1. COUPONRNT
AIR PORCR
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
(computer generated)
2. DATE
3. INSTALLATION AWD MCATION
S P A N -
A I R RAM, GRRWANY
5. PROGRAM ELRMSWT
4. PROJRCT TITLE
FITNESS CRNTRR
6. CATEGORY CODE 7. PROJECT NGWRRR 8. PROJECT COST ($000)
27596 742-674 vYliR043100
9.
COST ESTIMATES
17,117
UNIT COST
?ITNRSS CRNTER
FITWRSS CRWTXR FACILITY
ANTITERRORISM FORCE PROTECTION
SM s.5 I
I SM I
6,950
6,950
6,950
0
1,885
144
14,102
( 13,101)
( 1,001)
XIPPORTING FACILITIES
SITE IWPROVRMRNTS
FIRS ALARW SYSTRM
COBMDNICATIONS
PASSIVE FORCE PROTECTION WRASURRS
I I
LS
LS
LS
LS
1,243
( 496)
( 268)
( 214)
( 265)
XIBTOTAL
ZONTINGENCY rOTAL CONTRACT COST
IDPERVISION, INSPECTION AND OVERHEAD
L'OTAL REQUEST
(t5.0 %)
L'OTAL REQUEST (ROUNDED)
( 6.5 $1
15,345
767
16,112
1,047
17,159
17,117
.o.
Description of Proposed Construction: The project will include a newly constructed Fitness center consieting of a lobby, administration, support, locker
.ooms, gymnasium, group exercise room, fitness equipment epaces, racquetball courts, tnd
A
Health and Wellneee Center
(HAWC).
Includes minimum DoD interim force protection tandards.
l. REQUIREMENT: 6,950 SM ADEQUATE: 0 SM SUBSTANDARD: 6,783SM
'ROJZCT: Construct fitness center facility.
(Current Miesion)
!RQUIREMEWT: Amodern, adequate sized and properly configured fitness center to conduct omprehensive and balanced programs for physical fitness programs required for lpangdahlem APR personnel and their dependents which ie a major quality of life and
.etention requirement.
Personnel require safe fitness progrm including aerobics,
Lealth, mental, and nutritional training, indoor recreational athletic activitiee, and a
Lealth and wellnees center at this overseas base.
VRRENT SITUATION: The existing building has eubetantial space limitations, unreliable mechanical and electrical eyetams.
and ie located in a high-risk area known as the Q-D,
:guantity-dietance) exploeive zone violating safety criteria.
Limitated space result8
.n overcrowding and makes the fitness center unavailable for much if the baee copulation.
:MPACT IF NOT PROVIDED: Phyeical conditioning and recreational programs will continue
:o be limited due to apace restrictions.
This condition adversely affects the morale, rell being, and retention rate of aseigned military personnel.
Deficienciee theee area rill continue to negatively affect combat readiness, quality of life, fitness, and wrale of military members.
Testing, training, team and individual sports will continut
:o be hindered due to inadequate apace.
SDITIONAL: This project is not eligible for NATO funding.
This project meets the
DD FORM 1391, DEC 76 Previous editions are obsolete.
Page No.
235
1. COMPONRNf
AIR FORCE
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
3. INSTALLATION AND LOCATION
(computer generated)
4. PROJECT TITLE
2. DATE
SPANGDARLRM AIR BASE, GERMANY
5.
PROGRAM ELEbfENT 6.
CATEGORY CODE
FITNESS CENTER
7. PROJECT NUMBER
8.
PROJECT COST ($000)
27596 742-674 vyHK043100 17,117 criteria/scope specified in AF Handbook 32-1084, "Facility requirementsa and the
Air
Force Fitness Center Master Plan criteria.
This ie a corporate
Air Force directed project essential for personnel quality of life, and retention of highly skilled personnel.
Only one option meets the mieeion requirement.
Therefore, a full economic analysis was not completed.
A certificate of exception hae been prepared.
Base Civil
Engineer: Lt Co1 Kurt J. Kaieler, 011-49-6565-6302.
Fitness Center: 6,950 SM = 74,782
SF
FOREI(;N CURRENCY:
FCF Budget Rate Used: RURO-DOLLAR 1.1386
JOINT USE CERTIFICATION: This military components; however, facility is progranrmed for joint use with all it ie fully funded by the Air
Force.
other
L
DD FORM 1391, DEC 76 Previous editions are obsolete.
Page No.
236
1. COMPONENT
AIR FORCE
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
3. INSTALLATION AND LOCATION
SPANGDAHLEMAIRRASE, GERMANY
(computer generated)
4. PROJECT TITLE
FITNESS CENTER
2. DATE
5. PROGRAM ELRMXNT
27596
6. CATEGORY CODE 7. PROJECT NUMBER
742-674 vnm043100
8. PROJECT COST ($000)
12. SUPP LEMENTAL DATA: a. Estimated Design Data:
(1) Status:
(a) Date Design Started
(b) Parametric Cost Estimates used to develop costs l
(c) Percent Complete as of 01 JAN 2003 l
(d) Date 35% Designed
(e) Date Design Complete
(f) Energy Study/Life-Cycle analysis was/will be performed
17,117
15-m-02
YES
15%
Ol-AUG-02
Ol-SEP-03
YES
(2) Basis:
(a) Standard or Definitive Design -
(b) Where Design Was Most Recently Used -
NO
(3) Total C&at (c) = (a) + (b) or (d) + (e):
(a) Production of Plans and Specifications
(b) All Other Design Costs
(c) Total
(d) Contract
(e) In-house
(4) Construction Contract Award
(5) Construction Start
(6) Construction Completion
* Indicates completion of Project Definition with Parametric Cost Estimate which is c-arable to traditional 35% design to ensure valid scope, cost and executability.
($000)
1,027
514
1,541
1,284
257
04 FEB
04 FEB
05 DEC b. Equipment associated with this project provided from other appropriations:
N/A
DD FORM 1391, DEC 76 Previous editions are obsolete.
Page No.
1. COMPO~
AIRFOBCE
FY 2004 MILITARY COBWl'RUCTIOBl
PROJECT
DATA
(ccmputer generated)
3. ItWTALlATI~ AHD LOCATION 4. PROJRCT TITIZ sPAmMRrmlmRBAsR,GIERwmY
5.PRoQRARRLmdRcm
SOUTH GATE
6.
CATEGORY
CODE 7. PROJZCT NUHRER 8.
PROJXCT
2. DATE
COST ($000,
27596 851-147 VYlUO43210
9.
COST BSTMTM
2,800
BOUTE GATE WITH COM’RACTOR
INSPECTION STATION
SOUTRQATE FACILITY
ANl'ITRRRORISMFORCRPROTRCTIO~
SUPPORTIEXJ FACILITIRS
UTILITIRS
PAWS
SITR ms
- C A T I O N S U P P O R T
PASSIVE FORCE PRoTRCT10ml MRASURRS
BuBlaTAL
CoNTm ( Lo %)
ToTALwNTNAcTcosT
8lJPlmvISIOrJ, INSPRCTION Am oVRRm?m
TOTAL REQUMT
TOTAL NRQOEST (ROUHDRD)
( 1,306)
2,796
2,800
LO.
Description of Proposed Construction: Construct multi-lane primary traffic road rith new sentry gate, pass h ID facility, large vehicle inspection station with
Lnspection pits, office area, breakroan, restroams, dog kennel, passenger aegregatiou
3-b security alarm, fire protection system, associated parking, utilities, and site
Lmprovements.
Ind~de~ minimum DOD interim force prOteCtiOn Staadarda.
11.REQuu: 16,960SM ADEQUATE: OSM SOBSTANDABD: 16,960SM
?R-: Construct south gate.
(current Mission) aQ : The current gate and access road will be demolished by the new aircraft parking rm construction.
A new gate sized/configured for large trucks and equiplplent
La required to support the mobility/cargo mission of the new ramp.
An adequately sized md configured large vehicle security inspection station at the new gate is required for security inspections of large vehicles in accordance with current Antiterrorism/Ekxce
Protection (AT/~) measures 313~3 standards.
SITUATION: The perimeter road aud base access roads are located where the new drcraft r3uq3 will be constructed.
The roads load bearing capacity is not strong enough to support the large number of 'IO-ton vehicles involved with the new air mobility sission.
The existing lanes are too nanvwandtheturns are too small to accommodate
Long/oversizen5 vehicles.
Security forces personnel are performing large vehicle inspections on the south side of the base, in an unis&moved area. The location is not adequately sized or configured for proper security inspections.
Security personnel are wrfonsing these inspections in the open, on private land by placing their gate check in
L farmer's field, and are not protected fran inclement weather.
Due to these conditions md the high volume of large vehicle traffic, the security forces are not be able to adequately implement a Large Vehicle Search
Program for explosive devices.
These
DD FORM 1391, DRC 76 Previous editions are obsolete.
Page No.
238
1. CoHPom
AIRFORCS
Iy 2004 NILITARY WNSTRWXIOM PROJECT DATA
(mter generated)
2. DATE
3. INSTALLAT MID LOCATIOU
SPAlooDAaLw AXR BAsEi Gikwm s.PRomAMm
4. PROJECT TITLE
SommaaTE
6.CA~cooO7.~~ 8.
PROJECT
COST ($000)
27596 851-147 VYERO43210 2,800 inadequacies severely bamper the flow of contractors entering the gate and cause &lays
Ln deliveries and wtmmticm projects.
rNPAcTIFuoT-r Failure to conmtructthis newhase sentrygate ~lexwithti large vebkle inspection station and the perimeter road ccmnectiws will incrmame the possibility of terrorist strUI8 and redwe the personal safety of all spanodshlrp psmwnmel.
The ability to detect aad deter the terrorist threat rithin the wa ri1itary cmity is -red, which reUuce8 the effectiveness of existing resources.
Pbe overall equipment and cargo transportation to and fran the new aircraft parking apron will have to be performed on under8ired roads, rerouted to the north side of the
UmITIOHnLr Tbi6 project is not currently eligible for tWM funding, however, a pecautionary pre-finance stat-t dll be filed in the event eligibility be rstablished.
Them i8 no mpace criteria established in Ami 32-1084 for a large vehicle
Lnsgmction station.
%~'scope i8 ba8ed on an installation requir-ta et* validated
JY the user.
A prelidnai-y analysi8 of reasonsble aptioas was clone end indicate8 only me option meets &ational requiremanta.
A certificate of exception has been
?Vd.
Ba8e Civil Rhgimerr Lt Co1 Rurt J. Raider, 011-49-6565-6302.
South Oatet
16,960 LM -/182,490 BF""
~~RBIGN fmm~~CYr FCF Budget Rate Used: n]Ro-Do~ 1.1386
roIB?T USE CZRTIFICATIOHr Mm is an installation utility/infrastructure project, and km8 not qualify for joint use at thi8 location.
Eowemr, all tenants on this installation will benefit by thi8 project.
DD FOBM 1391, DRC 76 Previous editions are obsolete.
Page No.
1.CoRPorDQ?T
AIRMRCR yY 2004 MILITARY CORSTRDCTION PROJECT
DATA
(caqputer generated)
3. IRSTALLRTIOR ARD IAXATION
SPBAIRBASE, GERMMY
4. PROJECT TITLE
SOUTH GATE
5.
PROGRAW
-
27596
6. CATROORY CODR
851-147
7.
PROJECT m
VYRRO43210
2. MTE
8. PROJECT COST ($000)
2,800
12. 8uPP - A L D A T A : a. Estimated Design Data:
(1) Status:
(a) Date Design Started
(b) Parametric Cost Rstimates used to develop costs l
(c) Percent Casplete as of 01 IIAR 2003 l
(d) Date 35% Designed
(e) Date Design Ccswlete
(f) Rnergy Study/Life-Cycle analysis was/will be performed
02-APR-02
YES
15%
Ol-Auo-02
15-SRP-03
YES
(2) Basis:
(a) Standard or Definitive Design -
(b) Where Design was nest Recently used -
(3) Total Cost (c) = (a) + (b) or
(d)
+ (e):
(a) Produpiou of Plans and 8pecificatious
(b)
All Other Design Costs
(c) Total
(d)
Contract
(e) In-house
(4) Construction Contract Award
(5) constnlction start uo
($000)
168
84
252
224
28
04 JAU
04 PEB
(6) Construction CamDletion 05 FXB l
Indicates completion of Project Definition with Parametric Cost Estimate which is ccstDarable to traditional 35% design to ensure valid scape, cost and executability.
b. Rquipment associated with this project provided fram other appropriations:
N/A
DD PORR 1391, DRC 76 Previous editions are obsolete.
Page No.
240
I. COMPONENT
AIR FORCE
5. INSTALLATION AND LOCATION iVlAN0 AIR BASE
TALY j. Personnel strength
4s OF 30 SEP 02
IND FY 2007
4. COMMAND:
UNITED STATES AIR
FORCE, EUROPE
PERMANENT STUDENTS
O F F E N L
384 3579
CIV
588
O F F E N L C I V
13 44
379 3578 587 13 44
I
2. DATE
5. AREA CONST
COST INDEX
1.38
SUPPORTED
OFF
48
48
ENL
227
227
CIV
158
158 r. INVENTORY DATA ($000)
5. Total Acreage: 1,199
1. Inventory Total as of : (30 Sep 02)
:. Authorization Not Yet in Inventory:
1. Authorization Requested in this Program:
?. Authorization Included in the Following Program:
‘. Planned in Next Four Years Program:
J. Remaining Deficiency:
I. Grand Total:
(FY 2005)
TOTAL
5,017
5,012
805,53:
49,58C
14,025
9,644
26,loC
19.23c
924,092
3. PROJECTS REQUESTED IN THIS PROGRAM:
CATEGORY
CODE
I 13-321
I 16-661
216642
PROJECT TITLE a Airfield Obstruction - South Ramp
Zulu Arm/Dearm Pad
Munitions Admin Facility
(N 2004)
COST DESIGN STATUS
SCOPE
70,000 SM
6,075 SM
$.OOO S T A R T
7,736 May-02
994 Apr-02
C M P L
Sep-0:
Aug-0:
2,173 SM
Total
5 , 3 0 1 Apr-02
14,025
Aug-0:
3a. Future Projects: Included in the Following Program: (p/2005)
113-321 Airfield Obstruction - North Ramp PH II 6,266 SM
171-212 Flight Simulator 765 SM
422-758 ACS Warehouse 2,120 SM
Total
1,626
2,817
5,201
9,644
3b. Future Projects: Typical Planned Next Four Years:
113-321
141-453
141-786
I71 -875
North Ramp Ph I
Base Operations
Mobility Control Center
Weapon Load/Maintenance Trng Fclty i10-128 il O-243
ContractinglCPO
Consolidated Support Center Ph II
‘37-253
)22-271
Family Support Center
Construct Area 1 Parking Garage
)c. Real Propery Maintenance Backlog This Installation
6,116 SM
1,350 SM
1,379 SM
6,058 SM
2,500 SM
2,720 SM
1,115 SM
500 SP
1,500
2,900
1,300
2,200
1,900
8,200
2,100
6,000
59
IO. Mission or Major Functions: A host fighter wing supporting two F-l 6 squadrons, nultiservice/multinational forces in support of OPERATION JOINT GUARDIAN and headquarters Sixteenth
%r Force.
I 1. Outstanding pollution and Safety (OSHA) Deficiencies: a. Air pollution 0 b. Water Pollution c. Occupational Safety and Health d. Other Environmental
ID Form 1390,24 Jul 00
FY 2004 MILITARY CODSTRIJCTION PROJECT MTA
(ccewuter generated)
3. INSTALL&TION AND LOCATION
AvuM)-BASR,
ITALY
5. PROQUM m
4. PROSECT TITLE
MDDITIODS m FACILITY
6. CATRgORY CODR 7. pR0JRCT m 8. PROJECT COST ($000)
22176 216-642 ASRSO23003
9.
