB-1 CWT-1 / CWT-2 CWT-1 / CWT-2 PT-1 404 SF VCT-1 CWT-1 / CWT-2 CWT-1 / CWT-2 PT-1 400 SF CB-1 CWT-1 / CWT-2 CWT-1 / CWT-2 PT-1 GYP. CT-3 CWT-1 / CWT-2 CWT-1 / CWT-2 PT-1 GYP. 60 SF 69 SF SC-1 SC-1 SC-1 RB-1 RB-1 RB-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 PT-1 ACT-1 ACT-1 ACT-1 860 SF 220 SF 200 SF 860 SF 215 SF 192 SF VCT-1 RB-1 PT-1 PT-2 PT-1 PT-2 GYP. 500 SF 564 SF Module 9D: Front of House Restroom 9D.1 Restroom CT-3 CB-1 CWT-1 / CWT-2 CWT-1 / CWT-2 CWT-1 / CWT-2 CWT-1 / CWT-2 GYP. 60 SF 56 SF Module 10: Operations & Training/ S3 10.01 S3 Officer 10.02 S3 SMGT 10.03 Work Stations 10.04 Planning Area 10.05 Assistant S3 MSGT 10.06 PMD CPT-1 CPT-1 CPT-1 CPT-1 CPT-1 CPT-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 PT-4 PT-4 PT-3 PT-3 PT-1 PT-1 PT-1 PT-1 PT-2 PT-1 PT-1 PT-1 PT-1 PT-3 PT-3 PT-4 PT-4 PT-1 PT-1 PT-2 PT-1 PT-1 ACT-1 ACT-1 ACT-1 ACT-1/ GYP. ACT-1 ACT-1 120 SF 120 SF 100 SF 225 SF 120 SF 120 SF 125 SF 127 SF 100 SF 233 SF 124 SF 127 SF Module 8: Command/Orderly 8.01 Files/ Office Equipment/ Supply Storage 8.02 Open Office Area 8.03 First Sergeant 8.04 Waiting Area/ Secretary 8.05 Corridor 8.06 Files/ Office Equipment/ Supply Storage 8.07 SFM 8.08 Commander 8.09 Command Conference Room Module 9A: Back of House Restrooms 9A.1 Male Restroom B 9A.2 Female Restroom 9A.3 Janitor Module 9B: General Support 9B.1 Mechanical Room 9B.2 General Office Storage 9B.3 Electrical/ Comm. Equipment Storage Module 9C: Break Room 9C.1 Break Room A Ceiling Finish Comments 131 SF 68 SF 182 SF 127 SF 73 SF 64 SF 68 SF 80 SF 80 SF 80 SF 80 SF 68 SF 125 SF 166 SF 112 SF 144 SF 258 SF 75 SF 75 SF 39 SF 39 SF 01 WALLS CWT-1 CWT-2 EWP-1 EWP-2 EWP-3 EWP-4 PT-1 PT-2 PT-3 PT-4 12" X 6" CERAMIC TILE 12" X 6" CERAMIC TILE - ACCENT PAINT - EPOXY TYPICAL PAINT - EPOXY ACCENT PAINT - EPOXY ACCENT PAINT - EPOXY ACCENT PAINT - TYPICAL PAINT - ACCENT PAINT - ACCENT PAINT - ACCENT MATERIALS ARE PROVIDED AS SUGGESTIONS ONLY. FINAL FINISHES SHOULD BE EVALUATED AND CHOSEN FOR EACH NEW PROJECT. NOT FOR CONSTRUCTION 911 Central Parkway N., Suite 425 San Antonio, TX 78323 501 North Broadway, St. Louis, Missouri 63102-2121 02 FLOORS CFT-1 12" X 12" CERAMIC FLOOR TILE CPT-1 2' X 2' CARPET TILE EFP-1 PAINT - EPOXY SC-1 SEALED CONCRETE VCT-1 12" X 12" VINYL COMPOSITION TILE 03 BASE CB-1 RB-1 6" CERAMIC COVE BASE 5" RUBBER BASE 04 CEILING ACT-1 2' X 2' ACOUSTICAL CEILING TILE GYP. PAINTED GYPSUM BOARD CEILING OPEN EXPOSED TO STRUCTURE SEC. GYP. PAINTED GYPSUM BOARD SECURITY CEILING 05 MILLWORK LAM-1 PLASTIC LAMINATE - HORIZONTAL SURFACES LAM-2 PLASTIC LAMINATE - VERTICAL SURFACES SS-1 SOLID SURFACE TEXTURE FINISH Jacobs Project No.: 100% DESIGN C BIM Manual Required Area Actual Area 1. SECURITY FORCE OPERATIONS BUILDING D INTERIOR FINISH COLOR AND MATERIAL SCHEDULE ITEM MATERIAL NOTES AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) FACILITIES DYNAMIC PROTOTYPES DESIGN FOR: Room Numb er ROOM FINISH SCHEDULE 2 FINISHES WALLS Plan East Plan South Plan West Wall Wall Wall FDWD0262 Drawing Title: Room Finish Schedule Date: 18 NOVEMBER 2011 Designed By: JN/MRB/OF Drawing No.: JN/MRB/OF Drawn By: Checked By: JS A-302 1 3 2 4 5 SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET B A Height 1.01A 1.02A 1.03A 1.04A 1.05A 1.06A 1.08A 1.09A 1z 2.01A 2.01B 2.02A 2.03A 2.05A 2.06A 2.06C 2.09A 2.10A 2.11A 2.12A 3.01A 3.01B 3.01C 3.02A 3.02B 3.03A 3.04C 3.04D 3.05A 3.06A 3.06B 4.01A 4.02A 4.03A 4.04A 4.05A 4.06A 4.06B 4.07A 4.07B 4.08A 4.09B 4.10A 4.11A 4.12A 4.13A 4.14A 4.15A 4.16A 4.17A 4.18A 5.01A 5.02A 5.03A 5.04A 5.05A 5.06A 5.07A 5.08A 5.10A 5.11A 5.11B 5.13A 5.14A 5.15B 6.01A 6.01B 6.02A 6.02B 6.03A 6.03B 6.04A 6.05A 6.06A 6.07A 6.08A 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 6' - 0" 5' - 0" 3' - 0" 3' - 0" 3' - 0" 5' - 8" 5' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 10' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 4" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 2' - 8" 3' - 0" 3' - 0" 3' - 0" 2' - 8" 3' - 0" 3' - 4" 3' - 4" 3' - 4" 3' - 4" 3' - 4" 3' - 4" 3' - 4" 3' - 4" 3' - 4" 3' - 4" 3' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 6' - 8" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 10' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 3" 6.09A 3' - 0" 7' - 0" 0' - 3" 6.10A 3' - 0" 7' - 0" 0' - 3" 6.11A 3' - 0" 7' - 0" 0' - 3" 6.12A 6.13A 3' - 4" 3' - 0" 7' - 0" 7' - 0" 0' - 2" 0' - 3" 6.14C 6.14D 3' - 4" 3' - 4" 7' - 0" 7' - 0" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" Finish Frame Finish Jamb Head Comments CASED OPENING SECURE DOOR CASED OPENING 0' - 2" 0' - 2" 0' - 2" 0' - 2" CASED OPENING SECURE DOOR SECURE DOOR SECURE DOOR SECURE DOOR HALF DOOR SLIDING DETENTION DOOR SLIDING DETENTION DOOR SLIDING DETENTION DOOR SLIDING DETENTION DOOR HALF DOOR SLIDING DETENTION DOOR Door Number Width Height 6.15A 6.15B 6.15C 6.15E 6.15F 6.15G 6.15H 6.16A 6.16B 7.01A 7.02A 7.03A 7.04A 7.05A 7.05B 7.06A 7.07A 7.07B 7.07C 7.09C 8.01A 8.02A 8.02B 8.03A 8.04A 8.06A 8.07A 8.08A 8.09A 8.09B 9A.1A 9A.2A 9A.3A 9B.1A 9B.2A 9B.3A 9C.1A 9C.1B 9D.1A 9D.1C 10.01A 10.02A 10.04A 10.05A 10.06A 3' - 4" 6' - 0" 3' - 4" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 6' - 0" 6' - 0" 3' - 0" 6' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" Door Thickness Material 0' - 2" 0' - 2" 0' - 2" 0' - 3" 0' - 3" 0' - 3" 0' - 3" 0' - 3" 0' - 3" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" Finish Fire Glazing Rating Hardware Type Material Frame Finish Jamb Head Comments NOT FOR CONSTRUCTION 911 Central Parkway N., Suite 425 San Antonio, TX 78323 501 North Broadway, St. Louis, Missouri 63102-2121 Jacobs Project No.: 100% DESIGN C Width Fire Glazing Rating Hardware Type Material SECURITY FORCE OPERATIONS BUILDING D Door Thickness Material Door Number DOOR SCHEDULE AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) FACILITIES DYNAMIC PROTOTYPES DESIGN FOR: DOOR SCHEDULE FDWD0262 Drawing Title: Door Schedule Date: 18 NOVEMBER 2011 Designed By: JN/MRB/OF Drawing No.: JN/MRB/OF Drawn By: Checked By: JS A-303 1 3 2 4 5 SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET NOT FOR CONSTRUCTION WINDOW SCHEDULE B 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 3' - 6" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 1' - 6" 1' - 6" 1' - 6" 4' - 0" 4' - 0" Pass Drawer and Counter Pass Drawer and Counter Pass Drawer and Counter Pass Drawer and Counter Fixed Fixed Pass Drawer and Counter Fixed Fixed Fixed Fixed Pass Drawer and Counter Roll-Up Shutter with Counter Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Fixed Pass Drawer and Counter Fixed Fixed Transom with Trim Transom with Trim Transom with Trim Pass Drawer and Counter Pass Drawer and Counter 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 6" 7' - 0" 7' - 0" 7' - 0" 7' - 0" Comments 911 Central Parkway N., Suite 425 San Antonio, TX 78323 501 North Broadway, St. Louis, Missouri 63102-2121 Jacobs Project No.: A 100% DESIGN 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 5' - 0" 3' - 0" 3' - 0" 1' - 6" 1' - 6" 1' - 6" 1' - 6" 1' - 6" 1' - 6" 1' - 6" 3' - 0" 2' - 6" 3' - 0" 2' - 6" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" Head Height SECURITY FORCE OPERATIONS BUILDING C 1.06A 2.08A 2.08B 2.08C 3.03A 3.03B 3.04A 4.03A 4.03B 4.04A 4.04B 6.03A 6.03B 6.03C 6.03D 6.08A 6.09A 6.10A 6.11A 6.13A 6.13B 6.13C 6.15A 6.15B 6.15C 6.15D 6.15E 6.16A 6.16B 6.16C 7.06A 8.02A Type Glazing Manufacturer Model Material Finish Head Jamb Sill Thickness Type AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) FACILITIES DYNAMIC PROTOTYPES DESIGN FOR: D Mark R.O. Width Height FDWD0262 Drawing Title: Window Schedule Date: 18 NOVEMBER 2011 Designed By: JN/MRB/OF Drawing No.: JN/MRB/OF Drawn By: Checked By: JS A-304