Consent Agenda Item 8. B. 3) e) March 19, 2015 COLLEGE OF DuPAGE REGULAR BOARD MEETING STANDARD BOARD APPROVAL 1. SUBJECT Task Order Maintenance – Concrete. 2. BUDGET STATUS Funds in the maximum amount of $370,000.00 per year are being provided by the Facilities, Operations & Maintenance Budget #02-9020070-5309001. 3. BACKGROUND INFORMATION This bid represents a three-year task order maintenance project for the Facilities, Operations & Maintenance Department from February, 2015 through January 30, 2018. The scope of this project includes concrete sealant, replacement concrete, building sealant and new concrete throughout the Campus. There are areas currently in need of sealcoating to prevent deteriorating concrete. Concrete fractures, fissures and depressions are the characteristics of this deterioration. This is accelerated with the forces of the freeze/thaw cycle associated with prolonged winter temperatures. There are also various areas on campus in need of building sealant/caulking. This helps the building stay dry and prevent building leaks. The recommended contractor, Patriot Pavement Maintenance, Inc., has provided all of the required prequalification and certification documentation. References for this firm include work previously performed at the College of DuPage and Grayslake High School. A legal bid notice was published and three (3) vendors were solicited. Three (3) responses were received. One (1) vendor was in-district and no minority vendors were identified. This purchase complies with State Statute, Board Policy and Administrative Procedures. Consent Agenda Item 8. B. 3) e) March 19, 2015 The following is a recap of the bid tabulation: Item 1 2 3 Description REMOVE & REPLACE COLORED PCC SIDEWALK 5” REMOVE & REPLACE DETECTABLE PANELS EPOXY INJECTION OF CRACKS UOM SF EACH LF SF SF 7 8 9 REMOVE & REPLACE COLORED COMBINATION CONCRETE CURB & GUTTER REMOVE & REPLACE COLORED PCC CROSSW ALK 10" THIN CONCRETE OVERLAY – 2” REMOVE & REPLACE COLORED PCC INTERSECTION 10” CONCRETE SEALER EXTERIOR BUILDING EXPANSION SEALANT 10 NEW EXCAVATION AND INSTALLATION 5" CONCRETE 8" STONE COLORED CONCRETE SF 4 5 6 CONSTRUCTION MANAGEMENT * PATRIOT PAVEMENT ARLINTON SEALCOATING Unit Price $22.30 $300.00 $11.50 Unit Price $21.80 $285.00 $9.00 Unit Price $25.00 $310.00 $15.00 $50.25 $49.75 $60.00 $19.50 $18.50 $25.00 LF SF SF LF $9.50 $8.35 $11.00 $19.50 $18.50 $25.00 $1.65 $21.50 $1.58 $20.75 $1.75 $27.00 $24.00 $23.50 $28.00 Awarded vendor in Bold In-District Vendor * 4. RECOMMENDATION That the Board of Trustees awards the bid for Task Order Roadway Maintenance Concrete to the lowest responsible bidder, Patriot Pavement Maintenance, Inc., 825 Seegers Road, Des Plaines, IL 60016, for an estimated maximum annual expenditure of $370,000.00, and an estimated total three year expenditure of $1,110,000.00. BIDDER: _____________________________ BID NO.: 2015-B0043 COLLEGE OF DUPAGE TASK ORDER WORK FOR FY2015 CONCRETE MAINTENANCE FOR THE FACILITIES OPERATIONS AND MAINTENANCE DEPARTMENT COMMUNITY COLLEGE DISTRICT NO. 502 MANDATORY PREBID MEETING: TUESDAY, DECEMBER 9, 2014 AT 10:00 A.M. ROOM 1404 PROPOSALS DUE BY: THURSDAY, DECEMBER 18, 2014 AT 2:00 P.M. DELIVER PROPOSALS TO: COLLEGE of DuPAGE PURCHASING DEPARTMENT ROOM BIC 1540 425 FAWELL BLVD. GLEN ELLYN, ILLINOIS 60137 Requisition Number Dated: ISSUED BY THE PURCHASING DEPARTMENT BID FORM FOR TASK ORDER CONCRETE WORK FY2015 PRE-BID CONFERENCE: TUESDAY, DECEMBER 9, 2014 AT 10:00 AM LOCATION: College of DuPage Purchasing Department 425 Fawell Blvd Berg Instructional Center, Room BIC 1540 Glen Ellyn, IL 60137 DEADLINE FOR QUESTIONS: FRIDAY, DECEMBER 12, 2014 at 5:00 PM BID DUE DATE: THURDAY, DECEMBER 18, 2014 at 2:00 PM DELIVER SEALED BIDS TO: To: College of DuPage Purchasing Department 425 Fawell Blvd. Berg Instructional Center, Room BIC 1540 Glen Ellyn, IL 60137 FIRM NAME: the undersigned A. We as contractor having familiarized ourselves with the local conditions affecting the work and with the proposed Contract Documents on file at the Purchasing Department at the College of Dupage hereby propose to perform everything required to be performed and to provide all of the labor, material, necessary equipment and all utilities and transportation and services necessary to perform and complete in a workmanlike manner all work required to complete the proposed work indicated in the bidding documents for the TASK ORDER CONCRETE WORK FY2015 in accordance with the drawing and specification prepared by the College of Dupage F a c i l i t i e s P la nning a nd D e ve lo p me nt D e p a r t me nt inc lu d ing Ad d e nd a N o . _ _ _ , _ _ _ , _ _ _ issu