COST RSTIWATRS
5,301
NDRITIONS AEMIR FACILTIY
MORITIORS AR4ID FACILITY
Ar?r1TRRR0RISM/FoRcR PROTRCTIOIU
Ls
SW
Ls
2,173 1,761
3,946
( 3,826)
( 120) lDPPORTIbx;I FACILITIES
TJTILITIRS
P A - S
SITS IMPRDS
DEWOLITIDR
COMSINICATIOR SUPPORT
Ls
Ls
Ls
SW
Ls
2,016 32
736
( 309)
( 41)
(
(
165)
65)
( 155)
?DmoTAL
4,682
!oNTINGEtcY
( i-.0 %) roTAL CormRAcT COST
3uPmivI810N, IwsPRcTIoN AmI mmRBRAD ( 6.5 %)
234
4,916
320 roTAL RRQDRST
WI'AL REQUEST (RODNDED)
5,235
5,301 c@JIPMEM' FROM~APPROPRIATIOEJS (HOIU-ADD)
-
( 165.0)
.o .
Description of
Proposed
Construction: Project includes steel reinformed concrete iknmdations and floor slabs. Structure will be a steel reinforced concrete building rith a clay tile roof and plastered masonry exterior walls.
Includes two Days for
!xmventional weapons eguipmezrf/vehicle maintenance.
Demolishes 12 facilities (2,016 w .
Includes minimum DOD interim force protection standards.
.l.RRQLlIREmm: 2,173Sld ADEQUATE: OSH SUBSTANDARD: 2,173SM
ROiJECT:
Construct munitions administration facility.
(current Miesion) ml :
A properly sized/configured munitions administration building to provide rprk space for 135 personnel and two maintenance Days for conventional and nonconventional munitions vehicles, loading equipment, and aircraft generation equipment.
rpace is also required for a classified cawuter system vault, ccemand section, training ud mobility offices, and munitions ccmaand and control area.
'DRRRNT SITtlATION: Discrepancies identified by the DOD Ra&plosive Safety Board during
:heir i~rn 97 inspection, caused munitions administration aud maintenance
!unctione/personnel to be relocated out of the ccmventional munitions storage area.
%ese personnel and functions are currently housed in portable/tvauDorary facilities that tre inadeguate and significantly hinders the munitions mission and readiness. These
:ouditione cause delays in canDleting scheduled maintenance and unscheduled repair.
MPACTIFNOTPRCRJIDRD: Without this project maintenance and repair delays will
:ontinue on vital eguipmant necessary to accaaDlish the munitions mission.
Lack of
Ldeguate training, storage and maintenance areas will continue to adversely *act the
.evel of training and readiness for the conventional and non-conventional weapons sections.
DD FORM 1391, DEC 76 Previous editions are obsolete.
Page
No.
242
1.coMPoNmT
AIRFORCK
FY 2004 MILITARY CONSTRgCTION PROJRCT MTA
(cwter generated)
3. INSTALLRTION AND LOCATION
A~AXRBASK,
ITALY
4.
PROJECT
TITLE
WWITIONS ADMIN FACILITY
5. PRoGRAwlErzMmm 6.CATEGORYCODE 7.PROJXCTMJMBER
2. DATE
8. PROJKCT COST ($000)
22176 216-642 AsHEO23003 5,301
WITIONAL: This project meets the criteria/atop specified in APIA 32-1084, n
Facility tequiremmntem
A preliminary analysis of options for satisfying this reguirat indicates that only one option will meet miseiou needs.
Therefore, au ecommic aualysis pas not performed.
A certificate of exception has been prepared.
This project is mnjunctively funded with a FYOI NW0 project ($443K). This project will require
M/Italian Mixed Camaiseion approval.
Base Civil Kngineer: Lt Co1 Timothy S. green,
)ll-39-0434-665720.
Munitions A&in Facility: 2,173 SM = 23,381 SF.
roRR1mlcmRmxY: FCP Budget Rate Used: EURO-DOLLAR 1.1386
K)IWI USE CRRTIFICATION: Missian regui mte, operational considerations, and location we incamp&ible with use by other cvente.
FORW 1391, DRC 76 Previous editions are obsolete.
Page No.
243
1. COMPOraErm
NItFoRcE
FY ZOO4 MILITARY COBWl'RWTIO~ PRW DATA
3. INSTALIATIOH AND LOCATIOBl
AyuM)AIRBA8E,
ITALY
"
(cmputer g e n e r a t e d )
4. PROsJBX TITLE
MCINITIOLPS m l'ACILITY
2 . D A T E
5. PRomAw -
2 2 1 7 6
6 . C A T E G O R Y C O D E 7 . PROnK!T -
2 1 6 - 6 4 2 ASXIEO23003
8 . PRoimCT C O S T ( $ 0 0 0 )
5 , 3 0 1
1 2 . SUPP A L MT& a. Eetimated Dmign Data:
(1) Status:
(a) Date Design Started
(b) Parametric Co6t Ra!timatea used to develop costa l
(c)
* (d)
Percent Cmlete
D a t e 3 5 % Designed as of
01 m 2003
(e) Date Dedgn Cwlete
(f)
Rnergy Study/Life-Cycle analysis was/will be performed
02-APR-02
Ysa
1 5 %
Ol-Am+02
15-AUG-03
YES
(2) B a s i s :
(a) Standard or Definitive Deaiga -
(b) Where Design Was Host Recently Weed -
(3) Total Coet (c) = (a) + (b) or
(d) + (e):
(a) Produpion of Plant3 and Specifications
(b) Rll Other Design Costs
(cpotal
(d)' Ccakkct
(e) la-home
(4) Construction C o n t r a c t A w a r d
Dlo
($000)
318
159
4 7 7
4 2 4
5 3
0 4 JAbI
( 5 ) ConetnIction s t a r t 0 4 FEB
(6) Construction Cmleticm 0 5 OCT
* Indicates completion of
Project Definition with Parametric Cost Estimate which is cwrable to traditional 35% design to ensure valid scope, coat and executability.
b. Equipment associated with this project provided fran other appropriations:
APPROPRIATION
3 4 0 0
3 4 0 0
3 4 0 0
FISCAL YEAR
APPROPRIATRD
OR
RlSQDESlZD
2 0 0 6
2 0 0 6
2 0 0 6
COST
($000)
4 0
7 5
5 0
DD PORM 1391, DRC! 76 Previous editions are obsolete.
Page No.
244
1.cORPORSNT
AIREORCR
FY 2004 RILITARY CONSTRUCTION PROJECT DATA
(ccsvDuter generated)
2. DATE
3. INSTALLATDM MZD LOCATION 4. PROJECT TITLE
AV-INWAIRBAW, ITALY
5. PRo(3RMI m
ZULU ARN/DJmRN PAD
6. CATROORY CODR 7. PROJECT NDRRRR 8.
P- COST
($000)
27596 116-661 ASRRO43008
9.
COST ESTINATES
994
ZULU ARWDEARN
PAD
ARWDRARMPAD
8DPPORTRR3 FACILITIRS
DTILITIES
PAWS
SITR mPRms
-NALL
8uBlwrAL coNTnmmxx ( 5.0 %)
WTAL CONTRACT COST
8DPRRVISION, INSP&ION AND OVEMRAD
LO.
mscription of Proposed Construction: Construct 135x45 meter Arm/De-Arm Pad with
:apacity to hold six F-168.
Rscavate aud install new base course and place high sxength coucrete.
Install joint seals, additional airfield lighting, storm drainage, drcraft tie dowa/grounding points snd shoulders where necessary.
Construct a
:evetment wall to protect a near-by building.
Includes minimum DOD interim force zotection standards.
Ll.RFQuJLRmENT: 6,075 SN ZaEQuAm: OSN SUBSTAND?iRD: 500Sld
'ROJXCT construct sulu arm/de-Ann pad.
(current Nission) lEQL : A properly sized pad safely located on the airfield to conduct aircraft mnitions ardnu/de-anming and maintenance.
DRRRWI' SITUATION: The existing arm/de-arm pad is located outside the secured area and sside the inst nment landing system (ILS) glideslop zone.
Security clearance into/out
,f the secure area increases the time required to Derfonn aircraft munitions maintenance
Briar to take-off.
Furthermore, maintenance personnel must drive through grass and mud
:o get to the pad creating potential foreign object damage (FOD) to aircraft. Being n&de the ILS glideslope causes landing aircraft to receive signal fluctuations tncreasing the potential for an accident.
During aircraft instrument
Lpproaches/landings in inclement weather. the arm/de-arm function is forced to relocate
:o another area further away fran the airfield.
MPACT IF NOT PROVIDED: The potential to ground-abort aircraft and loss of training or
:cs&at sorties due to inadequate maintenance is extremely high. The FOD potential to zritical aircraft will remain.
Delays in munition maintenance will continue increasing
:he time to work on the aircraft when the munitions arming/de-arming problems are
Liecovered.
DDITIONAL: This project is eligible for NATO funding and a precautionary pre-finsnce statement will be filed.
This project meets the criteria/scape specified in AFR 32-
DD FORM 1391, DRC 76 Previous editions are obsolete.
Page No.
245
l.c!oRPcmRNT
AIRFCRCR
FY 2004 MILITARY CoNSTRUCTION PROJECT MTA
(ccawuter generated)
2. DATE
3. INSTALLATICIN AND LOCATION
A- AIR BASE, ITALY
5.PRmRAH~
4. PROJECT TITLE
ZULU ARIUDBARM PAD
6. CATRCCRY CODR 7. PROJECT NDHRRR 8. PR- COST ($000)
27596 116-661 ASRRO43008 994
LO84, "Facility Reqsirwmntsm.
A preliminary analysis of oDtion8 for satisfying this
:equirement indicates that only one option will meet missiou needs.
Therefore, an
~conanic analysis was not performed.
A certificate of exception has been prepared.
lhis project will require US/Italian Mixed Ccamission approval.
Design and constnlction must be camDleted in accordance with Italian laws and noms and will be designed aud mustructed to meet the stricter of
Italian or US stsndards.
Base Civil Engineer: Lt
:ol Timothy S. G&n, 011-39-0434-665720.
Arm/Dearm Pad: 6,075 SN = 65,367 SF.
m?RIGNCDRRRmY: FCP Budget Rate Used: EURO-DOLLAR 1.1386
TOIWI USR CRRTIFICATION: This facility cau be used by other camlponents on an "as mailable" basisi however, the scope of the project is based on Air Force requirements.
DD FORM 1391, DRC 76 Previous editions are obsolete.
Page No.
246
l.coWPoNRrm
AIR
FORCE
P'Y 2004 MILITARY CONSTRUCTION PROJECT
3. INSTNJATION AtUl LCCATION
AVIANOAIRBASE,
ITALY
(cacgmter generated)
MTA
4. PROJECT TITLE zULuARW/DRARWPAD
5. PRCU?RAW ELRWRNT
27596
2. DATE
6.
CATEGORY CODE
7. PROJRCT NUWRRR 8. PRWRCT. C0ST ($000)
116-661 ASHEO43008
994
12. SuPPLmaINT A L M T A : a . E s t i m a t e d D e s i g n D a t a :
(1) Status:
(a) Date Design Started
(b) Parametric Cost Estimates used to develop costs l
(c) Percent Car@ete as of
01 JAN 2003 l (d) Date 35% Designed
(e) Date Design Caoplete
(f) Rnergy Study/Life-Cycle aualysis was/will be performed
05-APR-02
YES
15%
30-dUL-02
01-AUa-03
No
(2) Basisr
(a) Standard or Definitive Design -
(b) Where ~esigu Was West Recently Used -
No
(3) Total Cost (c) - (a) +
(b) or (d) + (e):
(a) Productiou of Plans aud specifications
(b) lLz1 O&m Design Costs
(c) Total
(d)
C-tract
(e) In-house
(4) Construction Contract
Award
(5)
(6)
Construction Cmletion
($000)
60
30
90
80
10
04 JAN
04 FXB
05
JAN
* Indicates completion of
Project Definition with Parametric Cost Rstimate which is casparable to traditional 35% design to ensure valid acop, cost and executability.
b. Rguipmsnt associated with this project provided fraa other appropriatious:
N/A
;D
FORN
1391, DRC 76 Previous editions are obsolete.
Page
No.
247
1. c!OImONm?r
FY 2004 WLITARY CONSTRUCTION PROJECT MTA 2. DATE
AIR FORCE (caaputer generated)
3. INSTALJATION MID LOCATION
4. PROJECT
TITLE
AVIAWOAIRBASZ,
ITALY
5.
PRUGRAR W
AIRFIRL9 OBSTRUCTION - BOUTS RARP
6.
CATEaoRYCOUR 7.pRoJEtTNtJRBRR
8.
PROJECT COST ($000)
27596 113-321 AsRE993003
9.
COST ESTIMATES
7,730
IONSTRUCT SOUTB SUMP
RANP
3UPPORTIM3 FACILITIRS
RLRCTRICAL/LIGRTIm
SITE IR9ROvmgWrs
- TIR-UOWNS/ GRouNDfM3 PO1ms
SuBlwmL
ZONT-
( 5.0 %) roTAL-COST
SU9RRvISION, INS-ION MID B ro'l'AL-
( 6,370 1 to.
Description of Pro9osed Construction: Constnxt concrete pavement over select mse course to support twelve C-130 aircraft or five C-17 aircraft.
Includes kmmlition of existing pavements, clearing, c-acting, paving, tie-down, grounding, hainage, electrical, lighting and pavemen t markings.
L1.RRQU1RmuRNT:
70,000 SN ADEQUATE: OSN
SUBSTANDARD:
OSN
?ROJECT : Construct south ramp.
(current Nission)
IEQ-:
~rovitle adequate aircraft parking space for joint mission aircraft sztivities.
The ramp spacewillremove large frame aircraft frau within restricted
Lirfield clearance and setback zones, eliminating 32 existing airfield safety criteria riolations.
YJRRRNT SITUATION: misting C-130 parking pads create 32 violations of various restricted airfield clearances.
These violations im9act operations and safety for
and personuel, snd reguire annual requests for waivers.
In addition, the
&sting hardstands are structurally inadequate to su99ort C-130 aircraft loads.
tircraft are overloading the existing coucrete slabs and has caused both lougitudinal md transverse cracking.
WPACTIFNOTPROVI~: Flight operatious remain constrained with the potential for kir/ground accidents snd unuecessary waivers must be maintained aunually. Rsisting pavements will continue to fail under aircraft loads and risk damage to the aircraft aud
:reate potential foreign object dsmaue.
DITIONAL: This project is not eligible for
NATC fuuding.
This project meets the
:riteria/scope specified in Air Force
Randbcok 32-1084,
"Facility ReQuirementam.
A preliminary aualysis of options for satisfying this requirement indicates that only one mtion will meet mission needs.' Therefore, an econanic sualysis was not performed.
A
:ertificate of exception has been prepared.
This project will require US/Italian Mixed
:cmission approval.
~msign and construction must be completed in accordance with
Ctalian laws aud norms and will be designed aud constructed to meet the stricter of
FORN 1391, DEC!
76
Previous editions are obsolete.
Page No.
248
1. CmPoNmm
AIRFORCE
FY 2004 NILITARY CONSTRUCTION PROJECT MTA
(ccmgmter generated)
2. DATE
3. IUSTALIATI~ABDLOCATION
AVTfA@FJAIRBASE,
ITALY.
5.FRoGRmfzLl.mmT
4. PROJECT TITLE
AIRFIELDO-ION-SOUTRRAMP
6.CATEGORYCODE 7.-8. W COST ($000)
27596 113-321 ~993003 7,730 ttalian or US stsndards.
Base Civil
8tngineerr
Lt Co1 Thothy 8. Glreen, Oil-39-0434-
665720.
mr 70,000 SN = 753,200 SF).
KIRJEIGH~:
IClCBudget RateUHdt EURO-DOLLAR l.1386
JOINT USE CERTI?ICATION: This facility csn be used by
Other caqxments on as "as rvailablew basist however, the scope of the project is based cm Air Force requirements.
