Air Force Architects Presentation Dynamic Prototypes: 4-Airmen Dormitories Conceptualization

advertisement
Air Force Architects Presentation
Dynamic Prototypes: 4-Airmen Dormitories
Conceptualization
Implementation
of Program by AFCEE
of Prototype + Benefits of BIM
Jacobs
Integration Architects
for AFCEE Dynamic Prototypes Program
Dynamic Prototypes: 4-Airmen Dormitories
Conceptualization
of Program by AFCEE
AFCEE’s CHARGE
More effective control over design standards
Better incorporation of best practices, more efficient
More consistency in processes and products
Reduce facility aquisition time and costs
Avoid re-inventing the wheel
Dynamic Prototypes: 4-Airmen Dormitories
Conceptualization
of Program by AFCEE
Approaching Design
Performance Based
Kit of Parts
Prescriptive Based
(program criteria)
(modules)
(site adapt)
Aircraft Hangar
Administration
Flight Simulator
Dormitory
Fitness Center
Squad Ops
Munitions Igloo
Firing Range
Dog Kennel
Dynamic Prototypes: 4-Airmen Dormitories
Conceptualization
of Program by AFCEE
Three Dimensional Representation of Design Guide
Jumpstart Design
Incorporate Critical Functional + Technical Criteria
Balancing Flexibility + Standardization
Unaccompanied Housing Design Guide
U N I T E D
S T A T E S
A I R
F O R C E
Developed by:
Headquarters United States Air Force
Office of the Civil Engineer
Housing Division AF/ILEH
(703) 601.0478
J a n u a r y
2 0 0 6
Dynamic Prototypes: 4-Airmen Dormitories
Conceptualization
of Program by AFCEE
Leveraging BIM Technology
“Dynamic” - Flexible, adaptable, and easy to change
“Prototype” - A model on which to build
Stair
Unit A
Unit B
Unit C
Commons
Space
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Kit of Parts
Discipline Models - Arch, Struct, Mech, Elec, Plumb, + Fire
Unit A, B, + C
112
BEDROOM
101
129 SF
105
BATHROOM
102
35 SF
BATHROOM
106
35 SF
MECH.
105
10 SF
102
106
CLOSET
103
20 SF
BEDROOM
108
129 SF
CLOSET
107
20 SF
103
104
101
BATHROOM
109
35 SF
107
LAUNDRY
104
10 SF
108
BATHROOM
115
35 SF
03
03
112
LIVING
112
169 SF
105
CLOSET
110
20 SF
110
BEDROOM
101
129 SF
BATHROOM
102
35 SF
BATHROOM
106
35 SF
MECH.
105
10 SF
102
104
BEDROOM
116
129 SF
BEDROOM
108
129 SF
01
02
01
01
02
01
01
02
01
02
01
107
LAUNDRY
104
10 SF
101
115
116
KITCHEN
113
39 SF
REF.
03
CLOSET
107
20 SF
BATHROOM
109
35 SF
111
BEDROOM
111
129 SF
106
CLOSET
103
20 SF
103
109
114
CLOSET
114
20 SF
108
BATHROOM
115
35 SF
MECH.
123
10 SF
123
01
BEDROOM
127
129 SF
125
BEDROOM
117
129 SF
BATHROOM
118
35 SF
118
LIVING
112
169 SF
109
KITCHEN
113
39 SF
120
BATHROOM
120
35 SF
114
CLOSET
114
20 SF
111
127
128
CLOSET
119
20 SF
KITCHEN
126
40 SF
121
130
CLOSET
130
20 SF
122
132
BEDROOM
122
129 SF
02
BATHROOM
129
35 SF
129
131
BATHROOM
131
35 SF
BEDROOM
132
129 SF
LIVING
125
226 SF
115
116
01
BEDROOM
111
129 SF
119
LAUNDRY
124
10 SF
CLOSET
128
20 SF
CLOSET
121
20 SF
CLOSET
110
20 SF
110
124
117
REF.
03
03
01
01
02
01
REF.
BEDROOM
116
129 SF
03
MECH.
148
10 SF
REF.
