-7.1 FFFO-o ENGINEERING TECHNICAL INFORMATION SYSTEM NOTESTECHNICAL REPORTS DATA RETRIEVALMANAGEMENT PROFESSIONAL DEVELOPMENT FIELD VOLUME L -Ji 12 NUMBER 7 Notes ASTM CONCRETE CYLINDER FIELD THE HYDRAULIC SIZE IN NOTEBOOK ROCK RAKE PUBLIC LAND SURVEYS PERFORMANCE ECCP ASSESSMENT FOREST SERVICE NOVEMBER-DECEMBER S U.S. DEPARTMENT OF AGRICULTURE 1980 UýS FIELD NOTES ENGINEERING Volume Information contained this Number 12 has 7 been developed for of employees and its respon-sibility of the United cooperating for The Federal of Department and State agencies. or service product of others Such of the reader. that text in may be the The must not be construed or policy except engineers and engineering intended its contractors Department of Agriculture use of this information names in this by other than publication use does not constitute by the United guidance is assumes no its own employees. for the information and an official endorsement or approval States Department of Agriculture to the exclusion suitable. publication by Service Agriculture-Forest use of trade firm or corporation of any not publication the interpretation or convenience The in States as FSM exclusively the represents recommended personal or approved Because references. technicians opinions should procedures of the type read of the respective each issue however FOREST SERVICE DEPARTMENT OF AGRICULTURE Washington D.C. mandatory instructions of material in..the publication for engineers. U.S. author and 20013 this publication all is PELZNER RECEIVES ASTM AWARD Com-mittee Adrian Office staff received the Pelzner of the Washington Special Service Award at an awards dinner held June 24 in Chicago. Committee D18 on Soil and Rock for Engineering Purposes is sponsored by the American Society for Testing and Materials Pelzner is first vice-chairman. D18 Engineer-ing ASTM letter to Myles Howlett Forest Service Director of Committee Chairman Arnold Johnson wrote that Pelzner has not been of assistance to the committee as a only great whole but has carried out many special assignments. The award was presented for those many efforts and accomplishments on behalf of this committee and of ASTM as a whole.In a a I Adrian Pelzner right receives Committee D-18 Special Service Award from Arnold I. Johnson Chairman 1 CONCRETE CYLINDER TRANSPORTATION Steve Monlux Materials Lab Engineer Region 1 usu-ally The cylinder carrier described in the June 1980 Field Notes solves the physical damage problems associated with transporting concrete cylinders but does not meet the requirements of AASHTO unless the cylinders are transported within 24 T-23 section hours of fabrication. Because cylinder molds must be stripped hours of fabrication within 20 and because the cylinders are not shipped to the lab within 24 hours we encourage These cans which Forests to use curing cans for transportation. from Soil Test protect the cylinders from damage are available meet the moist cure requirements for storage and assist in even curing temperatures. 8 4 ob-taining fre-quent know AASHTO T-23 sections 7 Curing and 8 to Laboratory to ensure that the treatment of concrete is in conformance with specifications. cylinders Experience that proper curing of cylinders indicates is one of our most problems. Individuals should Shipment 2 THE ELECTRONIC FIELD NOTEBOOK J. Civil Campbell Engineer WO S. WO and the San The Systems Development Group in Engineering Center are developing to Dimas Equipment Development procedures field use the MSI/88D portable data terminal as an electronic notebook for collecting survey data for the Road Design System have been used for taking RDS. In the past similar devices Since its introduction the inventory in shopping centers. upgraded. equipment has been continuously Many of the previous problems such as limits in communications and transferring the use of this kind of equipment in prevented in its ability The present equipment is more adaptable to collect data and more complex applications have become in-formation sur-veying. re-duced notetak-ing usu-ally ter-minal possible. The procedures with this equipment will be used to input data for The the RDS system for traverse levels and cross sections. field notebook will be of the electronic primary advantages manual error no transcription error and improved are the departure from standard notetaking disadvantages procedures and the training required to familiarize personnel