e d t he r e t o fo r t he su m o f: a. All work required by the foregoing documents will be based on TOTAL BASE BID. 1 | Page B. Bidder agrees that if written notice of the acceptance of this bid is mailed or delivered to the undersigned within 60 days after the Bid Due Date, or any time thereafter before it is withdrawn, the undersigned shall meet a representative of College of DuPage to execute the Contract. Performance and Payment Bonds and the appropriate insurance certificates will be delivered to the College of DuPage at the time of execution of the Contract. Failure to execute said contract within ten (10) days after receipt of Notice to Award may be considered a default under the obligation of the bid bond. C. MILESTONE SCHEDULE DATES 1. 2. 3. 4. D. Anticipated Date of Notice to Proceed: After January 22, 2015 (Board Meeting) Commence Submittals: Upon Receipt of Notice to Proceed Commence Jobsite work for the proposal: Upon Complete Submittal Approval Complete Jobsite work for this proposal: June 30, 2015 TRADE SUBCONTRACTORS The following trade subcontractors are proposed for the item of work listed. Trade subcontractors are subject to review per the General Conditions. List only firms that will supply labor at the site. ITEM OF WORK E. TRADE SUBCONTRACTORS UNIT PRICES Unit Prices shall be used, where applicable, to make adjustments to the cost of the Work due to changes. All Unit Prices submitted shall be complete in-place prices (unless noted otherwise) and include all costs for overhead, profit, labor, materials, equipment, and any other incidentals related to the completion of the Work, and shall remain firm for the period of the contract. Unit prices listed are for additive work. 2 | Page WARRANTY The Contractor is responsible for inspecting all walks and intersections prior to installation. Contractor shall supply a three year warranty on all installed materials. During the three year warranty the contractor is responsible for excessive material loss and poor workmanship of the installed product. The College of DuPage will be the sole determining body for excessive wear and poor workmanship. The contractor must notify the College of DuPage in writing if at any time they find failures due to poor practices by the college staff. If an item goes unreported, it will up to the Contractor to cover any damages. Monthly site visit inspections for warranty compliance, shall be completed by the College of DuPage and Contractor. Any notification of work that is not in compliance with the specifications shall be provided to the Contractor within seven calendar days after the warranty inspection. The Contractor must complete all work identified during the site visits within seven days, or as weather permits, after receiving the site visit inspection notes. The Contractor will not be responsible for defects resulting from, abuse or damage by Owner or Owner’s users, or unusual phenomena or incidents beyond Contractor’s control which result from natural causes such as floods, lightning, storms, freezing rains, winds over 60 miles per hour, fires or vandalism. I. PAYMENT PROCEDURES Partial payment requests may be made during the life of this contract. All payment requests must be turned in by the 15th of the month to be considered for “Board” approval. Certified payroll sheets along with relevant waivers covering sub-contractors and materials must be submitted with all pay requests. Pay requests must be submitted on AIA forms (documents G702 & G703) and shall be accompanied with the contractor’s invoice. Payment requests will only be approved for work in place at the time of the request. No consideration will be given to stored materials, which have not yet been used. Payment requests will be approved based upon the lump sum item that was bid or by unit costs whichever is most relevant. Payments will be made based on the actual total quantities of work performed. II. ACH PAYMENT REQUIREMENTS All vendors responding to this bid must agree to receive all payments from the College via an Automated Clearing House (ACH) transfer. Paper checks will no longer be issued by the College. By signing this bid, you agree to receive all payments for goods and services via ACH transfer. Be advised that the College ACH financial website is secured and all your banking information is encrypted and can only be accessed by your company through a password protected site. Instructions for registering for ACH payments will be sent via email to all vendors awarded a contract as a result of this bid solicitation. Within 10 days of award of any contract or purchase order, the vendor must submit or