AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE) NOT FOR CONSTRUCTION

advertisement
1
2
3
4
5
SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET
NOT FOR
CONSTRUCTION
SHEET LIST
November 18, 2011
C
B
Police Service & Installation Security/ S5
Guardmount/Armory
Mobility/Supply
ECC/ BDOC
Training/Quality
Confinement
Investigation/ S2
Command/ Orderly
Back of House Restrooms & General Support
Break Room & Front of House Restrooms
Operations & Training/ S3
Building Rendering 1 - Rendering
Building Example 1 - Floor Plan
Building Example 2 - Rendering
Building Example 2 - Floor Plan
Building Example 2 - Floor Plan
Room Finish Schedule
Room Finish Schedule
Door Schedule
Window Schedule
Jacobs Project No.:
A
100% DESIGN
100% DESIGN
911 Central Parkway N., Suite 425 San Antonio, TX 78323
501 North Broadway, St. Louis, Missouri 63102-2121
SECURITY FORCE OPERATIONS BUILDING
FACILITIES DYNAMIC PROTOTYPES
DESIGN FOR SECURITY FORCE OPERATIONS BUILDING
A-101
A-102
A-103
A-104
A-105
A-106
A-107
A-108
A-109
A-110
A-111
A-201
A-202
A-203
A-204
A-205
A-301
A-302
A-303
A-304
Sheet Name
AIR FORCE CENTER FOR ENGINEERING AND
THE ENVIRONMENT (AFCEE)
FACILITIES DYNAMIC PROTOTYPES DESIGN FOR:
D
AIR FORCE CENTER FOR ENGINEERING AND THE ENVIRONMENT (AFCEE)
Sheet
Number
FDWD0262
Drawing Title:
Cover Sheet
Date:
18 NOVEMBER 2011
Designed By: JN/MRB/OF Drawing No.:
JN/MRB/OF
Drawn By:
Checked By: JS
G-000
1
3
2
4
5
SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET
GENERAL NOTES
1.
2.
3.
4.
5.
6.
D
EVERY WALL IS GENERIC UNLESS SPECIFICALLY NOTED
EVERY WALL IS A PLACE HOLDER
AS THE MODULES ARE COMBINED TO CREATE A FACILITY,
DISCRETION SHOULD BE USED AS TO WHICH WALLS NEED TO BE
MOVED, ADDED OR REMOVED
IF NO WALL IS PRESENT, IT IS THE DESIGN INTENT TO LEAVE THAT
SPACE OPEN TO ADJACENT SPACES WITHIN THE FACILITY
ALL FURNITURE IS A PLACE HOLDER UNLESS SPECIFICALLY NOTED
ALL MODULES HAVE BEEN ORGANIZED BASED ON A 15' GRID.
FLOOR FINISH LEGEND
CEILING LEGEND
CARPET
2X2 ACOUSTICAL TILE
EPOXY PAINT
PAINTED GYP. BOARD
SEALED CONCRETE
CONCRETE
VCT TILE
SECURED GYP. BOARD
NOT FOR
CONSTRUCTION
911 Central Parkway N., Suite 425 San Antonio, TX 78323
501 North Broadway, St. Louis, Missouri 63102-2121
CERAMIC TILE
Chief's Office
1.01
150 SF
HALF-WALL
PARTITIONS
Plans Office
1.02
121 SF
Counter Area at
Lobby
1.07
60 SF
Installation
Security Office
1.03
121 SF
Files/
Equipment/
Supply Storage
1.08
98 SF
CASED OPENING
C
Computer
Storage
1.09
100 SF
Reports &
Analysis
1.04
151 SF
1
Module 1 - Police Service & Installation Security/ S5 - Floor Plan
1/8" = 1'-0"
Open Office
Area
1.05
1117 SF
Chief's Office
1.01
150 SF
9' - 0"
9' - 0"
B
8' - 0"
Plans Office
1.02
121 SF
Waiting Room
1.06
121 SF
Counter Area at
Lobby
1.07
60 SF
10' - 0"
9' - 0"
100% DESIGN
PASS-THROUGH
WINDOW
SECURITY FORCE OPERATIONS BUILDING
Open Office
Area
1.05
1117 SF
AIR FORCE CENTER FOR ENGINEERING AND
THE ENVIRONMENT (AFCEE)
FACILITIES DYNAMIC PROTOTYPES DESIGN FOR:
Waiting Room
1.06
121 SF
9' - 0"
Files/
Equipment/
Supply Storage
1.08
98 SF
Installation
Security Office
1.03
121 SF
9' - 0"
Reports &
Analysis
1.04
151 SF
9' - 0"
Computer
Storage
1.09
100 SF
0
Module 1 - Police Station & Installation
Security/ S5 - Reflected Ceiling Plan
2
1/8" = 1'-0"
A
4'
8'
16'
SCALE: 1/8 " = 1'
3
Module 1 - Police Service & Installation Security/ S5 - Axon.
Jacobs Project No.:
FDWD0262
Drawing Title:
Police Service &
Installation Security/
S5
Date:
18 NOVEMBER 2011
Designed By: JN/MRB/OF Drawing No.:
JN/MRB/OF
Drawn By:
Checked By: JS
A-101
1
3
2
4
5
SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET
GENERAL NOTES
1.
2.
3.
COMPACT STORAGE: PROVIDE
ADEQUATE CLEARANCE ABOVE
FOR SPRINKLER SYSTEM
4.
5.
6.
CARPET
2X2 ACOUSTICAL TILE
EPOXY PAINT
PAINTED GYP. BOARD
SEALED CONCRETE
CONCRETE
VCT TILE
SECURED GYP. BOARD
NOT FOR
CONSTRUCTION
911 Central Parkway N., Suite 425 San Antonio, TX 78323
501 North Broadway, St. Louis, Missouri 63102-2121
CERAMIC TILE
NCOIC Armory
Office
2.03
119 SF
Guardmount
Area
2.01
736 SF
Circulation
2.04
36 SF
Restroom
2.05
54 SF
CASED OPENING
EXPANDABLE WEAPON
RACKS (TYP.)
PASS-THROUGH
WINDOW (TYP.)
Issue Windows
2.09
165 SF
Weapons
Cleaning Area
2.10
113 SF
C
Transient
Weapons
Storage
2.11
100 SF
SERVICE MAT
1
Personal
Weapons
Storage
2.12
64 SF
Module 2 - Guardmount & Armory - Floor Plan
1/8" = 1'-0"
Guardmount
Area
2.01
736 SF
Ammunition
Storage
2.02
150 SF
10' - 0"
10' - 0"
11' - 6"
NCOIC Armory
Office
2.03
119 SF
10' - 0"
B
Restroom
2.05
54 SF
Gear Lockers
2.06
919 SF
11' - 6"
100% DESIGN
CASED
OPENING
SECURITY FORCE OPERATIONS BUILDING
Weapons
Storage
2.08
300 SF
Weapons Issue
Area
2.07
211 SF
Gear Lockers
2.06
919 SF
CEILING LEGEND
AIR FORCE CENTER FOR ENGINEERING AND
THE ENVIRONMENT (AFCEE)
FACILITIES DYNAMIC PROTOTYPES DESIGN FOR:
D
Ammunition
Storage
2.02
150 SF
EVERY WALL IS GENERIC UNLESS SPECIFICALLY NOTED
EVERY WALL IS A PLACE HOLDER
AS THE MODULES ARE COMBINED TO CREATE A FACILITY,
DISCRETION SHOULD BE USED AS TO WHICH WALLS NEED TO BE
MOVED, ADDED OR REMOVED
IF NO WALL IS PRESENT, IT IS THE DESIGN INTENT TO LEAVE THAT
SPACE OPEN TO ADJACENT SPACES WITHIN THE FACILITY
ALL FURNITURE IS A PLACE HOLDER UNLESS SPECIFICALLY NOTED
ALL MODULES HAVE BEEN ORGANIZED BASED ON A 15' GRID.
FLOOR FINISH LEGEND
Weapons
Storage
2.08
300 SF
9' - 0"
10' - 0"
10' - 0"
10' - 0"
9' - 0"
0
Transient
Weapons
Weapons Issue Weapons
Cleaning Area
Storage
Area
2.10
2.11
2.07
113 SF
100 SF
211 SF
A
4'
8'
16'
SCALE: 1/8 " = 1'
Personal
Weapons
Storage
2.12
64 SF
Jacobs Project No.:
FDWD0262
Drawing Title:
2
Module 2 - Guardmount & Armory - Reflected Ceiling Plan
1/8" = 1'-0"
3
Module 2 - Guardmount & Armory
Guardmount/Armory
Date:
18 NOVEMBER 2011
Designed By: JN/MRB/OF Drawing No.:
JN/MRB/OF
Drawn By:
Checked By: JS
A-102
1
3
2
4
5
SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET
GENERAL NOTES
1.
2.
3.
4.
D
5.
6.
Maintenance
Supply
3.01
400 SF
EVERY WALL IS GENERIC UNLESS SPECIFICALLY NOTED
EVERY WALL IS A PLACE HOLDER
AS THE MODULES ARE COMBINED TO CREATE A FACILITY,
DISCRETION SHOULD BE USED AS TO WHICH WALLS NEED TO BE
MOVED, ADDED OR REMOVED
IF NO WALL IS PRESENT, IT IS THE DESIGN INTENT TO LEAVE THAT
SPACE OPEN TO ADJACENT SPACES WITHIN THE FACILITY
ALL FURNITURE IS A PLACE HOLDER UNLESS SPECIFICALLY NOTED
ALL MODULES HAVE BEEN ORGANIZED BASED ON A 15' GRID.
FLOOR FINISH LEGEND
CEILING LEGEND
CARPET
2X2 ACOUSTICAL TILE
EPOXY PAINT
PAINTED GYP. BOARD
SEALED CONCRETE
CONCRETE
VCT TILE
SECURED GYP. BOARD
NOT FOR
CONSTRUCTION
911 Central Parkway N., Suite 425 San Antonio, TX 78323
501 North Broadway, St. Louis, Missouri 63102-2121
CERAMIC TILE
OPEN SPACE TO
UNLOAD PALLETS
SHELVING (TYP.)
