CLASSROOM RENOVATIONS Robert C. Brown Building SUMMER 2012 RENOVATION SUMMARY Renovated 18 classrooms in the Robert C. Brown Building (RCB): 12 exterior and 5 interior classrooms plus one 78-seat theatre. Retrofitted the South East Classroom Block (SECB): 5 classrooms. Renewed and Upgraded the HVAC (Heating, Ventilation and Air Conditioning) system in the RCB. Installed a cooling system for Images Theatre. Installed new classroom furniture and introduced furniture labeling system. Re-upholstered over 200 pieces of lounge furniture. RCB5125 RENOVATION HIGHLIGHTS Asbestos removal to over 5,200 sq ft of floor space. Installed new eco-friendly rubber flooring – easy and cost-effective maintenance. Installed new acoustic ceiling tiles. Electrical upgrade includes installation of LED lighting system with two-tier controls and switches with motion sensors. Re-finished heritage doors and installed seethrough windows. Installed new blackboards and increased writing space by 30%. Installed 8 additional WAP (Wireless Access Points) for improved wireless coverage. Installed new window blinds in all exterior classrooms (2011). Paint! RCB7102 RCB6122 RCB5100 RCB5120 RCB5118 SOUTH EAST CLASSROOM BLOCK Retrofitted A/V equipment to SFU standards which include: HD projectors, audio speakers, wall mounted projector controller and overhead projectors. Installed new DDC (Digital Direct Control) for HVAC which allows for central control and monitoring. Paint and detailed cleaning. SECB1014 HVAC UPGRADE heating, ventilation, air conditioning Building automation and thermal controls for all classrooms had been upgraded from the original pneumatic (compressed air) controls to electronic direct digital control, which allows for central control and monitoring. Full cleaning and maintenance work to building supply and return air ductwork and plenums for improved indoor airflows and air circulation. Added cooling system to Images Theatre to allow for year round operation and improved summer comfort conditions. Other misc mechanical upgrades to address agerelated maintenance issues that are typical to this vintage building. AUDIO-VISUAL HIGHLIGHTS Images Theatre – installed new scaler, document camera and smart touch screen. Introduced new Electronic Podiums into four AQ5000 classrooms, which includes a built-in computer and smart touch screen plus HD projector. Arranged training sessions for faculty on the use of the new technologies. Installed new LCD and overhead projectors, projector screens and audio speakers. Installed network into 18 RCB classrooms (2011). RCB5125 MISC. OTHERS Completed the installation of new LED lighting, dimmers and control system in the Academic Quadrangle Theatres (a.k.a. “Seven Sisters”): AQ3003, AQ3005, AQ3149, AQ3150, AQ3153, AQ3154, AQ3159. Installed electrical outlets and accoustic panels in EDB7618 Theatre. RCB8106 FURNITURE RENEWAL Installed over 450 new chairs and 135 classroom tables. Introduced trapezoid tables for improved learning experience. Furniture Sweep - Inspected, repaired, cleaned and sorted over 1750 pieces of furniture in the RCB and WMC classrooms; re-used refurbished furniture. Introduced Furniture Labeling System, which includes furniture labelling and colour coding. Arranged for timely furniture set-up using furniture floor plans, posted behind each classroom door. LOUNGE FURNITURE RENEWAL Re-upholstered over 200 pieces of lounge furniture in AQ2000, AQ3000, East Theatre Annex and TASC 1 & TASC 2. Cleaned and repaired damaged lounge furniture in Applied Science Building and installed refurbished lounge furniture. Installed new rubber flooring in lounge area. EAST THEATRE ANNEX - LOUNGE TASC 2 - LOUNGE APPLIED SCIENCE BUILDING - LOUNGE ACADEMIC QUADRANGLE - LOUNGE RCB7101 - BEFORE RCB7101 - AFTER RCB6136 - BEFORE RCB6136 - AFTER RCB5120 - BEFORE RCB5120 - AFTER PROJECT OVERVIEW Budget: $2.2 Million Renovation Date: Contractor/Construction: HVAC Consultation: HVAC Upgrade: Electrical: Data: Hazardous Materials Consultation: Asbestos Remediation: Flooring Installation: Flooring Product: Blackboards: Furniture (Chairs): Furniture (Tables): Furniture Installation: Blinds Supplier: A/V Equipment Supplier: Painting: Cleaning Services: May 2012 to August 2012 Holaco Construction Cobalt Engineering Total Energy Systems, Houle Electric United Power Ltd. Axis Technical Services Sure Hazmat Phoenix Enterprises Donald Flooring Amtico Rubber Flooring Shanahan's Building Products Perry Chairs from KI by Cornerstone Agencies Classroom & Instructor Tables by Backwater Industries DLO Move Support Services Ltd., Christopher's Furniture Services Cascadia Design Products MVCC Video Communications Corp. Done Right Painting Best Facilities Project Director: Project Manager: KC Jones - SFU Facilities Marcos Eric Olindan - SFU Facilities Classrooms Sq. Ft. Occupancy RCB5100 RCB5118 RCB5120 RCB5125 RCB6100 RCB6101 RCB6122 RCB6125 RCB6136 RCB6206 RCB7100 RCB7101 RCB7102 RCB7105 RCB8104 RCB8105 RCB8106 RCB8100 375 610 585 395 375 457 385 772 902 567 817 436 445 313 322 331 331 1449 20 27 31 26 20 27 18 42 55 30 50 24 24 17 17 18 18 78 Totals: 9867 542 RCB8100