must have already submitted their ACH information within their user profile in the College’s financial system. Failure to comply with the ACH requirements may result in termination of the contract or purchase order. Before any ACH transfer takes place, all banking information will be pre-noted which verifies that the account numbers and routing information is valid. Prenoting takes approximately three weeks. ACH transfers will occur once per month, typically the third week of the month. Invoices must be received at least 3 weeks prior to each ACH payment release. You are strongly encouraged to set up your account upon notice of award to avoid unnecessary payment delays 3 | Page CERTIFICATIONS THE UNDERSIGNED IS CAUTIONED TO CAREFULLY READ THESE CERTIFICATIONS PRIOR TO SIGNING THE SIGNATURE PAGE. SIGNING THE SIGNATURE PAGE SHALL CONSTITUTE A WARRANTY BY THE UNDERSIGNED THAT ALL THE STATEMENTS, CERTIFICATIONS AND INFORMATION SET FORTH WITHIN THESE CERTIFICATIONS ARE TRUE, COMPLETE AND CORRECT AS OF THE DATE THE SIGNATURE PAGE IS SIGNED. THE UNDERSIGNED IS NOTIFIED THAT IF THE COLLEGE LEARNS THAT ANY OF THE FOLLOWING CERTIFICATIONS WERE FALSELY MADE, THAT ANY CONTRACT ENTERED INTO WITH THE UNDERSIGNED SHALL BE SUBJECT TO TERMINATION. A. Prevailing Wage Act. To the extent required by law, Contractor shall not pay less than the prevailing wage as established pursuant to an Act Regulating the Wages of Laborers, Mechanics, and Other Workman employed under Contract for Public Workers 820 ILCS 130/1 et seq. B. Human Rights Act. To the extent required by law, Contractor shall abide by the Illinois Human Rights Act, 775 ILCS 10/0.01 et seq. C. Drug Free Workplace. To the extent required by law, Contractor shall abide with the requirements of the Drug Free Workplace Act 30 ILCS 580.1 et seq. D. Sexual Harassment Policy. Contractor represents by the signing of this Agreement that it has a written sexual harassment policy that is in accordance with 775 ILCS 5/2-105 (A) (4). E. Non-debarment. By executing this agreement Contractor certifies that it has not been debarred from public contracts in the State of Illinois for violating either 33E-3 or 33E-4 of the Public Contracts Act, 720 ILCS 5/33E-1 et seq. F. Fair Employment Practice Contractor is in compliance with all State and Federal laws regarding Fair Employment Practice as well as all rules and regulations. G. Our company has an Equal Employment Opportunity and Affirmative Action Program which complies with Executive Order 11246, the Vietnam Era Veterans’ Readjustment Assistance Act of 1974, and the Rehabilitation Act of 1973. Yes _______ No _______ ADVICE MINORITY/WOMAN-OWNED, DISADVANTAGED BUSINESS? YES_____ NO_____. If yes, please attach copy of certification and advise certification number and expiration date below: STATE NEGOTIATED BID/ COOPERATIVE AGREEMENT: YES _____ NO _______ Contract No. ___________ Name of Certifying Entity: _________________________________________________________ Certification #: ________________ _____________ CE-1 4 | Page Expiration Date: _____ SIGNATURE PAGE Check One: SOLE PROPRIETOR PARTNERSHIP (and/or JOINT VENTURE) LIMITED LIABILITY COMPANY CORPORATION The undersigned acknowledges receipt of a full set of Contract Documents and Addenda Numbers __________________ (None unless indicated here). The undersigned makes the foregoing Bid subject to all of the terms and conditions of the Contract Documents. The undersigned certifies that all of the foregoing statements of the Vendor Certifications are true and correct. The undersigned warrants that all of the facts and information submitted by the undersigned in connection with this Bid are true and correct. Upon award and execution of this Contract by the College of DuPage Board of Trustees, the undersigned agrees that execution of this Bid shall stand as the undersigned's execution of this Contract. BUSINESS NAME:__________________________________________________________________________ BUSINESS ADDRESS: ____________________________________________________________________________________________ BUSINESS TELEPHONE: FAX NUMBER: EMAIL ADDRESS: CELLULAR TELEPHONE NUMBER: FEIN/SSN: AUTHORIZED SIGNATURE: _______ PRINT NAME: TITLE: __________________________ ____________________ DATE: Subscribed to and sworn before me this day of X , 2014. Notary Public Signature My commission expires: Notary Seal * Attach hereto a partnership resolution or other document authorizing the individual signing this Signature Page to so sign on behalf of the Partnership. ** If the LLC is not registered in the State of Illinois, a copy of a current Certificate of Good Standing from