KITCHEN
146
47 SF
148
147
LAUNDRY
147
10 SF
03
145
LIVING
145
173 SF
01
01
02
01
02
BEDROOM
133
129 SF
BEDROOM
144
129 SF
BATHROOM
134
35 SF
134
133
142
CLOSET
141
20 SF
01
02
01
01
02
137
CLOSET
135
20 SF
01
143
BATHROOM
143
35 SF
140
BEDROOM
140
129 SF
138
BATHROOM
138
35 SF
01
141
136
BEDROOM
136
129 SF
02
Dynamic Prototypes: 4-Airmen Dormitories
CLOSET
142
20 SF
CLOSET
137
20 SF
01
Unit A
01
144
135
139
01
02
BATHROOM
139
35 SF
01
Implementation
of Prototype + Benefits of BIM
Kit of Parts
Discipline Models - Arch, Struct, Mech, Elec, Plumb, + Fire
Unit A, B, + C
112
BEDROOM
101
129 SF
105
BATHROOM
102
35 SF
BATHROOM
106
35 SF
MECH.
105
10 SF
102
106
BEDROOM
108
129 SF
CLOSET
107
20 SF
CLOSET
103
20 SF
103
104
101
BATHROOM
109
35 SF
107
LAUNDRY
104
10 SF
108
BATHROOM
115
35 SF
03
03
LIVING
112
169 SF
CLOSET
110
20 SF
110
109
114
CLOSET
114
20 SF
111
115
116
KITCHEN
113
39 SF
BEDROOM
111
129 SF
REF.
BEDROOM
116
129 SF
03
01
02
01
01
02
01
MECH.
123
10 SF
01
02
01
02
123
01
01
BEDROOM
127
129 SF
125
BEDROOM
117
129 SF
124
119
KITCHEN
126
40 SF
121
02
130
CLOSET
130
20 SF
122
BEDROOM
122
129 SF
01
127
128
CLOSET
119
20 SF
CLOSET
121
20 SF
120
BATHROOM
120
35 SF
LAUNDRY
124
10 SF
CLOSET
128
20 SF
117
BATHROOM
129
35 SF
129
REF.
BATHROOM
118
35 SF
118
132
131
BATHROOM
131
35 SF
BEDROOM
132
129 SF
LIVING
125
226 SF
01
01
02
01
MECH.
148
10 SF
REF.
KITCHEN
146
47 SF
148
147
LAUNDRY
147
10 SF
03
145
LIVING
145
173 SF
01
01
02
01
02
BEDROOM
133
129 SF
BEDROOM
144
129 SF
BATHROOM
134
35 SF
134
133
142
CLOSET
141
20 SF
136
Unit A - Assembled Example
Dynamic Prototypes: 4-Airmen Dormitories
CLOSET
142
20 SF
143
BATHROOM
143
35 SF
141
140
BEDROOM
136
129 SF
BEDROOM
140
129 SF
138
02
BATHROOM
138
35 SF
01
CLOSET
137
20 SF
137
CLOSET
135
20 SF
01
01
144
135
139
01
02
BATHROOM
139
35 SF
01
Implementation
of Prototype + Benefits of BIM
Kit of Parts
Discipline Models - Arch, Struct, Mech, Elec, Plumb, + Fire
Unit A, B, + C
112
01
02
01
01
MECH.
123
10 SF
02
BEDROOM
101
129 SF
01
105
BATHROOM
102
35 SF
BATHROOM
106
35 SF
MECH.
105
10 SF
102
106
CLOSET
103
20 SF
BEDROOM
108
129 SF
CLOSET
107
20 SF
103
104
101
BATHROOM
109
35 SF
107
LAUNDRY
104
10 SF
108
BATHROOM
115
35 SF
03
03
LIVING
112
169 SF
123
BEDROOM
127
129 SF
CLOSET
110
20 SF
110
109
114
CLOSET
114
20 SF
111
115
116
KITCHEN
113
39 SF
BEDROOM
111
129 SF
REF.
125
BEDROOM
116
129 SF
03
BEDROOM
117
129 SF
CLOSET
128
20 SF
117
127
128
CLOSET
119
20 SF
BATHROOM
129
35 SF
129
01
02
01
01
02
01
MECH.
123
10 SF
KITCHEN
126
40 SF
01
130
CLOSET
130
20 SF
122
119
02
127
128
CLOSET
119
20 SF
KITCHEN
126
40 SF
121
130
CLOSET
130
20 SF
122
132
01
01
BEDROOM
132
129 SF
MECH.
148
10 SF
148
147
145
LIVING
145
173 SF
01
01
02
02
BEDROOM
133
129 SF
BEDROOM
144
129 SF
133
142
01
02
01
Dynamic Prototypes: 4-Airmen Dormitories
136
143
BATHROOM
143
35 SF
141
140
BEDROOM
140
129 SF
02
BATHROOM
138
35 SF
01
CLOSET
137
20 SF
137
CLOSET
142
20 SF
BEDROOM
136
129 SF
138
01
144
135
CLOSET
135
20 SF
01
Unit B
01
REF.
