V/TC&C SIC
Vehicle/Train Control and Communications
System Interface Committee
DAS PCB (Subgroup)
Change control and issue record
Issue
Draft v0.01
Date
04 December 2013
Draft v0.02 03 January 2014
Final draft v1.0 15 January 2014
Final v 1.1
Issue 2.0
Issue 2.1
04 March 2014
05 March 2014
20 March 2014
Comments
First draft
Distribution
Draft template to John
Collins for completion.
Update
Update
Template updated
Document changes incorporated
Update post DAS Board Meeting No3
Issue for review
Document changes incorporated
DAS Board Members
First issue following minor change mtg 4 DAS Board Members
1.1 This document defines the working arrangements for the Driver Advisory System
Programme Control Board (DAS PCB) in accordance with SIC Protocol. This remit is issued by the V/TC&C SIC for the DAS PCB.
2.1 The purpose of the DAS PCB is to promote the development and deployment of DAS systems to meet the needs of the rail industry in support of the industry technical strategy.
The board is also tasked with contributing to the industry objectives for the management of capacity and carbon, algorithm optimisation and impact on schedules that sit within access agreements through the undertaking of an optimisation operational trial to manage conflict at airport junction exploiting the on board DAS units fitted to First Great Western (FGW) trains as a near term primary goal
2.2 The technical scope of the subgroup is focused in the following key areas a) The development of connected DAS systems to build on the deployments of standalone DAS that has been implemented by a number of passenger and freight train operating companies in the past two years. b)
c) d)
To promote the undertaking of joint industry operational trial on the network to demonstrate the principles and operation of improved conflict management by the use of DAS and other predictive techniques such as mathematical algorithms to manage train path conflicts at key locations .
To support and monitor the integration of connected DAS with Traffic Management to optimise the effectiveness of Traffic Management in regulating the operational railway. e)
To support the development of principles and process, including algorithms,and system architecture to improve capacity management by the use of DAS at key locations.
To oversee the next phase of development (phase 2) of the COMPASS National programme for the generation of the tactical picture of a trains location, speed and direction of travel as a joint venture on behalf of the UK rail industry.
QP042_L4
Secretary Caroline Bukenya Xxxx Telephone 020 3142 5542 E-mail Caroline.Bukenya@rssb.co.uk
Page 1 of 11 Issue 2: January 2012
V/TC&C SIC
Vehicle/Train Control and Communications
System Interface Committee
DAS PCB (Subgroup) f) To support the realisation of the longer term strategy to progress from connected
DAS, Traffic Management and the roll out of the ERTMS system across the UK rail network with the aim of achieving Automatic Train Operation (ATO) at the earliest opportunity.
2.3 This aligns with the scope of V/TC&C SIC as set out in SIC Protocol,to ‘provide the focus for train control and communication issues’.
2.4 This subgroup will draw on membership from across the rail industry initially from the Train
Operating Companies, Network Rail and RSSB including the Enabling Innovation Team.
The activities will focus on the current deployment of DAS systems as exampled by First
Group and more recently undertaken by South West Trains. The subgroup will ensure alignment with the work to define DAS standards already being undertaken by Network Rail on behalf of Traffic Management and in the longer tern act as the governance body for the integration of connected DAS with Traffic Management as it is rolled out across the network from 2015.
2.5 The sub group will report to the V/TC&C SIC. The chairman has been appointed by
Network Rail to ensure direct linkage to the Network Operating Strategy being delivered in control period 5 (CP5).
3.1
Work plan
3.1.1 The DAS PCB will monitor the progress of the development of the selected technology demonstrators and operational trials programmes to ensure consistency of implementation to common standards that can be applied to any part of the network where there is a business benefit and complying with the themes and strategic drivers of the Rail
Technology Strategy for carbon, capacity, customer, cost together with reliability, journey time and safety.
3.1.2 A summary work plan for the proposed FGW Conflict Management Operational trials at
Airport Junction is included in Appendix B of this remit.
