Department of the Air Force Military Construction and Family Housing Program Fiscal Year (FY) 2001 Budget Estimates Justification Data Submitted to Congress February 2000 Table of Contents Family Housing Narrative Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 271 Index ...................................................................................... 273 Summary ............................................................................... 277 Legislative Language ........................................................... 279 New Construction ................................................................. 281 Post Acquisition Construction ............................................ 299 Advanced Planning & Design ............................................. 351 0 & M Summary ................................................................. 353 Operations ............................................................................ 361 Utilities .................................................................................. 371 Maintenance ......................................................................... 375 Maintenance & Repair Over $15K .................................... 379 G&FOQ Over $25K ............................................................. 387 Reimbursable Program ....................................................... 397 Leasing .................................................................................. 399 Debt Payments ...................................................................... 407 Foreign Currency Exchange Data ...................................... 409 2 FAMILY HOUSING PART 1 PAGES 271-298 2. DATE CONSTRUCTION PROGRAM (computer generated) AIR FCRCE ~~5. AREA CCNST 3. INSTALLATION AND LOCATION 4. CCMMSIND AIR FORCE DISTRICT COST INDE:I BOLLING AIR FORCE BASE, DISTRICT OF ,OF WASHINGTON C. 95 COLUMBIA PERMANENT STUDENTS SUPPORTED 6. PERSONNEL CIV STRENGTH OFF ENL OFF ENL ,CI'J OFF: ENL CIV TOTAL ~ 495' 1403 9i5i 301' a. As of 30 SEP 99 803, 40' 3,957 ( 492' 14081 876; 3011 803, 40 b. End FY 2005 3,920 7. INVENTORY DATA ($000) :a. Total Acreage: ( 607) b. Inventory Total As Of: (30 SEP 99) 247, 908 c. Authorizatron Not Yet In Inventory: 0 17 ,i37 d. Authorizatron Requested In This Program: e. Authorization Included in Following Program: (FY 2002) I?, 044 'f. Planned In Next Three Program Years: 35,900 ,g. Remaining Deficiency: 0 h. Grand Total: 317,989 ,8. PROJECTS REQUESTED IN THIS PROGRAM: FY 2001 ICATEGORY COST DESIGN STATUS 1 CODE PROJECT TITLE START SCOPE i$OOO) CMPL I __ 1. C3MPONEN" FY ZCCi '711-142 REPLACE FAMILY MILITARY HOUSING (PH 61 136 UN 17,13? JUL 99 MAY 001 17,137 TOTAL: ;Ya. Future Projects: Included in the Following Program (FY 2002) REPLACE FAMILY HOUSING (PH 73 711-142 130 UN 17,044 TOTAL: 17,044 ;9b. Future Projects: Typical Planned Next Three Years: ;711-142 REPLACE FAMILLY HOUSING (PH 8) 124 UN 17,483 REPLACE FAMILY HOUSING 1711-142 137 UN 18,417 :9c. Real Property Maintenance Backlog This Installation 87,600 ilO. Mission or Major Functions: Supports Air Force personnel in the INational Capitol Region. Headquarters USAF functions include Chief of ,Chaplains, Surgeon General, and Historian; Headquarters Air Force Office 'of Special Investigations; Air Force Office of Scientific Research; Air Force Legai Services Agency; Air Force Medical Operations Agency; USAF 'Band; USAF Honor Guard; and a support wing. . DD FORM 1390, 1 DEC 76 Previous editions are obsolete. Page No 283 1. 