the state of incorporation must be submitted with this Signature Page. *** Attach either a certified copy of the by-laws, articles, resolution or other authorization demonstrating such persons to sign the Signature Page on behalf of the LLC. *** If the corporation is not registered in the State of Illinois, a copy of the Certificate of Good Standing from the state of incorporation must be submitted with this Signature Page. ***** In the event that this Signature Page is signed by any persons other than the President and Secretary, attach either a certified copy of the corporate by-laws, a resolution or other authorization by the corporation, authorizing such persons to sign the Signature Page on behalf of the corporation. CE-2 5 | Page COLLEGE OF DUPAGE SIGNATURE PAGE ON BEHALF OF THE COLLEGE OF DUPAGE, A BODY POLITIC AND CORPORATE OF THE STATE OF ILLINOIS, THIS CONTRACT IS HEREBY EXECUTED BY: SENIOR VICE-PRESIDENT ADMINISTRATION AND TREASURER DATED AT GLEN ELLYN, ILLINOIS THIS _____ DAY OF______________________, ,2014 THE COLLEGE HEREBY ACCEPTS: THE FOREGOING PROPOSAL AS IDENTIFIED IN THE CONTRACT DOCUMENTS FOR CONTRACT FOR TASK ORDER CONCRETE WORK FY2015 TOTAL AMOUNT OF CONTRACT: $ (DOLLARS AND CENTS) FUND CHARGEABLE: CE-3 6 | Page General Provisions for TASK ORDER CONCRETE WORK I. GENERAL The “Standard Specifications for Road and Bridge Construction” prepared by the Department of Transportation of the State of Illinois and adopted by said department January 1, 2002, shall govern the construction of the proposed improvement. The following special provisions shall be taken to mean the “Standard Specifications for Road and Bridge Construction” as defined above. Reference to the “Department” in the Standard Specifications shall be taken to mean the College of DuPage or their authorized representative. Reference to the “Engineer” in the Standard Specification shall be taken to mean the authorized representative of the College of DuPage. II. SCOPE OF WORK The contractor shall provide all labor, materials, equipment, insurance and testing as required to provide a completed project within time schedules included herein and ready for the use intended This contract shall consist of unit pricing for task order work to include ; the removal and replacement of COLORED PCC sidewalk, The removal and replacement of PCC curb & gutter, replacement of detectable warning panels, epoxy crack injection of concrete slabs, mud-jack existing sidewalk slabs, other miscellaneous repairs. This contract will be awarded for three years. III. A. B. C. D. E. UNIT PRICE Unit Price is an amount proposed by bidders, stated on the Bid Form, as a price per unit of measurement for materials or services using minimum footages as mentioned Unit Prices shall be used to develop the cost of the Work approved by the Owner. All Unit Prices submitted shall be complete in place prices (unless noted otherwise) and include all costs for overhead, profit, labor, materials, equipment, and any other incidentals related to the completion of the Work and shall remain firm for the period of the contract. Contractor shall provide a detailed break out of their costs of labor, including social security, old age and unemployment insurance, fringe benefits required by agreement or custom, and workers’ compensation insurance. Contractor shall provide the name of the trade and the Local Union Number for all employees performing work on this contract. Unit Prices shall be utilized for calculation of all change orders submitted, as well as any allowances included, for the duration of the contract. The Owner may reject a bid if Unit Prices are considered noncompetitive by the College. 7 | Page IV. CONTRACTOR QUALIFICATIONS 1. All bidders must submit a fully completed AIA Contractor’s Qualification Statement (AIA document A305) 2. A current qualification Form from the Illinois Department of Transportation. The contractor’s IDOT Pre-qualification must contain the work category items that are relevant to this bid solicitation. Bidder must possess certification at time of bid submittal and be currrent. V. PROJECT DESCRIPTIONS AND REQUIREMENTS This Project is based on the Work specifically described in this Contract Document, these Plan Drawings and these Project Specifications. VI. SAFETY All items indicated and as may be otherwise required shall be paid for by the contractor. The contractor’s attention is called to the following items in particular: A. The Illinois Vehicle Code is the governing regulation for all motor vehicles operating on the College site. All vehicles of the contractors or sub-contractors must conform to this