EQ
Advisor
Resource Office
3.05
120 SF
Circulation
3.07
185 SF
Open Office
Area
3.02
224 SF
Supply Room
3.04
1205 SF
Hazmat Storage
3.06
143 SF
PASS-THROUGH WINDOW
1
Module 3 - Mobility and Supply - Floor Plan
1/8" = 1'-0"
9' - 0"
11' - 6"
Maintenance
Supply
3.01
400 SF
B
9' - 0"
Open Office
Area
3.02
224 SF
Logistics
Officer
3.03
120 SF
Supply Room
3.04
1205 SF
9' - 0"
9' - 0"
Advisor
Resource Office
3.05
120 SF
11' - 6"
Hazmat Storage
3.06
143 SF
0
2
Module 3 - Mobility and Supply - Reflected Ceiling Plan
1/8" = 1'-0"
3
Module 3 - Mobility and Supply - Axon
4'
8'
16'
SCALE: 1/8 " = 1'
Jacobs Project No.:
A
100% DESIGN
AIR FORCE CENTER FOR ENGINEERING AND
THE ENVIRONMENT (AFCEE)
FACILITIES DYNAMIC PROTOTYPES DESIGN FOR:
C
EQ
Logistics
Officer
3.03
120 SF
SECURITY FORCE OPERATIONS BUILDING
EQ
EQ
FDWD0262
Drawing Title:
Mobility/Supply
Date:
18 NOVEMBER 2011
Designed By: JN/MRB/OF Drawing No.:
JN/MRB/OF
Drawn By:
Checked By: JS
A-103
1
3
2
4
5
SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET
GENERAL NOTES
1.
2.
3.
4.
6" RAISED FLOOR
D
5.
6.
CEILING LEGEND
CARPET
2X2 ACOUSTICAL TILE
EPOXY PAINT
PAINTED GYP. BOARD
SEALED CONCRETE
CONCRETE
VCT TILE
SECURED GYP. BOARD
NOT FOR
CONSTRUCTION
911 Central Parkway N., Suite 425 San Antonio, TX 78323
501 North Broadway, St. Louis, Missouri 63102-2121
CERAMIC TILE
Waiting Area
4.05
139 SF
Comunication
Center
4.04
288 SF
Restroom
4.19
58 SF
4' - 0"
Server Room
4.02
83 SF
UP
Break Room
4.12
133 SF
Flight Sergeant
4.10
120 SF
Interview Room
B
4.07
73 SF
Corridor
4.09
510 SF
4' - 0"
Restroom
4.08
50 SF
Interview Room
A
4.06
73 SF
Storage
4.17
90 SF
DUI
4.14
92 SF
Holding Cell A
4.15
92 SF
AIR FORCE CENTER FOR ENGINEERING AND
THE ENVIRONMENT (AFCEE)
FACILITIES DYNAMIC PROTOTYPES DESIGN FOR:
Man Trap
4.16
138 SF
Flight Chief
4.11
178 SF
Holding Cell B
4.18
90 SF
C
Patrol Room
4.13
164 SF
1
FIXED SEATING (TYP.)
Module 4 - ECC/ BDOC - Floor Plan
1/8" = 1'-0"
Battle Staff
Room
4.03
144 SF
Waiting Area
4.05
139 SF
9' - 0"
OPEN TO
STRUCTURE
ABOVE
9' - 6"
9' - 6"
OPEN TO
STRUCTURE
ABOVE
B
9' - 0"
Interview Room
A
4.06
73 SF
Restroom
4.19
58 SF
Interview Room
B
4.07
73 SF
Comunication
Center
4.04
288 SF
9' - 6"
Restroom
4.08
50 SF
Corridor
4.09
510 SF
9' - 0"
Flight Sergeant
4.10
120 SF
Break Room
9' - 0" 4.12
133 SF
9' - 0"
9' - 0"
9' - 0"
Man Trap
4.16
138 SF
9' - 0"
9' - 0" Flight Chief
4.11
178 SF
DUI
4.14
92 SF
Patrol Room
4.13
164 SF
9' - 0"
9' - 0"
100% DESIGN
Battle Staff
Room
4.03
144 SF
SECURITY FORCE OPERATIONS BUILDING
Alarm Room
4.01
126 SF
EVERY WALL IS GENERIC UNLESS SPECIFICALLY NOTED
EVERY WALL IS A PLACE HOLDER
AS THE MODULES ARE COMBINED TO CREATE A FACILITY,
DISCRETION SHOULD BE USED AS TO WHICH WALLS NEED TO BE
MOVED, ADDED OR REMOVED
IF NO WALL IS PRESENT, IT IS THE DESIGN INTENT TO LEAVE THAT
SPACE OPEN TO ADJACENT SPACES WITHIN THE FACILITY
ALL FURNITURE IS A PLACE HOLDER UNLESS SPECIFICALLY NOTED
ALL MODULES HAVE BEEN ORGANIZED BASED ON A 15' GRID.
FLOOR FINISH LEGEND
Storage
4.17
90 SF
Holding Cell B
4.18
90 SF
Holding Cell A
4.15
92 SF
0
4'
8'
16'
SCALE: 1/8 " = 1'
Jacobs Project No.:
A
FDWD0262
Drawing Title:
2
Module 4 - ECC/ BDOC - Reflected Ceiling Plan
1/8" = 1'-0"
3
Module 4 - ECC/ BDOC - Axon.
ECC/ BDOC
Date:
18 NOVEMBER 2011
Designed By: JN/MRB/OF Drawing No.:
JN/MRB/OF
Drawn By:
Checked By: JS
A-104
1
3
2
4
5
SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET
GENERAL NOTES
Superintendant
5.02
154 SF
Training Officer
Office
5.01
154 SF
1.
2.
3.
Classroom A
5.03
752 SF
WALL MOUNTED TV
4.
D
5.
6.
EVERY WALL IS GENERIC UNLESS SPECIFICALLY NOTED
EVERY WALL IS A PLACE HOLDER
AS THE MODULES ARE COMBINED TO CREATE A FACILITY,
DISCRETION SHOULD BE USED AS TO WHICH WALLS NEED TO BE
MOVED, ADDED OR REMOVED
IF NO WALL IS PRESENT, IT IS THE DESIGN INTENT TO LEAVE THAT
SPACE OPEN TO ADJACENT SPACES WITHIN THE FACILITY
ALL FURNITURE IS A PLACE HOLDER UNLESS SPECIFICALLY NOTED
ALL MODULES HAVE BEEN ORGANIZED BASED ON A 15' GRID.
FLOOR FINISH LEGEND
CEILING LEGEND
CARPET
2X2 ACOUSTICAL TILE
EPOXY PAINT
PAINTED GYP. BOARD
SEALED CONCRETE
CONCRETE
VCT TILE
SECURED GYP. BOARD
NOT FOR
CONSTRUCTION
911 Central Parkway N., Suite 425 San Antonio, TX 78323
501 North Broadway, St. Louis, Missouri 63102-2121
CERAMIC TILE
Quality Control
NCOIC Office
5.04
120 SF
Private Testing
Room A
5.05
77 SF
ROOM SEPARATION
WALL PANELS
Private Testing
Room B
5.06
77 SF
Shared Office
5.07
132 SF
Study Carrells
5.08
117 SF
WALL MOUNTED TV
Classroom B
5.13
752 SF
Files/Office
Equipment/
Supply
5.14
165 SF
C
AIR FORCE CENTER FOR ENGINEERING AND
THE ENVIRONMENT (AFCEE)
FACILITIES DYNAMIC PROTOTYPES DESIGN FOR:
MARKER BOARD
Classroom
Storage
5.15
130 SF
Central
Circulation Conference
5.11
Area
316 SF
5.12
145 SF
1
Module 5 - Training & Quality - Floor Plan
1/8" = 1'-0"
Private Testing
Room B
5.06
77 SF
Private Testing
Room A
5.05
77 SF
9' - 0"
Training Officer
Office
5.01
154 SF
9' - 0"
Superintendant
5.02
154 SF
Classroom A
5.03
752 SF
9' - 0"
9' - 0"
B
Quality Control
NCOIC Office
5.04
120 SF
12' - 0"
9' - 0"
9' - 0"
Shared Office
5.07
132 SF
Study Carrells
5.08
117 SF
9' - 0"
9' - 0"
Classroom B
5.13
752 SF
9' - 0"
100% DESIGN
Storage
5.10
55 SF
SECURITY FORCE OPERATIONS BUILDING
Open Office
Area
5.09
407 SF
12' - 0"
Storage
5.10
55 SF
Open Office
Area
5.09
407 SF
8' - 0"
9' - 0"
9' - 0"
Classroom
Storage
5.15
130 SF
0
4'
8'
16'
SCALE: 1/8 " = 1'
Circulation
5.11
316 SF
A
Central
Conference
Area
5.12
145 SF
Jacobs Project No.:
Files/Office
Equipment/
Supply
5.14
165 SF
FDWD0262
Drawing Title:
Training/Quality
2
Module 5 - Training & Quality - Reflected Ceiling Plan
1/8" = 1'-0"
3
Module 5 - Training & Quality Axon.
Date:
18 NOVEMBER 2011
Designed By: JN/MRB/OF Drawing No.:
JN/MRB/OF
Drawn By:
Checked By: JS
A-105
1
3
2
Waiting
6.01
131 SF
9 LOCKERS
PASS-THROUGH WINDOW
SP
6.02
68 SF
4
5
SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET
Admin.
Processing
6.03
182 SF
Storage
6.04
127 SF
GENERAL NOTES
SP
6.02
68 SF
Waiting
6.01
131 SF
Storage
6.04
127 SF
Admin.
Processing
6.03
182 SF
Janitor's Closet
6.05
73 SF
D
Visitation/Training
Room
6.13
125 SF
Guard Room
6.15
112 SF
PHONE
Corridor
6.14
166 SF
WASHER/
DRYER
6 LOCKERS
Male Shower
6.12
68 SF
Corridor
6.19
75 SF
Male Cell
6.11
80 SF
Restroom
6.06
64 SF
6 LOCKERS
Female Shower
6.07
68 SF
PASS-THROUGH
WINDOW
Corridor
6.18
75 SF
1.
2.
3.
Female Cell
6.08
80 SF
4.
9' - 0"
Corridor
6.14
166 SF
Visitation/Training
Room
6.13
125 SF
Restroom
6.06
64 SF
Guard Room
6.15
112 SF
9' - 0"
Corridor
6.18
75 SF
9' - 0"
5.
6.