3.1.3 Should the progress of the development of the selected technology demonstrators and operational trials programmes not satisfy these objectives. The DAS the Board will seek to bring together like-minded individuals with a common purpose of delivering the objectives stated in this remit.
3.2
Conditions under which the subgroup will cease activity
3.2.1 The DAS PCB will cease activity:
Under instruction from the V/TC&C SIC.
Upon withdrawal of industry support in kind.
Upon completion of the gr oup’s purpose, objectives and/or work plan.
3.2.2 Any proposal to disband requires the endorsement of V/TC&C SIC.
4.1 Membership comprises of the following: a) Chair – Network Rail b) c)
Network Rail - Engineering
Network Rail - Operations
QP042_L4
Secretary Caroline BukenyaTelephone 020 3142 5542 E-mail Caroline.Bukenya@rssb.co.uk
Page 2 of 11 Issue 2: January 2012
V/TC&C SIC
Vehicle/Train Control and Communications
System Interface Committee
DAS PCB (Subgroup) d) RSSB e) f)
Train Operating Companies (Passenger & Freight)
DAS Operations Specialist
4.2 RSSB will provide administrative support which is in addition to formal membership.
4.3 Additional guests will be invited to specific meetings where an agenda item to be discussed would benefit from their domain knowledge. All invitations will be agreed with the chair prior to their issue ideally one month before the date of the meeting.
5.1 If a member, or a person for whom that member works, has a direct or indirect personal interest in a matter to be discussed by the committee, as distinct from a common interest of the industry category as a whole, the member shall declare that interest to the chair of the committee of which they are a member at the earliest opportunity: a) b)
On the first occasion at which the matter is discussed, or
If a member is not aware of an interest at that time, at the next committee meeting after which they become aware of that interest, regardless of whether the matter is being discussed at that meeting.
5.2 Once disclosed, an interest need not be disclosed again.
5.3 When a member declares an interest, the other members shall decide whether that member may continue to participate in discussions on the matter concerned or whether that member shall be excluded from the meeting while the matter is discussed.
6.1 Members will need to hold key decision making positions within the respective organisations and include experts from both engineering, operations and programme development with experience of the introduction of new technologies to the rail sector.
7.1
Decision Making
7.1.1 Decisions shall be based on consensus. If consensus cannot be achieved the matter shall be escalated to V/TC&C SIC.
7.2
Reporting / Recommendations
7.2.1 The DAS PCB will report to the V/TC&C SIC as a minimum twice a year and if required by exception.
7.2.2 The DAS PCB report to V/TC&C SIC shall also include information on and status of the work plan and projects that sit under its control.
8.1 Representation by the industry stakeholders on the DAS PCB shall be in kind.
8.2 Funding for specific packages of research and development will be made available from
RSSB subject to agreement from V/TC&C SIC and authorisation by RSSB.
8.3 RSSB will provide financial support for any non-research and development activities in line with the SIC agreement signed by RSSB and the V/TC&C SIC chair.
QP042_L4
Secretary Caroline BukenyaTelephone 020 3142 5542 E-mail Caroline.Bukenya@rssb.co.uk
Page 3 of 11 Issue 2: January 2012
V/TC&C SIC
Vehicle/Train Control and Communications
System Interface Committee
DAS PCB (Subgroup)
9.1 The DAS PCB shall follow the election process for new members or a new chair as set out in the SIC Protocol.
9.2 The DAS PCB will elect the chair from the membership of the group. The position of chair will be continuous, until the DAS PCB members agree by consensus to elect another chair, or when the existing chair resigns.
9.3 The retention of the position for the chair will be reviewed every three years.
10.1
Meeting Quorum
10.1.1 A meeting will be quorate with Chairman or nominated representative, Secretary, 1 x
Infrastructure Manager, 1 x TOC and 1 x RSSB or their nominated representatives.
10.1.2 If the meeting is not quorate absent members will have two weeks after the distribution of the draft minutes to make an objection to any decision taken in the meeting. If no objections are made the decision will stand.