field notebook is not with the new equipment. The electronic traverse notes that expected to replace the right-hand-side are included with the traverse book. portable data figure shows the details of the MSI/88D which has approximately 50 hours of keying capacity the of storage capacity of the unit being tested is 63791 characters coupler and an information. It comes equipped with an acoustic RS232 interface for communications with other terminals the are 7 3/4 inches by 3 5/8 dimensions of the unit being tested inches by 2 1/4 inches 196.85 mm by 92.08 mm by 57.15 mm. The re-quires field notebook is used process by which the electronic be that several initialization parameters established for for users by the machine. will be established These parameters the development process they include the type of storage control a case counter the transmission rate the transmission format a blocking factor and various factors controlling transmission of data from the unit. The 3 CONTROLS 1. LED can show up 16 to how on depending oper-ating fol-lowing Display you parameterizethe 2. CONNECTORS INDICATORS PRGM/OPER Switch mode. Use digits terminal. selects the tip the program either of to pen a slide or the to it right position. key-E 3. ON/OFF used Switch is display timeout. turn the to on unit or . informa-l a f 6. SRCH A A PROM oPE 16 E 14 DISP LO 15 12 d SEND 13 7. off disabling KYBD three Key then or release of line held if for you review one or release if held to two seconds for second a the keyboard disable time 8. Lpý a P BACK SP - Key permits the cursor 8 to data erasing the left the in display whatever removing 9. EDIT Key ously 10. 1 O D QQ White Data - Keys allow data keys used to is recorded. be to may be delete and change insert The assigned 0-9 characters entered the in H or in its previ- ENTER corded 12. CLR in 13. in into the initiates for display display data pressed is y display to be re- data entry and is to Key 16. STAT Key entry 3 5/8 in. 92.08 mm 17. cause is has been entered page number for recording page to be selected ofo anoa2 and the amount and held to is used display positions to as number remaining. connect such components page the optical terminal wands Label shows the terminals number. 19. Secondary 20. Primary Battery Compartment Battery Compartment MSI/88D OFF VINO BATTERIES in to and modules. Identification TURN swlrc BEFORE REM page. Connector optional Terminal the page number for that pressed communications 18. Em o a that number and memory Input/Output various E$ E transmisssion. after displays the accumulator 11 o used also cur-rent ACC DISP 18 - 00 God parameteri- data. 15. d the audible alarm. Key the up the sets SEND SKEY PAGE keyed data d N the terminals memory. Key silence 14. causes Key a a - and zation. 11. s was Non-numeric meanings through special o Nt2 entries F _ terminal. Q - by moving place. E o O while the reenable to 0 item. of line second. pressed 17 two recorded for a previously used is unit. per second. lines lines per LOCK the of board. Q5 Q6 N r three lets time press and at a more scanning 1E r or QrP initially unit review one you lets time press and a Key Key you search Reverse Review Key lets tion 4 Review more or 5. and operation display Forward at 1 turns infor-mation sec-onds the keyboard 4. also It portable data terminal. serial 20 of specific codes for To record cross-section data establishment This is done by certain types of descriptions will be necessary. 1 26 for the letters A through numeric codes establishing through will be In numeric codes addition specific respectively. established for the descriptions listed in the table. Z indi-cate user can choose not to use any specific code except code 40 will the turning point. Because the numeric calculations rotate on the turning point this code is fixed and must be used. To codes will be used in the following manner Nonspecific this the centerline use the numeric reference for C and code would be 0312 because C is the third letter and L is the twelfth letter of the alphabet. Thus the user can describe a cross-section point with the two letters he/she wishes to use. The for L geo-graphic The data entry process is as the fiscal location follows. SPECIFIC Code The first entry is the The number. year and the project DATA CODES Description Abbreviation TP 40 Turning 41 Centerline 42 Edge of surface 43 of road 44 Edge Edge 45 Bottom of ditch 46 Bottom of 47 Top of cut