2, COMPCNENT CONSTRUCTION PROJECT DATA F‘i 200 1 MILITARY (corn uter generated! AL" FSRCE 4. PROJECT TITLE 3. INSTALLATION AND LOCATION BOLLING AIR FORCE BASE REPLACE FAMIL-f HOUSING DISTRICT C)F COLLZ',lBIA %ASHINGTON, 8. PROJECT 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 711-142 8.87.11 9. -- BXUROi4002 COST ESTIMATES LS :Ls LS LS LS ,LS (PH 61 COST($OOO) l', UNIT COST 87,681 'U/M,QUANTITY 'JN 136 ITEM MILITARY FAMILY HOUSING SUPPORTING FACILITIES SITE PREPARATION ROADS AND PAVING UTILITIES LANDSCAPING ' RECREATION DEMOLITION/ASBESTOS REMED/DISPOSAL SUBTOTAL TOTAL CONTRACT COST SUPERVISION, INSPECTION AND OVERHEAD iTOTAL REQUEST DATE ~ 1 ~ : i I I (5.5%) I ~ I 137 COST ($000, 11,925 4,319 882: i , 7521 i 5581 273: ( 164; ( ( 1,691) 16 ,244 16 ,244 893 17,137 ~ I I ;AREA COST FACTOR .95 I ,lO. Description of Proposed Construction: Demolish 136 family housing ,units and construct new. Provide necessary site preparation and upgrades :to existing infrastructure. Provide new street layout in accordance with IHousing Cmmunity Plan (HCP) site development. Provide interior fixtures, lfinishes and utility systems. new construction must provide accessibility ;for physically challenged persons. Provide recreation and landscaping. UNIT TYPE 3BR JNCO 4BR JNCO JNCO 5BR NET AREA 111 125 144 PROJECT FACTOR .93 .93 .93 NO. UNITS 96 39 1 136 $/ NSM 818 818 818 TOTAL COST 8,106,445 3,708,608 109,547 11,924,600 11. REQUIREMENT: 6,839 UN ADEQUATE: 5,261 UN SUBSTANDARD: 1,172 UN IPROJECT: Military Family Housing (Current Mission) ~REQUIREMENT: This project is required to bring Bolling AFB housing units 'up to Air Force and minimum and contemporary living standards, eliminate #health and safety hazards and improve energy efficiency. CURRENT SITUATION: Housing units included in this project were constrcted :in 1975 under a very strict and low budget. There have not been any iinterior upgrades since the original construction. Previous economic 'analyses performed on units constructed in this era has proven to be more ,cost effective to replace than to renovate. Major problems exist as floor ldrains were placed in a closet adjacent to the living room under the 'original construction. The drains require constant maintenance to prevent ; sewer gas from forming in the units. The oriqinal floor tiles are in a DD FORM 1391, DEC 76 Previous editions are obsolete. Page No I ~ I : 284 i. 2. COblPCNENT F‘i 2001 AIR FORCE 3. INSTALLATION MILITARY CONSTRUCTION (computer generated) AND LOCATION BOLLING AIR FORCE BASE MASHINGTON, 4. PROJECT TITLE REPLACE FAJMILY HOUSING DISTRICT PRCJECT DATE DATA CF COLL'MBIA 5. (PH 6! PROJECT NUMBER BXUROi4002 Occupants are also living with insufficient lighting state of disrepair. and power in addition to defective lighting equipment. The stairwell openings were constructed below current national standard. Occupants have difficulty to move furnitures into the second floor. Air conditioning units are at the end of their lifespan. IMPACT IF NOT PROVIDED: Failure to improve the quality of life at this installation, impacts morale and therefore the mission. Government needs to provide housing comparable to civilian communities. This is essential to attract new recruits and retain existing forces. ADDITIONAL: An economic analysis has been prepared comparing the alternatives of new construction, revitalization, leasing and status quo operation. Based on the net present values and