SBCTC Capital Requests for New Appropriated Funds in 2012 Supplemental List is based on May 28, 2010, June 30, 2010 and January 7, 2011 WACTC Recommendations and SBCTC Resolutions 10-06-29, 10-08-33, 11-1-8 and 11-09-50. Projects funded in the 2011-13 biennial budget have been removed from the list. Tacoma Health Careers Center project was revised to correct construction dates 12Oct11. 2012 Request 2012 relative to 2011-13 Request Technical Corrections Priority Type College Number Project New Approp. Cummulative Major Project Academic and Student 30,574,000 Architect's updated cost estimate. Increase is due to the year delay in construction. 1 Skagit Valley 20081224 30,574,000 Construction Services Building Major Project Health and Science Architect's updated cost estimate. Increase is due to an additional 10 month delay in starting 69,189,000 2 Lower Columbia 20081225 38,615,000 construction. Construction Building Major Project Architect's updated cost estimte. This increase is primarily due to the increase in “Other Costs” 72,813,000 3 Olympic 30000122 College Instruction Center 3,624,000 for the parking lot and additional consultant services in “Extra Services." Design Major Project Technology Building Architect confirmed updated numbers. Includes additional contingency for remodel that is offset 96,148,000 4 North Seattle 30000129 23,335,000 by 1.5 years less escalation. Construction Renewal Major Project Architect provided updated MACC. Increase is due to an additional 10 month delay in starting 135,255,000 5 Tacoma 20082701 Health Careers Center 39,107,000 construction. Originally submitted with wrong dates for construction. Construction 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Notes: A B C Major Project Design Major Project Construction Major Project Design Major Project Design Major Project Construction Major Project Design Major Project Design Major Project Design Major Project Construction Major Project Construction Major Project Construction Major Project Design Major Project Construction Major Project Construction Centralia 30000123 Student Services Bellevue 20082702 Health Science Building Columbia Basin 20082704 Social Science Center Peninsula 30000126 Grays Harbor 20081226 Science and Math Building South Seattle 30000128 Cascade Court Renton 30000134 Edmonds Allied Health and Early Childhood Dev Center Automotive Complex Renovation Science Engineering 30000137 Technology Bldg 6,127,000 Architects's predesign estimate completed this month. The increase is primareily due to an 141,382,000 additional $1.6M for property acquisition. The total project cost is down 1% due to less escalation. 37,108,000 178,490,000 Staff updated cost estimate. Reduction reflects market with less escalation than expected. 1,030,000 179,520,000 Staff updated cost estimate. Reduction reflects market and smaller Management Reserve now that predesign is done. 1,701,000 181,221,000 Staff updated cost estimate. Market savings were offset by increased costs for utility relocation, contingency, equipment, and permit fees. 45,438,000 226,659,000 Architect's updated cost estimate from May 2011. Market savings offset by another year of escalation, moving building demolition into the MACC, and increased equipment costs. 2,676,000 229,335,000 Architect's predesign estimate. Increase primarily from additional management reserve. 1,800,000 231,135,000 Staff updated cost estimate. Market savings were offset by increased sales tax and two year delay in construction. 8,434,000 239,569,000 Architect's updated cost estimate. Market savings offset by increased sales tax and two year delay in construction. Seattle Central 30000120 Seattle Maritime Academy 17,579,000 257,148,000 Architect's updated cost estimate. Increase from one year delay in construction. Yakima Valley 30000121 Palmer Martin Building 19,038,000 276,186,000 Staff updated cost estimate. Savings from market conditions. Green River 20081222 Trades and Industry Building 29,181,000 305,367,000 Staff updated cost estimate. Savings from one less year escalation. Whatcom 30000138 Learning Commons 1,569,000 Bates 20082703 Clark Mohler Communications Technology Center Health and Advanced 20082705 Technologies Building Construction occurs in order of system priority. Predesigns and designs needed for 2013-15 construction are added to the list Construction Administration costs are included in the period when construction 306,936,000 Staff updated cost estimate. Market savings partially offset by two year delay in construction. 24,161,000 331,097,000 Architect's predesign estimate. Increase primarily from a mistake in the 2011-13 request and moving of broadcast equipment into the MACC from Equipment. 37,282,000 368,379,000 Staff updated cost estimate. This reduction is caused by 1.2 years less escalation for construction in 2012 supplemental. SBCTC Capital Requests for Alternatively Financed Projects to be paid from non-appropriated funds in 2012 List is based on SBCTC Resolutions 11-09-50. Request Authorize Authorize Authorize College Number Reference Project SBCTC 30000719 SSHB1909 Administrative System Replacement Project Everett 30000718 Renovate Corporate and Continuing Education Building Spokane Community 30000720 CollegeESHB 1497 Sec. 6007 Long Term Lease for Aerospace Training Center Principle 100,000,000 4,000,000 Note 1 Notes: 1) The lease will be paid in advance from the exchange of the Geiger Field property and lease-hold improvements at Felts Field.