THIS SHEET SHALL NOT FORM A PART OF THE BIDDING OR CONTRACT DOCUMENTS. REMOVE THIS SHEET BEFORE ISSUING TO BIDDERS OR CONSTRUCTION CONTRACTORS. DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING COMMAND STANDARD SPECIFICATION NAVFAC NFSS-C49 (JUNE 1990) SPECIFICATION C49 ATTACK SUBMARINE CAMEL NOTES ON THE USE OF THIS SPECIFICATION 1. STANDARD SPECIFICATION SECTIONS. The Standard Specification Sections listed below become part of the project specification together with the addition of other required sections prepared from NAVFAC Guide Specifications listed in Military Bulletin 34. The Standard Specification Sections are included herein and shall not be edited, changed, or modified unless specific authorization is obtained from NAVFACENGCOM Code 04. Section No. Title 01010 Summary of Work 02935 Rubber Fendering 05501 Metal Fabrications 06500 Fiberglass Grating 09875 Metal Fabrications Coating 2. APPLICABLE NFGS. Not applicable. ************************************************************************* * Prepared by: M. D. MUTTER, P.E. Date: * * * * Approved: EFD: LANTDIV Date: NAVFAC: Date: * * * * Branch Head: C. R. ROSE, P.E. * * * * Division Director: W. H. CRONE, P.E. * * * * Approved for NAVFAC: T. R. GANNON, P.E. * * * ************************************************************************* THIS SHEET SHALL NOT FORM A PART OF THE BIDDING OR CONTRACT DOCUMENTS. REMOVE THIS SHEET BEFORE ISSUING TO BIDDERS OR CONSTRUCTION CONTRACTORS. 1 THIS SHEET SHALL NOT FORM A PART OF THE BIDDING OR CONTRACT DOCUMENT. REMOVE THIS SHEET BEFORE ISSUING TO BIDDERS OR CONSTRUCTION CONTRACTORS. 3. STANDARD DRAWINGS. The below listed drawings forming a part of this specification are STANDARD DRAWINGS and shall not be changed in any respect. This list shall be edited to suit a specific project and incorporated in Section NFGS-01011, "General Paragraphs." All modifications necessary to suit a specific project shall be shown on new drawings prepared for that purpose. Drawing No. Title SD-1404667 General Arrangement SD-1404668 Plan, Elevation, and Section SD-1404669 Catwalk Details SD-1404670 Miscellaneous Fitting Details 4. REFERENCED PUBLICATIONS. The listed designations for publications referenced in this standard specification are those that were in effect when this standard specification was prepared, and the current edition shall be listed in the project specification under the appropriate section. Designations that are known to be out of date when project specifications are prepared should be changed to those current at that time, and the nomenclature, types, grades, classes, etc., referenced in this standard specification should be checked for conformance to the latest revision or amendment. The current issues of Military Bulletin 34, ENGINEERING AND DESIGN CRITERIA FOR NAVY FACILITIES, the DEPARTMENT OF DEFENSE INDEX OF SPECIFICATIONS AND STANDARDS, and other applicable publication indexes should be consulted before listing specifications and standards in the project specifications. TECHNICAL NOTES A. The following items, materials, equipment, requirements, etc., are unique for this construction and are not currently included in the NAVFAC Guide Specifications. The information shall be added without editing, except as specified herein, to the guide specifications indicated. The guide specifications shall be edited to reflect the project requirements, and the sections prepared from these guide specifications shall be included in the project specification. Use the guide specifications current at the time the project specification is being prepared. When paragraphs listed below are added to a NAVFAC Guide Specification, be certain that all publications referred to in these added paragraphs are added to paragraph 1.1 APPLICABLE PUBLICATIONS of the guide specification. THIS SHEET SHALL NOT FORM A PART OF THE BIDDING OR CONTRACT DOCUMENTS. REMOVE THIS SHEET BEFORE ISSUING TO BIDDERS OR CONSTRUCTION CONTRACTORS. 