Edge of Clearing Top of fill slope TC EC TF BF 53 Bottom of fill slope Creek edge Creek centerline Center of draw 54 Marshy area CC DC MA 55 Section Sc 56 59 One quarter corner Benchmark Rock Fench line 60 Utility 61 Building 48 49 50 51 52 57 58 of point of Road. ditch cut corner line 5 CL ES ER ED BD BC CE 4C BM RK FL UL BG estab-lished second entry is the current date of the survey. The third entry indicates the type of survey being done. These data are that will be covered in the users by a code reference guide for the equipment. After the type of survey designation data for the type of survey being done is entered using symbols compatible with the keyboard shown in the figure. Preliminary efforts indicate that this type of method is development feasible. Testing with field personnel using the equipment and the data entry process will be necessary before a final determination can be made. con-nected ter-minals After takes the information is entered in the MSI/88D the operator the device to a communications terminal that can be to the Fort Collins Computer Center. Two types of have been tested for this application the Execuport 300 and the Execuport 4000. The data must be sent twice to test transmission accuracy two data files will be built. sec-tion An output is sent back to the user. The type of output depends on the survey data transmitted. For traverse the output will contain the section station input angles and distance entered. For profiles it will contain the section station and data entered. For cross sections the output will consist of the The cross section station elevation and cross section. will be shown as a bar graph with the alphabetic description codes and turning points in their proper positions. The output for each station will include the input that came from the MSI unit. Also the output will produce an error list which will consist of diagnostic statements. ter-minals Preliminary testing will be completed with nonintelligent which are not equipped for receiving data with the acoustic coupler. The MSI/88D however has an acoustic coupler and can be used with an intelligent terminal if the terminal has a program to handle the coupler interface. Testing should be in 1981. completed The test will consist of a class 1 survey in construction and reconstruction projects. equip-ment. The Systems Development Group WO Engineering would like from any field unit that has experience with this type of 6 to hear NEW HYDRAULIC ROCK RAKE IMPROVES THE ROAD MAINTENANCE OPERATIONS EFFICIENCY OF James W. Tour Mechanical Engineer MEDC Increasing equipment and fuel costs coupled with limited FRT funds has reduced the miles of road Forests can grade each year. A few Forests report that as little as 10 percent of their road system can be graded annually. Center MEDC have Development Engineers at the Missoula Equipment road maintenance personnel to been working with Forest engineering that will improve grading develop light duty machines is the hydraulic rock rake a refined One such machine design of a rake successfully used by the Nezperce National Forest. It can be used to make the last few passes generally On many low-volume roads the rock rake required by the grader. light duty work. can be substituted for the grader to accomplish produc-tivity. Electro-hydraulic directly to the bed of a 1-ton 9.1-kg truck it is operated entirely from the cab. controls allow the operator to adjust the rake while around stumps over cattle guards moving--for rapid maneuvering and through turnarounds. The new service rake attaches side shifting to keep over older trailer rakes include Advantages rotation in two planes road and from the the vehicle edge away and to improve spreading surface to eliminate deadheading material. A raking speed as high as 15 mph 21.1 km/h can be attained without washboarding. Ad-justing Neu-tralizing 11-foot hydraulic cylinders control rake pressure on the road. the pressure difference between the cylinders tilts the rake so berms can be redistributed on the road as desired. the pressure in both cylinders allows the rake to to the roads surface. conforming Two float sections at each end of the rake fold up reducing its 3.4-m width to 8 feet 2.4 m. This allows the rake to be on public roads at normal speeds while mounted on the transported truck. Hinged 7 opera-tions The new rock 1. More miles of road maintenance 2. More road bladed 3. Less swamper time