LAUNDRY
147
10 SF
03
CLOSET
141
20 SF
01
02
BATHROOM
131
35 SF
132
BATHROOM
134
35 SF
134
02
131
BATHROOM
131
35 SF
131
01
01
BATHROOM
129
35 SF
129
BEDROOM
132
129 SF
LIVING
125
226 SF
KITCHEN
146
47 SF
LIVING
125
226 SF
01
LAUNDRY
124
10 SF
CLOSET
128
20 SF
BEDROOM
122
129 SF
BEDROOM
122
129 SF
02
BEDROOM
127
129 SF
124
117
CLOSET
121
20 SF
121
01
01
125
BEDROOM
117
129 SF
120
BATHROOM
120
35 SF
120
BATHROOM
120
35 SF
02
123
BATHROOM
118
35 SF
118
CLOSET
121
20 SF
01
REF.
119
LAUNDRY
124
10 SF
REF.
BATHROOM
118
35 SF
118
124
139
01
02
BATHROOM
139
35 SF
01
Implementation
of Prototype + Benefits of BIM
Kit of Parts
Discipline Models - Arch, Struct, Mech, Elec, Plumb, + Fire
Unit A, B, + C
112
BEDROOM
101
129 SF
105
BATHROOM
102
35 SF
BATHROOM
106
35 SF
MECH.
105
10 SF
102
106
BEDROOM
108
129 SF
CLOSET
107
20 SF
CLOSET
103
20 SF
103
104
101
BATHROOM
109
35 SF
107
LAUNDRY
104
10 SF
108
BATHROOM
115
35 SF
03
03
LIVING
112
169 SF
CLOSET
110
20 SF
110
109
114
CLOSET
114
20 SF
111
115
116
KITCHEN
113
39 SF
BEDROOM
111
129 SF
REF.
BEDROOM
116
129 SF
03
01
02
01
01
02
01
MECH.
123
10 SF
01
02
01
02
123
01
01
BEDROOM
127
129 SF
125
BEDROOM
117
129 SF
124
119
KITCHEN
126
40 SF
121
02
130
CLOSET
130
20 SF
122
BEDROOM
122
129 SF
01
127
128
CLOSET
119
20 SF
CLOSET
121
20 SF
120
BATHROOM
120
35 SF
LAUNDRY
124
10 SF
CLOSET
128
20 SF
117
BATHROOM
129
35 SF
129
REF.
BATHROOM
118
35 SF
118
132
131
BATHROOM
131
35 SF
BEDROOM
132
129 SF
LIVING
125
226 SF
01
01
02
01
MECH.
148
10 SF
REF.
KITCHEN
146
47 SF
148
147
LAUNDRY
147
10 SF
03
145
LIVING
145
173 SF
01
01
02
01
02
BEDROOM
133
129 SF
BEDROOM
144
129 SF
BATHROOM
134
35 SF
134
133
142
CLOSET
141
20 SF
136
Unit B - Assembled Example
Dynamic Prototypes: 4-Airmen Dormitories
CLOSET
142
20 SF
143
BATHROOM
143
35 SF
141
140
BEDROOM
136
129 SF
BEDROOM
140
129 SF
138
02
BATHROOM
138
35 SF
01
CLOSET
137
20 SF
137
CLOSET
135
20 SF
01
01
144
135
139
01
02
BATHROOM
139
35 SF
01
Implementation
of Prototype + Benefits of BIM
Kit of Parts
Discipline Models - Arch, Struct, Mech, Elec, Plumb, + Fire
Unit A, B, + C
112
REF.
KITCHEN
146
47 SF
105
BATHROOM
102
35 SF
BATHROOM
106
35 SF
MECH.
105
10 SF
102
106
CLOSET
103
20 SF
BEDROOM
108
129 SF
CLOSET
107
20 SF
103
148
147
LAUNDRY
147
10 SF
03
BEDROOM
101
129 SF
MECH.
148
10 SF
104
101
BATHROOM
109
35 SF
107
LAUNDRY
104
10 SF
108
BATHROOM
115
35 SF
03
03
LIVING
112
169 SF
145
CLOSET
110
20 SF
110
109
114
CLOSET
114
20 SF
111
115
116
KITCHEN
113
39 SF
BEDROOM
111
129 SF
REF.
BEDROOM
116
129 SF
03
LIVING
145
173 SF
01
01
02
02
01
02
01
01
02
01
MECH.
