Alternative Tyndall Air Force Base Overall Proposal You are in the Tyndall AFB section. This page is intended to help you find specific information about Tyndall AFB and to clarify this section’s relation to the rest of the Draft EIS. Preface Detailed Guide for Reading the Draft EIS Go back to the Preface for a detailed guide for reading the Draft EIS. Chapter 1 Purpose and Need for the Initial F-22 Operational Wing Beddown Go back to Chapter 1 to learn about the purpose and need for the Initial F-22 Operational Wing Beddown. Chapter 2 1 Overview of the Proposed Action and Alternatives 1 Alternative Identification Process 1 Summary Comparison of Proposed Action and Alternatives Go back to Chapter 2 for an overview of the proposed action and alternatives. Chapter 3 Information Specific to Each Base Five Base-Specific Sections LA-Langley AFB Proposed Action EG-Eglin AFB Alternative EL-Elmendorf AFB Alternative TY-Mountain Home AFB Alternative See Langley AFB Section See Eglin AFB Section See Elmendorf AFB Section See Mountain Home AFB Section TY-Tyndall AFB Alternative Section TY1 Introduction Section TY2 Detailed Description of Action This section of the Draft EIS presents sitespecific and resource-specific details on existing environmental conditions for Tyndall AFB. It also describes the potential environmental consequences of this alternative. Section TY3 Affected Environment, No-Action, Environmental Consequences, and Comparative Summary Aircraft Operations TY3.1 Airspace Management and Use TY3.2 Noise TY3.3 Air Quality TY3.4 Safety Natural TY3.5 TY3.6 TY3.7 Resources Soils and Water Terrestrial Communities Wetlands and Freshwater Aquatic Communities TY3.8 Threatened and Endangered Species TY3.9 Marine Communities A summary of public and agency comments received during scoping are included in section TY2.4. Throughout this section for Tyndall AFB, we have added margin notes defining terms and highlighting items of interest. Cultural and Traditional Resources TY3.10 Visual TY3.11 Cultural and Traditional Resources Human TY3.12 TY3.13 TY3.14 Resources Land Use Socioeconomics Environmental Justice Community and Infrastructure TY3.15 Public Services TY3.16 Transportation TY3.17 Hazardous Materials and Waste Section TY4 Cumulative Effects, Irreversible, and Irretrievable Commitment of Resources Overall Proposal Section TY5 Summary of Proposed Management Actions Chapter 4 References Volume 2 Chapter 5 List of Preparers Volume 2 Chapter 6 Index Volume 2 Appendices Volume 2 Glossary, Acronyms and Abbreviations