code. B. Rollover Protection Structures shall be mounted on all self-propelled material handling and Earth moving equipment used on the site, regardless of age of the equipment. These structures shall meet the minimum performance criteria stated in Subpart W 1926.1001 of construction Safety and Health Regulations. C. Reverse signal alarms shall be mounted and shall be operational on all self-propelled material handling and Earth moving equipment used on the site. These alarms shall be distinguishable from the surrounding noise level at the job site. D. Cab shields shall be provided on all vehicles utilized for hauling materials. E. Trip handles shall be provided on all dump trucks and/or tailgates. F. Seat belts shall be provided for the operators and passengers of all vehicles. G. Protective shoes shall be provided for and worn by all personnel. H. Ground fault protection shall be provided on all temporary electrical cords and other wiring. VII. PROJECT AND TRAFFIC CONTROL SIGNAGE Contractor will be required to furnish and maintain adequate signage that clearly signifies work areas and specifically parking lot closures during related construction times as directed by submitted work schedule. 8 | Page Lighted barricades will be required for all areas of construction related to vehicular traffic. VIII. EXISTING UTILITIES AND STRUCTURES The contractor shall carefully protect existing utilities and structures during all phases of the work. Attention is called, in particular, to the following areas: A. On site water will be available in a designated area only. Water used from sources other than those designated (i.e. building faucets, hydrants) will carry a $500.00 per incident fine against the contractor. B. Roadways along with related drainage structures shall be protected. Replace any damaged areas and return all roadways to original condition at the completion of the project. C. Where short term access is required by the contractor to areas outside the construction limits defined on the drawings, the Owner will modify operational procedures and cooperate with the contractor after receiving adequate advance notice and approving the proposed operation for feasibility and safety considerations. D. Contractor is responsible for the repair of any existing manhole, inlet structure that appears to be damaged as a result of truck and equipment traffic during construction phases. These structures will be inspected after construction and prior to any pay request applications. IX. MATERIAL AND INSTALLATION SPECIFICATIONS 1. REMOVE & REPLACE PCC SIDEWALK The Construction, Measurement, and Payment for this Work shall be performed in accordance with the: IDOT; Standard Specifications for Road and Bridge Construction; Adopted January 1, 2012: Sections 424 and 440. Additionally, the Proposed Sidewalk will match the depth, color, and finish of the Existing Sidewalk. 2. REMOVE & REPLACE DETECTABLE PANELS The Construction, Measurement, and Payment for this Work shall be performed in accordance with the: IDOT; Standard Specifications for Road and Bridge Construction; Adopted January 1, 2012: Sections 424 [424.09] and 440. Additionally, the Proposed Detectable Panels will exactly match the style, color, and finish of the Existing Detectable Panels. 9 | Page 3. EPOXY INJECTION OF CRACKS The Construction, Measurement, and Payment for this Work shall be performed in accordance with the: IDOT; Standard Specifications for Road and Bridge Construction; Adopted January 1, 2012: Section 590. Additionally, the Repaired Crack will closely match the color of the Existing Sidewalk. 4. REMOVE & REPLACE COMBINATION CONCRETE CURB & GUTTER The Construction, Measurement, and Payment for this Work shall be performed in accordance with the: IDOT; Standard Specifications for Road and Bridge Construction; Adopted January 1, 2012: Sections 606 and 440. Additionally, the Proposed Combination Concrete Curb & Gutter will closely match the style, color, and finish of the Adjacent Combination Concrete Curb & Gutter. 5. REMOVE & REPLACE PCC CROSSWALK The Construction, Measurement, and Payment for this Work shall be performed in accordance with the: IDOT; Standard Specifications for Road and Bridge Construction; Adopted January 1, 2012: Sections 424 and 440. Additionally, the Proposed Crosswalk will match the depth, color, and finish of the Existing Crosswalk. The work for this Item will NOT be allowed to commence until the Contractor has obtained an approved Maintenance of Traffic Plan for each location from the Owner. 