123
10 SF
01
02
01
02
123
BEDROOM
144
129 SF
BATHROOM
134
35 SF
134
133
125
BEDROOM
117
129 SF
01
BATHROOM
118
35 SF
118
124
119
142
CLOSET
141
20 SF
143
CLOSET
121
20 SF
120
BATHROOM
120
35 SF
CLOSET
142
20 SF
KITCHEN
126
40 SF
121
137
136
02
132
131
BATHROOM
131
35 SF
BEDROOM
132
129 SF
LIVING
125
226 SF
01
01
02
01
140
BEDROOM
140
129 SF
138
BATHROOM
129
35 SF
129
141
BEDROOM
136
129 SF
BATHROOM
138
35 SF
01
CLOSET
137
20 SF
130
CLOSET
130
20 SF
122
BATHROOM
143
35 SF
01
02
127
128
CLOSET
119
20 SF
BEDROOM
122
129 SF
01
LAUNDRY
124
10 SF
CLOSET
128
20 SF
117
144
135
CLOSET
135
20 SF
01
BEDROOM
127
129 SF
REF.
01
BEDROOM
133
129 SF
01
139
01
02
BATHROOM
139
35 SF
MECH.
148
10 SF
REF.
KITCHEN
146
47 SF
148
147
LAUNDRY
147
10 SF
03
145
LIVING
145
173 SF
01
01
02
01
02
BEDROOM
133
129 SF
BEDROOM
144
129 SF
BATHROOM
134
35 SF
134
01
133
142
CLOSET
141
20 SF
136
Unit C
Dynamic Prototypes: 4-Airmen Dormitories
CLOSET
142
20 SF
143
BATHROOM
143
35 SF
141
140
BEDROOM
136
129 SF
BEDROOM
140
129 SF
138
02
BATHROOM
138
35 SF
01
CLOSET
137
20 SF
137
CLOSET
135
20 SF
01
01
144
135
139
01
02
BATHROOM
139
35 SF
01
Implementation
of Prototype + Benefits of BIM
Kit of Parts
Discipline Models - Arch, Struct, Mech, Elec, Plumb, + Fire
Unit A, B, + C
112
BEDROOM
101
129 SF
105
BATHROOM
102
35 SF
BATHROOM
106
35 SF
MECH.
105
10 SF
102
106
BEDROOM
108
129 SF
CLOSET
107
20 SF
CLOSET
103
20 SF
103
104
101
BATHROOM
109
35 SF
107
LAUNDRY
104
10 SF
108
BATHROOM
115
35 SF
03
03
LIVING
112
169 SF
CLOSET
110
20 SF
110
109
114
CLOSET
114
20 SF
111
115
116
KITCHEN
113
39 SF
BEDROOM
111
129 SF
REF.
BEDROOM
116
129 SF
03
01
02
01
01
02
01
MECH.
123
10 SF
01
02
01
02
123
01
01
BEDROOM
127
129 SF
125
BEDROOM
117
129 SF
124
119
KITCHEN
126
40 SF
121
02
130
CLOSET
130
20 SF
122
BEDROOM
122
129 SF
01
127
128
CLOSET
119
20 SF
CLOSET
121
20 SF
120
BATHROOM
120
35 SF
LAUNDRY
124
10 SF
CLOSET
128
20 SF
117
BATHROOM
129
35 SF
129
REF.
BATHROOM
118
35 SF
118
132
131
BATHROOM
131
35 SF
BEDROOM
132
129 SF
LIVING
125
226 SF
01
01
02
01
MECH.
148
10 SF
REF.
KITCHEN
146
47 SF
148
147
LAUNDRY
147
10 SF
03
145
LIVING
145
173 SF
01
01
02
01
02
BEDROOM
133
129 SF
BEDROOM
144
129 SF
BATHROOM
134
35 SF
134
133
142
CLOSET
141
20 SF
136
Unit C - Assembled Example
Dynamic Prototypes: 4-Airmen Dormitories
CLOSET
142
20 SF
143
BATHROOM
143
35 SF
141
140
BEDROOM
136
129 SF
BEDROOM
140
129 SF
138
02
BATHROOM
138
35 SF
01
CLOSET
137
20 SF
137
CLOSET
135
20 SF
01
01
144
135
139
01
02
BATHROOM
139
35 SF
01
Implementation
of Prototype + Benefits of BIM
Prototype Test Runs
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Prototype Use
Grouping
Scheduling
Coordination
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Prototype Use
Grouping
Scheduling
Coordination
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Prototype Use
Grouping
Scheduling
Coordination
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Prototype Use
Grouping
Scheduling
Coordination
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Prototype Use
Grouping
Scheduling
Coordination
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Prototype Use
Grouping
Scheduling
Coordination
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Prototype Use
Grouping
Scheduling
Coordination
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Prototype Use
Grouping
Scheduling
Coordination
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Prototype Use
Grouping
Scheduling
Coordination
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Prototype Use
Grouping
Scheduling
Coordination
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Prototype Use
Grouping
Scheduling
Coordination
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Prototype Use
Grouping
Scheduling
Coordination
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Prototype Use
Grouping
Scheduling
Coordination
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Prototype Use
Grouping
Scheduling
Coordination
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Prototype Use
Grouping
Scheduling
Coordination
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Prototype Use
Grouping
Scheduling
Coordination
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Prototype Use
Grouping
Scheduling
Coordination
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Linked Specifications
Assembly Codes Linked to Spec Sections to Key Note Coordination
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Linked Specifications
Assembly Codes Linked to Spec Sections to Key Note Coordination
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
LEED Checklist
Silver Baseline
LEED 2009 for New Construction and Major Renovation
Project Scorecard
Project Name:
Project Address:
LEED 2009 for New Construction and MajorYesRenovation
?