DD
FORM 1391, DEC 76 Previous editions are obsolete.
Page No. '.
249
1. CGWPGNRm hIR
FORCE
FlI 2004 MILITARY CONSTRUCTION
3. INSTALLATION m LGCATION
PROJECT MTA
(canputer generated)
4. PROJECT TITLE
AVIANGAIRRASR,ITALY
2.
MTE
AIEVIRLJJ OBSTRUCTION - SODTH RAWP
5. PRoGRAW m 6.
CATEGORY
CODE 7. PRCil'RCT NDWsRR 8. PROJECT COST ($000)
113-321 AsliE 7,730 27596
12. SDPPrnAL
DATA: a. Estimated Design Data:
(1) Status:
(a) Date Design Started
(b)
Parametric Cost I&dmates used to develop costs
* (c) Percent Ca@ete as of
01 JAN 2003 l
(d) Date 35%
Designed
(e) Date Design Cwlete
(f)
Rnetgy Study/Life-Cycle analysis Was/will be performed
Ol-my-02
YES
15%
15-ADG-02
Ol-SRP-03
No
(2) Basis:
(a) Stsndard or Definitive Design -
(b) Where Design Was West Recently Deed -
No
(3) Total Cost (c) = (a) + (b) or (d) + (e):
(a) Produpion of Plans aud Specifications
(b) All
Other
Design Costs
(c) Total
(d) Contract
(e) In-house
(4) Construction Contract
Award
(5) construction start
($000)
464
232
696
619
77
04 JAN
04 FKB
(6) Construction CcmDletion 05 MAR l
Indicates cclqpletion of
Project Definition With Parametric Cost Estimate
Which is ccsparable to traditional 35% design to ensure valid score, cost and executability.
b. EQuipmut associated with this project prwided fraa other apOroxxiation8:
N/A
DD XIRW 1391, DRC 76 Previous editions are obsolete.
Page No.
250
1. COMPONENT
AIR FORCE
FY 2004 MILITARY CONSTRUCTION PROGRAM
3. INSTALLATION AND LOCATION
KUNSAN AIR BASE
4. COMMAND:
PACIFIC AIR FORCES
2. DATE
5. AREA CONST
COST INDEX
KOREA
6. Personnel
Strength
AS OF 30 SEP 02
END FY 2007
I
PERMANENT
O F F E N L
207
208
7. INVENTORY DATA ($000) a. Total Acreage:
2.440
2,449
2,557
!
STUDENTS
CIV OFF ENL
335
340
0
0
0
0
CIV
0
0
!
1.12
SUPPORTED
OFF
13
13
ENL
153
153
1 CIV
13
13
TOTAL
3,161
3.176
b. Inventory Total as of : (30 Sep 02) 513,152 c. Authorization Not Yet in Inventory: d. Authorization Requested in this Program: e. Authorization Included in the Following Program: (FY 2005) f. Planned in Next Four Years Program: g. Remaining Deficiency: h. Grand Total:
8. PROJECTS REQUESTED IN THIS PROGRAM:
CATEGORY
CODE
141-182
PROJECT TITLE
Upgrade Hardened Aircraft Shelters
45,570
7,059
0
37,000
80,300
683,081
SCOPE
(FY 2064)
COST DESIGN STATUS
$.OOO S T A R T C M P L
53 EA 7 , 0 5 9 Apr-02 Sep-03
9a. Future Projects: Included in the Following Program:
Total
(FY2005)
7,059
None
9b. Future Projects: Typical Planned Next Four Years:
211-152
721-312
740-000
Consolidated Acft Maint Sq Complex
Dormitory
5,157 SM
144 RM
Repl Consolid Personnel Process/Theater F 1,060 SM
16,000
16,400
4,600
9~. Real Propery Maintenance Backlog This Installation
10. Mission or Major Functions: The host fighter wing supports two F-16 squadrons. A joint use agreement with
Korea permits use of the runway by Korean Civil air carriers.
91
11. Outstanding pollution and Safety (OSHA) Deficiencies: a. Air pollution 0 b. Water Pollution 0 c. Occupational Safety and Health 0 d. Other Environmental 0
DD Form 1390.24 Jul 00
251
1. COMPONENT
AIR FORCE
PY 2004 MILITARY CONSTRUCTION PROJECT DATA
3. INSTALLATION AND LOCATION
(computer generated)
4. PROJECT TITLE
2. DATE
KUNSAN AIR BASE, KOREA (RRPURLIC UP)
5. PROGRAM ELEb5RNT 6.
UPGRADE HARD= AIRCRAFT SHELTERS
CATEGORY CODE 7. PROJECT NUWRRR
8. PROJECT COST ($000)
27596 141-182 WLWRo13144
9.
COST ESTIMATES
7,059
UNIT COST
IJJKllnANTITy
UPGRADE RARDENRD AIRCRAFT SHRLTRRS (HAS)
SHELTER FLOOR REPAIR
ANTITRRRORISM/FORCE PROTECTION
CONCRETE PLACEMEWT FOR EROSION CONTROL
VENTILATION
FLUOR REPAIRS AND COATINGS
WATERPROOFING & PAINT
SHELTER ELECTRICAL UPGRADE/REPAIR
SUPPORTING FACILITIES
UTILITIES II‘
COWTAMINATRD SOIL RRMEDIATION
SUBTOTAL
XMTINGRNCY ( 5.0 %)
POTAL CONTRAClY COST
SUPERVISION, INSPECTION AND OVERHEAD ( 6.5 %)
MTAL REQUEST
WTAL REQUEST (ROUNDED)
LS
I = I 53 26'ooo
(gl/ 2.
6 , 5 0 0
1: 1 :: :',::::
I EA I
5 3
2o 25'ooo
I I
LS
LS
LO.
Description of Proposed Construction: Upgrade Hardened Aircraft Shelters (HAS).
@grade includes repair/replacement of aircraft doors, door heater cables, floora, qlosion-proof electrical system, lighting, ventilation system, interior/exterior structural/water proofing. All necessary utilities, erosion control, installation of
:oncrete retaining walls, and contaminated soil remediation.
Ll. REQUIREMENT: 8OEA
ADEQUATE: 13 EA SUBSTANDARD: 64EA
?ROJRCT: Upgrade hardened aircraft shelters.
(Current Mission)
ZEQUIREKEWT: Adequate hardened aircraft shelters to protect combat fighter aircraft, iir crewe and sortie-generation maintenance personnel from hostile forces attack end zovide a safe working environment where aircraft engine run-up can be performed inside
:he shelter when doors are closed.
Properly functioning HASa are essential for comhat readiness and sustainment for the assigned wing combat fighter aircraft and follow-on
Fighters at this fight-in-place base that provides essential first line of defense and sustained combat air support for the defense of the Republic of Korea.
\ntiterrorism/force protection will be IAW local threat assessment.
URRRNT SITUATION: The base has a total of 56 HAS and eight flow-through shelters.
The
IASS were conetructed in 1969-70 and are hardened on both front and rear aides.
Each
U& requires major repair/upgrade to make it functionally adequate to protect combat resets and maintain con&at fighters, including engine run-up in the shelters when they ire totally closed during hostile attack.
The concrete exteriors of the shelters are xacked, resulting in water leaks and accelerated corrosion to the interior walls,
?lectrical/machanical systems and ponding on floors, all of which cause an unsafe
5 , 4 8 6
( 1,378)
( 100)
( 130)
( 450)
( 1,378)
( 500)
( 1 , 5 5 0 )
7 5 0
( 500)
( 250)
6 , 2 3 6
3 1 2
6 , 5 4 8
4 2 6
6 . 9 7 4
7.059
DD FORM 1391, DEC 76 Previous editions are obsolete.
Page No.
252
1. COUPONENT
AIR
FORCE
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
3. INSTALLATION AND LOCATION
(computer generated)
4. PROJECT TITLE
2. DATE
ICDNSAN AIR BASE, KOREA (REPUBLIC OF)
5.
PROGRAM ELEMENT
6.
IJPGRADRRARDRNRDAIRCRAFT SHRLTRRS
CATEGORY CODE 7. PROJECT NlJMBRR
8.
PROJECT COST ($000)
27596 141-182 xLwRo13144 7,059 rorking environment and foreign object damage (FOD) risk to combat fighters located in
:he shelters for protection. Concrete floors are cracked and another source of FOD. The mechanical ventilation and electrical eyetema muet be upgraded to keep the aircraft lhelters functional so maintenance operations can be performed in a safe and efficient
IaMer while providing protection from conventional, chemical-biological, and nuclear
Lttack. Additionally, fully functional shelters are needed to enhance Operational
;ecurity (OPSEC) by providing secure location8 to prepare and launch lperational/sensitive missions by screening mieeion preparations from any opposing
MPACT IF NOT PROVIDED: Aircraft will continue to be parked in substandard shelters
:hat do not provide adequate protection from attack and pose a FGD risk and maintenance
,ereonnel will continue to work in an unsafe work environment.
Coneequently, jwivability of wing combat aircraft and follow-on fighters will be severely ieopardized with a corresponding reduction in counteroffensives, air interdiction, and
:ombat air patrol*.miesione capability at this fight-in-place base which is postured to
:eepond to an attack within only a few minutes.
LDDITIONAL: This project meets the scope/criteria specified in Air Force Handbook 32-
L084, "Facility Requirements." A preliminary analysis of options for satisfying thie requirement was completed.
Only one option satisfies mieaion requirements.
Therefore,
L full economic analysis wae not performed.
A certificate of exception has been xepared.
CYOO/Ol Host Nation funding will upgrade 13 HAS.
However, the $30M annual
Funding level cannot satisfy all requirements in a reasonable time.
Some mieeion essential projects must be funded with WLCON to euetain combat capability.
EASE
XVIL RNGINRRR: Lt Co1 Susan E. Mitchell, 011-826-3470-5400.
roINT USE CERTIFICATION: These facilities can be ueed by other components on an .aa
available" basis; however, the xope of the project is based on Air Force requirements.
DD FORM 1391, DEC 76 Previous editions are obsolete.
Page No.
253
1. COMPONENT
AIR FORCE
PY 2004 MILITARY CGNSTRUCTION PROJECT DATA
(computer generated)
3. INSTALLATION AND LGCATION
RDNSAN AIR BASE, KOREA (RRPDBLIC OF)
2 . DATE
4. PROJECT TITLE
UPGRADE EIARDRNRDAIRCRAPT SRRLTRRS
5. PRGGRAM ELKMRNT
27596
6. CATRGGRY CODE 7. PROJECT NDMBRR 8. PROJECT COST ($000)
141-182 MLwRo13144
1 2 . SDPPLRMRNTAL DATA: a. Estimated Design Data:
(1) Statue:
(a) Date Design Started
(b) Parametric Coat Eetimatee used to develop coete l
(c) Percent Ccaqlete as of 01 JAN 2003 l
(d) Date 35% Designed
(e) Date Design Complete
(f) Energy Study/Life-Cycle analysis was/will be performed
7,059
02-APR-02
YES
15%
30-AUG-02
O l - S E P - 0 3
NO
(2) Basis:
(a) Standard or Definitive Design -
(b) Wherf-Design Was Most Recently Deed -
(3) Total Cost (c) (a) + (b) or (d) + (e):
(a) Production of Plane and Specificatione
(b) All Other Design Coats
(c) Total
(d) Contract
(e) In-house
(4) Conetruction Contract Award
(5) Conetruction Start
(6) Construction Completion
NO
($000)
420
210
6 3 0
5 6 0
70
03 DEC
04 JAN
0 5 JIJL
* Indicate8 completion of Project Definition with Parametric Coat Eetimate which is comparable to traditional 35% design to ensure valid mope, coat and executability.
b. Equipment aseociated with thie project provided from other appropriations:
N/A
FORM 1391, DEC! 76 Previous editione are obsolete.
Page No.
254
. COMPONENT
I
AIR FORCE
I
INSTALLATION AND LOCATION
FY 2004 MILITARY CONSTRUCTION PROGRAM
4. COMMAND:
12. DATE
I
5. AREA CONST
KSAN AIR BASE
;OREA
PACIFIC AIR FORCES COST INDEX
1.11
. Personnel PERMANENT STUDENTS SUPPORTED
;trength
S OF 30 SEP O;!
:ND FY 2007
O F F E N L
555 4,649
CIV
669
OFF ENL
12
556 4,670 677 12
. INVENTORY DATA ($000)
. Total Acreage: 1,777
938
938
CIV
0
0
OFF
134
134
ENL
675
675
CIV
160
160
. Inventory Total as of : (30 Sep 02)
TOTAL
7,79: 2
7,821 2
1,285,79r 5
. Authorization Not Yet in Inventory:
. Authorization Requested in this Program:
. Authorization Included in the Following Program:(FY 2005)
Planned in Next Four Years Program:
. Remaining Deficiency:
. Grand Total:
-
_ PROJECTS REQUESTED IN THIS PROGRAM:
:ATEGORY
:ODE
21-312
PROJECT TITLE
Dormibory la. Future Projects: Included in the Following Program:
41-753 Add/Alter Sq Ops/AMU Facility
21-312 Dormitory
(FY2005)
Total
3,940 SM
156 RM
Total lb. Future Projects: Typical Planned Next Four Years:
41-453 Consolidated Base OpslRAPCONmower Complex 1,924 S M
41-753 Add/Alter 36 FS OpslAMU Facility 7,500 S M
11-179 Replace Aircraft Fuels Maintenance Hangar 2,303 S M
18-868 Replace PMEL Facility 937 S M
‘30-835 Consolidated Security Forces/OS1 Facility 4,785 SM
16,638
16,793
16,497
33,290
14,000
18,100
7,500
3,800
12,300
118,871 0
16,631
33,29l D
55,701 3
148,68’ 1
1,658,97& 4
SCOPE
(FY 2004)
156 RM
COST DESIGN STATU!
5
S T A R T CMPI c
16,638 Apr-02 Sep-0: 3
IC. Real Propery Maintenance Backlog This Installation 15:
0. A host fighter wing supporting an F-16 squadron and an AIOA-10 squadron; Headquarters Seventh Air Force; a
3 pecial operations squadron with MH-53J aircraft; a civil engineer heavy repair squadron (RED HORSE); an Air iobility Command air mobility support squadron; an Air Combat Command reconnaissance squadron; and an Air ltelligence Agency intelligence squadron.
I. Outstanding pollution and Safety (OSHA) Deficiencies: a. Air pollution 0 b. Water Pollution 0 c. Occupational Safety and Health 0 d. Other Environmental 0 rD Form 1390,24 Jul 00
r
1. COMPONENT i
LIR FGRCR
PY 2004 MILITARY CONSTRUCTION PROJECT DATA
(computer generated)
2. DATE
3. INSTALLATION AND LOCATION
3SAN AIR BASE, KORRA (RRPWLIC OF)
5. PROGRAM ELRMRNT
4. PROJECT TITLE
DORMITORY (156 RAX)
6. CATEGORY CODE 7. PROJECT NDBBER 8. PROSECT COST ($000)
27596 721-312 sDlYrJ993120
9.
COST ESTIMATES
16,638
UNIT COST ll‘/KmTY
0RMITORY (156 RX)
ANTITRRRORISM FORCE PROTECTION
COLLECTIVE PROTECTION SYSTRM
SPLINTER PROTECTION
DORMITORY
S
ZJPPORTING FACILITIES
UTILITIES
PAVRMRNTS
SITE IBlPROVRb!RNTS
PILE FOUNDATION
CONTAUINATED SO&3UEDIATION
COMMDNICATIONS
LS j :: 1
I
1 z 1
I I
LS
LS
LS
LS
LS
LS
5,460
1,000
6,460
5,460
122
2,580
65
1,530
I
12,020
( 666)
( 2,580)
( 420)
( 8,354)
2,714
( 555)
( 100)
( 1,400)
( 284)
( 250)
( 125)
UBTOTAL 14,734
!ORTINGRNCY
( 5.0 $1
!OTAL CONTRACT COST
737
15,471
ITJPERVISION, INSPECTION AND OVERHEAD ( 6.5 %I 1,006
DTAL REQUEST 16,476
'OTAL REQUEST (ROUNDED) 16,638
0.