spent 4. Greater cost rake can mean miles of motor more grader efficient to each year at no increase in each year removing rocks productivity Currently rakes road maintenance the Bitterroot and Helena maintain their roads. National Forests use these A contract has been awarded to establish a commercial source for these rakes. Cost estimates for each rake range from $6000 to $7000. Additional and film information including specifications of the rake in operation footage without sound can be obtained by writing Director USDA Forest Service Center Equipment Development Fort Missoula Bldg. Missoula Montana 59801 1 Hydraulic rock 8 rake. LOT SIZE IN THE PUBLIC LAND SURVEYS W. H. Valentine P.E. L.S. Geometronics Group R-1 Leader Anyone ever having struggled with the problem of determining the dimensions of Government Lots given the acreage will agree that at times the solution to the problem is elusive. Many a surveyor that how earth has wondered on they got figure dimen-sions usually is the key clue to the lot plat acreage if the true lot the dimensions must be determined and be laid out in boundaries are to any subsequent survey. Yet the often differs from the actual. Even though The official acreage size of a lot the measurements the acreage is not the actual used to derive it must hold in proportion to legally establish the lot boundaries. Several methods were used through the years to compute acreage. Rules for lottings changed. Chapter 8 of Land Survey Systems by of this problem J. G. McEntyre contains an excellent discussion and outlines the-specific methods employed. affect-ing summarizes the various methods used and factors of acreage. The figure tabulates lotting and the computation the size of a sample lot as.derived under the various methods. on the depending It shows that the lot size can vary considerably method used. It also shows where the lot dimensions computed to the method used. from a given area will vary according The table Rules in effect were not always followed nonstandard cannot Therefore these techniques methods were sometimes used. be rigidly employed. A warning 9 COMPUTATION OF LOT ACREAGE FOR LOTS IN THE NORTH AND WEST TIERS AND ELSEWHERE IF APPLICABLE Manual NW1/16 Period Position SE Corner Lot Boundary Dimension Computation Line Section Regular Lots Limits/Mile Section Method 6 lots 123 4 567 Average dimensions Average dimensions Average dimensions Average dimensions Average dimensions Average dimensions Average dimensions Average dimensions d q quo-0 Mid-Point 18551880 1 /4 cor to 80 ch Proportional N C.C. 100 S7E boundary of are 1881- 20 ch 1893 of 1/4 NW So. Proportional Ik W 1 sec 100 l boundary 80 Ik k of N5EW tier cor boundary 80 k are l 1894- 20 ch 1929 of 1/4 NW Assumed cor if 20 ch So. in limits boundary SE tier 50 otherwise pro- N portional boundary 501k Ik of W quo- tient2 _ sum are differ- ence and or sum of Average dimensions 20 ch of 1/4 NW Assumed 20 cor if 80 ch ch sides3 sides average dimensions average dimensions Sum 50 1k 0021 from in limits otherwise cardinal. proportional if limits if out of if 1. 1/10 3. Op. cit. Sum of average dimensions average dimensions NOTE I mile latitudinal sides in chains. 1.6 km I chain ch 66 ft 20.1 m I link Ik 7.92 in. 0.201 if limits page meridional of sides product of average length by average width in chains. Land Survey Systems page 242 Manual 1902 page 76. McEntyre 4. Sum of m out of limits. sides4 or out of 2. or of average dimensions limits 1930- tient sum of sides4 out of Present d or Average dimensions Sum sides of or average. dimensions 79.68 acres 0.3224 4 80.20 3 km2 2 I 80.26 acres 0.3246 km2 0.3248 acres km2 -------------79.52 acres 0.3218 Manual Area Lot 4 Period 1855-1881 1 20.10 1 20.20 10 Acres km2 19.92 19.91 2 10 1881-1893 20.108 - 2 20.215 km2 Method Average 40.04 km 2 0.1620 19.915 Average dimensions 40.24 2 dimensions 1/ 16 cor@ mid-pt 0.1628 km 2 1/ 16 cor @ 20 ch 402.3 1894-1929 m 0460.0I4d0.01 220.20 1930-present 20.20 Quadrilateral 20.20 20.215 x 19.92 40.42 20.215 40.41 0.01 0.1636 0.1635 km2 x 19.91 0.05 Sample lot size 11 quotient Sum of merid-ional sides 40.24 0.1628 rule d km2 calculations. km2 DEVELOPMENT OF THE PRECONSTRUCTION PERFORMANCE TESTING AND TRAINING PROGRAM UTILIZING THE TEST DEVELOPMENT FOR QUALIFICATION AND TRAINING PROCESS Transportation Kenneth L. Tompkins Systems Preconstruction Engineer WO Perform-ance PPTT Preconstruction Performance Testing