Air Force Operation and Maintenance, Active Forces Budget Activity: Operating Forces

advertisement

Air Force

Operation and Maintenance, Active Forces

Budget Activity: Operating Forces

Activity Group: Space Operations

Detail by Subactivity Group: Satellite Systems

I. Description of Operations Financed: The Defense Meteorological Satellite Program (DMSP) collects and disseminates global visible/infrared cloud imagery and other specialized meteorological, oceanographic and solar-geophysical data to support worldwide DoD operations and high priority national programs. DMSP is the sole source of high-resolution weather imagery supporting critical Air Force, Navy,

Army, and Marine Corps centralized and theater missions. DMSP consists of two fully operational satellites, in polar orbit, a command and control (C2) system (back-up ops center, mission planning, satellite engineering, and logistics facilities) ground based satellite data processing equipment, and field/ship based terminals deployed worldwide. Operation and Maintenance funds provide for: C2 segment hardware/software maintenance, maintenance of DMSP equipment at remote tracking stations, support and service contract for launch pad maintenance and launch preparation activities, support and services contract for satellite and sensor daily operations support (factory experts performing telemetry analysis/trending, troubleshooting, and anomaly resolution), independent verification, validation, and modification of C2 system software, and civilian pay for system operators.

The NAVSTAR Global Positioning System (GPS) is a space-based radio navigation network that provides 24-hour navigation information to meet the needs of the US and allied military services worldwide. These services include: extremely accurate three-dimensional positioning, velocity and time; a worldwide common grid, passive all-weather operations; continuous real-time information; support to an unlimited number of users and areas and support to civilian users. The NAVSTAR satellites circle the globe every 12 hours, emitting continuous navigational signals.

The Delta II expendable launch vehicle is used to launch the current block of NAVSTAR GPS IIR satellites from Cape Canaveral Air Force

Station, FL into 11,000 mile circular orbits. O&M funding for the NAVSTAR GPS sustains the operational control segment and launch operations. These costs include maintenance, contractor logistics support, and funding for an interim backup mission control center. The new

GPS IIF Operational Control Segment (OCS) Single Prime Initiative (SPI) contract is now updating the ground control architecture to combine these tasks and reduce the complexity. Air Force Space Command is also building a fully functional Alternate Master Control Station (AMCS) at

Vandenberg AFB, CA, which will fulfill operational back up requirements currently fulfilled by the interim back up. The AMCS is also critical for transition to the new GPS Operational Control Segment and will serve as the Air Education Training Command Initial Qualification Training

Facility, which includes a high fidelity simulator trainer.

II. Force Structure Summary: Satellite Systems supports the constellation of Defense Meteorological Satellites and the Global Positioning

System satellites.

243

Air Force

Operation and Maintenance, Active Forces

Budget Activity: Operating Forces

Activity Group: Space Operations

Detail by Subactivity Group: Satellite Systems

III.

Financial Summary ($s in Thousands):

A. Program Elements:

Def Meteorological Program - Space

Def Meteorological Sat Prog - Comm

NAVSTAR GPS - User Eq. Space

NAVSTAR GPS - Space

Total

B. Reconciliation Summary:

Baseline Funding

Congressional Adjustments (Distributed)

Congressional Adjustments (Undistributed)

Adjustments to Meet Congressional Intent

Congressional Adjustments (General Provisions)

Subtotal Appropriated Amount

Rescission

Program Changes (CY to CY only)

Subtotal Baseline Funding

Reprogrammings

Price Changes

Functional Transfers

Program Changes

Current Estimate

FY 2000

Actuals

$11,538

2,077

1,041

25,899

$40,555

FY 2001

Budget

Request

$9,227

2,381

1,225

40,640

$53,473

Appn

$9,064

2,338

1,199

39,987

$52,588

Current

Estimate

$8,197

2,125

1,074

40,479

$51,875

FY 2002

Estimate

$9,212

2,168

1,245

41,155

$53,780

Change

FY 01/01

Change

FY 01/02

$53,473

0

0

0

-885

$52,588

-150

-1,238

$51,200

675

$51,875

$51,875

1,385

-628

1,148

$53,780

244

Air Force

Operation and Maintenance, Active Forces

Budget Activity: Operating Forces

Activity Group: Space Operations

Detail by Subactivity Group: Satellite Systems

C. Reconciliation of Increases and Decreases ($s in Thousands):

FY 2001 President's Budget Request .......................................................................................................................