10.2
Operation of Meetings
10.2.1 RSSB will facilitate the meeting in consultation with the chair of the meeting.
10.2.2 The meeting will operate to a pre-agreed agenda.
10.2.3 The DAS PCB will meet every two months, with exception where necessary to review progress and evaluate opportunities to further exploit DAS technologies.
10.2.4 If there are insufficient agenda items to be discussed at any single meeting the chair will, with consultation, cancel the meeting with a minimum of five working days’ notice.
11.1
Minutes
11.1.1 Draft minutes will be reviewed by the RSSB Technical Expert, and then by the chair before distribution to the group.
11.1.2 The draft minutes will be distributed to the group via the RSSB Extranet.
11.1.3 The draft minutes of each meeting will be approved at the following meeting.
11.1.4 The final approved minutes of each meeting will be distributed to the group via the RSSB
Extranet.
11.1.5 As part of the review of the draft minutes the DAS PCB members will confirm whether the approved minutes can be released into the public domain with or without modification.
11.2
Meeting Documentation
11.2.1 The DAS PCB meeting documentation will be provided to the group no later than one week prior to the meeting, exceptions to this must be approved by the chair.
11.2.2 The meeting documentation will be distributed to the group via the RSSB Extranet.
11.3
Remit Review
11.3.1 This remit shall be reviewed annually.
11.3.2 Any amendments to the remit shall be endorsed by the V/TC&C SIC prior to issue.
QP042_L4
Secretary Caroline BukenyaTelephone 020 3142 5542 E-mail Caroline.Bukenya@rssb.co.uk
Page 4 of 11 Issue 2: January 2012
V/TC&C SIC
Vehicle/Train Control and Communications
System Interface Committee
DAS PCB (Subgroup)
Appendix A V/TC&C SIC and Subgroup Organisation Chart
Vehicle Train Control & Communications
System Interface Committee (V/TC&C SIC)
Chair: Clive Burrows
QP042_L4
Train Control
Technical Sub
Group (TCTSG)
Chair: Nick Wright
Train Protection &
Warning System
Strategy Group
(TPWS SG)
Chair: Phil Barrett
Future
Communication &
Positioning Systems
Advisory Group
(FC&PS AG)
Chair: Ian Maxwell
Automatic Warning System Working Group (AWS
WG)
Chair: Nick Wright
DORMANT
Track Circuit Assisters Steering Group (TCA SG)
Chair: Nick Wright
Electro Magnetic
Compatibility
Subgroup (EMC
SG)
Chair: Maya
Peckova
Defect Recording
Analysis and
Corrective Action
System Sub Group
Future Traffic
Regulation
Optimisation
Programme Control
Board (FuTRO PCB)
Chair: Clive Burrows
(DRACAS)
Chair: Simon Tonks
Driver Advisory
Service Programme
Control Board (DAS
PCB)
Chair: Simon
Whitehorn
Chiltern Automatic Train Protections User
Management Group (Chiltern ATP UMG)
Chair: Graham Wire
Great Western Automatic Train Protection User
Management Group (GW ATP UMG)
Chair: Martin Evans
Secretary Caroline Bukenya Xxxx Telephone 020 3142 5542 E-mail Caroline.Bukenya@rssb.co.uk
Page 5 of 11 Issue 2: January 2012
Vehicle
Communications
Advisory Group
(VCAG)
Chair: Nick Wright
Radio Electronic Token
Block Working Group
(RETB WG)
Chair: Stephen
Muirhead
V/TC&C SIC
Vehicle/Train Control and Communications
System Interface Committee
DAS PCB (Subgroup)
Appendix B DAS Board Work Plan – FGW Conflict Management Operational Trial Airport Junction
Ref
Activity
Project Plans and Governance
Type of work/Task:
Summary activity
Resources/Roles Timescale:
Refer Gantt
Wed 04/12/13
Develop Remit, Develop Plan and Schedule Documentation SPONSOR
PROJECT MANAGER
(DELIVERY)
Wed 04/12/13
Review and Comment upon Remit and
Development plan
Administration DAS BOARD MEMBERS Thu 06/03/14
DAS Board Meeting Administration
Create Resource Plan & Org Chart Documentation
DAS BOARD MEMBERS Mon 10/03/14
PROJECT MANAGER
(DELIVERY)
Tue 11/03/14
Update remit schedule & DAS Board Work
Plan for Mobilisation
Documentation
Review project initiation documents with sponsor prior to mobilisation
Meeting
SPONSOR
PROJECT MANAGER
(DELIVERY)
SPONSOR
PROJECT MANAGER
(DELIVERY)
Tue 11/03/14
Thu 27/03/14
Timescale:
Refer Gantt
Thu 27/03/14
Constraints/Issues
Wed 05/03/14
None
Thu 10/03/14
None
Mon 10/03/14
None
Wed 26/03/14
None
Wed 26/03/14
DAS Board Members
Feedback
Thu 27/03/14
Updates / Feedback provided, assessed and applied to governance documentation.
