Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations C3I I. Description of Operations Financed: Airlift Operations C3I activities support the core of Mobility Operations through the provision of AMC Command and Control systems. These systems provide the capability to direct and control worldwide deployment of airlift assets and aircrew forces. They provide in-transit visibility of cargo and passengers; generate billing data; provide for deliberate planning, analysis and modeling; and provide for software maintenance and personnel to operate current systems including the Global Decision Support System (GDSS). These resources also replace out-of-date manual command and control processes with the AMC Command and Control Information Processing System (C2IPS), and integrated automated multi-level secure systems reaching from the airfield through AMC to USTRANSCOM and the National Command Authority. Resources also support engineering and installation support activities, various intelligence systems activities for military airlift, combat search and rescue operations and combat air traffic control for the Air Force Special Operations Command. II. Force Structure Summary: Airlift Operations C3I activities employ about 1,000 active duty personnel and 150 civilians in many diverse functions ranging from command and control systems development and maintenance at command posts throughout the Air Mobility Command to Combat Controllers and Pararescue teams in the Air Force Special Operations Command. 299 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations C3I III. Financial Summary ($s in Thousands): FY 2001 A. Program Elements: Mobility Airlift Intelligence Systems AMC Command and Control Systems Engineering Installation Support Special Tactics/Combat Control Service Support TRANSCOM Activities Total FY 2000 Actuals Budget Request Appn Current Estimate FY 2002 Estimate $3,341 30,572 2,493 5,067 0 $41,473 $1,687 26,507 3,219 5,378 1,170 $37,961 $1,652 $25,908 $3,161 $5,235 $1,130 $37,086 $1,835 25,464 3,291 5,768 1,167 $37,525 $1,727 23,000 3,418 5,334 4,227 $37,706 B. Reconciliation Summary: Baseline Funding Congressional Adjustments (Distributed) Congressional Adjustments (Undistributed) Adjustments to Meet Congressional Intent Congressional Adjustments (General Provisions) Subtotal Appropriated Amount Rescission Program Changes (CY to CY only) Subtotal Baseline Funding Reprogrammings Price Changes Functional Transfers Program Changes Current Estimate Change FY 01/01 Change FY 01/02 $37,961 0 0 0 -875 $37,086 -121 0 $36,965 560 0 $37,525 $37,525 300 1,043 -365 -497 $37,706 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations C3I C. Reconciliation of Increases and Decreases ($s in Thousands): FY 2001 President's Budget Request ....................................................................................................................... $37,961 1. Congressional Adjustments ................................................................................................................................... $-875 a) Distributed Adjustments ....................................................................................................... $0 b) Undistributed Adjustments ................................................................................................... $0 c) Adjustments to meet Congressional Intent ........................................................................... $0 d) General Provisions ................................................................................................................ $-875 i) Defense Working Capital Fund Rate Stabilization (Sec 8085, P.L. 106-259, FY 2001 Appn Act) $-543 ii) Headquarters and Administrative Support (Sec 8165, P.L. 106-259, FY 2001 Appn Act) $-150 iii) Foreign Currency (Sec 8094, P.L. 106-259, FY 2001 Appn Act) ................................... $-95 iv) Consulting and Advisory Services (Sec 8163, P.L. 106-259, FY 2001 Appn Act) ........ $-87 FY 2001 Appropriated Amount (subtotal) .............................................................................................................. $37,086 Government-Wide Rescission (Sec 1403, Chapter 14, General Provisions, Division A, P.L. 106-544) .................... $-121 2. Program Increases and Decreases ......................................................................................................................... $0 a) Transfers ............................................................................................................................... 