No
Project Scorecard
S US TAINAB LE S ITE S
Y
Project Name:
Project Address:
Yes
Yes
?
No
?
No
MATERIALS & RESOURCES
2
Y
Prereq 1
Credit 1.1
Credit 1.2
Credit 2
2
Credit 3
Credit 4
Credit 5
Credit 6
Credit 7
Yes
?
S torage and Collection of R ecyclables
Building Reuse- Maintain Existing Walls, Floors and Roof
Reuse 55%
Reuse 75%
Reuse 95%
Building Reuse Maintain
Interior Nonstructural Elements
Cons truction Was te Management
50% Recycled or Salvaged
75% Recycled or Salvaged
Materials R eus e
Reuse 5%
Reuse 10%
R ecycled Content
10% of Content
20% of Content
R egional Materials
10% of Materials
20% of Materials
R apidly R enewable Materials
Certified Wood
Yes
?
Y
No
INDOOR E NVIR ONME NTAL QUALITY
Y
Y
Yes
Prereq 1
Prereq 2
Credit 1
Credit 2
Credit 3.1
Credit 3.2
Credit 4.1
Credit 4.2
Credit 4.3
Credit 4.4
Credit 5
Credit 6.1
Credit 6.2
Credit 7.1
Credit 7.2
Credit 8.1
Credit 8.2
?
Minimum Indoor Air Quality Performance
Y
E nvironmental Tobacco S moke (E TS ) Control
Y
Outdoor Air Delivery Monitoring
Y
Increas ed Ventilation
Construction Indoor Air Quality Management Plan
During- Construction
Construction Indoor Air Quality Management Plan
Before- Occupancy
Low-Emitting MaterialsAdhesives
and Sealants
Low-Emitting MaterialsPaints
and Coatings
Low-Emitting MaterialsFlooring
Systems
Low-Emitting MaterialsComposite
Wood and Agrifiber Products
Indoor Chemical and Pollutant S ource Control
Controllability of SystemsLighting
Controllability of SystemsThermal
Comfort
Thermal ComfortDesign
Thermal ComfortVerification
Daylight and ViewsDaylight
Daylight and ViewsViews
-
No
INNOVATION IN DE S IGN
Credit 1
Credit 2
Yes
?
Innovation in Des ign
Innovation or Exemplary Performance
Innovation or Exemplary Performance
Innovation or Exemplary Performance
Innovation
Innovation
LEED ® Accredited Professional
No
R E GIONAL PR IOR ITY
Credit 1
Yes
?
