Chabot College - Facilities Committee Update February 10, 2011 Item Building Project / Designer Phase Activity / Issue Punch List Occupancy April 2010 Punch List Occupancy Jan 2010 1 CSSC/700 Community and Student Services Center - tBP 2 IOB/400 Instructional Office Building - LPA 3 Site Athletic Facilities - Verde Design DSA Close Out Awaiting DSA close Out 4 Site Football Field DONE PROJECT CLOSE-OUT COMPLETE 5 1900 Punch List Occupancy Jan 2010 6 Site Planetarium / Lecture Halls - DSK Pool Renovation - Aquatic Design Group DONE PROJECT CLOSE-OUT COMPLETE 7 Site M & O Facility - Gould On Hold On Hold 8 4000 PE Strength Fitness Center Construction Construction complete July 2011 9 800, 900, 1000 Classroom Building - HMC DSA Close Out B800 Occupancy Jan. 2009, B900 is occupied 10 500 Classroom Building - HMC DSA Close Out Occupancy Jan. 2010 11 Site Portable Offices Central Plant / Utility Loop - ESCO DSA Close Out Temporary Faculty Offices Charles Ham DONE 12 13 14 1000, 1400, 1200, 1300 508, 904, 1814, 2205 15 Art Gallery Doors, Industrial Tech Improvements, PAC Interior Improvements Phase 3 underway, Completion Dec. 2008 PROJECT CLOSE-OUT COMPLETE DONE PROJECT CLOSE-OUT COMPLETE Technology Enhanced Classroom Classroom Standards and Office Standards DONE PROJECT CLOSE-OUT COMPLETE DONE PROJECT CLOSE-OUT COMPLETE 16 Site Campus Security Plan - Catalyst Close Out Under Construction, complete Nov. 2008 17 300 Construction Construction complete December 2011 18 Site Classroom Building - HMC College Landscape Guidelines RHAA DONE standard is complete 19 Site Asbestos Inspections - HMS On-site Investigation HazMat removal in B1400 20 2500, 2600, 2700, 2800, 2900 PE Complex - SKW DSA review Budget Problems - Gym add alternate 21 Site Commissioning Authority - AEC On-going 22 Site District-Wide FF&E Consultant On-going B4000, B1200, B1400 Dovetail working with each of the building user groups, faciities groups and architects Responsibility / Action On Hold Chabot College - Facilities Committee Update February 10, 2011 23 Site IT Infrastructure Project - ESCO Close Out Scope of work coupled with Central Plant item #11. 24 Site Site Design Committee On Call As Needed 25 100 Building Modernization - Steinberg Schematic Design Chaired by Tim Nelson Feasibility study complete - moderate scope being documented, budget to be determined 26 Site College Marquee - tBP Working Drawings CDs underway 27 Site Complete Bricks being installed On-going 28 Site Founders Plaza - CSSC/tBP Space / Program Relocation Dovetail 29 2200 Dental Hygiene - HMC Close Out Occupancy October 2009 - Project Close -Out 30 Site Campus Signage - HM PAC Rigging Beam Analysis George Famous Working Drawings CDs under way DONE Analysis Done Site Parking Lots - tBP Close Out Finished Aug. 2008 Renovation - CHA Construction Phase 1 renovation of Auto, Classrooms, Yard complete May 2011. Phase 2 renovation of Welding complete Aug 2011. Phase 3 renovation of Machine shop complete Aug. 2011 Renovation - CHA 31 32 33A 1400 33B 1600 Construction Renovation of 1618 and 1620 to be complete May 2011 34 Site Solar - Chevron Energy DSA Close Out 35 1700/1800 Renovation - Steinberg DSA review Solar Panels are operational Awaiting permission to Proceed to Bid from Dept. of Finance. To be bid in 3 phases 36 1600 Renovation - TBD FPP revisions FPP being revised for FY 12/13. Awaiting state input 37 Site Soccer Field Restoration - Verde Close Out Construction finish October 2010/in maintenance period 38 200 1100, 1500, 2000 Light Renovation - Dovetail Schematic Design Schematics February 2011 Light Renovation Pre-Design Light Renovation Pre-Design 41 2300 B1200, SOTA Plaza Renovation - bfgc DSA review Budget challenges, SOTA Plaza will be an Add Alternate in bidding, Need Swing Space planning 42 Site Parking Lot F Restoration DONE February/March 2010 43 Site Traffic Signal Construction October 2010 start construction, signal install Summet 2011 44 Site Parking Lot G/H Security Schematic Design Design Process started 45 Site Villas Removal Removal complete February 2010 46 3400 Light Renovation DONE Design Team Selection 47 300, 500, 800, 900, 1000, 1100 Exterior Aesthetic Improvements Design Team Selection 39 40 48 Get design started to accommodate new BMW Program create budget, determine scope, hire Architect suggestion to align plant materials with curriculum Punchlist underway