2 THIS SHEET SHALL NOT FORM A PART OF THE BIDDING OR CONTRACT DOCUMENTS. REMOVE THIS SHEET BEFORE ISSUING TO BIDDERS OR CONSTRUCTION CONTRACTORS. I. Guide Specification 01010, "Summary of Work." 1. Paragraph "General Intention," specify the number of camels. 2. Paragraph "Location," fill in information requested. 3. Paragraph "Delivery," specify the delivery location for mooring camels. 4. Paragraph "Availability of Utility Services," if utility services are available, leave in paragraph and make appropriate selections. 5. Paragraph "Contractor's Work Area," select work area or areas which are available to the Contractor. 5. Delete Specification Section 01010, "Summary of Work" if NAVFAC Guide Specifications NFGS-01010, "General Paragraphs" and NFGS-01011, "Additional General Paragraphs" are included in the specification. Include information from Specification Section 01010, "Summary of Work" in the appropriate locations within Sections NFGS-01010 and 01011. THIS SHEET SHALL NOT FORM A PART OF THE BIDDING OR CONTRACT DOCUMENTS. REMOVE THIS SHEET BEFORE ISSUING TO BIDDERS OR CONSTRUCTION CONTRACTORS. 3 SECTION 01010 SUMMARY OF WORK 1. GENERAL PARAGRAPHS: 1.1 General Intention: It is the declared and acknowledged intention and meaning to provide and secure [_____] camel[s] complete in place and ready for use. 1.2 General Description: The work includes steel tube and miscellaneous metal framing system, rubber fendering, steel tube buoyancy, painting, and incidental related work. 1.3 Location: The work shall be located at the [name of Naval Station], [city], [state], approximately as shown. The exact location will be indicated by the Contracting Officer. 1.4 Delivery: Deliver the mooring camels to the [name of Naval Facility]. The exact location will be indicated by the Contracting Officer. Notify the Contracting Officer [_____] days prior to the delivery date. 1.5 Drawings Accompanying Specification: The following drawings accompany this specification and are a part thereof. Drawings are the property of the Government, and shall not be used for any purpose other than that intended by the specification. [The drawings included with this specification are half-size.] [Full-size drawings are available at the bidder's or Contractor's expense. Information on procuring these fullsize drawings may be obtained from the Contracting Officer. Full-size drawings may be inspected during regular working hours at the office of the Contracting Officer.] NAVFAC Drawing No. Title SD-1404667 General Arrangement SD-1404668 Plan, Elevation, and Section SD-1404669 Catwalk Details SD-1404670 Miscellaneous Fitting Details 1.6 Availability of Utility Services: Pursuant to contract clauses titled, "Availability of Utilities," reasonable amounts of the following utilities will be made available to the Contractor [at the following rates] [without charge]: NFSS-C49 01010-1 Electricity [$ per ] Potable Water [$ per ] Saltwater [$ per ] Compressed Air [$ per ] Steam [$ per ] Natural Gas [$ per ] The contract drawings indicate the point at which the Government will deliver such utilities or services and the quantity available. The Contractor shall pay costs incurred in connecting, converting, and transferring the utilities to the work. The Contractor will be responsible for such items as making connections, providing transformers, and for disconnections. Clean up the work area and dispose of debris [off station] [at a location designated by the Contracting Officer] if any part of the mooring camels is constructed on station. 1.7 Record Drawings: Maintain one set of full-size contract drawings marked to show any deviations which have been made from the contract drawings. Upon completion of the work, deliver the marked set of prints to the Contracting Officer. Requests for partial payments will not be approved if the marked prints are not kept current, and request for final payment will not be approved until the marked prints are delivered to the Contracting Officer. 