2
R egional Priority
Regionally Defined Credit Achieved
Regionally Defined Credit Achieved
Regionally Defined Credit Achieved
Regionally Defined Credit Achieved
No
PR OJ E CT TOTALS (Certification E s timates )
No
Prereq 1
Cons truction Activity Pollution Prevention
Credit 1
Site Selection
Credit 2
Development Dens ity and Community Connectivity
Credit 3
B rownfield R edevelopment
Credit 4.1 Alternative TransportationPublic
- Transportation Access
14 Points
Credit 4.2 Alternative TransportationBicycle
Storage and Changing Rooms
Credit 4.3 Alternative TransportationLow-Emitting
and Fuel-Efficient Vehicles
R equired
Credit 4.4 Alternative TransportationParking
Capacity
1 to 3
Credit 5.1 Site DevelopmentProtect
or Restore Habitat
1
Credit 5.2 Site DevelopmentMaximize
Open Space
2
Credit 6.1 Stormwater DesignQuantity
Control
3
Credit 6.2 Stormwater DesignQuality
Control
1
Credit 7.1 Heat Island EffectNonroof
1 to 2
Credit 7.2 Heat Island EffectRoof
1
Credit 8
Light Pollution R eduction
2
1 to 2
WATE R E FFICIE NCY
1
Prereq 1
Wate2r Us e R eduction
1Wtaote2r E fficient Lands caping
Credit 1
1 Reduce by 50%
2 No Potable Water Use or Irrigation
1Innovative
to 2
Credit 2
Wastewater Technologies
Credit 3
Wate1r Us e R eduction
2 Reduce by 30%
1 Reduce by 35%
1 Reduce by 40%
sERE
E NE R GY & A1T5MPOoSinPtH
Prereq 1 R eqFuuirneddamental Commis s ioning of B uilding E nergy S ys tems
uiirneid
Prereq 2 R eqM
mum E nergy Performance
Prereq 3
Fund1amental R efrigerant Management
1 ize E nergy Performance
Credit 1
Optim
1 Improve by 12% for New Buildings or 8% for Existing Building Renovations
1 Improve by 14% for New Buildings or 10% for Existing Building Renovations
1 Improve by 16% for New Buildings or 12% for Existing Building Renovations
1 Improve by 18% for New Buildings or 14% for Existing Building Renovations
1 Improve by 20% for New Buildings or 16% for Existing Building Renovations
1 Improve by 22% for New Buildings or 18% for Existing Building Renovations
1 Improve by 24% for New Buildings or 20% for Existing Building Renovations
1 Improve by 26% for New Buildings or 22% for Existing Building Renovations
1 Improve by 28% for New Buildings or 24% for Existing Building Renovations
1 Improve by 30% for New Buildings or 26% for Existing Building Renovations
1 Improve by 32% for New Buildings or 28% for Existing Building Renovations
1 Improve by 34% for New Buildings or 30% for Existing Building Renovations
1 Improve by 36% for New Buildings or 32% for Existing Building Renovations
Improve by 38% for New Buildings or 34% for Existing Building Renovations
6 PImprove
oints by 40% for New Buildings or 36% for Existing Building Renovations
Improve by 42% for New Buildings or 38% for Existing Building Renovations
1 to 5
Improve by 44% for New Buildings or 40% for Existing Building Renovations
1
Improve by 46% for New Buildings or 42% for Existing Building Renovations
1
Improve by 48%+ for New Buildings or 44%+ for Existing Building Renovations
1
Credit 2
On-S ite R enewable E nergy
1
1% Renewable Energy
1
3% Renewable Energy
1
5% Renewable Energy
7% Renewable Energy
4 P9o%inRtesnewable Energy
11% Renewable Energy
1 to 4
13% Renewable Energy
1
Credit 3
E nhanced Commis s ioning
1
Credit 4
E nhanced R efrigerant Management
1
Credit 5
Meas urement and Verification
1
Credit 6
Green Power
26 Points
R equired
1
5
1
6
1
3
2
1
1
1
1
1
1
1
10 Points
4
R equired
2 to 4
2
4
2
2 to 4
2
3
4
35 Points
R equired
R equired
R equired
1 to 19
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
1 to 7
1
2
3
4
5
6
7
2
2
3
2
110 Points
Certified: 40-49 points Silver: 50-59 points Gold: 60-79 points Platinum: 80+ points
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
SOW for Dormitories, Attachment F (BIM Requirements),
Harvesting Language & BIM Manual for Dormitories
ATTACHMENT F
BUILDING INFORMATION MODELING REQUIREMENTS
Version 1.0
Issued On: 04-21-09
DESIGN-BUILD/FFP, BIM Scope of Services – BIM Application Neutral
o A Design-Build, Firm Fixed-Price contract
o The customer will receive the BIM model in the format used by the winning contractor. Once
reviewed and approved, the document will serve as the parent for versions applicable to Dynamic
Prototype/ Kit of Parts projects and non-Kit of Parts projects that are BIM software specific.
o Prepare BIM linked to performance based specifications (dynamic prototypes) to update design
guides to the next level/ next generation of “smart” interactive dynamic prototype designs.
o Cost estimating, project scheduling and COBIE initiatives are Contractor implementation
electives. If the Contractor proposes to implement one or more electives in its accepted contract
or task order proposal, those criteria become a contract requirement.