FLOOR FINISH LEGEND
9' - 0"
Male Cell
6.11
80 SF
Female Cell
6.08
80 SF
9' - 0"
9' - 0"
NOT FOR
CONSTRUCTION
EVERY WALL IS GENERIC UNLESS SPECIFICALLY NOTED
EVERY WALL IS A PLACE HOLDER
AS THE MODULES ARE COMBINED TO CREATE A FACILITY,
DISCRETION SHOULD BE USED AS TO WHICH WALLS NEED TO BE
MOVED, ADDED OR REMOVED
IF NO WALL IS PRESENT, IT IS THE DESIGN INTENT TO LEAVE THAT
SPACE OPEN TO ADJACENT SPACES WITHIN THE FACILITY
ALL FURNITURE IS A PLACE HOLDER UNLESS SPECIFICALLY NOTED
ALL MODULES HAVE BEEN ORGANIZED BASED ON A 15' GRID.
911 Central Parkway N., Suite 425 San Antonio, TX 78323
501 North Broadway, St. Louis, Missouri 63102-2121
CEILING LEGEND
CARPET
2X2 ACOUSTICAL TILE
EPOXY PAINT
PAINTED GYP. BOARD
SEALED CONCRETE
CONCRETE
VCT TILE
SECURED GYP. BOARD
PHONE
Male
Segregated Cell
6.10
80 SF
Outdoor Yard
6.17
258 SF
TV
CLERESTORY
WINDOWS
Day/Recreation
Room
6.16
144 SF
Female
Segregated Cell
6.09
80 SF
9' - 0"
Female
Segregated Cell
6.09
80 SF
9' - 0"
Corridor
6.21
39 SF
CHAIN LINK FENCE
Day/Recreation
Room
6.16
144 SF
Corridor
6.19
75 SF
Corridor
6.20
39 SF
CONFINEMENT MODULE NOTES
1.
2.
3.
C
4.
1
Module 6 - Confinement - Floor Plan
1/8" = 1'-0"
2
Module 6 - Confinement - Reflected Ceiling Plan
1/8" = 1'-0"
USE CORRECTIONAL LIGHTING (TAMPER PROOF LENSES/BALLASTS).
PROVIDE AN EXTERIOR LOCKED "KNOX BOX" IF BUILT AS A STAND ALONE FACILITY.
FIRE ESCAPE ELECTRONIC RELEASE DOORS TO OUTDOOR RECRETIONAL YARD WILL BE CONNECTED TO ECC/
BDOC'S BACKUP GENERATOR.
USE SECURITY HARDWARE (SCREWS/BOLTS) THROUGHOUT.
ADMIN/ PROCESSING
1.
PROVIDE ACCESS CONTROL PANEL TO CONTROL SALLY PORT AND OUTDOOR RECREATIONAL YARD EXIT DOORS.
2.
PROVIDE REDUNDANT DISPLAY APPLICABILITY (RDA) TO CONTROL SALLY PORT DOORS FROM ADMIN. & GUARD
ROOM.
3.
PROVIDE LOCKABLE, WALL-MOUNTED KEY BOX & SMALL LOCKABLE SECURITY DRAWER/SAFE.
4.
USE ONE WAY GLASS ON WINDOWS TO PREVENT CONFINEES'/VISITORS' VIEW TO STAFF.
5.
OPTIONAL. USE ACOUSTICAL TILES IN CEILING.
GUARD ROOM
1.
PROVIDE LOCKABLE, WALL-MOUNTED KEY BOX & LOCKABLE MEDICINE STORAGE BOX.
2.
PROVIDE AN ON/OFF SWITCH FOR THE PHONE IN THE VISITATION/ TRAINING ROOM.
3.
USE ONE WAY GLASS TO PREVENT CONFINEES' VIEW TO STAFF.
4.
OPTIONAL. USE ACOUSTICAL TILES IN CEILING.
DAY/ RECREATION ROOM
1.
IN COLD-WEATHER CLIMATES, PROVIDE EXTRA SPACE FOR EXERCISE EQUIPMENT.
2.
DOORS SHOULD NOT SWING IN.
CONFINEMENT CELLS
1.
PROVIDE AN ON/OFF SWITCH OUTSIDE OF THE CELL TO CONTROL THE ELECTRICAL OUTLET WITHIN THE CELL.
2.
PROVIDE A METAL DEMOUNTABLE BED (WALL AND/OR FLOOR MOUNTED), DESK, SHELF, AND BREAKAWAY
CLOTHES
HOOK
IN EACH CELL.
3.
USE SECURITY ONE-PIECE SAFETY MIRRORS.
4.
USE ALL IN ONE TOILET, BUBBLER, AND SINK.
5.
USE EMERGENCY LIGHTING (BACKUP POWERED) AND TAMPER-PROOF (DETENTION) LIGHTING.
6.
CELL DOORS SHOULD NOT HAVE ONE WAY GLASS AND CAN EITHER SLIDE OR OPEN OUT.
7.
DO NOT USE BASEBOARDS.
B
CORRIDORS
1.
BETWEEN THE MALE AND FEMALE CELLS, USE SLIDING, POCKET, OR BIFOLD DOORS. THE PRIMARY FUNCTION OF
THIS DOOR IS FOR SOUND ABATEMENT.
SHOWERS
1.
USE BREAKAWAY CLOTHES HOOKS.
SALLY PORT
1.
ENSURE SALLY PORT IS LONG AND WIDE ENOUGH FOR AN EMS STRETCHER/GURNEY TO PASS THROUGH.
100% DESIGN
Corridor
6.21
39 SF
Corridor
6.20
39 SF
CERAMIC TILE
Male
Segregated Cell
6.10
80 SF
SECURITY FORCE OPERATIONS BUILDING
WATER
FOUNTAIN
AIR FORCE CENTER FOR ENGINEERING AND
THE ENVIRONMENT (AFCEE)
FACILITIES DYNAMIC PROTOTYPES DESIGN FOR:
ONE WAY WINDOW IN
CONFINEMENT CELL
DOORS (TYP.)
DOORS
1.
INSTITUTION SHOWER DOORS ARE CENTERED HALF-DOORS (TOP AND BOTTOM OPEN).
2.
USE SOLID MINIMUM INSTITUTION RATED DOORS TRHOUGHOUT. CELL AND CORRIDOR DOORS SHOULD BE
MAXIMUM
SECURITY RATED.
WALL CONSTRUCTION
1.
THE ENTIRE CONFINEMENT AREA FOOTPRINT NEEDS TO BE SOLID SECURITY RATED TO LEVEL 1 CONFINEMENT
WALLS. THE WALLS SHOULD BE 8-INCH THICK CONCRETE MASONRY UNITS WITH CELLS FILLED FULL HEIGHT WITH
GROUT CONFORMING TO ASTM C476; VERTICAL REINFORCEMENT NOT REQUIRED FOR SECURITY; EXTEND WALL
TO UNDERSIDE OF STRUCTURE. CRITERIA DOES NOT PRECLUDE THE USE OF OTHER MATERIALS MORE READILY
AVAILABLE IN THE LOCAL MARKET PROVIDED THEY MEET OR EXCEED THE BASIC REQUIREMENTS.
CEILING CONSTRUCTIONDV
1.
THE CELL CEILING SYSTEM SHALL BE CAST-IN-PLACE CONCRETE WITH A MINIMUM THICKNESS OF 5 INCHES OF
REINFORCED CONRETE WITH 6X6 - W1.4 X W1.4 WELDED WIRE FABRIC. SLAB AREA EXPOSED TO THE CELL SHALL
HAVE A STEEL TROWEL FINISH. THE ENTIRE CONFINEMENT AREA CAN BE MADE THIS WAY OR THE
CIRCUMFERENCE OF THE AREA WOULD NEED TO HAVE 14 GAUGE STEEL PLATE FROM FLOOR TO DECK (TO
PREVENT CONFINEES ACCESS TO THE ENTIRE SECURITY FORCES COMPLEX CEILING AND ESCAPE VIA A
DIFFERENT ROOM IN THE BUILDING).
A
0
4'
8'
16'
SCALE: 1/8 " = 1'
Jacobs Project No.:
FDWD0262
Drawing Title:
Confinement
Date:
3
Module 6 - Confinement - Axon.
18 NOVEMBER 2011
Designed By: JN/MRB/OF Drawing No.:
JN/MRB/OF
Drawn By:
Checked By: JS
A-106
1
3
2
4
5
SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET
GENERAL NOTES
1.
2.
3.
4.
D
5.
6.
CEILING LEGEND
CARPET
2X2 ACOUSTICAL TILE
EPOXY PAINT
PAINTED GYP. BOARD
SEALED CONCRETE
CONCRETE
VCT TILE
SECURED GYP. BOARD
NOT FOR
CONSTRUCTION
911 Central Parkway N., Suite 425 San Antonio, TX 78323
501 North Broadway, St. Louis, Missouri 63102-2121
CERAMIC TILE
Intel (S2) Office
7.02
120 SF
Evidence
Storage Vault
7.01
175 SF
MARKER
BOARDS
PASS-THROUGH
WINDOW
Open Office/
Conference
Area
7.06
372 SF
Waiting Area
7.08
83 SF
Interview 1
7.07
110 SF
2
Interview 2
7.09
95 SF
Module 7 - Investigation/ S2 - Floor Plan
1/8" = 1'-0"
Evidence
Storage Vault
7.01
175 SF
Intel (S2) Office
7.02
120 SF
9' - 0"
B
Files/
Equipment/
Supply Storage
7.03
107 SF
9' - 0"
9' - 0"
NCOIC
Investigations
7.05
120 SF
100% DESIGN
WEAPON
STORAGE
LOCKERS
AIR FORCE CENTER FOR ENGINEERING AND
THE ENVIRONMENT (AFCEE)
FACILITIES DYNAMIC PROTOTYPES DESIGN FOR:
Corridor
7.04
61 SF
SECURITY FORCE OPERATIONS BUILDING
NCOIC
Investigations
7.05
120 SF
Files/
Equipment/
Supply Storage
7.03
107 SF
C
EVERY WALL IS GENERIC UNLESS SPECIFICALLY NOTED
EVERY WALL IS A PLACE HOLDER
AS THE MODULES ARE COMBINED TO CREATE A FACILITY,
DISCRETION SHOULD BE USED AS TO WHICH WALLS NEED TO BE
MOVED, ADDED OR REMOVED
IF NO WALL IS PRESENT, IT IS THE DESIGN INTENT TO LEAVE THAT
SPACE OPEN TO ADJACENT SPACES WITHIN THE FACILITY
ALL FURNITURE IS A PLACE HOLDER UNLESS SPECIFICALLY NOTED
ALL MODULES HAVE BEEN ORGANIZED BASED ON A 15' GRID.