1.8 Storm Protection: Storm protection includes, but is not limited to removing loose materials, tools, and equipment from exposed locations; and removing or securing scaffolding and other temporary work. 1.9 Contractor's Work Area: The following options are available: [a. Use the area designated for on-station construction and launching of the camels.] [b. Select a location and construct a launch area off station.] [c. Use a combination of on-station and off-station construction.] 1.9.1 The Contractor shall determine the suitability of the designated work area for storage, assembly, and launching requirements. Take appropriate measures to ensure that station property is not damaged by Contractor's use. 1.9.2 Submit for review proposed operation, assembly, and launching plans, including schedules. NFSS-C49 01010-2 1.10 Inspection and Workmanship: Materials and workmanship shall be subjected to inspection by the Government representative as services are rendered. The Government shall have the right to reject inferior material and workmanship or require its correction. If the Contractor fails to proceed at once with the correction of inferior material and workmanship, the Government will have such corrections made, as necessary, and charge the cost thereof to the Contractor. The Contractor shall give the Contracting Officer sufficient notice prior to operations that require a Government witness. *** END OF SECTION *** NFSS-C49 01010-3 SECTION 02935 RUBBER FENDERING PART 1 - GENERAL 1.1 APPLICABLE PUBLICATIONS: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. 1.1.1 American Society for Testing and Materials (ASTM) Publications: D256-88 Impact Resistance of Plastics and Electrical Insulating Materials D638-89 Tensile Properties of Plastics D1894-87 Static and Kinetic Coefficients of Friction of Plastic Film and Sheeting D2000-86 Rubber Products in Automotive Applications D2240-86 Rubber Property - Durometer Hardness 1.2 SUBMITTALS: 1.2.1 Shop Drawings: Obtain approval prior to ordering fenders along with templates, and erection and installation details, as appropriate, for rubber fenders. Submittals shall be complete in detail; shall indicate thickness, type, properties, and dimensions; and shall show construction details, anchorage, and installation with relation to the construction. 1.2.2 Tests and Test Reports: Provide certified copies of test reports from approved laboratories performed on previously manufactured materials. Test reports shall be for tests accompanied by certificates from the manufacturer certifying that the previously tested material is of the same type, quality, manufacturer, and make as that proposed for this project. Tests shall have been conducted not more than one year prior to the date test reports are submitted. Test reports shall be submitted to the Contracting Officer for record purposes. 1.3 DELIVERY, STORAGE, AND HANDLING: Deliver materials to the site in an undamaged condition. Store material in a clean, properly drained location out of contact with the ground. Replace damaged material with new material or repair the damaged material in an approved manner. PART 2 - PRODUCTS 2.1 FENDERS: Shall conform to ASTM D2000, M3BA 717 A14B13C12F17. Size and shape of fenders shall be as indicated. Fenders shall be uniform in NFSS-C49 02935-1 in appearance and workmanship and shall not contain porous areas, bubbles, foreign matter, or irregularities. Fenders shall be molded, and metal reinforcing strips shall be bonded and encapsulated. Fenders shall be provided in two pieces for 12-foot length with a square butt joint and zero clearance between pieces. Horizontal joints shall be staggered in each pair of fenders provided per camel. 