benefits of the respective alternatives, new construction was found to be the most cost efficient over the life of the project. Base Civil Engineer: Co1 E. D. Mayfield, :2021 767-5565 DD FORM 1391C, DEC 76 Previous editions are obsolete. Page No 285 11. COMPONENT] , 1 I MILITARY CONSTRUCTION (computer g enerated) AND LOCATION FY ;AIR FORCE / i3. INSTALLATION I IBOLLING AIR FORCE BASE WASHINGTON, PROJECT TITLE 14. I 1REPTLACE FAMILY HCUSING (PH 6) j 12. : a. DISTRICT (2) (3) (4) (5) (6) DATE 15. ! I PROJECT /b. Equipments associated /other approprracicns: 1391C, CEC 76 NUMBER / I I BXUR014002 I Design. Bid, Build Definitive Was Most Design Recer?tly 99 JU-L 30 N 35% 99 DEC 20 00 MAY 25 be performed I Used this Previous project ed itions will - are be provided obsolete. , NO N/A ($000) 520 / j ; 520 520 / / 01 JAN ~ 01 APR / I 0' SE? 1 Completion with N/.4 I costs Total Cost (cl = (a) + (bj or (d) + (e): Droduction of Plats (a) and Specifications All Other Design Costs (b) Cc) Total (d) Contract In-hcuse (e) Contract .iward Constructron Start Cons:ruction / I I OF COLUMBIA Status: Date Design Started (a) Parametric Cost Estimates used to develop (b) Percent Complete as of Jan 2000 (cl Date 35% Designed. (d) Date Design Complete (e) Energy Study/k< (f) -e-Cycle analysis was/will Basis: Standard or (a) Where Design (b) 12. I DATA SUPPLEMENT= DATA: Estimated Design Data: (1) DD 'CR!! PROJECT 2001 from Page No 286 DISPOSED/REPLACED ,:, HOUSED On-base Plan IN EXISTING requirements approved DOD reflect at CORONA the methodology TOP by CSAF as documented and in the Air Force Family Housing Master SECAF. 287 1. CCblPONENT 2. DATE MILITAR'i CONSTRUCTION PROGRAM (computer qenerated) AIR FORCE 3. INSTALLATION AND LOCATION 4. COMMAND 5. AREA CONST. CAlb'ALIER AIR FORCE STATION, NORTH AIR FORCE COST INDEX DAKOTA SPACE COMMAND 1. oa PERMANENT 6. PERSONNEL STLTENTS i SUPPORTED OFF ENL C13; OFF ENL CIV STRENGTH OFF ENL 'CITi TOTAL 11 15 4 a. As of 30 SEP 99 33, b. End FY 2005 11 15' 4' 30 7. INVENTORY DATA ($000) a. Total Acreage: i 2953 b. Inventory Total As Of: (30 SEP 99; c. Authorization Not Yet In Inventory: 'd. Authorization Requested In This Program: e. Authorization Included In Following Program: f. Planned In Next Three Program Years: 'g. Remaining Deficiency: 'h. Grand Total: 8. PROJECTS REQUESTED IN THIS PROGRAM: FY 2001 iCATEGORY COST DESIGN STATUS I CODE PROJECT TITLE SCOPE START ($000) CMPL i FY 2001 L ~711-142 19a. i9b. 9c. !lO. ispace CONSTRUCT FAMILY HOUSING Future Projects: Included Future Projects: Typical Real Property Maintenance Mission or Major Functions: warning squadron. DD FORM 1390, 1 DEC 76 Previous 2UN TOTAL: in the Following Program Planned Next Three Years: Backlog This Installation Provides early warning editions are obsolete. 443 AUG 99 JUN 00, 443 (FY 2002) NONE defense Page 168 with a No 288 1. 2. DATE COMPONENT F-i' 2001 5. PROGRAM CONSTRUCTION (computer AIR FORCE 3. INSTALLATION CA'JALIER AIR MILITARY AND 8.87.41 6. 4. CATEGORY CODE DATA generated1 LOCATION 7. PROJECT TITLE CONSTRUCT FAMILY HOUSING 8. PROJECT COST($OOO! NUMBER ST.