Master Plan Options Board of Education April 25, 2016 Commi&eeMembers ChrisValen1ne-BoardofEduca1onMember BrionDeitsch-ChiefOpera1ngOfficer SteveOsborne-Treasurer/CFO MikeUlring-DublinCoffmanPrincipal CorrineEvans-GrizzellMiddleSchoolPrincipal JenniferSchwanke-IndianRunElementaryPrincipal StaciLutz-RiversideElementaryPrincipal WayneColman-GarmannandMiller TracyHealy-FutureThink PublicInput Publicmee1ngdatesMarch16,March29andMarch31 SpoketodifferentstakeholdergroupssuchasBAC,SeniorCouncil,Key Communicators,PTOPresidents,homeownersassocia1onsandmore. Surveyresults:1,400plusrespondents,64%to36%favornon-tradi1onalhigh schooloverfourthhighschool FactorsinDeterminingFacilityNeeds •10-yearstudentenrollmentprojec1ons • OhioSchoolsConstruc1onCommission • (formerlytheOhioSchoolsFacilityCommission) •Studentcapacitystudyofexis1ngfacili1es •Facili1esassessments •Nonewmillagebondissue 10-yearenrollmentprojec1onsaccordingtoFutureThink Elementary Red=highestgrowthratescenario Green=lowestgrowthratescenario 2015-16 6,526 2025-26 7,685 7,353 Delta 1,159 827 MiddleSchool HighSchool 2015-16 3,573 2025-26 4,574 4,099 Delta 1,001 531 2015-16 4,754 2025-26 Delta 5,865 1,111 5,194454 *Fallof2015 TheOhioSchoolsConstruc1onCommissionMatrix HighSchool(grades9-12) 160sq.k./student MiddleSchool(grades6-8) 140sq.k./student Elementary(gradesPK-5) 120sq.k./student Respec1vebuildingssq.k.isdividedbythenumberofstudentstodetermine capacity. Ex:60,000sq.k.elementarybuildingwouldhaveastudentcapacityof500. CurrentElementarySq.Footagevs.ProjectedNeeds CurrentMiddleSchoolSq.Footagevs.ProjectedNeeds CurrentHighSchoolSq.Footagevs.ProjectedNeeds Concurrentvariablesnotaddressedinthiswork: • Abnormalhighgrowthinspecificareas • Abnormalhighgrowthinspecificagegroups • Na1onal,stateandlocaleconomiccondi1ons • Schoolfundingissues • Statemandates • Educa1onaldeliverymodels • Redistric1ngneeds Construc1on1meframes Construc1ontoopen=30months+/-fromthepassageofaballotissue • Designwork • Planapproval • SiteDevelopment • Construc1on • Addi1ons/Renova1onscanrun24to30monthsdependingonsize,sitecondi1onsand construc1onlimits. Poten1alnewbuilding1meframes TBD-Nontradi1onalHighSchoolFacility Nolaterthan2021-Elementary13/preschoolopens-PK-Gr.5Building Nolaterthan2022-firsthighschooladdi1onsopen-JeromeHSand/orSciotoHS Nolaterthan2023-MiddleSchool5opens-Gr.6-8ofaK-8configura1on AdvantagesofNon-Tradi1onalHighSchoolSpace • Seekingcentralizedlocaletoserveall3highschools – HousevariousacademiescurrentlyinHSbuildings – WestBridge • Offeraddi1onaleduca1onalopportuni1es – Colleges/Universi1espartnerships – CareerandTechnicaltypeofferings – Helpseasefutureovercrowdingatgrowinghighschools – Muchmorecosteffec1ve(Seenextslide) Es1matedcostsassociatedwithHighSchoolFour Landacquisi1on-70+acresneededat$5,000-$25,000peracreormore. Construc1on-$70,000,000plus WaterandSanitarySewer?-$$$ Est.Opera1onal(Fixed)Costs(JustStaff)-Approx$9.5million-annually MaintenanceNeedsProjec1ons (Basedona2016assessmentbySchorrArchitects) • CoffmanHSChillersandAirHandlers • CoffmanHSexteriordoors,storefrontsandcurtainwalls • CoffmanHStoencapsulateexteriorwalls 20-yearoldchilleratThomas LeakingissuesatCoffman MaintenanceNeedsProjec1ons (BasedonGarmann&Millerstudy-fall2015) • SciotoHSHVACupdates • Updateligh1ngandLifeSafetysystems • Parkinglotsandsitework OriginalcoldwaterpumpingsystematScoqshCorners.Morethan25yearsoldandpartsnolongeravailable. Es1matedRenova1onCostsatExis1ngFacili1es ElementarySchools-$10,238,710 MiddleSchool-$25,800,000 HighSchool-$36,500,000 AssessmentscompletedbyGarmann/MillerandSchorrArchitecturalFirms.Theiden1fied workincludes,butisnotlimitedto: - ReplaceagingHVACequipment - Bringiden1fiedareasuptocodeincluding,butnotlimitedtolifesafetyandADA. - Increaseopera1onefficienciesandreducecosts - Insureeachbuildingenvelopeissecure - Theworkisbrokendownintoshorttermandlongtermplanningforbudgetpurposes - Dedicatedfundingstreamfortheseitemsisparamount Recommenda<on:Op1onD Facili<es Loca<onCost •Elementary13 BrightRoad $32,625,000 (Preschool/Elementarycombina1on) •Elementary14(K-8configura1on) JeromeVillage $20,312,500 •MiddleSchool5(K-8configura1on) JeromeVillage $37,500,000 •Non-tradi1onalhighschoolspace $15,000,000 •Addi1onstoJeromeand/orScioto *=both $46,312,500* Total:$151,750,000 Recommenda<on:NoNewMillageBondisneededforaddi1onalschools • In2019millagebeginstorolloffaspreviousbondcommitmentsarepaidoff. • Thisdynamicwilloccurfor3years(2019-2021) • Themillagerolloffallowsthedistrictanopportunitytoaddressfacilityneedswitha“no newmillage”levyiftheysodesire. • Thecapacitycreatedbyanonewmillagelevywouldgoalongwaytowardsaddressing thedistrict'sfuturenewfacilityneeds. • TheDistrictwoulds1llbelookingatameanstoaddressthemaintenanceneedsofour exis1ngfacili1esthatareagingandbeingaddedonto. Recommenda<on:PermanentImprovement(PI)Levy isneededtomaintainexis1ngschools TheDistrictneedsawaytoaddressthemaintenanceneedsofourexis1ngfacili1esthatareagingand beingaddedontonotcoveredbyanonewmillagebondissue. Es1matedRenova1onCostsatExis1ngFacili1es ElementarySchools-$10,238,710 MiddleSchool-$25,800,000 HighSchool-$36,500,000 AssessmentscompletedbyGarmann/MillerandTonySchorrArchitecturalFirms.Iden1fiedworkincludes,butisnot limitedto: - ReplaceagingHVACequipment - Bringiden1fiedareasuptocodeincluding,butnotlimitedtolifesafetyandADA. - Increaseopera1onefficienciesandreducecosts - Insureeachbuildingenvelopeissecure - Theworkisbrokendownintoshorttermandlongtermplanningforbudgetpurposes - Dedicatedfundingstreamfortheseitemsisparamount Ques1ons?