2.2 WEAR PADS: Shall be constructed of low friction, abrasion resistant, high impact strength, and chemically inert material with the following properties: 2.2.1 Frictional Properties: Friction between mild steel and wear pad determined in accordance with ASTM D1894: Static 0.15-0.20 2.2.2 Kinetic 0.12-0.20 Mechanical Properties: Properties ASTM Test Wear Pad Min. Valves Units Tensile Strength @ Break D638 (psi) Elongation @ Break D638 Izod Impact Strength D256(1) (ft-lb/in.) 29 Hardness, Shore "D" D2240 - 65 Abrasion Resistance (2) - 100 % 5500 570 (1) Izod Impact Strength: Samples have two (15 degrees + 1/2degrees) notches; each notch on opposite sides to a depth of 5 mm. (2) Abrasion Resistance: Sand slurry abrasion; 2 parts water, 3 parts sand; 1" x 3" x 1" specimen; rotational speed = 1200 rpm; test period = 24 hours. PART 3 - EXECUTION 3.1 INSTALLATION: Install rubber fenders and wear pads in accordance with the manufacturer's recommendations and as indicated. *** END OF SECTION *** NFSS-C49 02935-2 SECTION 05501 METAL FABRICATIONS PART 1 - GENERAL 1.1 APPLICABLE PUBLICATIONS: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. 1.1.1 American Institute of Steel Construction (AISC) Publications: AISC M011-80 Manual of Steel Construction (Eighth Edition) AISC M013-83 Detailing for Steel Construction AISC M014-84 Engineering for Steel Construction 1.1.2 American Society for Testing and Materials (ASTM) Publications: A36/A36M-89 Structural Steel A53-89 (Rev. A) Pipe, Steel, Black and Hot-Dipped, Zinc-Coated Welded and Seamless A123-89 (Rev. A) Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products A153-82 (R 1987) Zinc Coating (Hot-Dip) on Iron and Steel Hardware A307-89 Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength A563-89 (Rev. A) Carbon and Alloy Steel Nuts A780-80 (R 1987) Repair of Damaged Hot-Dip Galvanized Coatings F844-89 Washers, Steel, Plain (Flat), Unhardened for General Use 1.1.3 American Welding Society, Inc. (AWS) Publication: D1.1-90 1.1.4 Structural Welding Code Steel (Twelfth Edition) Federal Specifications (Fed. Spec.): RR-G-661E(1) Grating, Metal, Bar Type (Floor, Except for Naval Vessels) NFSS-C49 05501-1 1.1.5 Military Specifications (Mil. Spec.): MIL-I-24172A 1.2 Insulation, Plastic, Cellular Polyurethane, Rigid Preformed and Foam-in-Place SUBMITTALS: 1.2.1 Shop Drawings: Submit for approval by the Contracting Officer prior to fabrication. Prepare in accordance with AISC M013 and AISC M014. Shop drawings shall not be reproductions of contract drawings. Include complete information for the fabrication and erection of the structure's components, including the location, type, and size of bolts, welds, member sizes and lengths, connection details, blocks, copes, and cuts. Use AWS standard welding symbols. 1.2.2 Manufacturer's Certificates of Compliance: a. Steel b. Bolts, nuts, and washers c. Welding electrodes and rods 1.2.3 Welder, Welding Operation, and Tacker Qualification: Prior to welding, submit certification for each welder stating the type of welding and positions qualified for, code and procedure qualified under, date qualified, and firm and individual certifying the qualification tests. 1.3 DELIVERY, STORAGE, AND HANDLING: Handle, store, and protect materials in accordance with manufacturer's recommendations. Replace damaged items with new items, or repair as approved by the Contracting Officer. 1.4 SAFETY AND HEALTH PRECAUTIONS: The foam listed in this section contains isocyanate fumes, which are toxic. Follow safety procedures as recommended by the manufacturer. Work in a well ventilated area or provide air masks. Provide and require workers to use goggles, rubber gloves and protective clothing for protection during preparation of foam. PART 2 - PRODUCTS 2.1 MATERIALS: with AISC M011. Materials not specified shall be provided in accordance 2.1.1 Structural Steel: 2.1.2 Steel Pipe: 2.1.3 Bolts: ASTM A36/A36M. ASTM A53, Type E or S, Grade B. ASTM A307, Grade A, galvanized. 2.1.4 Nuts: ASTM A563, Grade A, heavy hex style, except nuts under 1 1/2 inches may be provided in hex style, galvanized. NFSS-C49 05501-2 2.1.5 Washers: ASTM F844, galvanized. 2.1.6 Gratings: 2.1.7 Foam Insulation: Fed. Spec. RR-G-661, with banded edges. Mil. Spec. MIL-I-24172, Type II, Class 1. 