&ION, NORTH DAKOTA ELEMENT PROJECT PRCJECT EGYN99400'A ‘2 711-142 443 9. COST ESTIMATES ) UNIT ITEM MILITARY FAMILi' HOUSING SUPPORTING FACILITIES SITE PREPARATION ROADS AND PAVING UTILITIES LANDSCAPING SUBTOTAL TOTAL CONTRACT COST SUPERVISION, INSPECTION AND OVERHEAD (5.5%) U/M ‘UN QUANTITY COST COST 2 ,16 7,420 i ($000) LS LS LS LS TOTAL REQUEST 335 85 t 51 I 19: i 57: ( 4; 420 420 I 73 443 ;AREA COST FACTOR 1.08 ~10. Description of Proposed Construction: Provides new construction of two single family housing units with all necessary amenities and supporting facilities. Project includes site preparation, attached single car garages,energy conserving heating and cooling features, parking, exterior patios and privacy fencing, support infrastructure of roads and and landscaping. utilities, TUNIT TYPE FGO -1BR NET AREA 172 PROJECT FACTOR 1.19 $1 NSM 818 NO. UNITS 2 2 TOTAL COST 334,856 334,856 REQUIREMENT: 20 UN ADEQUATE: 5 UN SUBSTANDARD: 12 UN PROJECT: Construct Military Family Housing. (Current Mission) #REQUIREMENT: This project is required to provide modern and efficient :housing for military members and their dependents stationed at Cavalier ,AS. All units will meet modern standards. The housing will provide a safe, comfortable and appealing living environment comparable to the ,off-base civilian community. The design will provide a modern kitchen, living room, family room, bedroom and bath configuration, with ample Jinterior and exterior storage. Four bedroom units will be constructed, identified in the most recent housing market analysis. Units will be jprovided with a single car garage and exterior parking for a second :vehicle. Space will also be provided for adequate support infrastructure cf roads and utilities. The base currently has 12 housing units versus validated requirement for 20. This is the only phase planned for new construction. The 12 substandard units will be improved under a FYOl All. DD FORM 1391, DEC 76 Previous editions are obsolete. Page No as / ' ~ a 289 1. 2. CObIPONEN" F-1' 2001 MILITARY CONSTRUCTION (computer qenerated! AND LOCATION AiR FORCE 3. INSTALLATION CA:/ALIER AIR STAION, 4. PROJECT TITLE CONSTRUCT FAMILY PROJECT NORTH DAKOTA - HOUSING DATE DATA 5. PRCJECT NUMBER EGYN99400,A improvement project. The most recent housing market analysis for the base ~CURRENT sITu.4TIoN: ~shows a deficit of 3 housing units over and above adequate affordable housing available in the rural local community. The shortage of suitable ihousing forces military families tc occupy inadequate housing units thus iaffecting family morale, or forcing members to occupy housing at rents loutside the acceptable, causing unacceptable financial hardships as other ,portions of limited budgets are used to offset high housing costs. ;IMPACT IF NOT PROVIDED: There are no alternatives to living in inadequate ior expensive housing if families desire to avoid lengthy and costly (both 'financially and psychologically) "voluntary" separations. The impact will 'be major morale and/or financial problems for the affected families. The ,local rural community can not support the base population. Members would be required tc rent old, energy inefficient farm houses that result in the member paying unreasonable amounts of out-of-pocket expenses to heat the :units during the harsh winter climate in the rural, northern tier ienvironment. ADDITIONAL: This project meets the criteria/scope specified in Part iI of lthe Military Handbook 1190, "Facility Planning and Design Guide." There on the local school district to support base dependents. !will be no impact :Base Civil Engineer: Mr. Mark Blake, (7011 993-3331. DD FORM 1391C, DEC 76 Previous editions are obsolete. Page No 290 11. , COMPONENT! :AIR FORCE i 13. INSTALLATION I /CAVZiER AIR STAICN, NORTH DAKOTA 14. PROJECT TITLE 1 !CONSTRUCT F.AM1L.l HOUSING I SUPPLZMENTAL DATA: / 12. / a. Estimated Design Data: (1) (2) ij! Sasis: Standard or Definitive (a) Where Design Xas Most (b) (a) (b) Cc) (d) (e) iother I I I Design. Bid. Build Status: Date Design Started (b) Paramet-+,,c Cost Estimates used to develop Complete as of Jan 2000 Cc) Percent Date 35% Designed. (d) (e) Date Design Complete (f) Energy Study/Life-Cycle analysis was/will Total I ! ! 