FLOOR FINISH LEGEND
9' - 0"
Open Office/
Conference
Area
7.06
372 SF
9' - 0"
9' - 0"
9' - 0"
0
Interview 1
7.07
110 SF
Waiting Area
7.08
83 SF
4'
Interview 2
7.09
95 SF
8'
SCALE: 1/8 " = 1'
Jacobs Project No.:
A
3
Module 7 - Investigation/ S2 - Reflected Ceiling Plan
1/8" = 1'-0"
16'
1
Module 7 - Investigation/ S2 - Axon.
FDWD0262
Drawing Title:
Investigation/ S2
Date:
18 NOVEMBER 2011
Designed By: JN/MRB/OF Drawing No.:
JN/MRB/OF
Drawn By:
Checked By: JS
A-107
1
3
2
4
5
SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET
GENERAL NOTES
1.
2.
3.
4.
D
5.
6.
Open Office
Area
8.02
642 SF
Files/ Office
Equipment/
Supply Storage
8.01
58 SF
2X2 ACOUSTICAL TILE
EPOXY PAINT
PAINTED GYP. BOARD
SEALED CONCRETE
CONCRETE
VCT TILE
SECURED GYP. BOARD
NOT FOR
CONSTRUCTION
911 Central Parkway N., Suite 425 San Antonio, TX 78323
501 North Broadway, St. Louis, Missouri 63102-2121
CERAMIC TILE
First Sergeant
8.03
153 SF
MARKER BOARD
WALL MOUNTED TV
Module - 8 Command and Orderly
1/8" = 1'-0"
9' - 0"
Open Office
Area
8.02
642 SF
B
9' - 0"
Files/ Office
Equipment/
Supply Storage
8.01
58 SF
9' - 0"
Files/ Office
Equipment/
Supply Storage
8.06
160 SF
9' - 0"
First Sergeant
8.03
153 SF
9' - 0"
Waiting Area/
Secretary
8.04
220 SF
9' - 0"
SFM
8.07
182 SF
10' - 6"
Commander
8.08
289 SF
9' - 0"
100% DESIGN
Command
Conference
Room
8.09
410 SF
SECURITY FORCE OPERATIONS BUILDING
Commander
8.08
289 SF
SFM
8.07
182 SF
1
CARPET
AIR FORCE CENTER FOR ENGINEERING AND
THE ENVIRONMENT (AFCEE)
FACILITIES DYNAMIC PROTOTYPES DESIGN FOR:
C
CEILING LEGEND
Corridor
8.05
142 SF
Waiting Area/
Secretary
8.04
220 SF
Files/ Office
Equipment/
Supply Storage
8.06
160 SF
EVERY WALL IS GENERIC UNLESS SPECIFICALLY NOTED
EVERY WALL IS A PLACE HOLDER
AS THE MODULES ARE COMBINED TO CREATE A FACILITY,
DISCRETION SHOULD BE USED AS TO WHICH WALLS NEED TO BE
MOVED, ADDED OR REMOVED
IF NO WALL IS PRESENT, IT IS THE DESIGN INTENT TO LEAVE THAT
SPACE OPEN TO ADJACENT SPACES WITHIN THE FACILITY
ALL FURNITURE IS A PLACE HOLDER UNLESS SPECIFICALLY NOTED
ALL MODULES HAVE BEEN ORGANIZED BASED ON A 15' GRID.
FLOOR FINISH LEGEND
10' - 0"
Command
Conference
Room
8.09
410 SF
0
4'
8'
16'
SCALE: 1/8 " = 1'
2
A
Module 8- Command and Orderly - Reflected Ceiling Plan
1/8" = 1'-0"
3
Module 8 - Command and Orderly
Jacobs Project No.:
FDWD0262
Drawing Title:
Command/ Orderly
Date:
18 NOVEMBER 2011
Designed By: JN/MRB/OF Drawing No.:
JN/MRB/OF
Drawn By:
Checked By: JS
A-108
1
3
2
4
5
SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET
GENERAL NOTES
1.
2.
3.
4.
5.
6.
D
EVERY WALL IS GENERIC UNLESS SPECIFICALLY NOTED
EVERY WALL IS A PLACE HOLDER
AS THE MODULES ARE COMBINED TO CREATE A FACILITY,
DISCRETION SHOULD BE USED AS TO WHICH WALLS NEED TO BE
MOVED, ADDED OR REMOVED
IF NO WALL IS PRESENT, IT IS THE DESIGN INTENT TO LEAVE THAT
SPACE OPEN TO ADJACENT SPACES WITHIN THE FACILITY
ALL FURNITURE IS A PLACE HOLDER UNLESS SPECIFICALLY NOTED
ALL MODULES HAVE BEEN ORGANIZED BASED ON A 15' GRID.
NOT FOR
CONSTRUCTION
911 Central Parkway N., Suite 425 San Antonio, TX 78323
501 North Broadway, St. Louis, Missouri 63102-2121
FLOOR FINISH LEGEND
CARPET
EPOXY PAINT
SEALED CONCRETE
VCT TILE
CERAMIC TILE
CEILING LEGEND
2X2 ACOUSTICAL TILE
SECURED GYP. BOARD
C
1
Module 9A - Back of House Restrooms - Axon.
6
Module 9B - General Support - Axon.
B
BENCH (TYP.)
9' - 0"
9' - 0"
Female
Restroom
9A.2
404 SF
Male Restroom
9A.1
404 SF
Mechanical
Room
9B.1
860 SF
9' - 0"
Mechanical
Room
9B.1
860 SF
Female
Restroom
9A.2
404 SF
Male Restroom
9A.1
404 SF
100% DESIGN
AIR FORCE CENTER FOR ENGINEERING AND
THE ENVIRONMENT (AFCEE)
FACILITIES DYNAMIC PROTOTYPES DESIGN FOR:
CONCRETE
SECURITY FORCE OPERATIONS BUILDING
PAINTED GYP. BOARD
9' - 0"
9' - 0"
Janitor
9A.3
69 SF
Janitor
9A.3
69 SF
3
Module 9A - Back of House Restrooms - Floor Plan
1/8" = 1'-0"
4
General Office
Storage
9B.2
215 SF
Module 9A - Back of House Restrooms - Reflected Ceiling Plan
1/8" = 1'-0"
Electrical/
Comm.
Equipment
Storage
9B.3
192 SF
General Office
Storage
9B.2
215 SF
9' - 0"
Electrical/
Comm.
Equipment
Storage
9B.3
192 SF
0
4'
8'
SCALE: 1/8 " = 1'
Jacobs Project No.:
A
16'
FDWD0262
Drawing Title:
2
Module 9B - General Support - Floor Plan
1/8" = 1'-0"
5
Module 9B - General Support - Reflected Ceiling Plan
1/8" = 1'-0"
Back of House
Restrooms & General
Support
Date:
18 NOVEMBER 2011
Designed By: JN/MRB/OF Drawing No.:
JN/MRB/OF
Drawn By:
Checked By: JS
A-109
1
3
2
4
5
SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET
D
5.
6.
CARPET
2X2 ACOUSTICAL TILE
EPOXY PAINT
PAINTED GYP. BOARD
SEALED CONCRETE
CONCRETE
VCT TILE
SECURED GYP. BOARD
NOT FOR
CONSTRUCTION
911 Central Parkway N., Suite 425 San Antonio, TX 78323
501 North Broadway, St. Louis, Missouri 63102-2121
CERAMIC TILE
C
3
Module 9C - Break Room - Axon.
6
Module 9D - Front of House Restrooms - Axon.
B
9' - 0"
9' - 0"
Break Room
9C.1
564 SF
Restroom
9D.1
56 SF
Break Room
9C.1
564 SF
Restroom
9D.1
56 SF
100% DESIGN
4.
EVERY WALL IS GENERIC UNLESS SPECIFICALLY NOTED
EVERY WALL IS A PLACE HOLDER
AS THE MODULES ARE COMBINED TO CREATE A FACILITY,
DISCRETION SHOULD BE USED AS TO WHICH WALLS NEED TO BE
MOVED, ADDED OR REMOVED
IF NO WALL IS PRESENT, IT IS THE DESIGN INTENT TO LEAVE THAT
SPACE OPEN TO ADJACENT SPACES WITHIN THE FACILITY
ALL FURNITURE IS A PLACE HOLDER UNLESS SPECIFICALLY NOTED
ALL MODULES HAVE BEEN ORGANIZED BASED ON A 15' GRID.
CEILING LEGEND
SECURITY FORCE OPERATIONS BUILDING
1.
2.
3.
FLOOR FINISH LEGEND
AIR FORCE CENTER FOR ENGINEERING AND
THE ENVIRONMENT (AFCEE)
FACILITIES DYNAMIC PROTOTYPES DESIGN FOR:
GENERAL NOTES
10' - 0"
2
Module 9C - Break Room - Floor Plan
1/8" = 1'-0"
Module 9C - Break Room - Reflected Ceiling Plan
4
1/8" = 1'-0"
1
Module 9D - Front of House Restrooms - Floor Plan
1/8" = 1'-0"
Module 9D - Front of House Restrooms Reflected Ceiling Plan
5
1/8" = 1'-0"
0
4'
8'
SCALE: 1/8 " = 1'
Jacobs Project No.:
A
16'
FDWD0262
Drawing Title:
Break Room & Front
of House Restrooms
Date:
18 NOVEMBER 2011
Designed By: JN/MRB/OF Drawing No.:
JN/MRB/OF
Drawn By:
Checked By: JS
A-110
1
3
2
4
5
SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET
GENERAL NOTES
1.
2.
3.
4.
5.
6.
D
S3 Officer
10.01
125 SF
EVERY WALL IS GENERIC UNLESS SPECIFICALLY NOTED
EVERY WALL IS A PLACE HOLDER
AS THE MODULES ARE COMBINED TO CREATE A FACILITY,
DISCRETION SHOULD BE USED AS TO WHICH WALLS NEED TO BE
MOVED, ADDED OR REMOVED
IF NO WALL IS PRESENT, IT IS THE DESIGN INTENT TO LEAVE THAT
SPACE OPEN TO ADJACENT SPACES WITHIN THE FACILITY
ALL FURNITURE IS A PLACE HOLDER UNLESS SPECIFICALLY NOTED
ALL MODULES HAVE BEEN ORGANIZED BASED ON A 15' GRID.