and Training has been evolving slowly on a Service-wide basis for approximately 4 years using the Construction Certification Program format. Job Requirements JPRs and tests for several preconstruction activities have been developed to various degrees. The report of the Road and Bridge Preconstruction Activity Review in July 1977 established published an action plan to correct deficiencies and to improve performance and effectiveness at all levels the development of JPRs standards and related trai-ring for preconstruction engineering was major remedies. The Chiefs Action report required identified as Plan included one of the in the July The Chief shall issue a policy statement that-requires all road designs to be developed under the direct of a designer certified supervision in advanced road design. estab-lished. As of the requirement in the Action Plan FSM 7720.31 now preconstruction certification program is to be FSM 7721.04a states The Chief will develop minimum standards to be used in qualifying preconstruction acceptable and construction personnel. a result states A pro-gram In October 1978 a for a Service-wide task group was formed to develop alternatives The group recommended that the program. be developed for Qualification using the Test Development and Training TDQT The first working process. session of a to develop the PPTT program using TDQT was held in the WO in August 1980. Their initial task is development of a Job Inventory. Service-widecommittee There are three essential training program items in 12 a performance testing and Job 1. description A 2. persons Requirements that provide a detailed and accurate of what a person must do and produce. valid Performance Test that accurately ability to perform the Job Requirements. measures a that specify the skills and Training Requirements to be able to perform on the job. person must acquire A set of 3. knowledge a Figure 1 shows the development these three items. and the relationship process of QUALIFICATION JOB DEVELOP DEVELOP JOB PERFORMANCE TESTS REQUIREMENTS I T R DEVELOP A TRAINING REQUIREMENTS _4W_ DESIGN I _ N THE INSTRUCTION N out-line G Figure These The 1. Development Process into developmental items can be divided stages the complete testing-training process as shown Job Inventory is the first and most development process. testing-training when problems develop in later stages in the Job traced back to deficiencies that in figure 2. important stage in the has shown that Experience they are almost always Inventory. as a job is broken down and each is developed Inventory scheme called Successive classification described. A component down from the broad to break an event is used to Approximation and standards The actions conditions the specific 3. figure activities in the become the basis for all developmental Process. Development The Job Testing-Training The committee Service-wide develop the Job Inventory. 1. 2. 3. 4. will use the following Collect and review job-related documents. Write general description of job. List major duties. Break duty into tasks. 13 steps as they I 3 JOB 3 JOB INVENTORY TRAINING REQUIREMENTS SPECIFICATIONS DEVELOP FORMULATE ORGANIZE DEVELOP lob lob Performance Test Performance Requirements In venlory Requi 4 TESTING- PERFORMANCE emen Bid D for Temng Blvepri PERFORMANCE TEST SPECIFY ni CONSTRUCT Performance Performance Objectives Tesi Activities and Iroi-g S d f/ REQUIREMENTS LEGEND d TRAINING Post-development SPECIFY Inventory Data of is used In the DEVELOP Instracti0t5I Instructional Tests Objectives Objectives f Performance Final Test Eaen lnation becomes for the Training. 6 VALIDATION 1. DIAGRAM 2 in Stages 3. the TestingTraining Performance Requirements 2. Developmental OF C. Performnnce Objectives Performance Iroi ing Tevt ements Requi Process Figure Testing-Training 2. Process JOB General A 7 S P P C R Tasks C 0X ES I M Description DUTIES L Steps S A I Key-Steps V T Standards E Conditions I 0 N Figure 5. 6. 7. 8. 9. 10. 11. 3. Successive Approximation Review tasks for single action and product. Examine action verb for observable action. Examine product - single - measurable. Identify tasks as Interim or End. Group tasks in sequence. Repeat 4-9 for each duty. Verify duties and tasks with others. 