Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations I. Description of Operations Financed: Operations support the day-to-day mission activity of Mobility Operations. Aircraft operations incorporate C-130 theater airlift; air refueling KC-10s and KC-135s; Operational Support Airlift for movement of personnel and cargo with time, place or mission sensitive requirements; C-9 Medical Evacuation operations; Short Takeoff and Landing contracted airlift; and headquarters operations at Air Mobility Command (AMC), its detachments, and numbered Air Force headquarters. Airlift Operations includes the entire spectrum for aircrew training activities directly related to schoolhouse and proficiency training for C-130, C-5, C-141, C-17, C-12, C-21, UH-1N, and HH-60 aircrews. Program funding also supports direct costs associated with training and operating KC-135 and KC-10 air refueling aircraft. Additionally, funding pays for operating the Operational Support Airlift (OSA) program, which includes the operation of C-9 (nonmedical evacuation), C-12, C-20, C-21, C-37, C-135, UH-1N, CT-43, and EC-135Y aircraft. Also funded in OSA are Air Force One aircraft used by the President of the United States, and C-137, C-32A, and C-37A aircraft used by the Vice President of the United States, Cabinet Members, and other high ranking dignitaries. Funding for Aircrew Training Systems (ATS) also included in this activity group, support Weapon System Trainers, Operational Flight Trainers, and Cockpit Procedures Trainers. Other Airlift Operations programs include Combat Aircrew Training at Nellis AFB, NV; the Air Transportation Training Center at Travis AFB, CA; the Air Mobility Warfare Center at McGuire AFB, NJ; and the Queen Bee Jet Engine Intermediate Maintenance Facility for helicopters at Kirtland AFB, NM. II. Force Structure Summary: Airlift Operations supports Air Mobility Command, a Major Command located at Scott AFB, IL, which serves as the Air Force component of USTRANSCOM. This subactivity group also supports two Numbered Air Forces, one at Travis AFB, CA, and one at McGuire AFB, NJ. Additionally, it supports the Air Mobility Warfare Center at Ft Dix, NJ; the Tanker Airlift Control Center located at Scott AFB, IL; and six airlift wings across the United States. The aircraft supporting Airlift Operations fly about 281,000 hours annually and supports about 852 total assigned aircraft. This activity employs about 23,000 active duty personnel and 1,200 civilians. 282 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations III. Financial Summary ($s in Thousands): FY 2001 A. Program Elements: KC-135 Squadrons (ACC/PACAF/USAFE) C-130 Airlift Squadrons C-130J Program Aeromedical Evacuation KC-135 Squadrons (AMC) KC-10 Squadrons Airlift Support O&M Operational Support Airlift SOUTHCOM STOL Aircraft Training Combatant Headquarters Total FY 2000 Actuals Budget Request Appn Current Estimate FY 2002 Estimate $48,330 153,543 2,900 0 134,944 232,612 161,960 399,439 5,318 562,428 49,624 $1,751,098 $48,153 146,457 0 64,270 139,825 246,691 4,251 298,721 5,096 653,639 45,981 $1,653,084 $47,229 143,066 0 63,025 137,370 241,950 4,215 296,341 4,931 639,727 45,059 $1,622,913 $47,922 160,523 0 62,769 142,598 243,664 3,113 297,282 4,943 645,622 55,843 $1,664,279 $55,412 180,675 0 76,193 166,858 308,419 120,318 385,525 5,239 690,020 67,724 $2,056,383 283 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations B. Reconciliation Summary: Baseline Funding Congressional Adjustments (Distributed) Congressional Adjustments (Undistributed) Adjustments to Meet Congressional Intent Congressional Adjustments (General Provisions) Subtotal Appropriated Amount Rescission Program Changes (CY to CY only) Subtotal Baseline Funding Reprogrammings Price Changes Functional Transfers Program Changes Current Estimate Change FY 01/01 Change FY 01/02 $1,653,084 3,500 0 0 -33,671 $1,622,913 -2,112 19,792 $1,640,593 23,686 0 $1,664,279 $1,664,279 284 59,903 148,500 183,701 $2,056,383 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations C. Reconciliation of Increases and Decreases ($s in Thousands): FY 2001 President's Budget Request ....................................................................................................................... $1,653,084 1. Congressional Adjustments ................................................................................................................................... $-30,171 a) Distributed Adjustments ....................................................................................................... i) PACAF Airlift Support.................................................................................................... $3,500 $3,500 b) Undistributed Adjustments ................................................................................................... $0 c) Adjustments to meet Congressional Intent ........................................................................... $0 d) General Provisions ................................................................................................................ $-33,671 i) Defense Working Capital Fund Rate Stabilization (Sec 8085, P.L. 106-754, FY 2001 Appn Act) $-23,480 ii) Headquarters and Administration Support (Sec 8165, P.L. 106-259, FY 2001 Appn Act) $-7,114 iii) Consulting and Advisory Services (Sec 8163, P.L. 106-259, FY 2001 Appn Act) ........ $-1,906 iv) Foreign Currency Fluctuation (Sec 8094, P.L. 106-259, FY 2001 Appn Act) ............... $-1,171 FY 2001 Appropriated Amount (subtotal) .............................................................................................................. $1,622,913 Government-Wide Rescission (Sec 1403, Chapter 14, General Provisions, Division A, P.L. 106-544) .................... $-2,112 285 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations 2. Program Increases and Decreases ......................................................................................................................... $19,792 a) Transfers ............................................................................................................................... $0 b) Program Increases ................................................................................................................. $24,972 i) One-time Costs ................................................................................................................ $0 ii) Program Increases............................................................................................................ $24,972 a. FY 2001 Flying Hour Consumption Changes (FY 2001 Base $523,137) ........ $14,441 The FY 2001 Flying Hour Program was repriced to reflect the CY 2000 AF Cost Analysis Improvement Group (AFCAIG) approved cost factors which are based on the most current consumption data available. Included in this reprice are AVPOL, Depot Level Reparables (DLRs), and consumable supplies purchased through General Support Division of the AF Working Capitial Fund and by IMPAC card. The most significant changes have occurred in the costs of General Support supplies and Depot Level Reparables. b. Civilian Pay (FY 2001 Base $74,052) .............................................................. $10,531 The increase represents revised civilian pay funding requirements based on updated assessment of actual workyear costs to reflect the impact of changes such as FY 2000 locality pay. The increase also includes multiple civilian manpower changes adding a net 100 positions driven primarily by a management headquarters restructure. All positions came from multiple sub-activity groups. c) Program Decreases ............................................................................................................... $-5,180 i) One-time Reductions ....................................................................................................... a. Mission Support Activity (FY 2001 Base $1,653,084) .................................... 286 $-5,180 $-5,180 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations Some mission support activities such as equipment and supply purchases, equipment maintenance and repair of non-flying Depot Level Reparables are deferred until FY02. Funds have been redirected to support emerging user requirements. FY 2001 Baseline Funding (subtotal) ....................................................................................................................... $1,640,593 3. Reprogrammings: .................................................................................................................................................. $23,686 i) Working Capital Fund Transfer (Sec 8005, P.L. 106-259, FY 2001 Appn Act) ............ $23,480 ii) Foreign Currency Fluctuation Account ........................................................................... $206 Revised FY 2001 Estimate ........................................................................................................................................ $1,664,279 4. Price Change ......................................................................................................................................................... $59,903 287 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations 5. Transfers ................................................................................................................................................................ a) Transfers In ........................................................................................................................... $152,124 i) Contingency Operations (FY 2001 Base $0) ................................................................... Operations in Southwest Asia (SWA), including Operation Northern Watch, Operation Southern Watch and Operation Desert Spring, have been ongoing for 10 years. With only a few notable exceptions, the force structure and operations tempo in SWA are fairly stable. Because these operations will continue into the foreseeable future, funding for SWA was transferred from the Overseas Contingency Operation Transfer Fund to the services' baseline effective FY02. Henceforth, services will plan, program and budget for these operations as they do for other baseline programs. The funding transfer resulted in a budget increase in all sub-activity groups that support SWA. $149,663 ii) PACAF KC-135 Corrosion Inspections (FY 2001 Base $47,923) .................................. Funds transferred from Mobility Depot Maintenance sub-activity group to perform for unit level corrosion inspections. $2,461 b) Transfers Out ........................................................................................................................ $-3,624 i) Operational Support Airlift (FY 2001 Base $297,281) ................................................... Funds transferred to the White House Communications Agency (O&M, Defensewide) to provide equipment support for dignitary level travel. $-3,380 ii) Military Transfer Out (FY 2001 Base $84,269) .............................................................. This transfer results from a change in approach to competitive sourcing and the cancellation of A-76 studies for programs such as Precision Measurement Equipment Laboratory (PMEL) and Corrosion Control. $-244 288 $148,500 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations 6. Program Increases ................................................................................................................................................. $188,700 a) Annualization of New FY 2001 Program ............................................................................. $0 b) One-time FY 2002 Increases ................................................................................................ $85,818 i) Contractor Logistic Support (Base FY 2001 $396,449) ................................................. Increase for ten engine overhauls for the KC-10 due to aging aircraft, and FAA required Periodic Depot Maintenance inspections for the C-9 and C-20 aircraft. Funds also added for contract price increases for engine repair of the training C-17A fleet. $69,700 ii) Airlift