FLOOR FINISH LEGEND
CEILING LEGEND
CARPET
2X2 ACOUSTICAL TILE
EPOXY PAINT
PAINTED GYP. BOARD
SEALED CONCRETE
CONCRETE
VCT TILE
SECURED GYP. BOARD
NOT FOR
CONSTRUCTION
911 Central Parkway N., Suite 425 San Antonio, TX 78323
501 North Broadway, St. Louis, Missouri 63102-2121
CERAMIC TILE
S3 SMGT
10.02
127 SF
C
Assistant S3 PMD
MSGT
10.06
10.05
127 SF
124 SF
1
Module 10 - Operations & Training/ S3
1/8" = 1'-0"
S3 Officer
10.01
125 SF
9' - 0"
S3 SMGT
10.02
127 SF
9' - 0"
B
10' - 0"
9' - 0"
Work Stations
10.03
100 SF
9' - 0"
Assistant S3
MSGT
10.05
124 SF
100% DESIGN
Work Stations
10.03
100 SF
AIR FORCE CENTER FOR ENGINEERING AND
THE ENVIRONMENT (AFCEE)
FACILITIES DYNAMIC PROTOTYPES DESIGN FOR:
Planning Area
10.04
233 SF
SECURITY FORCE OPERATIONS BUILDING
MARKER BOARD
Planning Area
10.04
233 SF
9' - 0"
PMD
10.06
127 SF
0
4'
8'
16'
SCALE: 1/8 " = 1'
2
A
Module 10 - Operations & Training - Reflected Ceiling Plan
1/8" = 1'-0"
3
Module 10 - Operations & Training/ S3 - Axon.
Jacobs Project No.:
FDWD0262
Drawing Title:
Operations & Training/
S3
Date:
18 NOVEMBER 2011
Designed By: JN/MRB/OF Drawing No.:
JN/MRB/OF
Drawn By:
Checked By: JS
A-111
1
2
3
4
5
SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET
C
B
NOT FOR
CONSTRUCTION
911 Central Parkway N., Suite 425 San Antonio, TX 78323
501 North Broadway, St. Louis, Missouri 63102-2121
Jacobs Project No.:
A
100% DESIGN
D
THIS BUILDING LAYOUT IS PROVIDED TO
ILLUSTRATE ONE POSSIBLE WAY OF
ARRANGING THE INDIVIDUAL MODULES. IT IS
NOT INTENDED TO CONSTITUTE A FINAL
DESIGN.
SECURITY FORCE OPERATIONS BUILDING
1.
AIR FORCE CENTER FOR ENGINEERING AND
THE ENVIRONMENT (AFCEE)
FACILITIES DYNAMIC PROTOTYPES DESIGN FOR:
BUILDING NOTES
FDWD0262
Drawing Title:
Building Rendering 1 Rendering
Date:
18 NOVEMBER 2011
Designed By: JN/MRB/OF Drawing No.:
JN/MRB/OF
Drawn By:
Checked By: JS
A-201
1
3
2
4
5
SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET
INDIVIDUAL MODULES
Module 1:
Police Service & Installation/ S5
Module 2:
Guardmount/ Armory
Module 3:
Mobility/ Supply
Module 4:
ECC/ BDOC
Module 5:
Training/ Quality
Module 7:
Investigation/ S2
Module 8:
Command/ Orderly
Module 9B:
General Support
Module 9A:
Back of House
Restrooms
Module 9C:
Break Room
Module 9D:
Front of House
Restrooms
Module 10:
Operations &
Training/ S3
NOT FOR
CONSTRUCTION
911 Central Parkway N., Suite 425 San Antonio, TX 78323
501 North Broadway, St. Louis, Missouri 63102-2121
D
SCALE: 1/32" = 1'0"
Transient
Weapons
Storage
Restroom
NCOIC Office
Restroom
Alarm Room
Flight Sergeant
Flight Chief
Server Room
Chief's Office
Plans Office
Installation
Security Office
Personal
Weapons
Storage
Training Officer
Reports &
Analysis
Issue Weapons
Superintendent
Ammunition
Storage
Quality Control
Officer
AIR FORCE CENTER FOR ENGINEERING AND
THE ENVIRONMENT (AFCEE)
FACILITIES DYNAMIC PROTOTYPES DESIGN FOR:
Weapons Issue
Area
Weapons
Cleaning Area
Shared Office
Private Testing
Room B
Break Room
C
Comunication
Center
Patrol Room
Gear Lockers
Study Carrels
DUI
Guardmount
Holding Cell A
Interview Room
A
Open Office
Area
Open Office
Area
Corridor
STORAGE
Classrooms
Man Trap
Interview Room
B
Waiting Area
Files/Equip/Supply
Computer
Storage
Holding Cell B
Central
Conference
Area
Waiting Area
Files/Equipment/
Supply
Classroom
Storage
Storage
Restroom
Corridor
Entry Lobby
Files/Storage
B
Janitor
First Sergeant
Office
S3 Officer
S3 SMGT
Evidence
Storage Vault
Intel (S2) Office
Open Office
Area
Maintenance
Supply
Open Office
Area
Female
Restroom
Command
Conference
Room
Male Restroom
NCOIC
Investigations
General Office
Storage
Work Stations
Files/
Equipment/
Supply Storage
Planning Area
Advisor
Resource Office
Logistics
Officer
Waiting
Assistant S3
MSGT
Electrical/
Comm.
Equipment
Storage
100% DESIGN
Private Testing
Room A
SECURITY FORCE OPERATIONS BUILDING
Battle Staff
Room
PMD
Open Office/
Conference
Area
Commander's
Office
Files/Equip/Supply
Break Room
Restroom
SFM Office
0 8' 16'
Mechanical
Room
32'
64'
SCALE: 1/32 " = 1'
Interview 2
Waiting Area
Interview 1
0
Mechanical
Room
4'
8'
16'
SCALE: 1/8 " = 1'
Entry Vestibule
Jacobs Project No.:
A
FDWD0262
Drawing Title:
BUILDING NOTES
1.
Building Example 1 - Floor Plan
1
1/8" = 1'-0"
THIS BUILDING LAYOUT IS PROVIDED TO
ILLUSTRATE ONE POSSIBLE WAY OF
ARRANGING THE INDIVIDUAL MODULES. IT IS
NOT INTENDED TO CONSTITUTE A FINAL
DESIGN.
Building Example 1 Floor Plan
Hazmat Storage
Supply Room
Date:
18 NOVEMBER 2011
Designed By: JN/MRB/OF Drawing No.:
JN/MRB/OF
Drawn By:
Checked By: JS
A-202
1
2
3
4
5
SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET
C
B
NOT FOR
CONSTRUCTION
911 Central Parkway N., Suite 425 San Antonio, TX 78323
501 North Broadway, St. Louis, Missouri 63102-2121
Jacobs Project No.:
A
100% DESIGN
D
THIS BUILDING LAYOUT IS PROVIDED TO
ILLUSTRATE ONE POSSIBLE WAY OF
ARRANGING THE INDIVIDUAL MODULES. IT IS
NOT INTENDED TO CONSTITUTE A FINAL
DESIGN.
SECURITY FORCE OPERATIONS BUILDING
1.
AIR FORCE CENTER FOR ENGINEERING AND
THE ENVIRONMENT (AFCEE)
FACILITIES DYNAMIC PROTOTYPES DESIGN FOR:
BUILDING NOTES
FDWD0262
Drawing Title:
Building Example 2 Rendering
Date:
18 NOVEMBER 2011
Designed By: JN/MRB/OF Drawing No.:
JN/MRB/OF
Drawn By:
Checked By: JS
A-203
1
3
2
4
5
SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET
INDIVIDUAL MODULES
Module 1:
Police Service &
Installation/ S5
Module 2:
Guardmount/ Armory
Module 3:
Mobility/ Supply
Module 4:
ECC/ BDOC
Module 5:
Training/ Quality
Module 6:
Confinement
Module 7:
Investigation/ S2
Module 8:
Command/ Orderly
Module 9B:
General Support
Module 9A:
Back of House
Restrooms
Module 9C:
Break Room
Module 9D:
Front of House
Restrooms
Module 10:
Operations &
Training/ S3
NOT FOR
CONSTRUCTION
911 Central Parkway N., Suite 425 San Antonio, TX 78323
501 North Broadway, St. Louis, Missouri 63102-2121
D
SCALE: 1/32" = 1'0"
2
A-205
1
A-205
1
A-204
BUILDING NOTES
3
Building Example 2
1" = 20'-0"
Room
Restroom
Restroom
Electrical
First Sergeant
Server Room
Alarm Room
Flight Chief
Command
Conference
Room
Flight Sergeant
Waiting Area
Interview 1
Interview 2
B
Battle Staff
Room
Mechanical
Female
Restroom
Central
Conference
Area
Patrol Room
Open Office/
Conference
Area
Break Room
Commander
Comunication
Center
Janitor's Closet
Storage
Open Office
Area
Male Restroom
NCOIC
Investigations
Corridor
Files/
Equipment/
Supply Storage
Corridor
Assistant S3
MSGT
100% DESIGN
C
SECURITY FORCE OPERATIONS BUILDING
THIS BUILDING LAYOUT IS PROVIDED TO
ILLUSTRATE ONE POSSIBLE WAY OF
ARRANGING THE INDIVIDUAL MODULES. IT IS
NOT INTENDED TO CONSTITUTE A FINAL
DESIGN.
AIR FORCE CENTER FOR ENGINEERING AND
THE ENVIRONMENT (AFCEE)
FACILITIES DYNAMIC PROTOTYPES DESIGN FOR:
1.
Work Stations
Holding Cell A
S3 Officer
DUI
SFM
Interview Room
A
Study Carrells
Intel (S2) Office
Shared Office
Private Testing
Room B
Waiting Area
Evidence
Storage Vault
Planning Area
Man Trap
Corridor
Waiting Area/
Secretary
Corridor
PMD
Quality Control
NCOIC Office
Private Testing
Room A
Break Room
Janitor's Closet
Storage
S3 SMGT
Files/ Office
Equipment/
Supply Storage
Holding Cell B
Interview Room
B
Superintendant
Training Officer
Office
COMM.