14 Write standards for each task product. Break each task into steps. Identify key steps. Review each key step to assure completed performance. Write standard for each key step. Specify condition for each task. action. Identify need for contingency Repeat 4-18 for each duty. Check inventory for completeness. Consult with other master performers. Review other master performer suggestions. Revise and validate with at least six master performers. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. pre-construction the full range of road is completed Inventory activities from route location through preparation for contracts will be of the final drawings and specifications described. The committee will complete the five remaining developmental stages resulting in a performance testing and training program that will function as shown in figure 4. After the Job This method 1. will result To evaluate in effective an JOB actual against employees program PERFORMANCE REQUIREMENTS QUALL J for - _J L PERFORMArFAI EMPLOYEE TO G V I N E THE THE 1ST T E T S TO T R A SPECIFIC REQUIREMENTS JOB AND AN EMPLOYEE .. DETERMINE CAN PERFORM IF IF 2ND. T 3RD. RE-T Figure 4. E S T N G OF EMPLOYEES JOB... to the JOB ...then... FOR SPECIFIC AND... N I on NI TO DETERMINE IS NOW DEFICIENCIES. IF QUALIFICATION ACHIEVED. PER-FORMANCE PROVIDES I A R YES... NO WHETHER THE I MANAGEMENT ON THE THE EXPECTED EMPLOYEE JOB. Development of Performance Training Program 15 be job requirements. ýTO PASS rcompare that will Testing and used on-the-job 2. cannot 3. The To train employees only for those activities perform adequately at the present time. To provide management performance committees draft with the employees that they expected Job Inventories can be used in monitoring performance elements that are required performance appraisal process. of the comple-tion developing by the new The or long-range development dates are June 1981 1981 September December 1981 stages and their approximate Job Inventory Job Performance Testing Training March 1982 Performance June Training 1982 September December 1982 1982 16 Specifications Test Requirements Validation PPTT Requirements Complete Program Ready ECCP ASSESSMENT Russell L. Rogler Assess-ment Engineer Technical Recruitment and Development WO Certification Program ECCP Engineering Construction has been published and distributed copies 1979 EM 7115-2 should be available at Forest Supervisors Offices. This report is the result of a survey of a cross section of Forest Service with the ECCP. personnel involved The question-naire A statistically selected sample of 468 FS specialists and managers received copies of a questionnaire in August 1979. The contained 24 agree/disagree hypotheses on a scale of 1 to 5 and three narrative response requests 1. Other certification 2. the ECCP areas of program Problems with FS activity the current that would structure benefit from a and administration of im-pressive statis-tical 3. Suggestions for improvements in the program Questionnaires completed by 374 individuals resulted in an 80% response rate for the agree/disagree portion and The and comments 1348 specific suggestions. report is a these and it does not include of comments responses summary detailed recommendations. The survey response included many negative comments but positive the negative comments and constructive suggestions outweighed and constructive items. The survey is considered a valid critique of a major engineering program it documents general support for the program and a need to improve examinations training and administration. The most significant suggestions are from exams by immediately scoring and Improve feedback and their supervisors informing participants promptly of exam scores and weak areas that were identified. 17 Clarify the role of prerequisite in the overall program. and remedial training man-agers administration Strengthen of the program. Hold accountable for followup of indicated training and certification. Continue top-priority effort to improve exam eliminate trick questions include more questions. quality Increase program emphasis on job performance emphasis on passing a written exam. reduce performance-related Administer exams at the Forest level where possible and include on-the-job performance testing. pro-gram Establish a strong along trainees. apprenticeship Increase Line awareness one method is the program to bring and involvement in use reviews. of activity the certifica-tion Simplify program by reducing the number of categories and simplify the recertification process. sum-marize Provide oral exams for those demonstrated performers who have difficulty taking written exams. Many The other suggestions in appendix overall The D for improvements of the report. conclusions of the to assessment the program are are objec-tives quality of constructed facilities Engineering Construction Certification are not clearly understood. The examination has improved. Program and administration improvement. training aspects im-proves of the program need Many to participants believe that the ECCP neither morale and job opportunities nor contributes career enhancement. 