Description of Proposed Construction:
A multi-story facility with reinforced oncrete foundation, floor slabs, walls, and roof.
Includes room-bath/kitchen-rooms odules, laundries, storage/lounge areas, fire sprinkler syssm, air-lock areas, mergency generator.
Splinter and chemical-biological protection, antiterrorism force rotection, and all supporting facilities/utilities and contaminated soil remediation.
.ir Conditioning: 4ooRw.
Grade Mix: El-E4 156
1 1. RRQUIRRHRNT: 5,114RM ADEQUATE: 4,088RM SUBSTANDARD: 38RM
ROJRCT: Construct a dormitory.
(Current Mission)
EQUIRRKRNT:
A major Air Force objective provides unaccompanied enlisted personnel with
.ousing conducive to their proper rest, relaxation, and personal well being.
Properly iesigned, adequately configured and furnished quarters that provide some degree of ndividual privacy are essential to the successful accomplishment of the increasingly amplicated and important jobs these people must perform.
The retention of these highly trained airmen is essential to our readiness posture and continuing world-wide
P 'resence.
This dorm will incorporate as part of its normal construction, antiterrorism f orce protection standards currently mandated by Congress.
Splinter and chemicalb iological collective protection are required to protect personnel from theater threats a t this remote, overseas, in-place warfighting base.
c
DRRRNT SITDATION: The base has insufficient on-base housing to accosnnodate the
U naccompanied enlisted personnel.
This project is in accordance with the Air Force
D ormitory Master Plan.
DD FORM 1391, DEC 76 Previous editions are obsolete.
Page No.
256
1. COMPONKNT
AIR FORCE
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
(computer generated)
2. DATE
3. INSTALLATION AND LOCATION 4. PROJECT TITLE
OSAN AIR BASE, KOREA (REPUBLIC OF)
5. PROGRAM ELRMENT
DORMITORY (156 RM)
6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000)
27596 721-312 sMYU993120 16,638
IMPACT IF NOT PROVIDED: Adequate living quarters which provide a level of privacy required for today's airmen will not be available, resulting in degradation of morale, productivity, and career satisfaction for unaccompanied enlisted personnel.
Lack of protected on-base quarters and personnel forced to live off-base leaves them vulnerable to loss to chemical-biological weapons and terrorist attack.
\DDITIONAL: This project meets the scope/criteria specified in the new mone-p1us-ones aarracks standard established by OSD.
All known alternatives were considered during development of this project.
No other option could meet mission requirements.
herefore, no econcmic analysis was needed or performed.
Unaccompanied Housing RPM
:onducted: $2,2663 in FYOl and $2,4OOK in EYO2.
Future Unaccompanied Housing RPM ceguirements (estimated): FYOJ: $2,507K, FYO4: $2,60OK, FYO5: $2,625K.
tititerrorism/force protection standards met via splinter protection/chemical-biological protection features in this project.
Project eligible for ROK Funded Construction, but milding dormitories in reasonable time requires both ROKFC and MILCON funds. BASE
XVIL ENGINEER: Lt Co1 Butchison, 011-82-31-661-4312.
Dormitory: 5,460SM = 58,773SF;
Zhemical-Biologic% Protection: 1,OOOSM = 10,760SF.
?ORRIGN CURRENCY: FCF Budget Rate Used: WON 1443.81
JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis; however, the scope of the project is based on Air Force requirements.
DD FORM 1391, DEC 76 Previous editions are obsolete.
Page No.
257
1. COWPONRNT
AIR FORCE
PY 2004 MILITARY CONSTRUCTION PROJECT DATA
(computer generated)
3. INSTALLATION AND LOCATION
OSAN AIR BASE, KOREA (RRPUBLIC OF)
4. PROJECT TITLE
DORWITORY (156 RW)
2. DATE
5. PROGRAM ELRWRWT
27596
6. CATEGORY CODE 7. PROJECT NUMBER
721-312 sWYU993120
8. PROJECT COST ($000)
12. SUPP LRWRWTAL DATA: a. Estimated Design Data:
(1) Status:
(a) Date Design Started
(b) Parametric Cost Estimates used to develop costs
* (c) Percent Ccmplete as of 01 JAN 2003 l
(d) Date 35% Designed
(e) Date Design Complete
(f) Energy Study/Life-Cycle analysis was/will be performed
16,638
02-APR-02
YES
15% lo-SEP-02
15-SEP-03
YBS
(2) Basis:
(a) Standard or Definitive Design -
(b) Where.Design Was Most Recently Used -
(3) Total Cost (c) = (a) + (b) or (d) + (e):
(a) Production of Plans and Specifications
(b) All Other Design Costs
(c) Total
(d) Contract
(e) In-house
(4) Construction Contract Award
(5) Construction Start
(6) Construction Completion
* Indicates completion of Project Definition with Parametric Cost Estimate which is comparable to traditional 35% design to ensure valid scope, cost and executability.
YES
OSAN
($000)
660
412
1,072
824
248
03 DEC
04 JAN
05 DEC b. Equipment associated with this project provided from other appropriations:
N/A
DD FORM 1391, DEC 76 Previous editions are obsolete.
Page No.
258
I. COMPONENT I
AIR FORCE
1:
3. INSTALLATION AND LOCATION!
NCIRLIK AIR BASE, TURKEY
5. Personnel strength
4s OF 30 SEP 02
:ND FY 2007
4. COMMAND:
UNITED STATES AIR
FORCE, EUROPE
PERMANENT
OFF ENL
133
133
1246 255
1255 255
STUDENTS
CIV OFF ENL CIV
1607
1607
5. AREA CONST
COST INDEX
0.9
SUPPORTED
OFF
229
229
ENL
I
12. DATE
CIV
69
89
7. INVENTORY DATA (!§OOO)
3. Total Acreage: 3,328
1. Inventory Total as of : (30 Sep 02)
:. Authorization Not Yet in Inventory:
1. Authorization Requested in this Program:
?. Authorization Included in the Following Program:
‘. Planned in Next Four Years Program:
1. Remaining Deficiency:
I . Grand Total:
(l=Y 2005)
TOTAL
3.75
3,761
779,72
8,99
3,26:
31,15r
23.10(
846,224
I
2
0
2
0
D
0
4
3. PROJECTS REQUESTED IN THIS PROGRAM:
;ATEGORY
;ODE
131-111
PROJFCT. TITLE
Consolidated Communications Facility la. Future Projects: included in the Following Program:
None
SCOPE
2,150 SM
Total
(FY 2004)
C O S T D E S I G N STATUS ;
$.(600) S T A R T C M P L
3,262 Apr-02 Aug-03
3,262 w 2005)
#b. Future Projects: Typical Planned Next Four Years:
113-321 Add to Aifcraft Parking Apron ‘C
141-000
214-000
452-252
742-674
74 1-000
841-000
351-147
Squadron Operations (F-16) AMU
WS-3 Truck Maintenance Facility
Upgrade WRM Equipment Parking
Fitness Center
Consolidated Community Center
Add to/Upgrade Water Storage and Dist.
Upgrade Base Main Road k. Real Propery Maintenance Backlog This Installation
160,000 SM
2,440 SM
690 SM
3,500 SM
2,452 SM
3,453 SM
1,290 KG
3,600 LM
7,750
5,106 l,ooO
1,050
5,600
5,500
2,150
3,006
26
IO. Mission or Major Functions: The 39th Wing provides host services to forces deployed in support of Operation
Jorthem Watch. It is also home to an AMC Air Mobility Squadron.
Il. Outstanding pollution and Safety (OSHA) Deficiencies: a. Air pollution b. Water Pollution c. Occupational Safety and Health d. Other Environmental
0
0
0
50
259
l.COBrPONEwr
AIRFORCE
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
(ccmgnater generated)
3. INSTALLkTIW ADD LOCATION 4. PROJECT TITLR
2. DATE
INcIRLIxAIRBAwADANA,-
5. PRooRMa RLm5nrr
CONSOLIDATED COlQRRDCATIONS yACILITI
6.CATRgORYCODR 7.PROJRCTNtMRRR
8. PROJRCT COST ($000)
22176 131-111 LJYC983011
9.
COST ESTJMATES
3,262
!ONSOLIDATH) COEBSINICATIONS PACILITY
CONHDNICATION FACILITT
AWIITRRRORISM/~RCR PROTRCTION
IDPPORTIEU FACILITIRS
DTILITIRS
PA-S
SITR IHPRUWDISWTS
DRMOLITION
( 2,236)
!or?rm
( 5.0 %)
!oTAL CONTRACT cod+
ITJPRRVISION, INSPRCTION MID B
!oTALREQulwr
!CT~RRQDl5ST(RODIdDRD)
QDIPRENT yROl4 OTHER APPROPRIATIONS
(NON-ADD)
3,262
( 271.0 1
0.
Description of
Proposed Construction: Reinforced concrete foundation and floor lab, masonry walls, structural steel frame and Ditched metal roof.
Includes security ystem, pavement 8, site work, and utilities. Force protection measures such as physical arriers, reinforced materials, and laminated windows to be incorporated IAW minimum oD interim force protectin standards.
Demolish four buildings (1,073 SW.
ir Conditioning: 290 RN.
1. RRQRxmmmNT: 4,409 SW ADEQUATE: 2,339 SM SUBSTANDARD: 1,073SN
Construct a consolidated ications facility. (Current Mission)
9 :
A consolidated camrmnications maintenance and administrative facility is eguired to efficiently and effectively house ccauauu ication squadron maintenance end ddnistrative functions, improve the operations aud maintenance cagability to ammrnication systems and equipment, and provide quality custamr service. Vital auaunication equipment must be properly maintained and in a ready state for support of ontingency operations.
The entire facility must be protected fran potential terrorist ttacks.
URRENT SITUATION: The camunication squadron currently occupies wer twenty buildings, ncluding old and deteriorated Quonset huts, widely scattered throughout the base. The eographic separation of unit functions makes operations, ccmmand, and control nefficient and difficult.
Persounel in these facilities work under crangmd conditions, everely imDacting mission capability.
Additional personnel assigned to handle ncreased aperations teagm due to ongoing contingency support has exacerbated the vercrowding problm, creating a safety hazard in shops which maintain and repair lectrical equipment.
Unit personnel have been forced to share spaces not designed for heir particular mission, resulting in lowered productivity.
The continuing growth of
DD FCRM 1391, DEC 76 Previous editions are obsolete.
Page No.
260
. .
l.CoMPCNRm
AIRFORCE
R[ 2004 MILITARY CONSTRUCTION PROJECT
(cauputer generated)
DATA 2. DATE
3. INSTALLATIW AND XACATION 4. PROJECT TITLE
CUNSOLIMTRD COMbRJNICATIONS FACILITY INcIRLIRAIRBAwADANA,TuRIcKy
5. PRUIIRAW m 6. CATRGURY CODE 7. PRoJM3T MlIIBw 8. PROJECT COST ($000)
22176 131-111 LJYC983011 3,262 lnit persouuel to support increased mission requirements will further strain existing lacilities.
MPACTIINCITPRUVI~: Widely separated ccsmuu ications functions will continue to reduce productivity for service providers aud custaaers, and negatively impact the
:ritical mission performed by the wing.
DDITIOtDU,: This project is not eligible for bIAT0 funding.
Nowever, a precautionary me-financing statement will be sukdtted in the event eligibility is established.
This moject supports mission, readiness, or force protection issues related to aperations iu
:he Balkans or other contingencies throughout the region.
This project meets the
:riteria/scope specified in Air Force Handbook 32-1084, "Facility Requirementem.
A
,reliminaxy analysis of reasonable options was done and indicated that only one option beets aperational requirements.
A c e r t i f i c a t e o f e x c e p t i o n h a s b e e n prepared.
Base
!ivil Engineer* Mr Roy Shoem&er, 011-90-332-346-3657.
Camuuications yacility: 2,150
M = 23,134 Sy.
mRR1(BJCURRRwY: ICI Budget Rate Used: LIRA 1493
IUINT USE CRRTIFI&TIUW: Mission reguirements, operational considerations, aud location we iucaaDatible w%th use by other ccqnments.
DD FORM 1391, DRC 76 Previcus editions are obsolete.
Page No.
261
l.coMPONRNT
AIRFORCE
FY 2004 MILITARY CONSTRUCTION PROJECT MTA
(canputer generated)
3. INSTALLATION MID LUCATION
INcIRLIKAsRBAsEADANA,Tmuu5Y
4. PRChJRCT TITLE
2. DATE
CONSOLIDATRU -CATIONS yACILITY
5. PROGRAM m
22176
6. CATRGCRY CODE 7. PROJECT NUMSRR
131-111 LJYC983011
8. PRGJRCT COST ($000,
12. SUPP -AL DATA: a. Estimated Design Data:
(1) Status:
(a) Date Design Started
(b) Parametric Cost Rstimates used to develop costs l
(c) Percent Cauplete as of 01 JRN 2003 l
(d) Date 35% Designed
(e) Date Design Ccuplete
(f) Rnergy Study/Life-Cycle analysis was/will be performed
3,262
15-APR-02
YES
15%
15-m-02
25-Aoo-03
YES
(2) Basis:
(a) Standard or Definitive Deeion -
(b) Where Design Was Most Recently Used -
(3) Total Cost (c) = (a) + (b) or
(d) + (e):
(a) Production of Plans and Specifications
(b) All O&r Design Costs
(c) Total
(d) Contract
(e) In-house
(4) ~OZlStNCtiOIl Contract Award
(5) cOIlStNCtiOIl
Start
(6)
COllStNCtiC@l
CCm@etioIl
No
($000)
195
98
293
260
33
04 SAN
04 FEB
05 APR l
Indicates cwletion of Project Definition with Parametric Cost Estimate which is canparable to traditional 35% design to ensure valid scope, cost and elxeJcutabilitY.
b.
Rq&xaent associated with this project provided fram other appropriations:
IqpJI- NoE4lmxkATuRE
COHlUUNICATIONS RQUIPMRNT
APPROPRIATION
3400
FISCAL YEAR
APPROPRIATRD
ORRRQURSlXD
2004
COST
($000)
271
DD FORN ldYl, DEC: JO yrevzous ec1c~one are ODBOI~L~.
Page No.