Corridor
32'
64'
SCALE: 1/32 " = 1'
0
Mechanical
Room
40'
SCALE: 1" = 20'
Restroom
Storage
20'
0 8' 16'
Storage
4'
8'
16'
SCALE: 1/8 " = 1'
Files/ Office
Equipment/
Supply Storage
A
0'
Jacobs Project No.:
Entry Vestibule
FDWD0262
Drawing Title:
Building Example 2 Floor Plan
Date:
Building Example 2 - Enlarged Floor Plan A
1
1/8" = 1'-0"
18 NOVEMBER 2011
Designed By: JN/MRB/OF Drawing No.:
JN/MRB/OF
Drawn By:
Checked By: JS
A-204
1
3
2
4
5
SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET
NOT FOR
CONSTRUCTION
BUILDING NOTES
1.
D
Corridor
Classroom
Storage
THIS BUILDING LAYOUT IS PROVIDED TO
ILLUSTRATE ONE POSSIBLE WAY OF
ARRANGING THE INDIVIDUAL MODULES. IT IS
NOT INTENDED TO CONSTITUTE A FINAL
DESIGN.
911 Central Parkway N., Suite 425 San Antonio, TX 78323
501 North Broadway, St. Louis, Missouri 63102-2121
Files/Office
Equipment/
Supply
Waiting Room
Open Office
Area
Files/
Equipment/
Supply Storage
Maintenance
Supply
Computer
Storage
Classroom B
Guardmount
Area
Circulation
Advisor
Resource Office
Logistics
Officer
Gear Lockers
Issue Windows
Ammunition
Storage
C
Transient
Weapons
Storage
Chief's Office
NCOIC Armory
Office
Personal
Weapons
Storage
Restroom
1
Classroom A
Plans Office
Installation
Security Office
Security
Manager's
Office
Hazmat Storage
Building Example 2 - Enlarged Floor Plan B
1/8" = 1'-0"
B
Outdoor Yard
Male Segregate
Confinement
Cell 1
Male
Confinement Male Shower
Cell 1
Corridor
Corridor
Day/Recreation
Room
Visitation/Training
Room
Waiting
SP
Admin.
Processing
Guard Room
0
Corridor
Corridor
A
Female Female Shower
Confinement
Cell 1
Janitor's Closet
Restroom
Building Example 2 - Enlarged Floor Plan C
1/8" = 1'-0"
8'
Storage
Jacobs Project No.:
16'
FDWD0262
Drawing Title:
Building Example 2 Floor Plan
Date:
2
4'
SCALE: 1/8 " = 1'
Corridor
MECHANICAL
ROOM
Female
Segregate
Confinement
Cell 1
100% DESIGN
Weapons
Cleaning Area
SECURITY FORCE OPERATIONS BUILDING
Open Office
Area
Supply Room
AIR FORCE CENTER FOR ENGINEERING AND
THE ENVIRONMENT (AFCEE)
FACILITIES DYNAMIC PROTOTYPES DESIGN FOR:
Weapons Issue
Area
18 NOVEMBER 2011
Designed By: JN/MRB/OF Drawing No.:
JN/MRB/OF
Drawn By:
Checked By: JS
A-205
1
3
2
4
5
SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET
B
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-2
PT-1
PT-2
PT-1
PT-1
PT-1
PT-1
PT-1
PT-3
PT-2
PT-4
PT-4
PT-4
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-2
PT-1
PT-1
PT-4
PT-4
PT-4
PT-4
PT-2
PT-1
PT-1
PT-1
PT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
150 SF
120 SF
120 SF
150 SF
1100 SF
120 SF
60 SF
100 SF
100 SF
150 SF
121 SF
121 SF
151 SF
1117 SF
121 SF
60 SF
98 SF
100 SF
Module 2: Guardmount/Armory
2.01 Guardmount Area
2.02 Ammunition Storage
2.03 NCOIC Armory Office
2.04 Circulation
2.05 Restroom
SC-1
SC-1
CPT-1
EFP-1
CFT-1
RB-1
RB-1
RB-1
CB-1
EWP-1
PT-1
PT-1
CWT-1 /
CWT-2
EWP-1
EWP-1
PT-1
EWP-1
PT-1
PT-1
EWP-1
PT-1
PT-1
PT-1
CWT-1 /
CWT-2
EWP-1
EWP-3
PT-1
PT-1
EWP-1
PT-1
PT-1
740 SF
150 SF
120 SF
0 SF
60 SF
736 SF
150 SF
119 SF
36 SF
54 SF
RB-1
RB-1
RB-1
EWP-1
PT-1
PT-1
PT-1
CWT-1 /
CWT-2
EWP-2
EWP-3
PT-2
EWP-1
PT-1
PT-1
GYP.
GYP.
GYP.
GYP.
GYP.
EFP-1
EFP-1
EFP-1
EFP-1
SC-1
SC-1
SC-1
EWP-2
PT-1
PT-4
PT-1
CWT-1 /
CWT-2
EWP-1
EWP-1
PT-1
PT-1
EWP-1
PT-1
PT-1
GYP.
GYP.
GYP.
GYP.
GYP.
GYP.
GYP.
920 SF
220 SF
300 SF
160 SF
120 SF
100 SF
64 SF
919 SF
211 SF
300 SF
165 SF
113 SF
100 SF
64 SF
Module 3: Mobility/Supply
3.01 Maintenance Supply
3.02 Open Office Area
3.03 Logistics Officer
3.04 Supply Room
3.05 Advisor Resource Office
3.06 Hazmat Storage
3.07 Circulation
SC-1
CPT-1
CPT-1
SC-1
CPT-1
SC-1
CPT-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
PT-1
PT-1
PT-1
PT-1
PT-3
PT-1
PT-1
PT-1
PT-4
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-2
PT-1
PT-1
PT-1
PT-1
-
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
400 SF
220 SF
120 SF
1200 SF
120 SF
140 SF
0 SF
400 SF
224 SF
120 SF
1205 SF
120 SF
143 SF
185 SF
Module 4: ECC / BDOC
4.01 Alarm Room
4.02 Server Room
4.03 Battle Staff Room
4.04 Comunication Center
4.05 Waiting Area
4.06 Interview Room A
4.07 Interview Room B
4.08 Restroom
4.09 Corridor
VCT-1
VCT-1
CPT-1
CPT-1
VCT-1
EFP-1
EFP-1
EFP-1
EFP-1
RB-1
RB-1
RB-1
RB-1
RB-1
-
PT-1
PT-1
PT-1
PT-1
PT-3
EWP-1
EWP-1
EWP-1
EWP-1
PT-1
PT-1
PT-2
PT-1
PT-1
EWP-1
EWP-1
EWP-1
EWP-1
PT-1
PT-1
PT-1
PT-1
PT-1
EWP-1
EWP-1
EWP-1
EWP-1
PT-1
PT-1
PT-1
PT-2
PT-4
EWP-1
EWP-1
EWP-1
EWP-1
OPEN
OPEN
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
120 SF
80 SF
150 SF
300 SF
140 SF
80 SF
80 SF
80 SF
0 SF
126 SF
83 SF
144 SF
288 SF
139 SF
73 SF
73 SF
50 SF
510 SF
CPT-1
CPT-1
VCT-1
CPT-1
EFP-1
EFP-1
EFP-1
VCT-1
EFP-1
CT-3
RB-1
RB-1
RB-1
RB-1
RB-1
CB-1
PT-1
PT-1
PT-1
PT-1
EWP-1
EWP-1
EWP-1
PT-1
EWP-1
CWT-1 /
CWT-2
PT-1
PT-1
PT-1
PT-3
EWP-1
EWP-1
EWP-1
PT-1
EWP-1
CWT-1 /
CWT-2
PT-1
PT-3
PT-1
PT-1
EWP-1
EWP-1
EWP-1
PT-1
EWP-1
CWT-1 /
CWT-2
PT-4
PT-4
PT-2
PT-3
EWP-1
EWP-1
EWP-1
PT-1
EWP-1
CWT-1 /
CWT-2
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
SEC. GYP.
SEC. GYP.
SEC. GYP.
SEC. GYP.
ACT-1
120 SF
200 SF
140 SF
150 SF
90 SF
90 SF
140 SF
90 SF
90 SF
60 SF
120 SF
178 SF
133 SF
164 SF
92 SF
92 SF
138 SF
90 SF
90 SF
58 SF
CPT-1
CPT-1
CPT-1
CPT-1
CPT-1
CPT-1
CPT-1
CPT-1
CPT-1
CPT-1
CPT-1
CPT-1
CPT-1
VCT-1
VCT-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
WT
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-3
PT-4
PT-1
PT-4
PT-3
PT-1
PT-4
PT-1
PT-2
PT-3
PT-4
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-2
PT-1
PT-1
PT-1
PT-4
PT-1
PT-3
PT-3
PT-1
PT-1
PT-4
PT-1
PT-3
PT-1
PT-1
PT-2
PT-3
PT-1
PT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
GYP.
ACT-1
ACT-1
ACT-1
150 SF
150 SF
750 SF
120 SF
80 SF
80 SF
130 SF
120 SF
400 SF
50 SF
0 SF
150 SF
750 SF
160 SF
130 SF
154 SF
154 SF
752 SF
120 SF
77 SF
77 SF
132 SF
117 SF
407 SF
55 SF
316 SF
145 SF
752 SF
165 SF
130 SF
4.10
4.11
4.12
4.13
4.14
4.15
4.16
4.17
4.18
4.19
Gear Lockers
Weapons Issue Area
Weapons Storage
Issue Windows
Weapons Cleaning Area
Transient Weapons Storage
Personal Weapons Storage
Flight Sergeant
Flight Chief
Break Room
Patrol Room
DUI
Holding Cell A
Man Trap
Storage
Holding Cell B
Restroom
Module 5: Training/Quality
5.01 Training Officer Office
5.02 Superintendant
5.03 Classroom A
5.04 Quality Control NCOIC Office
5.05 Private Testing Room A
5.06 Private Testing Room B
5.07 Shared Office
5.08 Study Carrells
5.09 Open Office Area
5.10 Storage
5.11 Circulation
5.12 Central Conference Area
5.13 Classroom B
5.14 Files/Office Equipment/ Supply
5.15 Classroom Storage
RAMP SIDE WALL TO
BE PAINTED EWP-4
01 WALLS
CWT-1
CWT-2
EWP-1
EWP-2
EWP-3
EWP-4
PT-1
PT-2
PT-3
PT-4
12" X 6" CERAMIC TILE
12" X 6" CERAMIC TILE - ACCENT
PAINT - EPOXY TYPICAL
PAINT - EPOXY ACCENT
PAINT - EPOXY ACCENT
PAINT - EPOXY ACCENT
PAINT - TYPICAL
PAINT - ACCENT
PAINT - ACCENT
PAINT - ACCENT
1.