FA8903-08-D-8773-0028
Attachment 1
21-APR-09
Page 1 of 8
The Contractor shall provide Other A-E Services for traditional projects and programs for the Air Force
Center for Engineering and the Environment (AFCEE). The scope of the contract includes support to the
HQ/AFCEE missions in the Technical Division Built Infrastructure areas. This task order is to develop
electronic prototype designs for specified facility types for use as design standards and for use by
design teams developing projects for the AF MILCON Program and other non-MILCON design and
construction projects. Work includes developing an electronic design tool to improve efficiency and
effectiveness of the design process across the Air Force. All efforts under this task order are in direct
support of the Military Construction Program (MILCON) or other Air Force construction programs.
The Building Information Model shall include the following BIM-based Facility Data –a set of parametric elements
for the Model (e.g., doors, air handlers, electrical panels) that clearly identify the objects specified. This Facility
Data shall include all material definitions, qualities, and attributes that are necessary for the Project facility design.
The BIM shall be the basis for project contract documents.
Each discipline will develop a Model to include the systems described below as they would be built to ensure
complete and accurate quantity takeoffs of relevant construction materials, satisfy commissioning requirements,
and reflect final as-built conditions.
4PAE08
STATEMENT OF WORK
The BIM will be linked to performance based specifications (dynamic prototypes) to update design guides to the
next level/ generation of “smart” interactive dynamic prototype designs.
The composite, integrated multi-discipline building information model will be used to ensure cross-discipline clash
checking coordination and then to generate fully coordinated fully dimensioned construction documentation.
FOR
Definitions:
Dynamic- a flexible and changeable design model which leverages the advantages of BIM
DESIGN-BUILD SERVICES
Prototype - a design model on which to build with two components:
TO
1) Standard Design Component-Schematic 3D facility model; performance specifications; standard cost
DEVELOP AND CONSTRUCT DORMITORY FACILITY DYNAMIC PROTOTYPES
models; LEED Scorecard
2) Customization Component-Scope flexibility; capable of including any regional & facility type Installation
(STANDARDIZED DORMITORY FACILITY DESIGN)
Design Standards; capable of adjusting for Local Cost variables
Kit of Parts- a discipline specific model that can be combined with other discipline models to create a prototype.
The Kit of Parts approach will allow arrangement flexibility. They will also include basic configurations,
alternatives, and optional arrangements.
21 April 2009
Dynamic Prototype BIM Manual for a 4-Airman Dormitory – V1.0
April 21, 2009
4PAE08 SOW
Developed by:
Air Force Center for Engineering and the Environment
Ralph “Rick” Sinkfield, YD-03, DAF – Project Manager
Email: rick.sinkfield@brooks.af.mil
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
When to utilize the dynamic prototypes
1391
PD
RD
RD2
CCD
RFP
SD
Architectural
Model to Develop
Program Validation
60%
DD
100%
CD
CA
Engineering
Architectural
Models Developed
Model to Develop
+ Fully Integrated
Design Solution +
with Linked Specs
Engineering Models
for Checks + Narrative
Development
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Customer Concept Document Process - Select a Unit Plan
01
02
01
01
MECH.
123
10 SF
02
106
CLOSET
107
20 SF
104
BEDROOM
108
129 SF
BEDROOM
117
129 SF
107
LAUNDRY
104
10 SF
108
BEDROOM
127
129 SF
125
BATHROOM
118
35 SF
118
BATHROOM
115
35 SF
124
CLOSET
128
20 SF
117
119
LIVING
145
173 SF
LAUNDRY
124
10 SF
127
128
CLOSET
119
20 SF
BATHROOM
129
35 SF
129
01
01
02
02
01
REF.
CLOSET
103
20 SF
103
123
BATHROOM
106
35 SF
MECH.
105
10 SF
102
101
03
03
CLOSET
110
20 SF
110
BEDROOM
111
129 SF
KITCHEN
113
39 SF
REF.
120
BATHROOM
120
35 SF
121
KITCHEN
126
40 SF
130
CLOSET
130
20 SF
122
132
131
BATHROOM
131
35 SF
BEDROOM
122
129 SF
01
142
01
02
LIVING
125
226 SF
136
02
01
01
01
02
143
BATHROOM
143
35 SF
141
140
BEDROOM
140
129 SF
138
BATHROOM
138
35 SF
01
01
CLOSET
142
20 SF
BEDROOM
136
129 SF
02
BEDROOM
132
129 SF
CLOSET
137
20 SF
137
CLOSET
135
20 SF
01
03
02
135
CLOSET
141
20 SF
CLOSET
121
20 SF
01
144
115
116
BEDROOM
116
129 SF
01
BEDROOM
144
129 SF
133
114
CLOSET
114
20 SF
111
BEDROOM
133
129 SF
BATHROOM
134
35 SF
134
LIVING
112
169 SF
109
145
105
BATHROOM
102
35 SF
BATHROOM
109
35 SF
148
147
LAUNDRY
147
10 SF
03
112
BEDROOM
101
129 SF
MECH.