QP042_L4
Secretary Caroline BukenyaTelephone 020 3142 5542 E-mail Caroline.Bukenya@rssb.co.uk
Page 6 of 11 Issue 2: January 2012
V/TC&C SIC
Vehicle/Train Control and Communications
System Interface Committee
DAS PCB (Subgroup)
Funding
Convene Technical workshop
Technical solutions workshop
Requirements definition
Summary activity
Set up funding governance
Project Mobilisation: Design
Administration
Summary activity
PROJECT MANAGER
(DELIVERY),
SPONSOR"
Meeting
Meeting
Documentation TECHNICAL LEAD
Tue 11/03/14
Tue 11/03/14
Mon 24/03/14
Mon 24/03/14
Dependant on DAS Board
Meeting feedback
Mon 10/03/14
Mon 10/03/14
Wed 26/03/14
Thu 27/03/14
Tue 08/07/14
Mon 10/03/14
Dependency on technical lead that at present isn’t confirmed.
Dependency on Principal
Engineer for the definition of
ALGORITHIMS, Systems
Interface Engineer to provide
DAS subject matter expertise,
FGW availability and DAS supplier to attend
Wed 26/03/14
Fri 25/04/14
Dependency on outcome of technical solutions workshop
QP042_L4
Secretary Caroline BukenyaTelephone 020 3142 5542 E-mail Caroline.Bukenya@rssb.co.uk
Page 7 of 11 Issue 2: January 2012
V/TC&C SIC
Vehicle/Train Control and Communications
System Interface Committee
DAS PCB (Subgroup)
Define current system architecture Documentation
Develop conflict Algorithms
Assess Safety issues
Documentation
Review /
Documentation
Assess Operational Activities Review /
Documentation
Assess Communications Workstream Review /
Documentation
Assess Documentation req'd / mandatory / governance
Review /
Documentation
Project Deployment: Develop Summary activity
PROJECT MANAGER
(DELIVERY),
TECHNICAL LEAD,
FGW"
Systems Interface
Engineer: DAS SME
Principal Engineer:
ALGORITHIMS,
TECHNICAL LEAD"
PROJECT MANAGER
(DELIVERY)
PROJECT MANAGER
(DELIVERY)
PROJECT MANAGER
(DELIVERY)
Mon 28/04/14
Mon 28/04/14
Tue 13/05/14
Tue 13/05/14
Mon 12/05/14
Dependency on outcome of technical solutions workshop
Tue 27/05/14
Tue 10/06/14
Dependency on outcome of technical solutions workshop and availability of SME
Dependency on outcome of technical solutions workshop and availability of SME
Tue 10/06/14
Wed 11/06/14 Tue 24/06/14
None
Wed 11/06/14 Tue 08/07/14
None, will discuss with sponsor
Wed 09/07/14 Tue 05/08/14
QP042_L4
Secretary Caroline BukenyaTelephone 020 3142 5542 E-mail Caroline.Bukenya@rssb.co.uk
Page 8 of 11 Issue 2: January 2012
V/TC&C SIC
Vehicle/Train Control and Communications
System Interface Committee
DAS PCB (Subgroup)
Utilise public GSM (FGW contract for server)
Establish link from IECC to DAS server
Review /
Documentation /
Development
Review /
Documentation /
Development
Develop C-DAS Trial Application with simulated train movement information .