MATERIALS ARE PROVIDED AS SUGGESTIONS ONLY. FINAL FINISHES
SHOULD BE EVALUATED AND CHOSEN FOR EACH NEW PROJECT.
NOT FOR
CONSTRUCTION
911 Central Parkway N., Suite 425 San Antonio, TX 78323
501 North Broadway, St. Louis, Missouri 63102-2121
02 FLOORS
CFT-1
12" X 12" CERAMIC FLOOR TILE
CPT-1 2' X 2' CARPET TILE
EFP-1
PAINT - EPOXY
SC-1
SEALED CONCRETE
VCT-1 12" X 12" VINYL COMPOSITION TILE
03 BASE
CB-1
RB-1
6" CERAMIC COVE BASE
5" RUBBER BASE
04 CEILING
ACT-1 2' X 2' ACOUSTICAL CEILING TILE
GYP.
PAINTED GYPSUM BOARD CEILING
OPEN
EXPOSED TO STRUCTURE
SEC. GYP. PAINTED GYPSUM BOARD SECURITY
CEILING
05 MILLWORK
LAM-1 PLASTIC LAMINATE - HORIZONTAL
SURFACES
LAM-2 PLASTIC LAMINATE - VERTICAL
SURFACES
SS-1
SOLID SURFACE
TEXTURE FINISH
Jacobs Project No.:
A
100% DESIGN
Comments
Module 1: Police Services & Installation Security/ S5
1.01 Chief's Office
CPT-1
1.02 Plans Office
CPT-1
1.03 Installation Security Office
CPT-1
1.04 Reports & Analysis
CPT-1
1.05 Open Office Area
CPT-1
1.06 Waiting Room
CPT-1
1.07 Counter Area at Lobby
CPT-1
1.08 Files/ Equipment/ Supply Storage
CPT-1
1.09 Computer Storage
VCT-1
2.06
2.07
2.08
2.09
2.10
2.11
2.12
C
Ceiling Finish
Bim Manual
Required
Area
Actual Area
GENERAL NOTES
SECURITY FORCE OPERATIONS BUILDING
D
Room Name
Floor
Finish
INTERIOR FINISH COLOR AND MATERIAL SCHEDULE
ITEM
MATERIAL
NOTES
AIR FORCE CENTER FOR ENGINEERING AND
THE ENVIRONMENT (AFCEE)
FACILITIES DYNAMIC PROTOTYPES DESIGN FOR:
Room
Number
ROOM FINISH SCHEDULE 1
FINISHES
WALLS
Base Plan North Plan East Plan South Plan West
Finish
Wall
Wall
Wall
Wall
FDWD0262
Drawing Title:
Room Finish Schedule
Date:
18 NOVEMBER 2011
Designed By: JN/MRB/OF Drawing No.:
JN/MRB/OF
Drawn By:
Checked By: JS
A-301
1
3
2
4
5
SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET
GENERAL NOTES
Room Name
Floor
Finish
Base
Finish
Plan North
Wall
Module 6: Confinement
6.01 Waiting
6.02 SP
6.03 Admin. Processing
6.04 Storage
6.05 Janitor's Closet
6.06 Restroom
6.07 Female Shower
6.08 Female Cell
6.09 Female Segregated Cell
6.10 Male Segregated Cell
6.11 Male Cell
6.12 Male Shower
6.13 Visitation/Training Room
6.14 Corridor
6.15 Guard Room
6.16 Day/Recreation Room
6.17 Outdoor Yard
6.18 Corridor
6.19 Corridor
6.20 Corridor
6.21 Corridor
EFP-1
EFP-1
CPT-1
VCT-1
VCT-1
CFT-1
CT-3
EFP-1
EFP-1
EFP-1
EFP-1
CT-3
EFP-1
EFP-1
VCT-1
EFP-1
EFP-1
EFP-1
EFP-1
EFP-1
RB-1
RB-1
RB-1
CB-1
CB-1
CB-1
RB-1
-
EWP-1
EWP-1
PT-4
PT-1
PT-1
CWT-1
CWT-1
EWP-1
EWP-1
EWP-1
EWP-1
CWT-1
EWP-1
EWP-1
PT-1
EWP-1
EWP-1
EWP-1
EWP-1
EWP-1
EWP-1
EWP-1
PT-1
PT-1
PT-1
CWT-1
CWT-1
EWP-1
EWP-1
EWP-1
EWP-1
CWT-1
EWP-1
EWP-1
PT-1
EWP-1
EWP-1
EWP-1
EWP-1
EWP-1
EWP-1
EWP-1
PT-4
PT-1
PT-1
CWT-1
CWT-1
EWP-1
EWP-1
EWP-1
EWP-1
CWT-1
EWP-1
EWP-1
PT-4
EWP-3
EWP-1
EWP-1
EWP-1
EWP-1
EWP-1
EWP-1
PT-1
PT-1
PT-1
CWT-1
CWT-1
EWP-1
EWP-1
EWP-1
EWP-1
CWT-1
EWP-1
EWP-1
PT-1
EWP-1
EWP-1
EWP-1
EWP-1
EWP-1
SECURED GYP.
SECURED GYP.
SECURED GYP.
SECURED GYP.
SECURED GYP.
SECURED GYP.
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
125 SF
100 SF
180 SF
100 SF
60 SF
60 SF
60 SF
80 SF
80 SF
80 SF
80 SF
60 SF
120 SF
120 SF
120 SF
150 SF
250 SF
Module 7: Investigation/S2
7.01 Evidence Storage Vault
7.02 Intel (S2) Office
7.03 Files/ Equipment/ Supply Storage
7.04 Corridor
7.05 NCOIC Investigations
7.06 Open Office/ Conference Area
7.07 Interview 1
7.08 Waiting Area
7.09 Interview 2
VCT-1
CPT-1
VCT-1
CPT-1
CPT-1
CPT-1
VCT-1
VCT-1
VCT-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
PT-1
PT-4
PT-1
PT-1
PT-1
PT-3
PT-1
PT-4
PT-1
PT-1
PT-1
PT-1
PT-1
PT-4
PT-2
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-3
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-2
PT-1
PT-1
PT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
175 SF
120 SF
100 SF
120 SF
375 SF
100 SF
80 SF
100 SF
175 SF
120 SF
107 SF
61 SF
120 SF
372 SF
110 SF
83 SF
95 SF
VCT-1
RB-1
PT-1
PT-1
PT-1
PT-1
ACT-1
60 SF
58 SF
CPT-1
CPT-1
CPT-1
CPT-1
RB-1
RB-1
RB-1
RB-1
PT-1
PT-1
PT-1/ PT-2
-
ACT-1
ACT-1
ACT-1
ACT-1
650 SF
150 SF
220 SF
0 SF
642 SF
153 SF
220 SF
142 SF
RB-1
PT-1
PT-4
PT-1
PT-1/ PT-2/
PT-3
PT-1
PT-1
PT-1
PT-3
PT-3
VCT-1
PT-1 / PT-2
PT-4
PT-3
PT-1/ PT-2/
PT-3
PT-1
PT-1
ACT-1
160 SF
160 SF
CPT-1
CPT-1
CPT-1
RB-1
RB-1
RB-1
PT-1
PT-1
PT-1
PT-4
PT-4
PT-3
PT-1
PT-1
PT-1
PT-1
PT-1
PT-2
ACT-1
ACT-1
GYP.
180 SF
300 SF
400 SF
182 SF
289 SF
410 SF
CT-3
CB-1
GYP.
400 SF
404 SF
RB-1
CWT-1 /
CWT-2
CWT-1 /
CWT-2
PT-1
404 SF
VCT-1
CWT-1 /
CWT-2
CWT-1 /
CWT-2
PT-1
400 SF
CB-1
CWT-1 /
CWT-2
CWT-1 /
CWT-2
PT-1
GYP.
CT-3
CWT-1 /
CWT-2
CWT-1 /
CWT-2
PT-1
GYP.
60 SF
69 SF
SC-1
SC-1
SC-1
RB-1
RB-1
RB-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
PT-1
ACT-1
ACT-1
ACT-1
860 SF
220 SF
200 SF
860 SF
215 SF
192 SF
VCT-1
RB-1
PT-1
PT-2
PT-1
PT-2
GYP.
500 SF
564 SF
Module 9D: Front of House Restroom
9D.1 Restroom
CT-3
CB-1
CWT-1 /
CWT-2
CWT-1 /
CWT-2
CWT-1 /
CWT-2
CWT-1 /
CWT-2
GYP.
60 SF
56 SF
Module 10: Operations & Training/ S3
10.01 S3 Officer
10.02 S3 SMGT
10.03 Work Stations
10.04 Planning Area
10.05 Assistant S3 MSGT
10.06 PMD
CPT-1
CPT-1
CPT-1
CPT-1
CPT-1
CPT-1
RB-1
RB-1
RB-1
RB-1
RB-1
RB-1
PT-4
PT-4
PT-3
PT-3
PT-1
PT-1
PT-1
PT-1
PT-2
PT-1
PT-1
PT-1
PT-1
PT-3
PT-3
PT-4
PT-4
PT-1
PT-1
PT-2
PT-1
PT-1
ACT-1
ACT-1
ACT-1
ACT-1/ GYP.