15. PROJECT NUMHER / I I EGYN994002A ) (a) /b. 12. DATE I FY 2001 MILITARY CONSTRUCTION PROJECT DATA (computer qenerated) AND LOCATION Des:gn Recently i 99 AUG 31 N 35% 99 DEC 31 00 JUN 30 be performed costs Used 1 ($000) 1 Cost (c) = (a) t (b) or (d) t (e): Production of Plans and Specifications All Other Design Costs Total Contract In-house is j 25 ; 40 : 40 (J) Contract (5) Construction Start 01 FEB 01 w,I (6) Construction Completion 02 JL'L Award Equipment associated with appropriations: N/A DD FORM 1391C, DEC 76 this Previous project editions will be provided are obsolete. from Page No 291 fllLlTARY FAMILY HOUSING JUSTIFICATION j l.DATE / 2. FISCAL j 8. DOD COMPONENT 4. REPORTING INSTALLATION AIR FORCE a. NAME 8. DATA AS OF Cavalier AS Jun-99 I ANALYSIS OF REQUIREMENTS AND ASSETS 8. TOTAL PERSONNEL STRENGTH YEAR /REPORT CNTRL DD-ABL(AR)1716 2001 SYMBOL I / b. LOCATION ND I I CURRENT OFFICER (a) t TOTAL OFFICER (d) (e) PROJECTED E9-E7 (0 I E6-El TOTAL (9) (h) 13 PERMANENT PARTY PERSONNEL 13 GROSS FAMILY HOUSING REQUIREMENTS =I= 9 I. TOTAL UNACCEPTABLY HOUSED (a + b + c) 3 a INVOLUNTARILY SEPARATED 0 9 IN MILITARY HOUSING 0 0 0 I 0 HOUSED IN COMMUNITY I 3 I. VOLUNTARY 10 0 / TO BE DISPOSED/REPLACED 2 UNACCEPTABLE 0 SEPARATIONS i 0 I. EFFECTIVE HOUSING REQUIREMENTS 9 1. HOUSING ASSETS (a + b) 6 a UNDER MILITARY IN EXISTING 6 12 DOD 0 1 11 17 I I 5 (11 HOUSED 17 CONTROL 5 01 71 12 3 0 0 3 2 0 0 2 I I OWNED/CONTROLLED (21 UNDER CONTRACT/APPROVED ‘31 VACANT 0 ,4~ INACTIVE 0 c PRIVATE HOUSING 1 1 ACCEPTABLY HOUSED ‘21 ACCEPTABLE VACANT 1 RENTAL 0 3. EFFECTIVE HOUSING DEFICIT 2 5. REMARKS 292 1. COMPONENT FY 2001 ;IR 3. MILITARY CONSTRUCTION (computer FORCE INSTALLATION BASE, a. As of 30 SEP 99 b. End FY 2005 4. COMMAND NORTH DAKOTA LAIR. COMBAT PERMANENT STUDENTS 3FF ENL Ci'b. CFF ENL 725 720 4455 443?‘5 7. REPLACE MILITARY HOUSING IPH 7) 5. AREA COST COMMAND SUPPORTED CIV 549 554 IW1ENTOR.1' 3AT.A OFF 3 3 134 UN FAMILY ENL CONST INDEX 1.C8 CIV 51 70' 5 70 - TOTAL 5,807 5,784 '~$0001 a. Total Acreage: ( 5,383) b. Inventory Total As Of: :30 SEP 99) ,c. Authorization Not Yet In Inventory: id. Authorization Requested In This Program: e. Authorization Included In Following Program: (FY 2002) f. Planned In Next Three Program Years: g. Remaining Deficiency: ‘h *_. Grand Total: :8. PROJECTS REQUESTED IN THIS PROGRAM: FY 2001 CATEGORY COST CODE PROJECT TITLE SCOPE !$OOO) 711-142 DATE generated) AND LOCATION MINOT AIR FORCE 6. PERSONNEL STRENGTH ?-. PROGRAM 19,097 300 655 11 250 19 097 0 59 595 74 150 464,747 / DESIGN STATUS START CMPL ~ ~ __ OCT 99 APR 00: TOTAL: 19,097 Future Projects: Included in the Followinq Proqram (FY 2002) NONE Future Projects: Typical Planned Next Three Years: ;?ll-142 REPLACE MILITARY FAMILY 134 UN 19,477 HOUSING (PHASE 8.) I ;711-142 REPLACE MILITARY FAMILY 134 UN 19,853 I HOUSING (PHASE 9) (711-142 REPLACE FAMILY HOUSING (PH 10) 134 UN 20,265 ,9c. Real Property Maintenance Backlog This Installation 43,200 10. Mission or Major Functions: A bomb wing with one B-52H squadron and 'an Air Force Space Command missile group with three Minuteman III Iintercontinental ballistic missile squadrons and HH-1H aircraft, converting to UH-1Ns in FY 96/4. I i9a. i9b. I I ! DD FORM 1390, 1 DEC 76 Previous editions are obsolete. Page No 293 i. 2. CSMPONENT FY 2001 MILITARY CONSTRUCTION (computer AIR FORCE 3. iNSTALLATICN NORTH DAKCTA CATEGORY CCDE ?il-142 8.8-'.4: 9. COST DATE DATA generated) AND LOCATION IvIINoT Ail? FGRCE BASE, 6. 