262
Il. COMPONENT 2’ j FY 2ow MlLfTARY CONSTRUCTfON PROGRAM
AIR FORCE I
3. INSTALLATION AND LOCATION ktAF LAKENHEATH
UNITED KINGDOM
6. Personnel
Strength
AS OF 36 SEP 02
END FY 2007
14. COMMAND:
I UNI TE D S TATES AIR
FORCE, EUROPE
PERMANENT
OFF
520
520
STUDENTS
ENL CIV OFF ENL CIV
4163 652
4191 656
I
I
5. AREA CONST
COST INDEX
1.2
SUPPORTED
OFF
4
4
ENL
6
6
12. DATE
CIV
45
45
TOTAL
541
5.42
7. INVENTORY DATA ($000) a . T o t a l A c r e a g e : 2,004 b. Inventory Total as of : (30 Sep 02) c. Authorization Not Yet in Inventory: d. Authorization Requested in this Program: e. Authorization Included in the Following Program:
1. Planned in Next Four Years Program: g. Remaining Deficiency: h. Grand Total: w 2005)
1,234,24
116,72
303
=,=
42,79
1,492,31
1
6. PROJECTS REQUESTED IN THIS PROGRAM:
CATEGORY
CODE
131-111
PROJFCT TfTt&
Communfcations Facitii
721-312
731-142
Dormttory 120 RM
Add To And After Crash Fire Station
737-253
I-
Family Support Center
SCOPE
(FY2004)
2,013 SM
COST DESIGN STATUS
M P L
6,436 Design Build
120 RM
1,240 SM
Total
1 LS
13,666 Design
2,667 Design
5,676 Design
30,567
Build
Build
Build w=w 9a. Future Projects: Inclr&fed,in’the Following Program:
N~J Projects
9b. Future Projects: Typical Planned Next Four Years:
113-321
141-766
144-753
171-212
173-616
211-712
721-312
730-632 lnfill Hardstands A, B, C, D, E
Mobility Cargo Processing Center
F-15C SQD OPS I AMU
CBay Mission Training Facility
Field Training Detllogisttcs Training FligM
Add to AGE Shop
Dormitory
Construct Large Vehicle Entry lnsp Station
12,ooO SM
2,640SM
3,400 SM
1.175 SM
3,249 SM
1,210 SM
96 RM
630 SM
3,350
15,600
10,266
7.600
9,500
3,150
12,900
3,400 a. Air pollution
69 r 9c. Real Propery Maintenance Backlog This Installation
10. Mission or Major Functions: A fighter wing equipped with two squadrons of F-15Es and one squadron of F-15CIDs.
11. Outstanding pollution and Safety (OSHA) Defiiiencles: b. Water Pollution c. Occupational Safety and Health d. Other Environmental 0
263
1. COMPONENT
AIR FORCE
FY 2004 MLITARY CONSTRUCTION PROJECT DATA
(computer generated)
3. INSTALLATION ABD LOCATION
R&F -TN, UNITED KINGDOM
5. PROGRAM ELEKEBT
4. PROJECT TITLE
FAMILY SUPPORT CEBTBR
6. CATEGORY CODE 7. PROJECT NDWBER
2. DATE
8. PROJECT COST ($000)
22176 737-253 MSET043002R
9.
COST ESTIMATES
5,878
UNIT COST n/Y-
?AWILY SUPPORT CENTER SM 1,240 0 4,037
FAMILY SUPPORT COWPLBE
ANTI TERRORISM / FORCE PROTECTION
SM
SM
1,240
1,240
2,629
627
( 3,260)
( 777)
BJPPORTING FACILITIES 1,368
I
UTILITIES
PAVEMENTS
SITE IMPROVBWENTS
DEMOLITION
COMMUNICATIONS
PASSIVE FORCE PROBTCTION WBASDRES
.‘
:UBTOTAL
LS
LS I
LS I
LS I
Is I
LS
I
I
( 388)
( 239)
( 175)
( 234)
( 306)
( 26)
XRBl'INGENcy ( 5.0 %I
POTAL CONTRACT COST
5,405
270
XJPBRVISION, INSPECTION AND OVBRBBAD
COTAL REQUEST
( 2.5 %I
5,675
142 lOTAL REQUEST (ROUNDED)
~QUIPWBBT FROM OTHER AP
PROPR
IA
TIONS
(NON-ADD)
5,817
5,878
( 285 1
0.
Deecription of Proposed Construction: Reinforced concrete foundation and floor labs, multi-story reinforced masonry walls with brick veneer, steel frame, and tiled oof.
All electrical, mechanical, ventilation, fire protection, parking, exterior ighting, television, LAN, and telephone connections and all essential support.
lemolish one building (1,132 SM).
Includes minimum DOD interim force protection tandarde.
1. REQUIREWENT: 1,240SU ADEQUATE: 0 SM SWSTANDARD: 1,241SM
'ROJBm: (Current Wssionl
BQUIREWBNT: Facility is required to provide a full range of family support services to lilitary and civilian members and their dependants in an atmosphere customers feel omfortable.
Services provided include personal matters of family readiness, financial nd family counseling, education and relocation information, employment and ransitioning assistance, travel assistance, and aid programs.
DRRENT SITUATION: The Family Support Center is located in a dormitory converted to ffice space as a temporary measure. The building design and layout are not suitable for he current mission and requires workarounds to provide private consultations and ounseling eeseions.
The facility does not meet current life, health, and safety eguirements and the Americans with Disabilities Act standards.
The Woman, Infant, hildren (WIG) administrative staff and the Ministry of Defence (MOD) personnel offices re currently located in temporary facilities not designed to support the services rovided.
These conditions are detrimental to business and lack the appropriate tmosphere conducive to an effective family support operation.
DD
FORM
1391, DEC 76 Previous editions are obsolete.
Page No.
264
1. COMPONENT
AIR
FORCE
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
3. INSTALLATION AND LQCATION
(computer generated)
4. PROJECT TITLE
2. DATE
RAP UKENNEATB, UNITED KINGDOM
5. PROGRAM ELRMRNT 6.
FAHILY SUPPORT CENTER
CATEGORY CODE 7. PROJECT NDl48= 8. PROJECT COST ($000)
22176 737-253 MSET043002R 5,878
:MPACT
IF NOT PROVIDED: Personal and private matters of military and civilian members rill continue to be administered in a facility with conditions not conducive to the
[uality and care needed to promote a feeling of privacy and comfort in individual ratter8 relating to family readiness.
Continued use of these facilities will fail to
.educe limited base operating costs and force further use of facilities that are lemoralizing to users and fails to provide the comfort, attractive and warm inviting mvironment that complies with life, health, safety, and
ADA standards.
WIC and the l4OD
Bersonnel will continue to provide services from less than desirable facilities with a mtential decrease in number of customers.
LDDITIONAL: This project is not eligible for NATO funding. This project meets the
:riteria/scope specified in AFR 32-1084, "Facility Requirements".
According to the xonomic analysis, this is the best option to meet operational requirements.
Base Civil hgineer Lt Co1 Thomas D. Quasney, 001-44-1638-522-100.
Family Support Center: 1,240
:M - 13,342
SF.
zoRR1m CDRRRNCYi.
FCF
Budget Rate Used: POUND .7081
JOINT USE CERTIFICATION: This facility can be used by other components on an "as available" basis: however, the scope of the project is based on Air Force requirements.
FORM
1391, DEC 76 Previous editions are obsolete.
Page No.
265
I
L. coMPoNEm
UR FORCE
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
3. INSTALLATION AND LOCATION
RAP LAKENHEATN, UNITED KINGDOM
(computer generated)
4. PROJECT TITLE
FAMILY SUPPORT CENTER
5.
PROGRAM ELEMENT
22176
2. DATE
6.
CATEGORY CODE 7. PROJBCT NUMBER 8.
PROJECT COST ($000)
737-253
WSSET043002R
5,878
12.
SDPP LEMENTAL DATA: a. Estimated Design Data:
(1) Project to be accomplished by design-build procedures
(2) Basis:
(a) Standard or Definitive Design -
(b) Where Design Was West Recently Used -
(3) All Other Design Costs
(4)
Construction Contract Award
(5) Construction Start
(6)
Construction Completion
(7)
Energy Study/Life-Cycle analyeis was/will be performed
NO
180
04
JAN
04 MAY
05 MAR
YES b. Equipment hkmociated with this project provided from other appropriations:
EQIJIPMBNT NOMENCLATDRR
COMMDNICATION EQUIPMENT
PDRNITDRB
FISCAL YEAR
PROCURING APPRO
APPROPRIATED
OR REQUESTED
3400
3400
2005
2005
COST
($000)
35
250
DD
FORM
1391, DEC 76 Previous editions are obsolete.
Page No.
266
1 . col4PoNBNT
KIRFORCB
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
(cwter generated)
3. INST-TIOKU MID -TIOBl 4. PROJECT TITLE
2. DATE
RAF-TB,DNxTBD-
5. PRo(3RMI V
-CATIONS FACILITY
6 . C A T E G O R Y CODB 7 . PROJBCT NUNBBR 8. PROJECT COST ($000)
22176 131-111
9 .
MSBT953006R
C O S T BSTIWAl%S
8 , 4 3 6
C * -CATION FIUZILITY
COlSRlNICATIONS FACILITY
ANTIWRISMFGRCE PROTRCTION
ZUPPORTIM3 PACILITIRS
UTILITIES
PAWS
SITB
IMPRm8
IIQIOLITION
~CATIONS
( 5.161)
( 1 . 2 4 8 )
I 3uBToTILc c ZONT( i-.0 %)
1 POTAL - COST
‘1
.!
mPRRvI810tJ, INSPRcTIGtJ AND OVRWRAD roTAL REQQBST 8 , 4 2 6
I
‘1 POTAL REQUBST (ROUNDED)
!QUIPMBNT FRCMOTHRRAPPROPRIATIONS 0RZJ-ADD)
8 , 4 3 6
( 1,311)
1 0 .
Description of Proposed
Construction: Coustruct two-story facility with r riuforced coucrete foundations and floor slabs, masonry walls, and pitched metal r oaf.
Ground floor includes workshop, loading dock and storage area, upper floor to h ave administration areas.
Includes security systems, pavmaents, site work, and
U tilities for a celete and usable facility.
Demolish 5 buildings (1,224 SM).
Force
P Brotection I&W the USAFR staudards.
1 .l. RRQQ: 2 , 7 4 6 SM ZmEQuATEr 7 3 3 sld SUBSTANDARD: 1,243 SW
E ccamnun Construct a consolidated ication facility.
(current MiSSion)
I!
BQ-: A functional and adequately sized structure is required to support aud
C caabine all the functions of the camunications squadron. Consolidate the comaand,
P llans and implementation , netwrk control center, administration, ground radio storage, a nd radio frequency mauagemLent sections out of undersized, substandard and
Q geographically separated facilities.
Space is required for administration sectious, m udntenance areas, equipnent areas, storage areas, and loading dook for the various f unctions within the ccazmmication squadron.
c
URREWI' SITUATION: The camumications squadron operates from a number of geographically s 'eparated, substandard 50-year old Quonset huts, trailers, and concrete block facilities t hat do not have space to support the functions aud have exceeded their ecomnnic
U aefulness.
The existing facilities do not have the correct fire suppression/detection
S ystems, which consequently endangers health, life, and safety of the building
0 ccupants.
The buildings have inadequate heating, ventilation, and electrical systems,
W hich cause high maintenanc e costs and require work arounds.
The separate location of t he various facilities disrupts the critical lines of ctmmum ication between the
FOR&l 1391, DEC 76 Previous editions are obsolete.
Page No.
267
1. CCHPO-
AIRFORCE
Iy 2004 NILITARY CORSTRgCTION PROJECT DATA
(wter generatsd)
2. DATE
3. IRSTNJATI~ AND LOCATION 4. PBOJXCT TITLE co301[IMCATIOUS FACILITY RAF-TIi,vuITmlCIbXZDOY
5.pmxzMRraT
6. CA- CODE 7. PROJZCT- 8 . PBOJBCT COST ($000)
22176 131-111 MSRT953006R 8,436 sections Overcrowded facilities reduce available maintenanc8 space, storage and
Mministration areas which dsgrades the mission performaPc e and the quality of life of the personnel working in these facilitiem.
INPMX'IF~PROVIDED: The~i0~SfuUCti011S Ofthecrmrnln ications squadron till remain in separate, undersized facilities that were not designed for the current mission.
Facility conditions will continue to degrade organizational cohesivenes8 necessary to maintain efficient and effective operations.
geographical separation will continue to mr the lines of comnaud, coaItrol# andCanmJnicat ions.
Essential sQuadtcnr operations and logistic function8 will continue to require additional mxk arounda that further degrade mission performance and the overall base mission.
Deteriorated facilities will continue to present maintenance problems, which will effect the Quality of life of those working in the buildings.
AIIDITIDUU: This project may be partially eligible for
HATC funding, and will be proposed for inclusion in HATC Najor Worhs program.
This project meets the criteria/stops mpscifid in AFR 32-1084, Vacility Reguirempentsw. An econaaic analysis has been prepared.s~ing the alternatives of new construction, revitalization, leasing, and status quo.
Based on net present values and benefits of the respective alternativea, mew constructiosr wea found to he the most cost efficient over the life of the facility.
Base Civil wineerr Lt Co1 Thanas D. Quasney, 001-44-1638-522-100.
CamaunicatioM F a c i l i t y : 2,013 811 = 21,660 Sy.
RASRcNIL~IRJEBRxQuasney
PwRS1gtJB: FCF Budget Rate Veed: POVUD .7091
JO= gw CRRTIFI~TI~R: mciesion requirempenfs, operational considerations, and locations are incwtible withuse by other wents.
DD
FORM
1391, DRC 76 Previous editions are obsolete.
Page No.
268
1.coHPoNENT
AIRFORCB
FY 2004 MILITARY CONSTRVCTION PROJECT DATA
(computer generated)
3. INSTALLATION AND XACATION
RAF LAxEmmATN, VNITED KIuGDoM
4. PROJECT TITLE
COMHVNICATIONS FACILITY
5. PROGRAM m
22176
2. DATE
6. CATEGORY CODE 7. PROJECT-ER 8. PROJECT COST ($000)
131-111 MSRT953006R 8,436
12. SVPP-AL MTA: a. Estimated Design Data:
(1) Project to be accqlished by design-build procedures
(2) Basis:
(a) Standard or Definitive Design -
(b)
Where
Design Was Host Recently Used -
(3) All Other Design Costs
(4) Construction Contract Award
(5) Constnlction start
(6) Construction Cmletion
(7) Energy Study/Life-Cycle analysis was/will be performed uo
235
04 JAU
04 JUN
05 DEC
YES b. Equipment apociated with this project provided from other appropriations:
PROCUBIUG APPRO
3400
3400
FISCAL YEFAR
APPROPRIATKD
ORREQVESTRD
2005
2005
COST
($000)
561
750
DD
FORM
1391, DEC! 76 Previous editions are obsolete.
Page
No.
269
-
-
1. coxPoNENT
AIR FORCE
FY 2004 MILITARY CONSTRUCTION PROJECT
3. INSTALLATION AND LOCATION
(computer generated)
DATA
4. PROJECT TITLE
2. DATE
-
RAF LAKKNHEATII, UNITED KINGDOM
5. PROGRAM ELBMENT
ADD TO ABD ALTER CRASH FIRE STATION
6. CATEGGRY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000)
27596 731-142
9.
BSET013002R
COST EST11
2,667
UNIT COST
E PIRB CRASH/RBSCUB STATION
CRASB/RBSCDR STATION
ANTITBRRORISM/FORCR PROTECTION
LS
LS
LS
2,220
( 2,010)
( 210)
XWPORTING FACILITIES
UTILITIES
PAWS
SITE IMPROvEMEwT.9
TEMPORARY ACCOMODATIONS
COMUUNICATIONS
PASSIVE FORCE PROTECTION MBASURBS a-
KIBTOTAL
XXJTINGBNCY ( 5.0 %)
TOTAL CONTRACT COST
UPERVISION, INSPECTION AND OVERBBAD
'OTAL REQVBST
'OTAL REQUEST (ROUNDED)
( 2.5 %)
:QUIPMENT FROM OTHER APPROPRIATIONS (NON-ADD)
LS
LS
LS
LS
LS
LS
283
( 60)
( 50)
( 20)
( 90)
( 50)
( 13)
2,503
125
2,628
66
2,694
2,667
( 297.0)
0.
Description of Proposed Construction: Construct a 700 SM addition with reinforced oncrete foundation, steel structure, masonry and pre-finished metal walls, roof, omplete electrical and mechanical systems. Addition includes space for emergency esponse vehicles, emergency response center, alarm center, command and admin space, iving quarters, and protective clothing storage.
Includes minimum D
O
D interim force rotection standards.
1. REQUIREMENT: ADBQUATB: SUBSTANDARD:
ROJBCT: Construct an addition and alter the Crash Fire Station.
(Current Mission)
EQUI-:
A fire station with sufficient space to house the base structural and crash fire fighting vehicles and equipment, including adequate sleeping quarters, kitchen, and eating areas for personnel assigned to 24-hour shifts.
CURRENT SITUATION: There is a shortfall of adequate indoor fire vehicle parking.
Fire personnel are forced to "double-bunk" in cramped bedrooms located directly behind vehicle bays and the lack of a ventilation system results in infiltration of fuel vapors and exhaust fumes.