ACT-1
ACT-1
120 SF
120 SF
100 SF
225 SF
120 SF
120 SF
125 SF
127 SF
100 SF
233 SF
124 SF
127 SF
Module 8: Command/Orderly
8.01 Files/ Office Equipment/ Supply
Storage
8.02 Open Office Area
8.03 First Sergeant
8.04 Waiting Area/ Secretary
8.05 Corridor
8.06 Files/ Office Equipment/ Supply
Storage
8.07 SFM
8.08 Commander
8.09 Command Conference Room
Module 9A: Back of House Restrooms
9A.1 Male Restroom
B
9A.2 Female Restroom
9A.3 Janitor
Module 9B: General Support
9B.1 Mechanical Room
9B.2 General Office Storage
9B.3 Electrical/ Comm. Equipment
Storage
Module 9C: Break Room
9C.1 Break Room
A
Ceiling Finish
Comments
131 SF
68 SF
182 SF
127 SF
73 SF
64 SF
68 SF
80 SF
80 SF
80 SF
80 SF
68 SF
125 SF
166 SF
112 SF
144 SF
258 SF
75 SF
75 SF
39 SF
39 SF
01 WALLS
CWT-1
CWT-2
EWP-1
EWP-2
EWP-3
EWP-4
PT-1
PT-2
PT-3
PT-4
12" X 6" CERAMIC TILE
12" X 6" CERAMIC TILE - ACCENT
PAINT - EPOXY TYPICAL
PAINT - EPOXY ACCENT
PAINT - EPOXY ACCENT
PAINT - EPOXY ACCENT
PAINT - TYPICAL
PAINT - ACCENT
PAINT - ACCENT
PAINT - ACCENT
MATERIALS ARE PROVIDED AS SUGGESTIONS ONLY. FINAL FINISHES
SHOULD BE EVALUATED AND CHOSEN FOR EACH NEW PROJECT.
NOT FOR
CONSTRUCTION
911 Central Parkway N., Suite 425 San Antonio, TX 78323
501 North Broadway, St. Louis, Missouri 63102-2121
02 FLOORS
CFT-1
12" X 12" CERAMIC FLOOR TILE
CPT-1 2' X 2' CARPET TILE
EFP-1
PAINT - EPOXY
SC-1
SEALED CONCRETE
VCT-1 12" X 12" VINYL COMPOSITION TILE
03 BASE
CB-1
RB-1
6" CERAMIC COVE BASE
5" RUBBER BASE
04 CEILING
ACT-1 2' X 2' ACOUSTICAL CEILING TILE
GYP.
PAINTED GYPSUM BOARD CEILING
OPEN
EXPOSED TO STRUCTURE
SEC. GYP. PAINTED GYPSUM BOARD SECURITY
CEILING
05 MILLWORK
LAM-1 PLASTIC LAMINATE - HORIZONTAL
SURFACES
LAM-2 PLASTIC LAMINATE - VERTICAL
SURFACES
SS-1
SOLID SURFACE
TEXTURE FINISH
Jacobs Project No.:
100% DESIGN
C
BIM Manual
Required
Area
Actual Area
1.
SECURITY FORCE OPERATIONS BUILDING
D
INTERIOR FINISH COLOR AND MATERIAL SCHEDULE
ITEM
MATERIAL
NOTES
AIR FORCE CENTER FOR ENGINEERING AND
THE ENVIRONMENT (AFCEE)
FACILITIES DYNAMIC PROTOTYPES DESIGN FOR:
Room
Numb
er
ROOM FINISH SCHEDULE 2
FINISHES
WALLS
Plan East
Plan South
Plan West
Wall
Wall
Wall
FDWD0262
Drawing Title:
Room Finish Schedule
Date:
18 NOVEMBER 2011
Designed By: JN/MRB/OF Drawing No.:
JN/MRB/OF
Drawn By:
Checked By: JS
A-302
1
3
2
4
5
SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET
B
A
Height
1.01A
1.02A
1.03A
1.04A
1.05A
1.06A
1.08A
1.09A
1z
2.01A
2.01B
2.02A
2.03A
2.05A
2.06A
2.06C
2.09A
2.10A
2.11A
2.12A
3.01A
3.01B
3.01C
3.02A
3.02B
3.03A
3.04C
3.04D
3.05A
3.06A
3.06B
4.01A
4.02A
4.03A
4.04A
4.05A
4.06A
4.06B
4.07A
4.07B
4.08A
4.09B
4.10A
4.11A
4.12A
4.13A
4.14A
4.15A
4.16A
4.17A
4.18A
5.01A
5.02A
5.03A
5.04A
5.05A
5.06A
5.07A
5.08A
5.10A
5.11A
5.11B
5.13A
5.14A
5.15B
6.01A
6.01B
6.02A
6.02B
6.03A
6.03B
6.04A
6.05A
6.06A
6.07A
6.08A
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
6' - 0"
5' - 0"
3' - 0"
3' - 0"
3' - 0"
5' - 8"
5' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
10' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 4"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
2' - 8"
3' - 0"
3' - 0"
3' - 0"
2' - 8"
3' - 0"
3' - 4"
3' - 4"
3' - 4"
3' - 4"
3' - 4"
3' - 4"
3' - 4"
3' - 4"
3' - 4"
3' - 4"
3' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
6' - 8"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
10' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 3"
6.09A
3' - 0"
7' - 0"
0' - 3"
6.10A
3' - 0"
7' - 0"
0' - 3"
6.11A
3' - 0"
7' - 0"
0' - 3"
6.12A
6.13A
3' - 4"
3' - 0"
7' - 0"
7' - 0"
0' - 2"
0' - 3"
6.14C
6.14D
3' - 4"
3' - 4"
7' - 0"
7' - 0"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
Finish
Frame
Finish
Jamb Head
Comments
CASED OPENING
SECURE DOOR
CASED OPENING
0' - 2"
0' - 2"
0' - 2"
0' - 2"
CASED OPENING
SECURE DOOR
SECURE DOOR
SECURE DOOR
SECURE DOOR
HALF DOOR
SLIDING
DETENTION DOOR
SLIDING
DETENTION DOOR
SLIDING
DETENTION DOOR
SLIDING
DETENTION DOOR
HALF DOOR
SLIDING
DETENTION DOOR
Door
Number
Width
Height
6.15A
6.15B
6.15C
6.15E
6.15F
6.15G
6.15H
6.16A
6.16B
7.01A
7.02A
7.03A
7.04A
7.05A
7.05B
7.06A
7.07A
7.07B
7.07C
7.09C
8.01A
8.02A
8.02B
8.03A
8.04A
8.06A
8.07A
8.08A
8.09A
8.09B
9A.1A
9A.2A
9A.3A
9B.1A
9B.2A
9B.3A
9C.1A
9C.1B
9D.1A
9D.1C
10.01A
10.02A
10.04A
10.05A
10.06A
3' - 4"
6' - 0"
3' - 4"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
6' - 0"
6' - 0"
3' - 0"
6' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
Door
Thickness Material
0' - 2"
0' - 2"
0' - 2"
0' - 3"
0' - 3"
0' - 3"
0' - 3"
0' - 3"
0' - 3"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
0' - 2"
Finish
Fire
Glazing Rating Hardware Type Material
Frame
Finish
Jamb Head
Comments
NOT FOR
CONSTRUCTION
911 Central Parkway N., Suite 425 San Antonio, TX 78323
501 North Broadway, St. Louis, Missouri 63102-2121
Jacobs Project No.:
100% DESIGN
C
Width
Fire
Glazing Rating Hardware Type Material
SECURITY FORCE OPERATIONS BUILDING
D
Door
Thickness Material
Door
Number
DOOR SCHEDULE
AIR FORCE CENTER FOR ENGINEERING AND
THE ENVIRONMENT (AFCEE)
FACILITIES DYNAMIC PROTOTYPES DESIGN FOR:
DOOR SCHEDULE
FDWD0262
Drawing Title:
Door Schedule
Date:
18 NOVEMBER 2011
Designed By: JN/MRB/OF Drawing No.:
JN/MRB/OF
Drawn By:
Checked By: JS
A-303
1
3
2
4
5
SCALE(S) AS NOTED ON THIS SHEET ARE BASED ON A FULL 36"X24" SIZE SHEET
NOT FOR
CONSTRUCTION
WINDOW SCHEDULE
B
4' - 0"
4' - 0"
4' - 0"
4' - 0"
4' - 0"
4' - 0"
4' - 0"
4' - 0"
4' - 0"
4' - 0"
4' - 0"
4' - 0"
3' - 6"
4' - 0"
4' - 0"
4' - 0"
4' - 0"
4' - 0"
4' - 0"
4' - 0"
4' - 0"
4' - 0"
4' - 0"
4' - 0"
4' - 0"
4' - 0"
4' - 0"
1' - 6"
1' - 6"
1' - 6"
4' - 0"
4' - 0"
Pass Drawer and Counter
Pass Drawer and Counter
Pass Drawer and Counter
Pass Drawer and Counter
Fixed
Fixed
Pass Drawer and Counter
Fixed
Fixed
Fixed
Fixed
Pass Drawer and Counter
Roll-Up Shutter with Counter
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Fixed
Pass Drawer and Counter
Fixed
Fixed
Transom with Trim
Transom with Trim
Transom with Trim
Pass Drawer and Counter
Pass Drawer and Counter
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 6"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
Comments
911 Central Parkway N., Suite 425 San Antonio, TX 78323
501 North Broadway, St. Louis, Missouri 63102-2121
Jacobs Project No.:
A
100% DESIGN
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
5' - 0"
3' - 0"
3' - 0"
1' - 6"
1' - 6"
1' - 6"
1' - 6"
1' - 6"
1' - 6"
1' - 6"
3' - 0"
2' - 6"
3' - 0"
2' - 6"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
3' - 0"
Head Height
SECURITY FORCE OPERATIONS BUILDING
C
1.06A
2.08A
2.08B
2.08C
3.03A
3.03B
3.04A
4.03A
4.03B
4.04A
4.04B
6.03A
6.03B
6.03C
6.03D
6.08A
6.09A
6.10A
6.11A
6.13A
6.13B
6.13C
6.15A
6.15B
6.15C
6.15D
6.15E
6.16A
6.16B
6.16C
7.06A
8.02A
Type
Glazing
Manufacturer Model Material Finish Head Jamb Sill Thickness Type
AIR FORCE CENTER FOR ENGINEERING AND
THE ENVIRONMENT (AFCEE)
FACILITIES DYNAMIC PROTOTYPES DESIGN FOR:
D
Mark
R.O.
Width
Height
FDWD0262
Drawing Title:
Window Schedule
Date:
18 NOVEMBER 2011
Designed By: JN/MRB/OF Drawing No.:
JN/MRB/OF
Drawn By:
Checked By: JS
A-304
Download