Stage 1: Off line trial Summary activity
PROJECT MANAGER
(DELIVERY),
TECHNICAL LEAD,
FGW"
PROJECT MANAGER
(DELIVERY),
TECHNICAL LEAD,
FGW"
TECHNICAL LEAD,
FGW"
Demonstrate the C-DAS Trial Application with simulated train movement information.
Meeting /
Documentation /
Development
FGW
Wed 09/07/14 Tue 05/08/14
None, will discuss with FGW representative
Wed 09/07/14 Tue 05/08/14
None, will discuss with FGW representative
Wed 09/07/14 Tue 05/08/14
None, will discuss with FGW representative
Wed 06/08/14
Wed 06/08/14
Thu 04/09/14
Wed 03/09/14
None, will discuss with FGW representative
QP042_L4
Secretary Caroline BukenyaTelephone 020 3142 5542 E-mail Caroline.Bukenya@rssb.co.uk
Page 9 of 11 Issue 2: January 2012
V/TC&C SIC
Vehicle/Train Control and Communications
System Interface Committee
DAS PCB (Subgroup)
Interface the C-DAS Trial Application via the
DAS server to a test DAS train borne system not in use by a driver (e.g. back cab).
Meeting /
Documentation /
Development
Gather train running data in the proposed live trial area and analysed to identify the process to be applied in the live trial
Documentation /
Research / Analysis
Analyse/monitor quality of data communications to trains in the live trial area to determine how far in advance a revised schedule will need to be advised
Documentation /
Research / Analysis
Stage 2: On line trial Summary activity
FGW
FGW
FGW
Wed 06/08/14
Thu 07/08/14
Thu 14/08/14
Go No Go with 'On Line Trial Meeting
Set up user interface to the C-DAS Trial
Application in a First Great Western control office
Documentation /
Research / Meeting /
Development / Test
FGW
C-DAS Trial Application fed with train movement information from a dynamic timetable system/source
Documentation /
Research / Meeting /
Development / Test
FGW
Wed 20/08/14
DAS BOARD MEMBERS Thu 04/09/14
Wed 20/08/14
Mon 08/09/14
Wed 03/09/14
None, will discuss with FGW representative
Thu 04/09/14
None, will discuss with FGW representative
Thu 04/09/14
None, will discuss with FGW representative
Fri 03/10/14
Thu 04/09/14
Wed 03/09/14
None, will discuss with FGW representative
Fri 03/10/14
None, will discuss with FGW representative
QP042_L4
Secretary Caroline BukenyaTelephone 020 3142 5542 E-mail Caroline.Bukenya@rssb.co.uk
Page 10 of 11 Issue 2: January 2012
V/TC&C SIC
Vehicle/Train Control and Communications
System Interface Committee
DAS PCB (Subgroup)
Project Analysis: Handback Summary activity
Analyse results Analysis
Update architecture Documentation
Project Complete Milestone
FGW
TECHNICAL LEAD
CLIENT
Mon 06/10/14
Mon 06/10/14
Mon 06/10/14
Fri 31/10/14
Fri 31/10/14
Fri 31/10/14
Fri 31/10/14
Fri 31/10/14
None, will discuss with FGW representative
None, will discuss with FGW representative
QP042_L4
Secretary Caroline BukenyaTelephone 020 3142 5542 E-mail Caroline.Bukenya@rssb.co.uk
Page 11 of 11 Issue 2: January 2012