The facility lacks restrooms for the control center and the public use portion of the building.
Only one room is identified for female fire fighters and it contains the only ladies restroom for the entire facility.
The lack of adequate storage space forced personnel to store protective clothing and other supplies between vehicles and in a facility two miles away from the station.
The existing showers are degraded resulting in a demoralizing facility for the occupants.
IMPACT IF NOT PROVIDED2 Fire protection personnel will continue to work in inferior, inefficient facilities that adversely impact their ability to provide fire protection to
DD FORM 1391, DEC 76 Previous editions are obsolete.
Page No.
270
1. COMPONRNT
AIR FORCE
FY 2004 MILITARY CONSTRVCTION PROJECT DATA
(ccrnputer generated)
3. INSTALLATION AND LOCATION
RAF LMENHEATH, UNITED KINGDOM
5.
PROGRAM E-
4. PROJECT TITLE
ADD TO AND ALTER CRASH FIRE STATION
6.
CATEGORY CODE 7. PROJECT NUMBER 8.
2. DATE
PROJECT COST ($000)
27596 731-142 WSET013002R 2,667 the base.
The continued use of substandard facilities will result in inefficient operations.
excessive maintenance/operations costs and perpetuate an unacceptable quality of life for personnel.
ADDITIONAL: This facility is eligible for NATO Infrastructure cormnon funding, and is included in the NATO Works program.
This prograuuaed cost and scope is beyond NATO's cost share.
This project meets the criteria/scope specified in AFE 32-1084, "Facility
Requirements".
A preliminary analysis of options for satisfying this requirement indicates that only one option will meet mission needs.
Therefore, a complete economic analysis was not performed.
A certificate of exception has been prepared.
Base Civil
Engineer: Lt Co1 Thomas D. Quasney, 001-44-1638-522-100.
BASE CIVIL ENGINEER: Quasney
FOREIGN CURRENCY:
FCF
Budget Rate Used: POUND .7091
JOINT USE CERTIFICATION: Mission requirements, operational are incompatible with use by other coqonenets.
considerations, and location
DD FORM 1391, DEC 76 Previous editions are obsolete.
Page No.
271
1. COMPONENT
AIR
FORCE
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
3. INSTALLATION AND LOCATION
(ccmputer generated)
RAP LAKBHBATH, VNITBD KINGDOM
2.
DATE
4. PROJECT TITLE
ADD TO AND ALTER CRASH
FIRE
STATION
5.
PROGRAM ELEMKUT
27596
6. CATEGORY CODE 7. PROJECT NUMBER
8.
PROJECT COST ($000)
731-142 MSET013002R
2,667
12.
SUPPLEKKNTAL DATA: a. Estimated Design Data:
(1) Status:
(a) Date Design Started
(b) Parametric Cost Estimates ueed to develop costs
(c) Percent Complete as of 01 JAN 2003
(d) Date 35% Designed
(e) Date Design Complete
(f) Energy Study/Life-Cycle analysis was/will be performed
02-APR-02
Ol-AUG-02
15-AUG-03
YBS
(2)
Basis:
(a) Standard or Definitive Design -
(b) Where Design
Was
Most Recently Used -
NO
(3) Total C&t (c) = (a) + (b) or (d) + (e):
(a) Production of Plans and Specifications
(b) All Other Design Costs
(c) Total
(d) Contract
(e) In-house
(4) Construction Contract Award
(5) Construction Start
(6)
Construction Coaqletion
($000)
0
75
75
0
0
04
JAN
04 MAY
05 MAR b. Equipment associated with this project provided from other appropriations:
EQUIP- NOMENCLATURE
COMMIJNICATION EQUIPMENT
FDRNITuRE
PROCURING
APPROPRIATION
3400
3400
FISCAL YEAR
APPROPRIATED
OR REQUESTED
2005
2005
COST
($000)
197
100
FORM 1391, DEC 76 Previous ealclons are oosolece.
rage 1~0~
272
l.COMPOmtJT
NRFORCB
FY 2004 MILITARY CONSTRUCTION PRO.JECT MTA
(computer genemated)
2.
MTE
3. INSTALLATI~AND LQCATION
RAFLAlmmBATB,vuI~-
5.PROgRAM~
4. PBOJZCT TITLE
DONIUTORY
(120 RM)
6.CATSgOxYCOm 7. PBDJBCTUUMBXB 8 . PBOJXCT COST ($000)
27596 721-312 llWT923005R
9.
COST EsTmTBs
13,606
DORWITORY (120 RX)
DORMITORY
ANTITERRoRISMFORCRPROTECTIOH
SUPPORT= FACILITIIS
UTILITILS
SITE IMP-s
PAWS
CO~CATIONS
8vBlwrAL couT( 5.0 %) roT~coxull?Am~
EUPRRVISI~, ImPRcTIoHAErDovKRsmm m=-
POTAL BBQVBST (ROVIYDH)) 13,606
BQDIPMRWTFRCMOTKKRAPPROPRX&TIONS (m-&DD)
( 113 1 to.
Description of Proposed Construction: Thrse story facility with reinforced zoncrete foundations and floor slab, masonry walls with brick veneer, pitched roof with
:lay tiles. Includes rocm-bath-kitchen-roan modules, lounge, laundry snd storage rmm.
mzludes all utilities, site * mvements, all supporting facilities.
Includes rinimum DOD interim force protection standards.
Ll.REQUIREMWT: 1,310RM ADEQVATB: 846RH SVBSTANMRD: OBM
?ROJECT: Construct a dmmitoxy.
(current Mission) lEQt : A major
Air Foroe objective provides unaccaapanied enlisted personnel with musing conducive to their proper rest, relaxation, and personal well-being. Properly lesigned snd furnished quarters pruviding scme degree of indAvidua1 privacy are mseutial to the successful ac-libhment of the increasingly complicated and important lobs these people must perform.
The retention of these highly trained airmen is msential to our readiness posture and continuing world-wide presence.
Complies with
&e DOD interim minimum force protectiw ConStruCtion Standards.
VRREWT SITUATION: The base has insufficient on-base housing to acccmmodate the maccaapanied enlisted (El - M) personuel.
ThiS project is prioritized in accordance pith the Air
Force Dormitory Master Plan.
tBIPAC!TIFNOT PROVIDED: Adequate living quarters which provide a level of privacy required for today's aizmen will not be available, resulting in degradation of morale, moductivity, and career satisfaction for unacccqmnied enlisted personnel.
4DDITIONAL: This project meets the scope/criteria specified in OSD's design and
:onstruction standards for unaccolqpanied enlisted personnel housing, published in ;htn
)l.
All lmown alternatives were considered during the developaent of this project. No jther option could meet mission requirements.
Therefore, an ecommic analysis was not
DD FORM 1391,
DEC 76 Previous editions are obsolete.
Page No.
273
l.coMPoNRNT
AIR FORCE
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
3. INSTALWTIW AND LOCATION
(camlputer generated)
4. PROJECT TITLE
2. DATE
RAFLAmQamATN,uNITH)~
5. PROGRAM m 6.
DORMITORY (120 RM)
CATRGORY CODR 7. PROJECT NtR5RR 8. PROJECT COST ($000)
27596 721-312 MSET923005R 13,606 performed.
This project is not eligible for NATO funding.
FYOl Unaccceqpanied Rousing
WN Conducted: $0; RlO2 Unaccaapanied Rousing RPM Conducted: $238K.
Future haccuapanied Housing RPN requi-ts (estimated): FYO3: $0; FYO4: $387.4Ki l'YO5:
:4,960X.
Base Civil Ragineer: LT Co1 Thanas D. Quasney, 01-44-1638-522-100.
lonnitory: 3,960 SN = 42,610 SF
~RRIGNCuRRmwr: FCF Budget Rate Used: POUND -7091
TOINT USE CRRTIFICATION: Mission requirements, OpratiOIEd COnSideratiOn, and location ue incompatible rrith use by other cwnents
DD FORM 1391, DRC 76 Previous editions are obsolete.
Page No.
274
l.cOMPOx6Rm
AIRFORCE
FY 2004 MILITARY CONSTRUCTION PROJECT
3. INSTALLATION AND LOCATION
RAFLAKmEmATN,uNITH)luNoDox
(computer generated)
DATA
4. PROJXCT TITLE
DORMITORY (120 RR)
5. PROGRAM RLRMEWT
27596
2. MTE
6. CATRGORY CODE 7. PROJECT RUldRm 8. PROJECT COST ($000)
721-312
MSET923005R
13,606
12. SUPP -AL DATA: a. IQdnbated Design Data:
(1)
Project to be accqlished by design-build procedures
(2) Basis:
(a) Standard or Definitive Design -
(b) Where Design Was Most Recently Used -
(3) All Other Design Costs
(4) Construction Contract
Award
(5) Constnlction start
(6) Construction Caapletion
(7) Energy Study/Life-Cycle analysis was/will be performed
No
382
04 JAN
04 MAY
05 OCT
YES b. Rquipment associated with this project provided from other appropriations: l -
EQOI- -L?iToRE
COMMUNICATION RQUIPBlTWI
FURNITURE
FISCAL YRAR
PRocuRINo APPRO APPROPRIATED
ORRRQURSTRD
3400
3400
2005
2005
COST
($000)
13
100
DD FORM 1391, DEC 76 Previous editions are obsolete.
Page No.
275
AIR FORCE
3. INSTALLATION AND LOCATION
?AF MILDENHALL
JNITED KINGDOM
3. Personnel
Strength
PERMANENT
OFF ENL CIV
4s OF 30 SEP 02
END FY 2007
7. INVENTORY DATA ($000)
400
396
3443
3406
3. Total Acreage:
1. Inventory Total as of : (30 Sep 02)
:. Authorization Not Yet in Inventory:
1. Authorization Requested in this Program:
1,121
?. Authorization Included in the Following Program:
630
626
. Planned in Next Four Years Program:
1. Remaining Deficiency:
I. Grand Total:
3. PROJECTS REQUESTED IN THIS PROGRAM:
ZATEGORY
=ODE
Zl4-425
‘32-443
‘37-884
PROJECT TITLE
Vehicle Maintenance Complex
Post Office
Child Development Center Annex aa. Future Projects: Included in the Following Program:
None
4. COMMAND:
UNITED STATES AIR
FORCE, EUROPE
STUDENTS
OFF ENL CIV
184 394
184 394
48
48
(FY 2005)
7
7
5. AREA CONST
COST INDEX
1.2
SUPPORTED
OFF ENL
17
17
CIV
2
2
TOTAL
512 15
5,08 i0
1,104,77 1
23,24 9
1055 8
0
83,83 8
125.460
1,347,87 6
975 SM
1,042 SM
1,161 SM
Total
(FY2005)
SCOPE
(FY 2004)
COST DESIGN STATUS
M P L
3,320 Design
3,592 Design
3,646 Design
10,558
Build
Build
Build
)b. Future Projects: Typical Planned Next Four Years:
113-321
131-111
171-627
!I4425
! 19-944
‘30-832
Strategic A/C Apron
Mobility Comm Complex
Water Survival Training Complex
LRS Complex
Base Civil Engineer Complex
Construct Large Vehicle Entry lnsp Station
125,000 SM
5,165 SM
5,511 S M
6,155 S M
8,349 S M
630 SM
17,500
17,800
2,900
16,330
24,008
5,300
)c. Real Propery Maintenance Backlog This Installation 111
IO. Mission or Major Functions: A host air refueling wing supporting a KC-l 35 squadron and the European Tanker Task
‘orce; headquarters Third Air Force; a special operations group flying MC-130H/P and MH-53M aircraft: a reconnaissance squadron; an intelligence squadron; and an air mobility support squadron.
3
1. Outstanding pollution and Safety (OSHA) Deficiencies: a. Air pollution b. Water Pollution c. Occupational Safety and Health d. Other Environmental
0
0
0
0
276
l.CcMPoNRNT
AIR FORCE
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
(ccaputer generated)
2. DATE
3. INSTALLATION AND LOCATION 4. PROJECT TITLE
RAF MI-, UNITED Km
5. PROGRAM ELEMENT
22176
6. CATEGORY CODE 7. PROiDZT NDMRRR
214-425 vERICLRmIwmNANCR~LEi
WQEO33008
8 . PROJBCT C O S T 18000)
Auth:
Approp:
3,320
3,320
9.
COST ESTIMATES
UNIT COST
U/LB
SPECIAL PURPOSE VERICLEMkIM7BANCECOUPLEX vERICLRlmINpENANcE FACILITY
ANFI-TERRORISM/ FORCE PROTRCTION
SM
SN
SM
975
975
975
2 , 3 5 8
2 , 4 2 6
2 , 5 1 5
153
( 2 , 3 6 5 )
( 149 1
8TJPPORTIbK; FACILITIES
UTILITIES
PAWS
SITE IMPRUVRMEM'S
DRMOLITION
=I
LS I
Ls
SM 7 7 2 1 2 3
6 0 5
( 180)
(
255)
( 75)
( 95)
S U B T O T A L
3,119
CONTt.5.0 %)
TOTALWWFRACTCOST
8uPRRvIs1oN, INSPRCTIcmANDovERHEm ( 2 . 5 %)
156
3 , 2 7 5
8 2
TOTAL REQUEST
TOTALREQlJRST(RODNDRD)
3 , 3 5 7
3 , 3 2 0
10.
Description of
Proposed Construction: Reinforced concrete foundations and floor
IlabS, steel frame structure, metal sidings and standing metal seam roof coverings, pavements, utilities and all necessary support.
Demolishes one facility (772SM). All vork to cazply with Host Nation/USAF Base Standards, and
NFPA reguirezmnts.
Includes tinizzm DOD interim force protection standards.
11. REQVIREMRNT: 975 SM
ADEQUATE:
OSM SUBSTANDARD: 772SM
?ROJRCT: Construct special purpose vehicle maintenance ccm@ex.
(current Mission)
?JIQD1RRMEWr:
A functional and adequately sized structure to support maintenance of 267 special purpose vehicles.
An adequate facility is required to maintain RAF Mildenhall rehicles and eguimt assets in ready condition to support mission readiness and nastain operational effectiveness.
* WRRRVI' SITlJATION: The special purpose vehicle maintenance operation is housed in a milding originally built as a receational workshop in 1938.
Since the original
:onstruction, there has been no major facility upgrades.
The building is undersized to met the functional requirements of the vehicle maintenance operation.
Inadequate and
Limited access to maintenance bays causes vehicles to be queued for maintenance.
Once peued, vehicles canuot be zmved until the vehicle in the front is moved.
This creates
:ongestion and inefficient working conditions.
space restrictions limit the number of
:echnicians that can work inside the facility.
Op to 50% of the assigned technicians zmt conduct vehicle maintenance in the prevailing weather.
The roof has reached the md of its useful life and rainwater penetrates the building causing damage to the
.nterior finishes.
Additionally, during heavy rain, water floods the facility resulting
.n operational down time.
The general condition of internal finishes; mechanical and llectrical systems have deteriorated and have reached the end of their useful life.
hese conditions create a degraded working environment, impair operational
DD FORM 1391, DEC 76 Previous editions are obsolete.
P a g e N o .
277
1. Cm¶PoNENT
AIRFCRCR
FY 2004 MILITARY CONSTRDCTION PROJECT
DATA
(caigruter generated)
3. INSTALTATI~ AND WCATICN 4. PROJRCT TITLE
2. DATE
RAFNILDENBALC,uNITKD-
5.
PRCGRAM W
6. CATRSDRY CODR
VERICLRBlAIBmRNAmR~LEx
7. PRCNRCT NDMSRR 8. PROJECT COST ($000,
22176 214-425 QFQEO33008 3,320 rffectiveness, wastes v, and may be detrimental to the morale of military wrscmnel.
R4Pm
IF
NOTPROVIDED: Inadequate space in a substandard facility will continue to degrade the vehicle maintenance operation.
The overall effect of physical separation, md insufficient functional space will continue to inpair vehicle maintenance operationr md hauger effectiveness.