5. PROGRAM ELEMENT PROJECT 7. 4. PROJECT TITLE REPLACE MILITARY FAMILY HOUSING (PH ?) 8. PROJECT PROJECT NUMBER QJVFO19001 ESTIMATES ITEM #MILITARY FAMILY HOUSING SUPPORTING FACILITIES ROADS AND PAVING UTILITIES LANDSCAPING RECREATION DEMOLITION L ENVIRONMENTAL ;ASB/LBP! SPECIAL CONSTRUCTION FEATURES (ARCTIC) SUBTOTAL ,TOTAL CONTRACT COST SUPERVISION , INSPECTION AND OVERHEAD 15.7%) #TOTAL REQUEST 19,097 UNIT COST 118,631, U/M,QUANTITY, 134 ,JJN !LS LS ILS LS 'LS iLS ~ I I COST!$OOO 1 I ~ COST ($OOO! 15,897 2 ,170 582 i , ( 513; i 86: 132: 264) ~ i 624 1 ~ ( ' 18,067 ~ 18,067 ~ 1,030 19,097 ~ I / I 1 I ~AREA ;10. COST FACTOR 1.08 I I I Description of Proposed Construction: Construct 134 housing units 'with all necessary supporting facilities including garages, patios, ,fencing, utilities, air conditioning, appliances, exterior storage, roads, :parking, sidewalks, playground, landscaping, as well as any other necesary support facilities. This project includes demolition of 142 units with .I34 new being built, which results in 8 less units upon completion. NET UNIT TYPE JRENL AREA 116 2BR PROJECT FACTOR 1.04 JRENL 3BR 139 1.04 JRENL 153 1.04 4BR $/ NSM 818 818 818 NO. UNITS 12 98 24 134 TOTAL COST 1,184,202 11,588,508 3,123,844 15,896,554 il. REQUIREMENT: 2,747 UN ADEQUATE: 812 UN SUBSTANDARD: 1,960 UN PROJECT: Replace Military Family Housing (Ph 7). (Current Mission) iREQUIREMENT: This project is required to provide modern and efficient ~housing for military members and their dependants stationed at Minot AFB. ~A11 units will be "whole house" improved to provide a safe, comfortable land appealing living environment comparable to off-base civilian icommunity. This project is programmed in accordance with the Housing ;COmmunity Plan. This is the seventh of multiple phases to improve 2,445 'housing untis for base personnel. 244 units have already been upgraded. (The replacement housing will provide a modern kitchen, living room and ,bath configuration with ample interior and exterior storage plus an Iadditional 28 NSM artic recreation room for harsh climates. Parking wiil ibe provided for a second vehicle. The neighborhood support infrastructure DD FORM 1391, DEC 76 Previous editions are obsolete. Page No 1 294 1. 2. CCMP3NENT FY 2001 MILITARY CONSTRUCTION (computer generated! AND LOCATION AIR FORCE ~ 3. INSTALLATION MINOT AIR FORCE BASE, 4. PROJECT TITLE REPLACE MILITARY FAMILY PROJECT DATE DATA NORTH DAKOTA 5. HOUSING (PH 7) PROJECT NUMBER QJVF019001 will be upgraded to meet modern housing needs to include landscaping, playgrounds and recreation areas. CURRENT SITUATION: This project replaces appropriated housing units built in 1964, which are showing the effects of age and continuous heavy use. They have had no major upgrades since construct;on, do not meet the needs of today's families, nor do they provide a modern home environment. Kitchens are too narrow and dark, and do not provide adequate cabinet and counter space. The bathrooms are very small and in poor condition. Bathroom fixtures are outdated and inefficient. Lighting