1. Congressional Adjustments ................................................................................................................................... a) Distributed Adjustments ....................................................................................................... b) Undistributed Adjustments ................................................................................................... c) Adjustments to meet Congressional Intent ........................................................................... d) General Provisions ................................................................................................................ i) Defense Working Capital Fund Rate Stabilization (Sec 8085, P.L. 106-259, FY 2001 Appn Act) ii) Headquarters and Administrative Activities (Sec 8165, P.L. 106-259, FY 2001 Appn Act)

$-675

$-201 iii) Consulting and Advisory Services (Sec 8163, P.L. 106-259, FY 2001 Appn Act) ........

FY 2001 Appropriated Amount (subtotal) ..............................................................................................................

$-9

Government-Wide Rescission (Sec 1403, Chapter 14, General Provisions, Division A, P.L. 106-544) ....................

2. Program Increases and Decreases ......................................................................................................................... a) Transfers ............................................................................................................................... b) Program Increases ................................................................................................................. c) Program Decreases ...............................................................................................................

$0

$0

$0

$-885

$0

$0

$-1,238

$53,473

$-885

$52,588

$-150

$-1,238

245

Air Force

Operation and Maintenance, Active Forces

Budget Activity: Operating Forces

Activity Group: Space Operations

Detail by Subactivity Group: Satellite Systems i) One-time Costs ................................................................................................................

1) Realignment of Funds (FY 2001 Base $53,473) ...............................................

The FY 2001 Flying Hour Program reprice, based on the CY 2000 AFCAIG consumption factors, resulted in an overall shortfall which Air Force cash flowed from other Air Force Operation and Maintenance programs. After careful consideration of the alternatives, funds were realigned from this Sub Activity Group.

While we recognize the detrimental impact on this Sub Activity Group, this one-time realignment was necessary to ensure continued aircrew readiness and safety of flight, and will be restored in subsequent years.

$-1,238

$-1,238 ii) Program Reductions ........................................................................................................

FY 2001 Baseline Funding (subtotal) .......................................................................................................................

$0

3. Reprogrammings: .................................................................................................................................................. a) Working Capital Fund Transfer (Sec 8005, P.L. 106-259, FY2001 Appn Act) .............

Revised FY 2001 Estimate.........................................................................................................................................

4. Price Change .........................................................................................................................................................

5. Transfers ................................................................................................................................................................ a) Transfers In ...........................................................................................................................

$675

$0

$51,200

$675

$51,875

$1,385

$-628

246

Air Force

Operation and Maintenance, Active Forces

Budget Activity: Operating Forces

Activity Group: Space Operations

Detail by Subactivity Group: Satellite Systems b) Transfers Out ........................................................................................................................ i) Federally Funded Research and Development Centers ...................................................

Decrease reflects transfer of funding to Other Space Operations to properly align funding with efforts.

$-182 ii) Weather Ground System Consolidation ..........................................................................

Transfer to Navigation/Weather Support subactivity as part of the effort to centralize all weather ground systems into one area, in order to allow leadership to better manage the program.

$-446

6. Program Increases ................................................................................................................................................. a) Annualization of New FY 2001 Program ............................................................................. b) One-time FY 2002 Costs ...................................................................................................... i) Rescission Restoration ....................................................................................................

Restoration of FY01 Government-Wide Rescission. ii) Restoration of Flying Hour Reprice Realignment (FY 2001 Base $51,875) ..................

When the FY 2001 Flying Hour Program was repriced using the CY2000 AFCAIG factors, the resultant shortfall was cash flowed from other Air Force Operation and

Maintenance programs. Funds realigned from this Sub-Activity Group in FY 2001 have been restored in full for FY 2002. c) Program Growth in FY 2002 ................................................................................................

7. Program Decreases ................................................................................................................................................ a) Annualization of FY 2001 Program Decreases ....................................................................

$150

$1,238

$-628

$0

$1,388

$0

$0

247

$1,388

$-240

Air Force

Operation and Maintenance, Active Forces

Budget Activity: Operating Forces

Activity Group: Space Operations

Detail by Subactivity Group: Satellite Systems b) One-time FY 2001 Costs ...................................................................................................... c) Program Decreases in FY 2002 ............................................................................................ i) Satellite Systems (FY 2001 Base $51,875) ....................................................................

Decreases in contractor support and supplies due to emerging user requirements.

$-240

FY 2002 Budget Request ...........................................................................................................................................

IV. Performance Criteria and Evaluation Summary:

Defense Meteorological Satellite Program (DMSP)

Satellites in orbit ..................................................................................

Global Positioning System (GPS)

Satellites in orbit ...................................................................................