2.2 PAINTING: As specified in Specification Section 09875, "Metal Fabrications Coating." 2.3 GALVANIZING: specified otherwise. ASTM A123 or ASTM A153, as applicable, unless 2.3.1 Galvanizing Repair: ASTM A780. 2.3.2 Welding Electrodes and Rods: AWS D1.1. PART 3 - EXECUTION 3.1 INSTALLATION: Installation including materials, workmanship, fabrication, and assembly shall be provided in accordance with AISC M011, except as modified herein. 3.2 FABRICATION: Metalwork shall be well formed to shape and size, with sharp lines, angles, and true curves. Work shall be fabricated to allow for expansion and contraction of materials. Provide welding and bracing of adequate strength and durability, with tight, flush joints, dressed smooth and clean. 3.2.1 Metal Surfaces: Shall be clean and free from mill scale, flake rust, and rust pitting. Shearing and punching shall leave clean true lines and surfaces. Weld permanent connections. Finish welds flush and smooth on surfaces that will be exposed after installation. 3.2.2 Fastenings: Provide the necessary rabbets, lugs, and brackets necessary for assembly of the work. Holes for bolts and screws shall be drilled. 3.3 CONNECTIONS: AISC M011. 3.4 WELDING: Design non-detailed connections in accordance with AWS D1.1. [3.5 FOAM: After welding has been completed, pressure inject Mil. Spec. MIL-I-24172 foam into closed pipes.] NOTE: Pressure injecting foam into closed pipes increases the corrosion protection and buoyancy. However, the foam gives off toxic fumes when subjected to welding which will require special respirators and ventilation of the work area when making any welding repairs. Based on the above, the specifier shall decide if the pressure injected foam will or will not be included. NFSS-C49 05501-3 3.6 FIELD TESTS AND INSPECTIONS: Perform field tests, and provide labor, equipment, and incidentals required for testing. 3.6.1 Welds: Perform the visual inspection in accordance with AWS D1.1, Part 6. Provide AWS certified welding inspectors for fabrication and erection inspection and testing and verification inspections. Welding inspectors shall visually inspect and mark welds. 3.6.2 Nondestructive Testing: AWS D1.1. Test each lifting eye weld using magnetic particle method. Defective welds shall be repaired and retested after repair. *** END OF SECTION *** NFSS-C49 05501-4 SECTION 06500 FIBERGLASS GRATING PART 1 - GENERAL 1.1 APPLICABLE PUBLICATIONS: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. 1.1.1 American Society for Testing and Materials (ASTM) Publications: D2584-68 (R 1985) Ignition Loss of Cured Reinforced Resins E84-89 (Rev. A) Surface Burning Characteristics of Building Materials 1.2 SUBMITTALS: 1.2.1 Manufacturer's Catalog Data: Submit manufacturer's standard catalog data, including load tables, for grating and accessories to the Contracting Officer for approval. 1.3 DELIVERY, STORAGE, AND HANDLING: Deliver, store, and handle grating and accessories in such a manner not to damage or overload grating during construction period. 1.4 DESIGN CRITERIA: Grating shall be suitable for safely supporting a uniform load of 100 pounds per square foot. Deflection for a simply supported span of 36 inches shall not exceed 0.4 inch. PART 2 - PRODUCTS 2.1 MATERIALS: 2.1.1 General: Grating shall be constructed of fiberglass reinforced chlorendic polyester resin. Resin shall be a premium chemical grade polyester resin which completely wets the glass fibers. Glass content shall be a minimum of 25 percent and a maximum of 35 percent by weight as determined by ASTM D2584 for maximum sunlight and chemical resistance. ASTM E84, flame spread 25 or less. 2.1.2 Configuration: Grating shall be one-piece construction, rectangular grid pattern having approximately equal strength in both grid directions. Grating depth shall be as indicated or deeper as required to support the loads indicated. The tops of the bearing bars and cross members shall be in the same plane. Top surface of grating shall have a nonskid finish. 