301 $0 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations C3I b) Program Increases ................................................................................................................. $2,215 i) One-time Costs ................................................................................................................ $0 ii) Program Growth .............................................................................................................. $2,215 a. Mobility Equipment .......................................................................................... Increase in ground combat equipment to sustain Air Force Special Operations Command Special Tactics Forces. $2,215 c) Program Decreases ............................................................................................................... $-2,215 i) One-time Costs ................................................................................................................ $0 ii) Program Reductions ........................................................................................................ $-2,215 a. Civilian Pay Adjustment ................................................................................... $-2,215 The decrease represents revised civilian pay funding requirements based on updated assessment of actual workyear costs to reflect the impact of changes such as FY 2000 locality pay. It also includes a net reduction of 87 civilian manpower positions for management headquarters restructure and mobility force structure realignment. FY 2001 Baseline Funding (subtotal) ....................................................................................................................... $36,965 3. Reprogrammings: ................................................................................................................................................. $560 a) Working Capital Fund Transfer (Sec 8005, P.L. 106-754, FY 2001 Appn Act) ........ $543 b) Foreign Currency Fluctuation Transfer ....................................................................... $17 Revised FY 2001 Estimate ........................................................................................................................................ 302 $37,525 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations C3I 4. Price Change ......................................................................................................................................................... $1,043 5. Transfers ................................................................................................................................................................ $-365 a) Transfers In ........................................................................................................................... $0 b) Transfers Out ........................................................................................................................ $-365 i) ANG Transfer (FY 2001 Base $5,768) ........................................................................... Transfer of O&M funds to support 13 manpower slots to the 123rd Special Tactics Flight (ANG), Staniford, KY. This completes a transfer of Special Operations communications from the active Air Force to the Air National Guard. Funds transfer from Air Force O&M and Military Personnel appropriations to Air National Guard O&M and Personnel appropriations. $-365 6. Program Increases ................................................................................................................................................. $3,414 a) Annualization of New FY 2001 Program ............................................................................. $0 b) One-time FY 2002 Costs ...................................................................................................... $121 i) Rescission Restoration (FY 2001 Base $37,525) ........................................................... Restoral of FY01 Government-Wide Rescission. $121 c) Program Increases ................................................................................................................. $3,293 i) Civilian Pay (FY 2001 Base $10,268) ............................................................................ This increase is primarily associated with eight additional manpower positions resulting from mobility force structure realignment. This also accounts for 261 compensable calendar workdays in FY 2002 versus 260 days in FY 2001. $2,708 ii) Special Tactics and Rescue Specialists Recruiting (FY 2001 Base $5,768) .................. $200 303 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations C3I Increase for travel and equipment to support the STARS recruiting teams to alleviate severe manning shortages. iii) Competitive Sourcing (FY 2001 Base $2,743) .............................................................. This increase results from a change in approach to competitive sourcing and the cancellation of A-76 studies for programs such as Precision Measurement Equipment Laboratory (PMEL) and Corrosion Control. $193 iv) PACAF Air Operations Center (FY 2001 Base $25,464) .............................................. Increased funding to consolidate the PACAF Air Operations Center at Hickam AFB, HI under the 501st Air Operations Group. Also establishes a Contingency Response Squadron at Anderson AFB, Guam and moves the Tactical Airlift Control Element from Kadena AB to Yokota AB, Japan. $192 7. Program Decreases ................................................................................................................................................ $-3,911 a) One-time FY 2001 Costs ...................................................................................................... $0 b) Annualization of FY 2001 Program Decreases .................................................................... $0 c) Program Reductions .............................................................................................................. $-3,911 i) Command and Control (FY 2001 Base $29,387) ........................................................... Decreased funding for contract support and equipment for increased efficiencies for Air Mobility Command command posts and the Tanker Airlift Control Center. $-3,911 FY 2002 Budget Request ........................................................................................................................................... 304 $37,706 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations C3I IV. Performance Criteria and Evaluation Summary: FY 2000 24 AMC Command Posts ................................................................... 305 FY 2001 24 FY 2002 24 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations C3I V. Personnel Summary Active Military End Strength (Total) Officer Enlisted Civilian End Strength (Total) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire Active Military Average Strength (Total) Officer Enlisted Civilian FTEs (Total) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire FY 2000 FY 2001 FY 2002 Change FY 01/02 1,072 297 775 892 211 681 880 206 674 -12 -5 -7 151 150 1 151 0 130 129 1 130 0 138 137 1 138 0 8 8 0 8 0 1,136 324 812 982 254 728 887 209 678 -95 -45 -50 142 142 0 142 0 140 139 1 140 0 133 132 1 133 0 -7 -7 0 -7 0 306 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations C3I VI. OP-32 Line Items: FOREIGN 101 103 104 308 401 411 412 414 415 417 502 503 505 506 647 649 671 771 914 915 920 922 924 925 930 932 933 934 989 998 AIRLIFT OPERATIONS C3I EXECUTIVE GENERAL SCHEDULE WAGE BOARD FOREIGN NATIONAL DIRECT HIRE (FNDH) TRAVEL OF PERSONS DFSC FUEL ARMY MANAGED SUPPLIES/MATERIALS NAVY MANAGED SUPPLIES/MATERIALS AIR FORCE MANAGED SUPPLIES/MATERIALS DLA MANAGED SUPPLIES/MATERIALS LOCAL PROC DWCF MANAGED SUPL MAT ARMY DWCF EQUIPMENT NAVY DWCF EQUIPMENT AIR FORCE DWCF EQUIPMENT DLA DWCF EQUIPMENT DISA - INFORMATION AF INFO SERVICES COMMUNICATION SERVICES(DISA) TIER 2 COMMERCIAL TRANSPORTATION PURCHASED COMMUNICATIONS (NON-DWCF) RENTS (NON-GSA) SUPPLIES & MATERIALS (NON-DWCF) EQUIPMENT MAINTENANCE BY CONTRACT MEDICAL SUPPLIES EQUIPMENT (NON-DWCF) OTHER DEPOT MAINT (NON-DWCF) MANAGEMENT & PROFESSIONAL SUP SVS STUDIES, ANALYSIS, & EVALUATIONS ENGINEERING & TECHNICAL SERVICES OTHER CONTRACTS OTHER COSTS AIRLIFT OPERATIONS C3I FOREIGN FY 2000 CURRENCY ACTUAL 7,947 935 19 3,745 53 25 8 70 392 404 17 5 276 265 500 675 0 26 192 32 3,166 232 13 4,987 3,188 925 748 723 11,895 10 RATE DIFF 41,473 PRICE PROGRAM FY 2001 0 0 0 -57 0 0 0 0 0 0 0 0 0 -11 0 0 0 0 -12 0 -46 0 0 0 0 0 0 0 0 0 GROWTH 351 43 1 61 33 -1 1 4 19 7 0 1 18 12 -32 40 0 0 2 1 51 4 1 79 50 15 12 12 189 0 GROWTH 1,111 -151 12 -681 -86 -14 -6 -11 -255 -249 118 39 1,909 1,848 -468 -715 24 -26 484 -33 -2,760 2,270 -14 -3,262 -3,238 87 -4 38 -3,496 2,733 ESTIMATE 9,409 827 32 3,068 0 10 3 63 156 162 135 45 2,203 2,114 0 0 24 0 666 0 411 2,506 0 1,804 0 1,027 756 773 8,588 2,743 -126 974 -4,796 37,525 307 CURRENCY RATE DIFF. PRICE PROGRAM FY 2002 0 0 0 -4 0 0 0 0 0 0 0 0 0 -6 0 0 0 0 -8 0 -26 0 0 0 0 0 0 0 0 0 GROWTH 415 36 1 54 0 0 0 7 0 3 -3 -2 233 7 0 0 3 0 12 0 8 43 0 32 0 18 13 14 146 47 GROWTH 1,573 1,135 0 -150 1 0 0 22 -4 -6 -22 -6 -641 -394 0 0 -6 0 -40 0 35 -230 0 283 0 50 -83 68 -2,637 190 ESTIMATE 11,397 1,998 33 2,968 1 10 3 92 152 159 110 37 1,795 1,721 0 0 21 0 630 0 428 2,319 0 2,119 0 1,095 686 855 6,097 2,980 -44 1,087 -862 37,706