6. THIN CONCRETE OVERLAY – 2” The Construction, Measurement, and Payment for this Work shall be performed in accordance with the: IDOT; Standard Specifications for Road and Bridge Construction; Adopted January 1, 2012: Sections 424 and 440. The Overlaid Sidewalk will match the color, and finish of the Adjacent Sidewalk. The ends of the overlay will require a 1” saw cut and a tapered grinding of 20 lineal feet. This should create a smooth butt joint, which will create a tight overlay construction. 7. Exterior Building Sealant The precast concrete joints should be installed using approved methods and procedures. Contractor will need to cut out the existing sealant materials, grind the joint sides to expose clean concrete bonding surfaces, and install new approved sealant. Unit cost will include any rental fees for machinery or lifts to access jobs. Product: Dow Corning 790 silicone sealant or approved equal 8. Concrete Sealer 10 | P a g e The contractor shall supply and install the approved product per the manufacturer’s installation specifications. Using industry knowledge and techniques to provide a consistent coating and finish on all designated areas. Product: BASF MasterProtect H 1000 or approved equal 9. MAINTENANCE OF TRAFFIC The Construction, Measurement, and Payment for this Work shall be performed in accordance with the: IDOT; Standard Specifications for Road and Bridge Construction; Adopted January 1, 2012: Section 700. The Contractor is solely responsible to maintain a safe and orderly project site; 24 hours a day and 7 days a week through the duration of the project. The work for the Proposed Crosswalks will NOT be allowed to commence until the Contractor has obtained an approved Maintenance of Traffic Plan for each location from the Owner. If not satisfied with the Maintenance of Traffic Plan and/or Approach; the Owner may insist that the Contractor increase its level of signing, or barricading, or striping, or all the above. 10. TESTING Testing of all installed concrete shall be performed in accordance with the: IDOT; Standard Specifications for Road and Bridge Construction; Adopted January 1, 2012. Section 1020. A “testing laboratory” is an independent entity to be paid by the Contractor , engaged to perform specific inspections or tests, either at the Project Site or elsewhere, and to report on, and, if required, to interpret, results of those inspections or tests. The testing company will be the choice of the College of DuPage When requested by the Engineer, the Contractor shall furnish a complete written statement of the origin, composition, and manufacture of any or all materials that are used in the work. Any work in which unacceptable materials are used without approval or written permission of the Engineer shall be performed at the Contractor’s risk and may be considered as unacceptable and unauthorized and will not be paid for. Testing of materials shall be at the expense of the Contractor. 11. WARRANTY The Contractor is responsible for inspecting all walks and intersections prior to installation. Contractor shall supply a three year warranty on all installed materials. During the three year warranty the contractor is responsible for excessive material loss and poor workmanship of the installed product. The College of DuPage will be the sole determining body for excessive wear and poor workmanship. The contractor must notify the College of DuPage in writing if at any time they find failures due to poor practices by the college staff. If an item goes unreported, it will up to the Contractor to cover any damages. 11 | P a g e Monthly site visit inspections for warranty compliance, shall be completed by the College of DuPage and Contractor. Any notification of work that is not in compliance with the specifications shall be provided to the Contractor within seven calendar days after the warranty inspection. The Contractor must complete all work identified during the site visits within seven days, or as weather permits, after receiving the site visit inspection notes. The Contractor will not be responsible for defects resulting from, abuse or damage by Owner or Owner’s users, or unusual phenomena or incidents beyond Contractor’s control which result from natural causes such as floods, lightning, storms, freezing rains, winds over 60 miles per hour, fires or vandalism. IX. PAYMENT PROCEDURES Partial payment requests may be made during the life of this contract. All payment requests must be turned in by the 15th of the month to be considered for “Board” approval. Certified payroll sheets along with relevant waivers covering sub-contractors and materials must be submitted with all pay requests. Pay requests must be submitted on AIA forms (documents G702 & G703) and shall