2.1.3 Color: Grating color shall be orange. NFSS-C49 06500-1 2.1.4 Holddown Attachments: Provide with stainless steel "saddle clip" type fasteners and stainless steel bolts. 2.2 FABRICATION: 2.2.1 Main Bars: Main bars shall be vertical within a tolerance of 0.10 inch per inch of depth. Longitudinal bow (before fastening to supports) shall be less than 1/200 of the length. Transverse bow (before fastening to supports) shall be less than 3/8 inch in 3 feet. 2.2.2 Crossbars: Crossbars shall not deviate from a straight line perpendicular to the main bars by more than 3/16 inch in 3 feet. Crossbars shall match crossbars of adjacent sections to form a continuous pattern of straight lines. Panel width and length tolerances shall be plus or minus one inch. 2.2.3 Openings: Provide openings in gratings indicated as required for installing ballast. End cuts shall be coated with resin. PART 3 - EXECUTION 3.1 INSTALLATION: 3.1.1 Grating Panels: Place grating panels on supports and properly adjust and align. Grating shall bear at least one inch on supports. Cuts shall be coated with resin. Stainless steel clips shall be used to tie the end span bars of each panel together. 3.1.2 Anchorage: Space fasteners as required to overcome irregularities and maintain grating contact with supports. Minimum anchorage of each panel shall be two fasteners at each end and one fastener at each intermediate support. Gratings shall be removable. *** END OF SECTION *** NFSS-C49 06500-2 SECTION 09875 METAL FABRICATIONS COATING PART 1 - GENERAL 1.1 APPLICABLE PUBLICATIONS: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. 1.1.1 Federal Specifications (Fed. Spec.): QPL-24441-26 1.1.2 Paint, Epoxy-Polyamide Military Specifications (Mil. Spec.): MIL-P-15931E(3) Paint, Antifouling, Vinyl (Formulas No. 121 and No. 129) MIL-P-24441A(SH) Suppl 1 Paint, Epoxy-Polyamide MIL-P-24441/1B(SH) Paint, Epoxy-Polyamide, Green Primer, Formula 150, Type I MIL-P-24441/2B(SH) Paint, Epoxy-Polyamide, Exterior Topcoat, Haze Gray, Formula 151, Type I MIL-P-24441/4B(SH) Paint, Epoxy-Polyamide, Exterior Topcoat, Black, Formula 153-Ro = 1.8, Type I 1.1.3 American Society for Testing and Materials (ASTM) Publications: D1186-87 Nondestructive Measurement of Dry Film Thickness of Nonmagnetic Coatings Applied to a Ferrous Base E376-89 Measuring Coating Thickness by Magnetic-Field or Eddy Current (Electromagnetic) Test Methods 1.1.4 Steel Structures Painting Council (SSPC) Publications: SSPC SP 1-82 Solvent Cleaning SSPC SP 10-89 Near-White Blast Cleaning 1.2 SUBMITTALS: 1.2.1 Manufacturer's Certificates of Compliance: Submit manufacturer's certificates of compliance before delivery of the coating system to the job site attesting that the materials proposed for use meet the requirements specified as follows: NFSS-C49 09875-1 1.2.1.1 Epoxy-Polyamide: Mil. Spec. MIL-P-24441, Type I. Fed. Spec. QPL-24441-26 is satisfactory evidence. Listing on 1.3 ENVIRONMENTAL CONDITIONS: Start work only when ambient and curing temperatures are within limits of coating manufacturer's recommendations and at least 5 degrees F above the dew point temperature. 1.4 SAFETY AND HEALTH PRECAUTIONS: Materials listed in this section contain coal tar pitch volatiles, which are toxic. Follow safety procedures as recommended by the manufacturer. Work in a well ventilated area. Provide and require workers to use impervious clothing, gloves, face shields (8-inch minimum), and other appropriate protective clothing necessary to prevent eye and skin contact with coating materials. Keep coatings away from heat, sparks and flame during storage, mixing, and application. PART 2 - PRODUCTS 2.1 MATERIALS: 2.1.1 Coating: Epoxy-Polyamide, Mil. Spec. MIL-P-24441, Type I. Provide catalyst components for coatings specific for resin components. thinners which are compatible with the coating. 