FY 2000

4

24

FY 2001

5

24

$0

$-240

FY 2002

4

24

$53,780

248

V. Personnel Summary

Active Military End Strength (Total)

Officer

Enlisted

Civilian End Strength (Total)

U.S. Direct Hire

Foreign National Direct Hire

Total Direct Hire

Foreign National Indirect Hire

Active Military Average Strength (Total)

Officer

Enlisted

Civilian FTEs (Total)

U.S. Direct Hire

Foreign National Direct Hire

Total Direct Hire

Foreign National Indirect Hire

Air Force

Operation and Maintenance, Active Forces

Budget Activity: Operating Forces

Activity Group: Space Operations

Detail by Subactivity Group: Satellite Systems

FY 2000

152

77

75

153

78

75

19

19

0

19

0

11

11

0

11

0

249

FY 2001

229

109

120

191

93

98

20

20

0

20

0

20

20

0

20

0

FY 2002

230

109

121

230

109

121

20

20

0

20

0

20

20

0

20

0

Change

FY 01/02

1

0

1

39

16

23

0

0

0

0

0

0

0

0

0

0

VI. OP-32 Line Items:

SATELLITE SYSTEMS

101 EXECUTIVE GENERAL SCHEDULE

103 WAGE BOARD

308 TRAVEL OF PERSONS

401 DFSC FUEL

411 ARMY MANAGED SUPPLIES/MATERIALS

412 NAVY MANAGED SUPPLIES/MATERIALS

414 AIR FORCE MANAGED SUPPLIES/MATERIALS

415 DLA MANAGED SUPPLIES/MATERIALS

417 LOCAL PROC DWCF MANAGED SUPL MAT

502 ARMY DWCF EQUIPMENT

505 AIR FORCE DWCF EQUIPMENT

506 DLA DWCF EQUIPMENT

671 COMMUNICATION SERVICES(DISA) TIER 2

771 COMMERCIAL TRANSPORTATION

914 PURCHASED COMMUNICATIONS (NON-DWCF)

915 RENTS (NON-GSA)

920 SUPPLIES & MATERIALS (NON-DWCF)

921 PRINTING & REPRODUCTION

922 EQUIPMENT MAINTENANCE BY CONTRACT

923 FACILITY MAINTENANCE BY CONTRACT

925 EQUIPMENT (NON-DWCF)

930 OTHER DEPOT MAINT (NON-DWCF)

932 MANAGEMENT & PROFESSIONAL SUP SVS

933 STUDIES, ANALYSIS, & EVALUATIONS

934 ENGINEERING & TECHNICAL SERVICES

989 OTHER CONTRACTS

998 OTHER COSTS

TOTAL SATELLITE SYSTEMS

Air Force

Operation and Maintenance, Active Forces

Budget Activity: Operating Forces

Activity Group: Space Operations

Detail by Subactivity Group: Satellite Systems

FOREIGN FOREIGN

FY 2000

250

203

195

32,147

1,064

89

0

279

10

266

91

233

976

ACTUAL

631

77

793

2

302

0

8

114

118

1

21

22

2,662

1

CURRENCY PRICE

RATE DIFF

0

0

0

0

0

0

0

0

0

0

0

0

0

0

-1

0

0

0

0

0

0

0

0

0

0

0

0

4

16

4

1

4

0

1

0

3

513

4

3

17

GROWTH

28

4

12

0

19

0

0

1

-10

0

0

1

6

2

PROGRAM FY 2001

GROWTH

515

80

711

2

78

3

3

59

64

1

13

13

925

102

-226

-92

-187

-586

-80

32

-77

17

24

-1

11

5,752

3,532

ESTIMATE

1,174

161

1,515

3

11

4

399

179

184

2

35

36

3,577

103

278

205

209

38,412

4,613

10

32

206

27

44

0

50

406

CURRENCY PRICE

RATE DIFF.

0

0

0

0

0

0

0

0

0

0

0

0

0

0

-1

0

0

0

0

0

0

0

0

0

0

0

0

0

7

0

0

3

0

0

0

4

654

5

4

78

GROWTH

51

7

26

0

43

0

0

0

494

2

0

4

1

3

PROGRAM FY 2002

GROWTH

-21

38

-669

0

-1

0

235

-11

-12

0

-11

-9

-346

-6

13

-22

17

1,444

-286

34

54

6

0

65

3

1

4

ESTIMATE

1,204

206

871

3

10

4

677

169

175

2

28

27

3,725

99

296

187

230

40,510

4,405

11

36

274

30

50

0

84

467

40,555 -1 633 10,688 51,875 -1 1,386 520 53,780

250

Download