in hallways, bathrooms, and bedrooms is indequate. The exteriors of these units lack landscaping and have no patio. Off street parking is severly limited, and traffic flow in and around the housing area is inefficient. IMPACT IF NOT PROVIDED: Air Force members and their families will continue to live in extremely outdated, unsuitable and unsatisfactory The housing will continue to detriorate, resulting in increasing housing. and unacceptable maintenance costs, and extreme inconvenience to the occupants. Without this and subsequent phases of this initiative, repairs to these units will continue at a costly, piecemeal fashion, with little or no improvement in living quality. Low morale can be expected if such conditions are permitted to continue. ADDITIONAL: This project meets the criteria/scope specified in Part II of the Military HAndbook 1190, "Facility PLanning and Design Guide". Since this is replacement housing, there will be no increase in the student population or impact on the local school district to support base dependents. Base Civil Engineer: Lt Co1 Wright, (701) 723-2434. DD FORM 1391C, DEC 76 Previous editions are obsolete. Pacre Nn --I- -.- 295 11. COMPONElXT I F-r' 2001 MILITARY CONSTRUCTION , , !AIR FORCX (computer seneracedl 13. INSTALLATION AND LOCATION I 'MINOT AIR FORCE BASE, NORTH DAKOTA 14. PROJECT TITLE I :REPLACE (12. I a. I MTTT"ARY d-1& i FAMILY HOUSZNG PROJECT 15. I I (PH 7) SUPPLZMENTAL DATA: Estimated Design Data: (1) (3) (6’ PROJECT !b. Equipment associated lother appropriations: Defixtlve Was Most NUMBER ( I I I , I Design Recently be performed Used this 99 OCT 01 N 35% 99 DEC 15 00 APR 01 costs NO N/A - ( ($000) j 800 400 1200 1200 1 j ( 01 JAN i 01 MAR Completion with N/A I I CVJF019001 Total Cost iCj = (ai + (b) or (d) + (e) : ia; ?roduction of Plans and Specifications (b, All Other Design Costs Total ic) Contract (d) !e) Zn-lhouse Contract Award C3nstrucrion Star= A Const-uction DATE Design. Bid. Build Status: Date Design Started (a) Parametric Cost Estimates used to develop (b) Percent Complete as of Jan 2000 Cc) Date 35% Designed. (d) Date Design Complete (2) Energy Study/Life-Cycle analysis was/will (f) Basis: (a) Standard or where Design ib) 12. I DATA 02 AUC; ! project will be provided from I i3D FORM 1391C, 3EC -5 Previous editions are obsolete. Page No 296 MILITARY 3. FAMILY HOUSING JUSTIFICATION DODCOMPONENT AIR AS OF OF REPORT ’ 2. FISCAL 2001 I INSTALLATION 4. REPORTING a. NAME FORCE 5. DATA 1 1. DATE AFB ND CURRENT / E9-E7 OFFICER (a) j C?O “.,il 8. GROSS 9. TOTAL PARTY FAMILY UNACCEPTABLY 11. EFFECTIVE 12. HOUSING a UNDER ASSETS MILITARY 1, HOUSED (C) (d) (a) -.I -1iq3 “‘I,-,* I 639 326 2 14 3 743 PROJECTED E9-E7 E6-El (0 / TOTAL (9) CIC “JO _I - ^ 510 ^ ^ -. -.(,“V 4,708 636 318 3602 3 bUZ j I I (h) 4,556 4,556 (a + b + c) IN COMMUNITY 434 254 2 464 244 464 244 (a + b) CONTROL VACANT DOD 39 23 REQUIREMENTS IN EXISTING 121 ACCEPTABLE 1?C .I/0 OFFICER TO BE HOUSED HOUSING (b) TOTAL REQUIREMENTS HOUSED D IN MILITARY HOUSING DISPOSED/REPLACED C UNACCEPTABLE EG-El PERSONNEL HOUSING SYMBOL I ANALYSIS OF REQUIREMENTS AND ASSETS 6. TOTAL PERSONNEL STRENGTH 7. PERMANENT REPORT CNTRL DD-ABL(AR)l716 1 b. LOCATION Minot I L YEAR 2 14 22 2,846 430 246 2.069 2,747 1.984 2,692 484 244 1,902 2,630 1,584 2,292 464 244 1,584 2,292 150 RENTAL On-base requirements reflect the methodology Plan approved at CORONA TOP by CSAF and as documented SECAF. 38 in the Air Force Family Housing Master 297