2.1.1.1 Primer: 2.1.1.2 Intermediate Coat: 2.1.1.3 Top Coat: 2.1.2 Grade B. Use Mil. Spec. MIL-P-24441/1. Mil. Spec. MIL-P-24441/2. Mil. Spec. MIL-P-24441/4. Antifouling Paint: Mil. Spec. MIL-P-15931, Type II, Class 2, PART 3 - EXECUTION 3.1 CLEANING AND PREPARATION OF SURFACES: 3.1.1 Solvent Cleaning: SSPC SP 1. Remove visible oil, grease, and drawing and cutting compounds by solvent cleaning. 3.1.2 Blast Cleaning: SSPC SP 10. After solvent cleaning, complete surface preparation by near-white blast cleaning. Remove residual dust from blasted surface by blowing with dry, oil-free air, vacuuming, or sweeping. Provide surface profile of at least 1 1/2-mil thickness. 3.2 PROPORTIONING AND MIXING OF COATING SYSTEM: 3.2.1 Proportioning of Epoxy-Polyamide System: Epoxy-polyamide coatings consist of a two-component system that includes a pigmented polyamide resin, Component A and an epoxy resin, Component B. Mix both components in a ratio of 1 to 1 by volume. Should the coating thicken appreciably during cold NFSS-C49 09875-2 temperature application, and thinning is necessary, or to improve application characteristics, add up to one pint of ethylene glycol monoethyl (EGM) ether for each gallon of the coating. 3.2.2 Mixing of Epoxy-Polyamide System: Mix components of coating by power stirring until a smooth, uniform consistency results. Stir coating periodically during its induction period. Follow Table 1 for induction time and pot life of mixed batches. Table 1 Job Site Ambient Temperature and Induction Time for Epoxy-Polyamide System 3.3 Ambient Temperature Degrees F (degrees C) Induction Time (in hours) 40 to 50 (4.4 to 10.0) 2 at 70 degrees F (21.1 degrees C) 50 to 60 (10.0 to 15.6) 2 60 to 70 (15.6 to 21.1) 1 to 1 1/2 70 and above (21.1 and above) 1/2 to 1 COATING APPLICATION: 3.3.1 General: Apply primer coating to dry surfaces not more than 4 hours after near-white blast cleaning. Except as specified, shop or field apply. Apply coats of each system so that finished surfaces are free from runs, sags, brush marks, and variations in color. Coat surfaces to minimum thicknesses specified. 3.3.1.1 Application Method for Epoxy-Polyamide System: Allow previous coat to dry to tack-free condition but not more than 72 hours before applying the next coat. If more than 72 hours should elapse between coats, then clean the surface and apply a fog coat at a minimum dry film thickness of one mil, using the same material as the previous coat. Allow the fog coat to become tacky, and then apply the subsequent coat. 3.3.2 Repair of Defects: Repair detected coating holidays, thin areas, and exposed areas damaged prior to or during installation by surface treatment and application of additional coating or by manufacturer's recommendations. Allow a period of not less than 72 hours to pass following the final coat before placing in immersion service. 3.3.3 Three-Coat Epoxy-Polyamide System: thickness of between 3 mils and 4 mils. NFSS-C49 09875-3 Apply each coat at a dry film 3.3.4 Dry Film Thickness: Provide total epoxy-polyamide system minimum dry film thickness of 9 mils. Measure using a magnetic gauge. 3.3.5 Antifouling Paint: While the last coat of epoxy-polyamide is still tacky, apply first coat of antifouling paint. After first coat is dry, apply a second coat. Total minimum dry film thickness for both coats shall be 4 mils. 3.4 SURFACES TO BE COATED: Coat steel work. 3.5 FIELD TESTS: 3.5.1 Holiday Testing: Prior to installation, test for holidays in total coating system. Use a low-voltage holiday detector of less than 90 volts in accordance with manufacturer's instructions. After repair of any holidays by surface treatment and application of additional coating or by manufacturer's recommendation, retest with detector. 3.5.2 Dry Film Thickness: After repair of holidays, measure the total dry film thickness of the epoxy-polyamide system and the antifouling paint using a magnetic dry film thickness gauge in accordance with ASTM D1186 and ASTM E376. *** END OF SECTION *** NFSS-C49 09875-4