Crew Training (Base FY 2001 $645,622) .......................................................... Increase mitigates a shortfall in airlift training for C-5, C-17 and C-141 aircrews. Funds will ensure aircrews train in necessary tasks based on wartime requirements in order to gain flying experience, maintain currency, and meet readiness ratings. Funds will allow additional flying hours for training. $14,006 iii) Rescission Restoration (Base FY 2001 $1,664,280) ..................................................... Restoral of FY01 Government-Wide Rescission $2,112 c) Program Increases ................................................................................................................. i) Logistic Support (FY 2001 Base $351,044) .................................................................... Increase for added equipment maintenance costs, replacement reparables, procurement of technical data, contracts, supplies, and other expendable equipment for KC-135s and C-130s. 289 $102,882 $33,553 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations ii) Civilian Pay (FY 2001 Base $84,269) ............................................................................. The increase represents revised civilian pay funding requirements based on updated assessment of actual workyear costs to reflect the impact of changes such as FY 2000 locality pay. The increase also includes multiple civilian manpower changes adding a net 9 positions driven primarily by rated staff military to civilian conversions, communications and computer realignments, and competitive sourcing & reengineering decisions. There are 261 compensable calendar workdays in FY 2002 versus 260 days in FY 2001. $29,997 iii) FY 2002 Flying Hour Consumption Changes (Base FY 2001 $537,578) ...................... The FY 2002 Flying Hour Program was reprice to reflect the latest (CY 2001) AF Cost Analysis Improvement Group (AFCAIG) approved cost factors which are based on the FY2000 consumption, adjusted for a 5 year historical pattern of cost growth in spares and consumables that reflect an aging fleet. Included in this reprice are AVPOL, Depot Level Reparables (DLRs), and consumable supplies purchased through General Support Division of the AF Working Capital Fund and by IMPAC card. The most significant changes have occurred in the costs of Depot Level Reparables and General Support supplies. $19,825 iv) Operational Support (FY 2001 Base $279,281) ............................................................. Increase in funds for lease, CLS, fuel, and travel costs for five C-37A aircraft, and for CLS, fuel, and travel costs for two CINC support C-40B aircraft ($46,807). This is offset by a reduction in CLS due to completion of effort for FY01 adds for air worthiness directives and aging weapon systems ($-27,300). $19,507 7. Program Decreases ................................................................................................................................................ a) One-time FY 2001 Reductions ............................................................................................. i) PACAF Airlift Support (FY 2001 Base $297,282) ......................................................... Return to normal funding levels from one-time congressional add for airlift support. 290 $-4,999 $-3,500 $-3,500 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations b) Annualization of FY 2001 Program Decreases .................................................................... $0 c) Program Reductions .............................................................................................................. $-1,499 i) Competition and Privatization (FY 2001 Base $19,507) ................................................ This decrease reflects estimated savings, which will be achieved by reducing costs through increased competition and expanded employee/private sector participation. These savings have been realigned to Air Force modernization accounts. $-1,499 FY 2002 Budget Request ........................................................................................................................................... 291 $2,056,383 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations IV. Performance Criteria and Evaluation Summary: FY 2000 FY 2001 FY 2002 54 228 164 5 27 12 74 2 1 1 0 22 1 2 4 2 70 54 52 7 782 54 228 164 23 24 12 74 2 0 0 0 25 0 2 4 2 70 66 32 0 782 54 228 164 23 23 10 74 2 0 0 2 25 0 2 4 6 70 81 8 0 776 Primary Authorized Aircraft (PAA) KC-10............................................................................................. KC-135R/T... ................................................................................. C-130E/H/J .................................................................................... C-9A/C ........................................................................................... C-12C/F/J ....................................................................................... C-20A/B/C/H ................................................................................. C-21................................................................................................ C-135.............................................................................................. EC-135 ........................................................................................... C-137C ........................................................................................... C-40................................................................................................ UH-1N............................................................................................ CT-43A .......................................................................................... VC-25A .......................................................................................... C-32A............................................................................................. C-37A............................................................................................. C-5.................................................................................................. C-17................................................................................................ C-141B ........................................................................................... H-60 ............................................................................................... Total .......................................................................................... 292 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations FY 2000 FY 2001 FY 2002 54 228 164 5 24 12 74 2 25 2 4 2 70 64 37 54 228 164 23 24 12 74 2 25 2 4 2 70 64 37 54 228 164 23 23 10 74 2 25 2 4 5 70 79 10 Average Primary Aircraft Inventory (APAI): KC-10............................................................................................. KC-135........................................................................................... C-130E/H/J .................................................................................... C-9.................................................................................................. C-12................................................................................................ C-20................................................................................................ C-21................................................................................................ C-135.............................................................................................. UH-1N............................................................................................ VC-25A .......................................................................................... C-32A............................................................................................. C-37A ............................................................................................ C-5.................................................................................................. C-17................................................................................................ C-141.............................................................................................. 293 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations FY 2000 FY 2001 FY 2002 59 253 188 4 20 13 75 1 2 1 29 1 2 4 3 0 81 66 69 9 880 59 251 183 23 24 12 76 2 0 0 34 0 2 4 4 0 80 72 40 2 868 59 251 184 23 23 10 76 2 0 0 34 0 2 4 6 2 80 86 8 2 852 Total Aircraft Inventory (TAI): KC-10............................................................................................. KC-135........................................................................................... C-130E/H/J .................................................................................... C-9.................................................................................................. C-12................................................................................................ C-20................................................................................................ C-21................................................................................................ C-135.............................................................................................. EC-135 ........................................................................................... C-137C ........................................................................................... UH-1N............................................................................................ CT-43A .......................................................................................... VC-25A .......................................................................................... C-32A............................................................................................. C-37A............................................................................................. C-40................................................................................................ C-5.................................................................................................. C-17................................................................................................ C-141.............................................................................................. H-60 ............................................................................................... Total .......................................................................................... 294 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations FY 2000 FY 2001 FY 2002 530 357 372 396 149 462 608 1,025 331 318 784 947 42 102 120 478 345 404 935 194 600 642 642 416 400 706 530 36 109 83 496 340 399 935 202 720 642 554 416 400 733 722 43 106 0 Flying Hours Per Average Primary Aircraft Inventory: KC-10............................................................................................. KC-135........................................................................................... C-130E/H/J .................................................................................... C-9.................................................................................................. C-12................................................................................................ C-20................................................................................................ C-21................................................................................................ C-135.............................................................................................. UH-1N............................................................................................ VC-25A .......................................................................................... C-32A............................................................................................. C-37A............................................................................................. C-5.................................................................................................. C-17................................................................................................ C-141.............................................................................................. Note: Does not include Transportation Working Capital Fund (TWCF) assigned aircraft. 295 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations FY 2000 FY 2001 FY 2002 28,594 81,348 60,936 1,979 3,573 5,541 44,974 2,049 8,275 636 3,137 1,894 2,944 6,525 4,439 256,844 25,816 78,602 66,180 21,503 4,648 7,196 47,512 1,283 10,396 800 2,823 1,059 2,552 7,007 3,064 280,441 26,758 77,591 65,420 21,503 4,648 7,196 47,512 1,108 10,396 800 2,932 3,608 3,034 8,381 0 280,887 Flying Hours: KC-10............................................................................................. KC-135R/T .................................................................................... C-130E/H/J .................................................................................... C-9A/C ........................................................................................... C-12C/J .......................................................................................... C-20A/B/C/H ................................................................................. C-21................................................................................................ C-135.............................................................................................. UH-1N............................................................................................ VC-25A .......................................................................................... C-32A............................................................................................. C-37A............................................................................................. C-5.................................................................................................. C-17................................................................................................ C-141B ........................................................................................... Total ............................................................................................... Note: Transportation Working Capital Fund (TWCF) hours are not included (i.e. reimbursed as flown) 296 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations V. Personnel Summary Active Military End Strength (Total) Officer Enlisted Civilian End Strength (Total) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire Active Military Average Strength (Total) Officer Enlisted Civilian FTEs (Total) U.S. Direct Hire Foreign National Direct Hire Total Direct Hire Foreign National Indirect Hire FY 2000 FY 2001 FY 2002 Change FY 01/02 26,145 4,228 21,917 26,633 4,499 22,134 27,654 4,534 23,120 1,021 35 986 1,084 1,072 12 1,084 0 1,230 1,208 22 1,230 0 1,239 1,206 33 1,239 0 9 -2 11 9 0 23,496 4,223 19,273 26,397 4,367 22,030 27,160 4,523 22,637 763 156 607 1,190 1,151 39 1,190 0 1,115 1,098 17 1,115 0 1,335 1,301 34 1,335 0 220 203 17 220 0 297 Air Force Operation and Maintenance, Active Forces Budget Activity: Mobilization Activity Group: Mobility Operations Detail by Subactivity Group: Airlift Operations VI. OP-32 Line Items: FOREIGN 101 103 308 401 411 412 414 415 417 502 503 505 506 671 703 707 771 901 912 913 914 915 920 921 922 923 924 925 930 932 933 934 937 989 998 AIRLIFT OPERATIONS EXECUTIVE GENERAL SCHEDULE WAGE BOARD TRAVEL OF PERSONS DFSC FUEL ARMY MANAGED SUPPLIES/MATERIALS NAVY MANAGED SUPPLIES/MATERIALS AIR FORCE MANAGED SUPPLIES/MATERIALS DLA MANAGED SUPPLIES/MATERIALS LOCAL PROC DWCF MANAGED SUPL MAT ARMY DWCF EQUIPMENT NAVY DWCF EQUIPMENT AIR FORCE DWCF EQUIPMENT DLA DWCF EQUIPMENT COMMUNICATION SERVICES(DISA) TIER 2 AMC SAAM/JCS EX AMC TRAINING COMMERCIAL TRANSPORTATION FOREIGN NAT'L INDIRECT HIRE (FNIDH) RENTAL PAYMENTS TO GSA (SLUC) PURCHASED UTILITIES (NON-DWCF) PURCHASED COMMUNICATIONS (NON-DWCF) RENTS (NON-GSA) SUPPLIES & MATERIALS (NON-DWCF) PRINTING & REPRODUCTION EQUIPMENT MAINTENANCE BY CONTRACT FACILITY MAINTENANCE BY CONTRACT MEDICAL SUPPLIES EQUIPMENT (NON-DWCF) OTHER DEPOT MAINT (NON-DWCF) MANAGEMENT & PROFESSIONAL SUP SVS STUDIES, ANALYSIS, & EVALUATIONS ENGINEERING & TECHNICAL SERVICES LOCALLY PURCHASED FUEL (NON-SF) OTHER CONTRACTS OTHER COSTS TOTAL AIRLIFT OPERATIONS FY 2000 CURRENCY ACTUAL 66,258 7,652 70,034 204,735 1,929 643 161,685 30,338 31,532 67 22 1,136 1,096 68 21,003 574,067 930 654 0 392 494 102 35,975 315 3,994 655 89 16,530 352,455 13,046 10,543 10,159 0 133,898 -1,398 RATE DIFF 1,751,098 FOREIGN PRICE PROGRAM FY 2001 0 0 -821 0 0 0 0 0 0 0 0 0 -126 0 0 0 0 -143 0 0 0 0 -234 0 -25 0 0 -73 0 0 0 0 0 -119 0 GROWTH 2,928 361 1,116 121,956 -81 100 10,350 1,365 508 -1 2 70 48 0 2,878 64,295 13 24 0 6 8 1 576 5 63 10 3 264 5,640 207 168 164 0 2,139 -23 GROWTH 5,802 570 -26,370 -3,455 328 -15 -23,302 3,070 3,550 82 26 1,627 1,539 -68 -14,477 -307,466 -886 163 23 -382 -86 875 -26,011 -195 1,941 -634 655 -4,649 40,550 1,230 -43 578 3 16,438 28,548 ESTIMATE 74,988 8,583 43,959 323,236 2,176 728 148,733 34,773 35,590 148 50 2,833 2,557 0 9,404 330,896 57 698 23 16 416 978 10,306 125 5,973 31 747 12,072 398,645 14,483 10,668 10,901 3 152,356 27,127 -1,541 215,163 -300,441 1,664,279 298 CURRENCY RATE DIFF. PRICE PROGRAM FY 2002 0 0 -73 0 0 0 0 0 0 0 0 0 -57 0 0 0 0 -125 0 0 0 0 -104 0 -14 0 0 -14 0 0 0 0 0 -40 -5 GROWTH 3,314 370 748 -3,229 -51 -30 15,764 138 600 -3 -2 302 7 0 -356 31,766 1 25 0 0 6 15 172 2 102 0 30 204 6,780 247 180 185 0 2,586 462 GROWTH 21,243 8,072 5,539 6,738 330 120 8,287 4,311 4,003 -5 -4 -466 -100 0 -1,968 114,920 91 682 0 -9 -2 28 4,638 -3 2,494 47 52 3,264 118,617 713 -1,165 979 -1 24,786 5,970 ESTIMATE 99,545 17,025 50,173 326,745 2,455 818 172,784 39,222 40,193 140 44 2,669 2,407 0 7,080 477,582 149 1,280 23 7 420 1,021 15,012 124 8,555 78 829 15,526 524,042 15,443 9,683 12,065 2 179,688 33,554 -432 60,335 332,201 2,056,383