Work efficiency and morale of military personnel will
:ontinue to suffer.
LDDITION?&: This project is not eligible for HATO funding, however, a precautionary
>re-financing statement will be filed in the event eligibility is established.
This project meets the criteria/scope specified in AF?I 32-1084, "Facility Requirements.m A preliminary analysis of options for satisfying this requirement indicates that only one wtion will meet operational requirements, therefore, a certificate of exception has men prepared.
Base Civil Engineer: 'Lt Co1 Erin Mercer, 011-44-1638-542205.
Special
?urpose Vehicle Maintenance Caqplex: 975 SM = 10,496
SF
?ORRI~mRRRNCY: FCF Budget Rate Used: PODND -7091
.
POINT USE CERTIFICATION: This facility can be used by other caaponents on an 'as rvailable" basis; however, the scope of the project is based on Air Force requirmaents.
DD FORM 1391, DRC 76 Previous editions are obsolete.
Page No.
278
I l.COMPoNRNT
AIR FORCE
F'Y 2004 MILITARY CONSTRDCTION PROJ-ECT
3. INSTALLATION AND LOCATION
RAFMImENEALL,uNITEDKlIwDm
(computer generated)
4.
MTA
PROJ'RCT TITLE vERIcLEMAI~ COMPLEX
2. MTE
5 .
PROGRAM m
22176
6. CATEGORY CODE 7 .
214-425
PROJEZT NUMRRR 8.
PROJRCT COST ($000)
QFQEO33008 3 , 3 2 0
12. SUPP - A L D A T A : a. Estimated Design Data:
(1) Project to be acccanDlished by design-build procedures
(2) Basis:
(a) Standard or Definitive Design -
(b) Where Design Was Most Recently Used -
(3) All Other Design Costs
(4) Construction Contract Award
(5) Construction Start
(6) Construction Ccc@etion
(7) Energy Study/Life-Cycle analysis was/will be performed
No
94
04 JAN
0 4 JUN
0 5 NAR
YES b. Equipment associated with this project provided frorm other appropriations:
N / A
DD
PORN
1391, DRC 76 Previous editions are obsolete.
Page
No.
273
1. COMPONENT
AIR FORCE
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
3. INSTALLATION AND LOCATION
(computer generated)
4. PROJECT TITLE
RAFWILDRWHALL, UNITED KINGDOM
5. PROGRAM ELEMENT
POST OFFICE
6. CATEGORY CODE 7. PROJECT NIJb5RR 8.
2. DATE
PROJECT COST ($000)
27596 7 3 2 - 4 4 3
9 .
QFQQE033007
COST ESTIWATES
3 , 5 9 2
UNIT COST
POST OFFICE
POST OFFICE FACILITY
ANTITERRORISM FORCE PROTECTION
SM
SM
SY
1,042
1,042 (
1,042
0
2 , 3 8 3
151
2 , 6 4 0
( 2.483
1
( 157 )
SUPPORTING FACILITIES 6 4 2
UTILITIES
PAVEMENTS
SITE IWPROVEMENTS
COWWUNICATIONS
LS
LS
LS
LS
( 165)
( 285)
( 115)
( 77)
SUBTOTAL 3 , 2 8 2
CONTINGENCY (,5.0 %)
TOTAL CONTRACT COST
SUPERVISION, INSPECTION AWD OVERRRAD
TOTAL REQUEST
( 2 . 5 %I
164
3 , 4 4 7
8 6
3 , 5 3 3
TOTAL REQUEST (ROUNDED)
11. REQUIREWRNT: 1.042SM
ADEQUATE: 0 SM
3,592
LO.
Description of Proposed Construction: Construction will include required site uork, reinforced concrete foundation, steel structure, masonry exterior walls, roof system, fire protection, parking, and all utilities.
Include minimum DOD interim force
Frctection standards.
SUBSTANDARD : 9 6 9 SM
PROJECT: Construct post office.
(Current Mission)
RRQUIRKKEWT: A properly sized and configured facility to conduct comprehensive processing and delivery of both official and personal mail.
Space required for customer service and administrative support area.
The existing post office is too small and does not adequately meet current base population requirements and volume of mail.
The post office is located in
I facility originally constructed in 1931 as a dining hall.
Although part of the ground
Eloor area has been modified to accommodate the post office, the available functional space is undersized and does not meet the operational requirements of a post office. The
Lack of functional space to receive, sort, and distribute the high volume of mail results in having to store and sort mail in other work areas.
These conditions create a degraded work environment, inqpair operational effectiveness, and may be detrimental to the morale of post office personnel.
Additionally, the post office is located in a highly populated area and is the second most visited building on base.
With few parking spaces available, this creates vehicle congestion during peak periods leading to xstomer frustration, long waiting times, and traffic queues.
Road congestion also restricts access for emergency response vehicles.
MPACT IF NOT PROVIDED: Inadequate space in an undersized facility will continue to degrade the post office operation.
Insufficient functional space will continue to impair post office operations and hamper effectiveness in processing and delivering
DD FORM 1391, DEC 76 Previous editions are obsolete.
Page No.
280
1. COWPONRNT
AIR PORCE
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
(computer generated)
3. INSTALLATION AWD LOCATION
RAPWILDRNRALL, MTRDKINGDOM
5. PROGRAM ELRWRWT 6. CATEGORY CODE
4. PROJECT TITLE
POST OFFICE
7. PROJECT NDWRRR
2. DATE
8. PROJECT COST ($000)
27596 732-443 QPQE033007 3,592 official and personal mail.
Work efficiency and morale of post office pereonnel will
:ontinue to suffer.
Inadequate parking apace and road traffic congestion at peak periods will continue ae will customer frustration, long waiting times, and traffic peuee Customer dissatisfaction will negatively impact quality of life and morale throughout the community.
U)DITIONAL: This project is not eligible for NATO funding.
This project meets the
:riteria/scope specified in APEX 32-1084, "Facility Requirements".
A preliminary malysis of options for satisfying this requirement indicates that only one option will neet operational requiremente.
A certificate of exception has been prepared.
Base
Xvi1 Engineer: Lt Co1 Erin Mercer, 011-44-1638-542205.
Post Office: 1,042 SM =
11,216 SF.
'ORRIGN c[JRRENcy: FCB Budget Rate Used: POUND .7091
JOINT USE CERTIFICATION: This facility can be used by other components on an "aa available" basis; however, the scope of the project ie based on Air Force reguiramente.
DD FORM 1391, DEC 76 Previous editions are obsolete.
Page No.
1. COMPONBNT
AIR PORCE
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
(computer generated)
3. INSTALLATION AND LOCATION
RAFMILDENHALL, UNITED KINGDOM
4. PROJECT TITLE
POST OFFICE
5. PROGRAM ELEMENT
27596
2. DATE
6. CATEGORY CODE 7. PROJECT NDMEER 8. PROJECT COST ($000)
732-443 QFQE033007 3,592
12. SUPP LRMRNTAL DATA: a. Estimated Design Data:
(1) Project to be accomplished by design-build procedures
(2) Basis:
(a) Standard or Definitive Design -
(b)
Where
Design Wae Moat Recently Used -
(3) All Other Design Costs
(4) Conetruction
Contract Award
(5) Construction Start
(6) Construction Completion
(7) Energy Study/Life-Cycle analysis wae/will be performed
04
NO
98
JAN
04 MAY
05 J-UN
YES b. Equipment ksociated with this project provided frcun other appropriations:
N/A
DD FORM 1391, DEC 76 Previous editions are obsolete.
Page No.
232
1. COMPONENT
I
AIR FORCE
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
(ccunputer generated)
I
2. DATE
3. INSTALLATION AND LOCATION 4. PROJECT TITLE
R A F M I L D - , UNITED KINGDOM
5. PROGRAM ELRHRNT
I
I CHILDDRVRLOPMRWT CRNTRRANNRX
6.
CATEGORY CODE 7. PROJECT NUMRRR 8. PROJECT COST ($000)
27596 737-884 QFQR033011
9.
COST ESTIMATES
I ai
UNIT
3,646
COST
CRILDDRVRLOPMRNT CRNTRRANNRR
CHILDDRVRLOPMRNTANNRX
ANTITERRORISM FORCE PROTECTION
SM
SM
SY
1,161
1,161
1,161
0
2,424
152
2,991
( 2,814)
( 176)
SUPPORTING FACILITIES
UTILITIES
PAVRMENTS
SITE IMPROVRMRNTS
COMMUNICATIONS
SUBTOTAL
ZONTINGRNCY (,5.0 %)
POTAL CONTRACT COST
SUPERVISION, INSPECTION AND OVERRRAD
KYTAL REQUEST
POTAL REQUEST (ROUNDRD)
( 2.5 %I
LS
LS
LS
LS
.o .
Description of Proposed Conetruction: Construction will include required eite rork, reinforced concrete foundation, steel etructure, masonry exterior walls, roof system, fire protection, and all utilities.
Includes administration, support, hourly iare, toddler area, infant care, kitchen area, pre-school area, including mechanical
'Oom .
Includes minimum DoD interim force protection etandarde.
.l. REQUIRRMRNT: 3,466SM
ADEQUATE:
2,305 SM SUBSTANDARD : 0 SM
'ROJRCT: Construct child development center (CDC) annex.
(Current Miseion)
!RQUIRRMEWT: A properly sired and configured facility to conduct comprehensive and
Balanced programs for child development.
Programs to be supported include hourly care,
:oddler care, infant care, kitchen area, and pre-school area.
'URRRNT SITUATION:
The exieting CDC ie too amall to adequately meet the requirements of
:he baee population.
The existing facility currently provides child development mograme for
184 children.
The current waiting list ranges between 210 and 260 hildren, and hae remained at thie level for over two years.
Lack of adequate apace at
:he existing facility severely impacts the baee'e ability to offer child development brograma to prcnmte the social, mtional, phyeical, and cognitive development of the
!hildren of military and civilian personnel. Additionally, off-base alternatives are tnreliable, inconveniently located, expeneive, and do not provide the development kpportunities that are available in an Air
Force facility.
:MPACT IF NOT PROVIDED: Failure to provide a suitably sized child development center rill continue to degrade the base's ability to provide effective child development mograma The social, emotional, physical, and cognitive development of the children rill continue to be impaired. The baee will not meet local and Air Force-wide child
Levelopment program directives.
Lack of adequate facilities will continue to negatively mpact quality of life and morale throughout the community.
405
( 76
( 190
( 114
( 25
3,396
170
3,566
89
3,655
3,646
)D FORM 1391, DEC 76 Previous editions are obsolete.
Page No.
1. COMPONENT
AIR FORCE
5. PROGRAM ELEMEBT
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
3. INSTALLATION AND LOCATION
RAF MILDENNALL, UNITED KINGDOM
(computer generated)
4. PROJECT TITLE
CBILDDEVELOPMEBT CENTER ABNEE
6. CATEGORY CODE 7. PRO
J
ECT NUMBER 8.
2. DATE
PROJECT COST ($000)
27596 737-804 QFQEO33011 3,646
UlDITIONAL: This project is not eligible for NATO funding.
This project meets the
:riteria/scope specified in AFB 32-1084, "Facility Reguirementsm.
A preliminary malysis of options for satisfying this requirement indicate8 that only one option will neet mission requirements.
A certificate of exception hae been prepared.
Base Civil
3ngineer: Lt Co1 Erin Mercer, 011-44-1638-542205.
Child Development Center Annex:
1,161 SE = 12,500 SF.
?OREI(;N CURRENCY: FCF Budget Rate Used: POUND .7091
JOINT USE CERTIFICATION: This facility can be used by other components on an .as
available" basis; however, the scope of the project is baaed on Air Force requirements.
DD FORM 1391, DEC 76 Previoue editions are obsolete.
Page No.
1. COMPONENT
AIR FORCE
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
3. INSTALLATION AND LOCATION
RAPMILDRNHALL, UNITED KINGDOM
(computer generated)
4. PROJECT TITLE
2. DATE
CHILD DRVKLGPMKNT CKNTERANNRK
5. PROGRAM ELKbZRNT
27596
6. CATEGORY CODE 7. PROJECT NUMSER 8. PROJECT COST ($000)
737-004 QFQEO33011 3,646
12. SUPPLKMKNTAL DATA: a. Estimated Design Data:
(1) Project to be accomplished by design-build procedures
(2) Basis:
(a) Standard or Definitive Design -
(b) Where Design Was Most Recently Used -
(3) All Other Design Costs
(4) Construction Contract Award
(5) Construction Start
(6) Construction Completion
(7) Energy Study/Life-Cycle analysis was/will be performed
NO
102
04 JAN
04 JON
05 OCT
YES b. Equipment associated with this project provided from other appropriations:
N/A
DD FORM 1391, DEC 76 Previous editions are obsolete.
Page No.
b. Inventory Total as of : (30 Sep 02) c. Authorization Not Yet in Inventory: d. Authorization Requested in this Program: e. Authorization Included in the Following Program: (FY 2005) f. Planned in Next Four Years Program: g. Remaining Deficiency: h. Grand Total:
8. PROJECTS REQUESTED IN THIS PROGRAM:
CATEGORY
CODE
112-211
113-321
PROJECT TITLE
Repair Airfield Pavement, Ph 3
Upgrade Island-Wide Infrastructure, Ph 1
91,000
203,724
SCOPE
(FY 2004)
117,000 SM
90,000 SM
COST DESIGN STATUS
$000 S T A R T C M P L
14,000 Jun-02
10,000 Jun-02
Sep03
Sep-03
9a. Future Projects: Included in the Following Program:
Total
(FY2005)
24,000
None
9b. Future Projects: Typical Planned Next Four Years:
113-321 Upgrade Island-Wide Infrastructure, Ph 3
113-321 Upgrade Island-Wtde Infrastructure, Ph 2
1 LS
1 LS
Total
25,000
25,000
50,000
9c. Real Prooetv Maintenance Backloa This Installation 0
10. Mission or Major Functions: An airlift wing with five C-l 30 squadrons conducting operations and training--the only DOD C-l 30 training base; an Air Mobility Command airlift group with C-l 30 aircraft; an ANG C-l 30 airlift wing; and an AFRC aerial port squadron.
11. Outstanding pollution and Safety (OSHA) Deficiencies: a. Air pollution b. Water Pollution c. Occupational Safety and Health d. Other Environmental
286
1. COMPONEWT
AIR FGRCE
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
(computer generated)
3. INSTALLATION AWD LGCATION
WARE ISLANDAIRFIELD, GUAW
5. PRGGRAW ELRWKWT
4. PROJECT TITLE
REPAIR AIRFIELD PAVEbUINT, PH 3
6. CATEGGRY CODE 7. PROJECT NZTblBRR
2. DATE
8. PROJECT COST ($000)
22176 112-211 YGF7.953012
9.
COST ESTIMATES
14,000
UNIT COST
-ITEM n/EL-
REPAIR AIRFIELD PAVEbENT, PH 3
REPAIR AIRFIELD PAW
APRONS
SUPPORTING FACILITIES
UTILITIES
Dm & OFF SITE DISPOSAL
I
LS
SM
SM
LS
LS
97,000
20,000
110
80
12,270
( 10,670)
( 1,600)
690
( 220)
( 470)
SUBTOTAL
CONTINGENCY ( 5.0 %I
TOTAL CONTRAeT COST
SUPERVISION, INST$CTION AND OVERHEAD ( 6.5 %I
TOTAL REQUEST
TOTAL REQUEST (ROUNDED)
12,960
648
13,608
885
14,493
14,000
10.
Description of Proposed Construction: Repair existing taxiway and apron pavement.
Repair base and subgrade material as needed before resurfacing and restriping.
Replace pavement markings, signage, airfield lighting, off-island disposal of debris, and all necessary support.
11. RRQUIRRWRNT: 117,000 SM ADEQUATE: 0 SW SUBSTANDARD: 117,OOOSM
PROJECT: Repair airfield pavements. (Current Wiseion).