148
10 SF
REF.
KITCHEN
146
47 SF
01
01
Dynamic Prototypes: 4-Airmen Dormitories
139
01
02
BATHROOM
139
35 SF
01
Implementation
of Prototype + Benefits of BIM
Customer Concept Document Process - With a plan comes
a fully vetted program
Unaccompanied Housing for 4-Airmen Dormitories - Square Footage Comparison
E1-E4 Module Areas (NLA)
1 Bedroom 1
2 Bedroom 2
3 Bedroom 3
4 Bedroom 4
5 Bathroom 1
6 Bathroom 2
7 Bathroom 3
8 Bathroom 4
9 Closet 1
10 Closet 2
11 Closet 3
12 Closet 4
13 Laundry
14 HVAC
15 Kitchen/Dining
16 Living
17 NET TOTAL
Common Support Areas (NLA)
18 Multi-Purpose
19 Supply Storage
20 Office
21 Vending
22 Bathroom
23 Bulk Storage
24 Utility
25 NET TOTAL
26 Stairs + Balconies
27 BLDG CIRC
28 GMA
29 GBA *
Unit A (144)
Unit B (144) Unit C (144)
129
129
129
129
129
129
129
129
129
129
129
129
35
35
35
35
35
35
35
35
35
35
35
35
20
20
20
20
20
20
20
20
20
20
20
20
10
10
10
10
10
10
45
40
35
166
190
175
967
986
966
UHDG (min.)
129
129
129
129
35
35
35
35
20
20
20
20
10
10
123
639
Notes
min. bedroom width 10'-0" (p. 15) - required
min. bedroom width 10'-0" (p. 15) - required
min. bedroom width 10'-0" (p. 15) - required
min. bedroom width 10'-0" (p. 15) - required
exclude from net living area (NLA) calculations (p. 15)
exclude from net living area (NLA) calculations (p. 15)
exclude from net living area (NLA) calculations (p. 15)
exclude from net living area (NLA) calculations (p. 15)
exclude from net living area (NLA) calculations (p. 15)
exclude from net living area (NLA) calculations (p. 15)
exclude from net living area (NLA) calculations (p. 15)
exclude from net living area (NLA) calculations (p. 15)
included in living room (p.31)
included in living room (p.31)
included in living room (p.31)
min. room width 11'-0" (p. 15) recommended
refer to page 15 for NLA calculation requirements
270
100
0
25
100
1196
0
1691
270
100
0
25
100
1196
0
1691
270
100
0
25
100
1196
0
1691
270
100
recommended
25
100
70.6CF per airman
as required
1691
min. net required (p.32)
min. net required (p.32)
part of the multi-purpose room (78 sqft)
min. net required (p.32)
min. net required (p.32)
1196 sqft = (70.6 cuft per person * 144 people) / 8.5 ft tall
8% of building gross is recommendation
5132
5132
4171
4171
3821
3821
1/2 of area if nonconditioned
refer to page 18 for calculatio requirements
307
352
307
353
307
345
Recommended: 285-307
Maximum Limit:
355
refer to page 17 for calculation requirements
refer to page 18 for calculation requirements
* Calculations are based on demonstration Assembled Plan Examples
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Customer Concept Document Process - Focused Building
Plan Development (in BIM)
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Customer Concept Document Process - Site Plan (in SketchUp)
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Other Advantages for the Future
4D - Time (animating construction & better understanding sequencing)
5D - Cost Estimating (BIM Take Offs)
6D - Operation (Maintenance + Performance)
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
FP
ID
M
E
Sub2
A
A/E
S
Sub3
P
Sub1
create
Sub4
GC
refine
Sub5
C
BIM
Sub6
Owner
scope
Operate
maintain
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
http://www.wbdg.org/references/afbim_tools.php
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Dynamic Prototypes: 4-Airmen Dormitories
Implementation
of Prototype + Benefits of BIM
Program Dates
V2.0 is available (see AFCEE for website access)
- Includes Architectural, Structural, MEP, Fire Protection
Linked Specifications, + LEED Checklist
Measuring Success
Acquisition time saved
Construction costs (initial & life-cycle)
Easy to maintain and sustainable
Adequate scope + functional
Continuous Improvement
Feedback
Dynamic Prototype Site
Question/Answer
Thank you!
Dynamic Prototypes: 4-Airmen Dormitories
Download