be accompanied with the contractor’s invoice. Payment requests will only be approved for work in place at the time of the request. No consideration will be given to stored materials, which have not yet been used. Payment requests will be approved based upon the lump sum item that was bid or by unit costs whichever is most relevant. Payments will be made based on the actual total quantities of work performed. ACH PAYMENT REQUIREMENTS All vendors responding to this bid must agree to receive all payments from the College via an Automated Clearing House (ACH) transfer. Paper checks will no longer be issued by the College. By signing this bid, you agree to receive all payments for goods and services via ACH transfer. Be advised that the College ACH financial website is secured and all your banking information is encrypted and can only be accessed by your company through a password protected site. Instructions for registering for ACH payments will be sent via email to all vendors awarded a contract as a result of this bid solicitation. Within 10 days of award of any contract or purchase order, the vendor must submit or must have already submitted their ACH information within their user profile in the College’s financial system. Failure to comply with the ACH requirements may result in termination of the contract or purchase order. Before any ACH transfer takes place, all banking information will be pre-noted which verifies that the account numbers and routing information is valid. Prenoting takes approximately three weeks. ACH transfers will occur once per month, typically the third week of the month. Invoices must be received at least 3 weeks prior to each ACH payment release. You are strongly encouraged to set up your account upon notice of award to avoid unnecessary payment delays 12 | P a g e ENCLOSURES □ AIA Contractor qualifications statement included _____YES _____NO □ Current IDOT prequalification form included _____YES _____NO □ Acknowledge certified payroll and prevailing wages _____YES _____NO □ Material certification sheet _____YES _____NO The above price includes all stipulations and requirements of Addenda No. , No. , No. , No. , which have been received and accepted by the undersigned. BID TABLE – TASK ORDER CONCRETE WORK ITEM CONCRETE 1 REMOVE & REPLACE COLORED PCC SIDEWALK 5” REMOVE & REPLACE DETECTABLE PANELS EPOXY INJECTION OF CRACKS REMOVE & REPLACE COLORED COMBINATION CONCRETE CURB & GUTTER REMOVE & REPLACE COLORED PCC CROSSWALK 10" THIN CONCRETE OVERLAY – 2” REMOVE & REPLACE COLORED PCC INTERSECTION 10” CONCRETE SEALER EXTERIOR BUILDING EXPANSION SEALANT ANNUAL ESCALATION YEAR 2 ANNUAL ESCALATION YEAR 3 2 3 4 5 6 7 8 9 10 11 UNITS QTY SF UNIT PRICE TOTAL PRICE 500 Each LF 1 20 LF 20 SF SF 500 500 SF SF 500 500 LF 100 % % A. Proposes to furnish all labor, materials, equipment and services as required to satisfactorily complete all Work, described here in as required for the completion of the TASK ORDER CONCRETE WORK all in accordance with the Drawings prepared by the C o l l e g e o f D u P a g e a n d this Bid Form. B. All work required by the foregoing documents will be accomplished for the TOTAL BASE BID Dollars ($ ) (Show amount in both words and figures. In case of discrepancy, amount shown in words will govern.) The Base Bid Price above EXCLUDES all applicable sales and/or use taxes; 13 | P a g e Purchasing Department 425 Fawell Boulevard Glen Ellyn, Illinois 60137-6599 http://www.cod.edu PHONE (630) 942-2813 FAX (630) 942-3750 2014 TASK ORDER MAINTENANCE BID ADDENDUM #1 December 16, 2014 This addendum is issued to clarify the quote package for this project, as issued by this office on December 9, 2014 and is now considered a part thereof. In accordance with the scope of work, bidders are instructed to be advised of the following: 1. CHANGES TO BID IRRIGATION a. Installation of 6” directional bore HDPE min 100 lf 2. CHANGES TO BID CONCRETE a. Excavation and installation of new concrete with 8” stone base and 5” of PCC. To include material haul off. Min 500 SF 3. CHANGES TO BID LANDSCAPE a. Tree removal, stump grind and haul off of debris for trees 6”-14” diameter. Min 1 tree b. High tree trimming with bucket truck. Min 1 hr 4. ATTACHED UPDATED BID UNIT COST TABULATION SHEETS AND BID COVER 5. NO CHANGES TO PAINT SPECIFICATION I HAVE RECEIVED ADDENDUM #1 _________________________________ Authorized Signature FIRM NAME & ADDRESS: __________________________________ ___________________________________ ___________________________________ Sincerely, Chris Kornsey College of DuPage 425 Fawell Blvd. BIC 1540 Glen Ellyn, IL 60137 kornsey@cod.edu (630) 942-2574