RRQUIRRWRNT: Adequate tsxiway and apron pavement free from foreign object debris (FOD) risk to aircraft is reguired to support safe operations of fighter and transport nircraft.
This is an essential enroute airfield needed to support Pacific Cozzzand
(PACOM) contingency operations and is used by all U.S. military services.
w WRRRWT SITUATION: The taxiway and apron pavements are badly deteriorated and major POD generators.
Surface distresses include high severity block cracking, weathering, swelling and depressions.
The traffic lanes also have rutting and alligator cracks indicating areas of weak base material.
Taxiways have not been paved since the 1970's
%nd are in need of repair.
CWPACT IF NOT PROVIDED: Aircraft safety is severely jeopardized and FOD will be an increasing safety problem.
Without innnediate attention, the runway will continue to deteriorate to the point of complete failure and will not support future aircraft
Dperations.
4DDITIONAL: This projects meets the criteria/scope specified in AFH 32-1004, "Facility
Requiremsnts.n
All known alternative options were considered during the development of this project.
No other option meets the mission requirement; therefore, no economic analysis was performed.
A certificate of exemption has been prepared.
This is phase three of a multi-phase initiative totaling over $75M to restore essential island infrastructure to a safe condition to support enroute missions.
Antiterrorism/Force
Protection features will be in accordance with local threat assessment.
BASE CIVIL
ENGINEER: Lt Co1 Bide, (671) 366-7101.
Repair Taxiway and Apron Pavement: 117,000 SM =
DD
FORM
1391, DEC 76 Previous editions are obsolete.
Page No.
237
1. comoNENT
AIR FORCE
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
(cwuter generated)
2. DATE
3. INSTALLATION AND LOCATION 4. PROJZCT TITLE
WAKX ISLAND AIRFIELD, GUAM
5.
PROGRAM ELEbXENT
6.
REPAIR AIRFIELD PAVEMENT, PE 3
CATEGORY CODE 7. PROoJEcr =ER
8.
PROJECT COST ($000)
22176 112-211 YGFZ953012 14,000
L39,935 SY.
JOINT USE CERTIFICATION: This facility is prograuuued for joint use with all U.S. service
:wonents supporting PACAF missions; however, it is fully funded by the Air Force.
3’
DD FORM 1391, DEC 76 Previous editions are obsolete.
Page No.
258
2. DATE 1. COMPONENT
UR FORCE
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
(computer generated)
3. INSTALLATION AND LOCATION 4. PROJECT TITLE
WARE ISLANDAIRFIELD, GDAW
5.
PROGRAW ELEWENT
22176
12. SDPP LEWENTAL DATA:
6.
CATEGORY CODE
112-211
I REPAIR AIRFIELD PAVEblENT, PH 3
7.
PROJECT NDMBER 8. PROJECT COST ($000)
YGPZ953012 14,000 a. Estimated Design Data:
(1) Status:
(a) Date Design Started
(b) Parametric Cost Eetimatee ueed to develop coets l
(c) Percent Complete as of 01 JAN 2003
* (d) Date 35% Designed
(e) Date Design Complete
(f) Energy Study/Life-Cycle analysis was/will be performed
21-JDN-02
YES
15%
15-AUG-02
Ol-SEP-03
NO
(2) Basis:
(a) Standard or Definitive Design -
(b) Where Design Was Most Recently Used -
NO
(3) Total Cost (c) = (a) + (b) or (d) + (e):
(a) Prowction of Plane and Specifications
(b) All Other Design Costs
(c) Total
(d) Contract
(e) In-house
(4) Construction Contract Award
(5) Construction Start
(6) Construction Completion
($000)
840
420
1,260
1,050
210
03
DEC
04
JAN
05
DEC l
Indicates completion of Project Definition with Parametric Cost Estimate which ie comparable to traditional 35% design to ensure valid mope, coet and executability.
b. Equipment aaeociated with this project provided from other appropriations:
N/A
DD FORM 1391, DEC 76 Previous editions are obsolete.
Page No.
1. COMPONENT
AIR FORCE
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
(computer generated)
2. DATE
3. INSTALLATION AND LOCATION
WARE ISLAND AIRFIELD, GUAW
5. PROGRAM ELEWRNT
4. PROJECT TITLE
UPGRADE ISLAWD-WIDE INFRASTRUCTURE,
PH 1
6. CATEGORY CODE 7. PROJECI NUMRER 8. PROJECT COST ($000)
22176 113-321 YGFZO43001
9.
COST ESTIMATES
10,000
UNIT COST u/EL-
1
TF'GRADE
APRON
ISLAND WIDE INFRASTRUCTURE, PH 1
PAVEMENT
LS
SM 90,000 07
7,830
( 7,830)
WJPPORTING FACILITIES
UTILITIES
DEMO AND OFF SITE DISPOSAL
3UBTOTAL
ZONTINGENCY ( 5.0 %)
POTAL CONTRACT COST
XIPERVISION, INSPECTION AND OVERHEAD ( 6.5 %) a-
FOTAL REQUEST mTAL REQUEST (ROUNDED)
I I
LS
LS
1,100
( 300)
( 800)
8,930
447
9.377
609
9,986
10,000
.O.
Description of Proposed Construction: Repair existing apron pavement.
Repair base and sub-base materials as needed before resurfacing and restriping.
Replace bavement markings, signage, airfield lighting, off-island disposal of debris, provide et fuel resistant sealant, and all necessary support.
l. RRQUIREWRWT: 110,146 SM ADEQUATE: 0 SM SUBSTANDARD: 110,146SW
'ROJ'RCT: Upgrade island-wide infrastructure (phase 1) to include the repair of aircraft apron pavements.
(Current Mission)
EQUIRRKENT: Adequate apron pavement free from foreign object debris (FOD) risk is eguired to support safe operations for fighter and transport aircraft.
This is an ssential enroute airfield needed to support Pacific Command (PACOM) contingency perations and is used by all U.S. military services.
URRENT SITUATION: The apron pavements are badly deteriorated and major POD generators.
Distress include high severity block cracking, fuel spill damage, and weathering. The r aveled condition creates POD and requires frequent pavement sweeping.
Parking r estrictions are periodically imposed due to FOD.
I WPACI IF NOT PROVIDED: Aircraft safety is severely jeopardized and FOD will be an i ncreasing safety problem.
Without immediate attention, the apron pavements will
C ontinue to deteriorate to the point of complete failure and will not support future a ircraft operations.
i!
DDITIONAL: This project meets the criteria/scope specified in AFR 32-1084, "Facility
R equirements.m
All known alternative options were considered during the development of t his project.
No other option meets the mission requirement; therefore, no economic a nalysis was performed.
A certificate of exemption has been prepared.
T his is the first phase of a three-phase initiative totalling $60M to restore essential i eland infrastructure and facilities to a safe condition to support enroute missions.
A ntitesrrorism/Force Protection features will be in accordance with local threat a ssessment.
BASE CIVIL ENGINEER: Lt Co1 Eide, (671) 366-7101. Repair Apron Pavement:
1 10,146 St4 = 131,738 SY.
DD
FORM
1391, DEC 76 Previous editions are obsolete.
Page No.
290
1 . coMPoNENT
AIR FORCE
FY 2004 MILITARY CONSTRUCPION PROJEer DATA
(computer generated)
2. DATE
3. INSTALLATION AND LOCATION 4. PROJECT TITLE
WARE ISLAND AIRFIELD, GUAM
5.
PROGRAM ELEMENT
6.
CATEGORY
UPGRADE ISLAND-WIDE INFRASTRUCTURE,
PH 1
CODE 7. PROJECT NUMEER
8.
PROJECT COST ($000)
22176 113-321 YGFZ043001 10,000
JOINT USE CERTIFICATION: This facility is programmed for joint use with all U.S. service xmponents supporting PACOM missions; however, it is fully funded by the Air Force.
DD FORM 1391, DEC 76 Previous editions are obsolete.
Page No.
1. comoNENT
AIRPDRCE
PY 2004 MILITARY CONSTRUCTION PROJECT DATA
3. INSTALLATION AND LGCATION
WARE
ISLAND
AIRFIELD, GUAM
(ccmputer generated)
4. PROJECT TITLE
2. DATE
UPGRADE ISLAND-WIDE INPRASTRUCTURE,
PH 1
5. PROGRAM ELEMENT
22176
6. CATEGGRY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000)
113-321
YGFZ043001
10,000
12. SUPP LEMENTAL DATA: a. Estimated Design Data:
(1) Status:
(a) Date Design Started
(b) Parametric Cost Estimates used to develop costs l
(c) Percent Complete as of 01 JAN 2003
* (d) Date 35% Designed
(e) Date Design Cqlete
(f) Energy Study/Life-Cycle analysis was/will be performed
21-J-UN-02
YES
15%
01-AUG-02
15-SEP-03
NO
(2) Basis:
(a) Standard or Definitive Design -
(b) Where Design Was Most Recently Used -
*-
(3) Total Cost (c) P (a) + (b) or (d) + (e):
(a) Production of
Plans and Specifications
(b) All Other Design Costs
(c) Total
(d) Contract
(e) In-house
(4) Construction Contract Award
(5) Construction Start
(6) Construction Completion l
Indicates completion of Project Definition with Parametric Cost Estimate which is comparable to traditional 35% design to ensure valid scope, cost and executability.
NO
($000)
600
300
900
750
150
03 DEC
04 JAN
05 JUL b. Equipment associated with this project provided from other appropriations:
N/A
I
1391, DEC 76 Previous editions are obsolete.
Page No.
Il. COMPONENT
AIR FORCE
I
INSTALLATION AND LOCATION
VARIOUS LOCATIONS
ICOMMAND:
I
DATE
AREA CONST
AS OF 30 SEP 02
Inventory Total as of : (30 Sep 02)
Authorization Not Yet in Inventory:
Authorization Requested in this Program:
Authorization Included in the Following Program:
Planned in Next Four Years Program:
Remaining Deficiency:
. PROJECTS REQUESTED IN THIS PROGRAM:
LATEGORY
:ODE
IO-21 1
RROJECT TITLE
Planning and Design
‘a. Future Projects: Included in the Following Program:
~10-211 Planning and Design lb. Future Projects: Typical Planned Next Four Years:
~10-211 Planning and Design
11 o-21 1
110-211
110-211
Planning and Design
Planning and Design
Planning and Design
IC. Real Propery Maintenance Backlog This Installation
1. Outstanding pollution and Safety (OSHA Deficiencies: a. Air pollution b. Water Pollution c. Occupational Safety and Health d. Other Environmental
SCOPE
(FY 2004)
COST DESIGN STATUS
$.OOO S T A R T C M P L
Total
74,345
74,345
(FY2005)
Total
133,501
133,501
129,961
135,500
147,292
184,914
I
DD Form 1390,24 Jul 00
293
DRAFT1
1. COrnONENT
AIR FGRCB
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
(computer generated)
2. DATE
3. INSTALLATION AND LOCATION
EQ USAF, DISTRICT
OF
CGLUEEIA
5. PRGGRAM ELEMENT
4. PROJECT TITLE
PLANKING AND DESI@I
6. CATEGGRY CODE 7. PROJECT N'UEEER 8. PROJECT COST ($000)
91211 102-11 PAY2040001
9.
COST ESTIMATES
74.345
UNIT COST
U/~~
'LANNING AND DESIGN
KlPPORTING FACILITIES l. REQUI RENENT: &as
LS
XIBTOTAL
DTAL CONTRACT COST
!OTAL REQUEST
!OTAL REQUEST (ROUNDED)
74,345
74,345
74,345
74,345
0.
Description of Proposed Construction: The funds requested will be used to provide inancing for architectural and engineering services and construction design for Air
'orce Military construction and host nation funded construction program.
ADEQUATE: LS SWSTANDARD:LS
74,345
0
EQUIRBMBET: These planning and design funds are required to complete the design of acilities in the FY05 Military Construction Program, initiate design of facilities in
.he FY06 Military Construction Program and accomplish planning and design for major and cmplex technical projects with a long lead-time to be included in subsequent Military lonstruction Programs.
Also provides funds for value engineering and for the support of design and construction management of projects that are funded by foreign governments nd for design of classified and special programs.
DD FORM 1391, DEC 76 Previous editions are obsolete.
Page No.
II. COMPONENT
AIR FORCE
I
INSTALLATION AND LOCATION
VARIOUS LOCATIONS
COMMAND:
HQ USAF
I
2. DATE
5. AREA CONST
COST INDEX
WASHINGTON, DC
6. Personnel
Strength
AS OF 30 SEP 02
END FY 2007
PERMANENT
O F F E N L CIV
STUDENTS
O F F E N L C I V
SUPPORTED
OFF ENL CIV
7. INVENTORY DATA ($000)
Total Acreage:
Inventory Total as of : (30 Sep 02)
Authorization Not Yet in Inventory:
Authorization Requested in this Program:
Authorization Included in the Following Program:
Planned in Next Four Years Program:
Remaining Deficiency:
Grand Total:
(FY 2005)
TOTAL
0
0
12,000
13,000
59,000
0
84,000
I
8. PROJECTS REQUESTED IN THIS PROGRAM:
CATEGORY
CODE
010-211
PROJECT TITLE
Unspecified Minor Construction
9a. Future Projects: Included in the Following Program:
010-211 Unspecified Minor Construction
SCOPE
(FY 2004)
COST DESIGN STATUS
S.000 S T A R T C M P L
Total
12,000
12.000
(FY2005)
Total
’
13,000
13,000
9b. Future Projects: Typical Planned Next Four Years:
010-211 Unspecified Minor Construction
01 o-21 1 Unspecified Minor Construction
010-211 Unspecified Minor Construction
010-211 Unspecified Minor Construction
9c. Real Propery Maintenance Backlog This Installation
11. Outstanding pollution and Safety (OSHA Deficiencies:
a. Air pollution b. Water Pollution
14,000
15,000
15,000
15,000 c. Occupational Safety and Health
I
DD Form 1390.24 Jul 00
295
1. COMPONENT
AIR FORCE
FY 2004 MILITARY CONSTRUCTION PROJECT DATA
(computer generated)
2. DATE
3. INSTALLATION AND LGCATION
HQ USAF, DISTRICT OF COLUMBIA
5. PROGRAM ELBMENT
4. PROJECT TITLE
UNSPECIFIED
6. CATEGGRY CODE 7. PROJECT NUblBBR
MINOR
CONSTRUCTION
8. PROJECT COST ($000)
91211 102-11 PAY2040002
9.
COST ESTIMATES
12,000
UNIT COST
UNSPECIFIED MINOR CONSTRUCTION
SUPPORTING FACILITIES
LS 12,000
0
SUBTOTAL 12,000 l!OTAL CONTRACT COST
POTAL REQUEST
I'OTAL REQUEST (ROUNDED)
12,000
12,000
12,000
LO.
Description of
Proposed Construction: Provide a lump sum amount for unspecified
:onstruction projects not otherwise authorized by law.
Minor construction projects
:osting less than these limits are authorized to be funded frcan the operations and
Paintenance appropriation.
Includes construction, alteration, or conversion of
>ermanent or tempb‘rary facilities.
11. REQUIREbIENT: LS ADEQUATE: LS SWSTANDARD:LS
'ROJECI': As required.
REQUIREMENT: BSinor construction projects authorized by 10 U. S. Code 2805 are military
:onstruction projects with an estimated funded cost between $750,000 and $1,500,000; mwever, projects with au estimated funded cost of $l,OOO,OOO to $3.000.000 may be iunded under this authority when specifically planned to correct a life, health or safety deficiency.
This package prwides a means of accomplishing urgent projects that ue not identified but which are anticipated to arise during FYO4.
Included would be mojects to support new mission requirements, support of new equipment and concept, and
Bther essential support to Air
Force missions and funtions that could not wait until availability of FYO4 Military Construction Program funds.
DD FORE 1391, DEC 76 Previous editions are obsolete.
Page No.
296