18 compe-tent The program does not ensure use of qualified projects. personnel on construction The quality improved. of construction project administration has purchasers personnel report that contractors/timber of CORs has not think the program improved competence and FS opinion. ERs Inspectors FS The program should be continued. certifi-cation Consideration should be given into other areas. to expansion of On some issues responses of the local employee groups or differ significantly from average response particular Regions this indicates where improvements might be made to gain better commitment to the program. Recommendations resulting from the Assessment are indi-cated 1. Continue the Engineering Construction Certification Program. Expand certification programs in other areas assessment data to Furnish in the suggestions. affected. 2. as staff units Office with assistance from the Regions Washington indicated problems more should develop a detailed plan to define to the program. corrective action strengthen precisely and take 3. The and recommendations provide conclusions These suggestions to make ECCP more effective. renewed effort framework for a a at the National The Assessment was a major topic of discussion Certification and Technical Data Systems Workshop June 1980. at the Workshop includes nine issues The Action Plan developed Report directly related to suggestions included in the Assessment and Regional Office personnel with ECCP Washington will be working on these issues over the next several months. The result should be improved program administration. alternatives for improving the examinations are In addition in being explored. Progress and changes will be reported issues of Field Notes. responsibil-ities subse-quent 19 used for January 1983 we will send the same questionnaire this study to an appropriate sample of each respondent group. This action will allow us to monitor the effectiveness of the corrective actions we are undertaking and will provide an opportunity for the identification of any new problem areas. In 20 INVITATION TO READERS OF FIELD NOTES Every reader a is author potential you would of an article for Field Notes. share with we Service engineers you have a news item If send or for ac-curate short article Material to you invite to it Field Notes. in publication like submitted the to Office for Washington should publication be reviewed by the Washing-ton Office Regional respective may material submitted however short articles prints glossy Field Notes is Coordinator also to available from the their should R-2 R-3 Royal Coordinators short sentences several and timely FSM 7113. to several of length pages the to be should illustrations all The typewritten All material submitted ideally technically the and Forest Office directly Service retirees. Manager or the Regional number of copies sent to Washington If to all you original Station currently and on the Data Systems Technical Engineering your Regional are not Copies of back issues office. are Office. submit material for publication or questions concerning Dittmer R-4 Ted Wood R-9 Mujeebul M. Ryser Gomez R-5 Paul Stutes R-10 Bo McCoy R-6 Kjell Melvin Juan current is Field Notes Coordinators Regional R-1 information. or negatives. Office increase Field personnel to from the Forest Service Engineers news items are preferred. Forests ask your list vary to distributed from the Washington Area Headquarters mailing or that see interest be typed double-spaced Office should drawings to and of informative should R-8 direct questions WO Bakke Tom Hasan Al Colley Vanderpool concerning format editing publishing dates and other problems to Forest Service Engineering - USDA Staff Attn Gordon L. P.O. Box 2417 Washington Telephone RP-E Bldg Rome D.C. Editor 20013 Area Code 703 235-8198 U.S. GOVERNMENT PRINTING OFFICE 1981 - 723-574/696 REGION 3-1